An Entity of Type: infrastructure, from Named Graph: http://dbpedia.org, within Data Space: dbpedia.org

Delhi–Amritsar–Katra Expressway is an approved 670 km (420 mi) long, 4-lane (expandable to 8 lanes) wide controlled-access expressway, which will connect Bahadurgarh border in Delhi with Katra in Jammu and Kashmir via Nakodar and Gurdaspur in Punjab.It will have a spur section which will connect Nakodar with Sri Guru Ram Dass Jee International Airport located in Raja Sansi, Amritsar. The 397.7 km (247.1 mi) long Delhi–Nakodar–Gurdaspur section is National Expressway 5 (NE-5) and 99 km (62 mi) long Amritsar–Nakodar section is National Expressway 5A (NE-5A). Once completed, it will reduce the current Delhi-Katra distance from 727 km (452 mi) to 588 km (365 mi) and the time travel will be reduced from 14 hours to 6 hours, and Delhi-Amritsar distance to 405 km (252 mi) and from the time travel

Property Value
dbo:Infrastructure/length
  • 670.0
dbo:abstract
  • Delhi–Amritsar–Katra Expressway is an approved 670 km (420 mi) long, 4-lane (expandable to 8 lanes) wide controlled-access expressway, which will connect Bahadurgarh border in Delhi with Katra in Jammu and Kashmir via Nakodar and Gurdaspur in Punjab.It will have a spur section which will connect Nakodar with Sri Guru Ram Dass Jee International Airport located in Raja Sansi, Amritsar. The 397.7 km (247.1 mi) long Delhi–Nakodar–Gurdaspur section is National Expressway 5 (NE-5) and 99 km (62 mi) long Amritsar–Nakodar section is National Expressway 5A (NE-5A). Once completed, it will reduce the current Delhi-Katra distance from 727 km (452 mi) to 588 km (365 mi) and the time travel will be reduced from 14 hours to 6 hours, and Delhi-Amritsar distance to 405 km (252 mi) and from the time travel will be reduced from 8 hours to only 4 hours. It will have a trauma centre, ambulances, fire brigades, traffic police, bus bays, truck stops, interchanges with refreshment, and recreational facilities. To be constructed as a part of the Bharatmala Pariyojana, it is expected to cost ₹35,000 crores. Detailed Project Report (DPR) was completed in November 2019, and land acquisition commenced from January 2020. M/S Feedback Infra Pvt Ltd. was appointed as DPR consultant to carry out alignment studies which submitted the final shortest proposed alignment report of Delhi–Nakodar–Gurdaspur section in September 2019,Nakodar–Amritsar section in June 2020, and the survey is currently under progress in Jammu section. (en)
dbo:length
  • 670000.000000 (xsd:double)
dbo:routeEnd
dbo:routeEndDirection
  • North
dbo:routeStart
dbo:routeStartDirection
  • South
dbo:wikiPageExternalLink
dbo:wikiPageID
  • 55414965 (xsd:integer)
dbo:wikiPageLength
  • 28592 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 1124831061 (xsd:integer)
dbo:wikiPageWikiLink
dbp:country
  • IND (en)
dbp:directionA
  • South (en)
dbp:directionB
  • North (en)
dbp:established
  • October 2023 (en)
dbp:headerType
  • UC (en)
dbp:lengthKm
  • 670 (xsd:integer)
dbp:maint
dbp:mapCustom
  • yes (en)
dbp:mapNotes
  • Map of Delhi–Gurdaspur section of expressway in red (en)
dbp:name
  • Delhi–Amritsar–Katra Expressway (en)
dbp:states
dbp:terminusA
  • Jasaur Kheri village near Bahadurgarh border, Delhi (en)
dbp:terminusB
  • 1 (xsd:integer)
  • 2 (xsd:integer)
dbp:wikiPageUsesTemplate
dcterms:subject
rdf:type
rdfs:comment
  • Delhi–Amritsar–Katra Expressway is an approved 670 km (420 mi) long, 4-lane (expandable to 8 lanes) wide controlled-access expressway, which will connect Bahadurgarh border in Delhi with Katra in Jammu and Kashmir via Nakodar and Gurdaspur in Punjab.It will have a spur section which will connect Nakodar with Sri Guru Ram Dass Jee International Airport located in Raja Sansi, Amritsar. The 397.7 km (247.1 mi) long Delhi–Nakodar–Gurdaspur section is National Expressway 5 (NE-5) and 99 km (62 mi) long Amritsar–Nakodar section is National Expressway 5A (NE-5A). Once completed, it will reduce the current Delhi-Katra distance from 727 km (452 mi) to 588 km (365 mi) and the time travel will be reduced from 14 hours to 6 hours, and Delhi-Amritsar distance to 405 km (252 mi) and from the time travel (en)
rdfs:label
  • Delhi–Amritsar–Katra Expressway (en)
owl:sameAs
prov:wasDerivedFrom
foaf:isPrimaryTopicOf
foaf:name
  • Delhi–Amritsar–Katra Expressway (en)
is dbo:wikiPageRedirects of
is dbo:wikiPageWikiLink of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License