Material Inspection Report: Project Name Date Insp

The document contains three inspection reports from an industrial piping project. The material inspection report details the material properties, quantities and inspection results of piping components. The fit-up inspection report provides similar information for pipe joints. And the visual inspection report outlines the welding specifications, inspectors and results for pipe welds. The reports document the quality control process to verify the piping system was constructed according to specifications.

Uploaded by

RafiqKu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
275 views22 pages

Material Inspection Report: Project Name Date Insp

The document contains three inspection reports from an industrial piping project. The material inspection report details the material properties, quantities and inspection results of piping components. The fit-up inspection report provides similar information for pipe joints. And the visual inspection report outlines the welding specifications, inspectors and results for pipe welds. The reports document the quality control process to verify the piping system was constructed according to specifications.

Uploaded by

RafiqKu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 22

MATERIAL INSPECTION REPORT

PROJECT NAME

INSP.
REPORT

LINE/EQUIP. NO.

SHEET

DATE

PIPING CLASS

REPORT NO.
NO.

Prepared by;
QA/QC
Name :

DESCRIPTION

SIZE (inch)

SCH / THK
(mm)

QTY

MATERIAL

Reviewed by;
Client Representative
Name :

HEAT NUMBER

RESULT
ACC

Date :

Date :

DATE

PLANT
AREA

RESULT
ACC

REJ

REMARKS

FIT-UP INSPECTION REPORT


PROJECT NAME

INSP.
REPORT

LINE/EQUIP. NO.

SHEET

DATE

PIPING CLASS

REPORT NO.
JT NO
SW

FW

Prepared by;
QA/QC
Name :

JOINT
TYPE

SIZE (inch)

SCH / THK
(mm)

COMPONENT MATERIAL

MATERIAL SPEC

Reviewed by;
Client Representative
Name :

HEAT NO

RESULT
ACC

Date :

Date :

DATE

PLANT
AREA

RESULT
ACC

REJ

REMARKS

VISUAL INSPECTION REPORT


PROJECT NAME

INSP.
REPORT

LINE/EQUIP. NO.

SHEET

DATE

PIPING CLASS

REPORT NO.
JT NO
SW

FW

Prepared by;
QA/QC
Name :

WELD
TYPE

SIZE (inch)

SCH / THK
(mm)

MATERIAL SPEC

P NUMBER

WELD
PROCESS

WPS REFERENCE FILLER METAL

Reviewed by;
Client Representative
Name :

WELDER

RESULT
ACC

Date :

Date :

DATE

PLANT
AREA

RESULT
ACC

REJ

REMARKS

ENPROSERVE (M) SDN. BHD.

(417834-X)

Fab. Yard : Lot 7731, Kaw. Perindustrian Chacar, 23100 PAKA, TRG.

Tel : 09-827 2777

BLASTING & PAINTING FINAL REPORT

CLIENT

GAS PROCESSING KERTEH

PROJECT

TO REPLACE 3/4'' PIPE SPOOL FOR STEAM TRAP NUMBER G2-PRU-ST-LP-49A

INSP. REPORT REF.

VI-15-003.2-G2

PAINTING SYSTEM

PTS 5A2

ITEM

PIPE SPOOL

DATE
APPLICATION STAGE

(04/08/2016)

(04/08/2016)

(04/08/2016)

1ST COAT

2ND COAT

3RD COAT

SURFACE PREPARATION
SURFACE CLEANLINESS

SA 2.5

ABBREVIATE

ABBREVIATE

BLASTING

ABBREVIATE

ABBREVIATE

75 m

ABBREVIATE

ABBREVIATE

GARNET

ABBREVIATE

ABBREVIATE

ABRASIVE SIEVE SIZE

30/60

ABBREVIATE

ABBREVIATE

PRESSURE USED

100 psi

ABBREVIATE

ABBREVIATE

CLEANING METHOD
AVE. SURFACE PROFILE
ABRASIVE TYPE

PAINT APPLICATION
EQUIPMENT USED

CONVENTIONAL POT

CONVENTIONAL POT

CONVENTIONAL POT

TIP SIZE

N/A

N/A

N/A

PRESSURE USED

N/A

N/A

N/A

REQUIRED DFT

75 m

25 m

25 m

AVERAGE DFT
PRODUCT NAME
GENERIC TYPE

80 m

30 m

35 m

INTERZINC 22 (G.GREY)

INTERTHERM 50

INTERTHERM 50

Inorganic Zinc Silicate

Silicone Aluminium

Silicone Aluminium

BASE BATCH NO.

SC1138MJ

SC1264MJ

SC2089MP

CURING AGENT BATCH NO.

SC0632MJ

N/A

N/A

THINNER

GTA 803

GTA 007

GTA 007

TIME

0930 AM

1130 PM

1600 PM

WEATHER

SUNNY

SUNNY

SUNNY

DRY BULB TEMPERATURE

32 C

36 C

32 C

WET BULB TEMPERATURE

26 C

30 C

29 C

WEATHER CONDITION

RELATIVE HUMIDITY
DEW POINT

67%

64%

79%

25 C

28 C

28 C

REMARKS :
1) ACCORDING TO PETRONAS PROTECTIVE COATINGS AND LINING VENDOR APPROVED LIST (MARCH 2013)
2) FREE FROM MOISTURE,OIL AND OTHER CONTAMINATION

PREPARED BY :

REVIEWED BY :

EMSB REPRESENTATIVE

CLIENT REPRESENTATIVE

Name

: MUHD RAFIQ

Name

Date

: 04/08/2016

Date

ENPROSERVE (M) SDN. BHD.

(417834-X)

Fab. Yard : Lot 7731, Kaw. Perindustrian Chacar, 23100 PAKA, TRG.

Tel : 09-827 2777

BLASTING & PAINTING FINAL REPORT

CLIENT

GAS PROCESSING KERTEH

PROJECT

TO REPLACE NEW SPOOL AT BOILER FEED WATER PUMP P2-752, PLANT GPP-2

INSP. REPORT REF.

VI-16-510-G2

PAINTING SYSTEM

PTS 5A2

ITEM

PIPE SPOOL

DATE
APPLICATION STAGE

(04/08/2016)

(04/08/2016)

(04/08/2016)

1ST COAT

2ND COAT

3RD COAT

SURFACE PREPARATION
SURFACE CLEANLINESS

SA 2.5

ABBREVIATE

ABBREVIATE

BLASTING

ABBREVIATE

ABBREVIATE

75 m

ABBREVIATE

ABBREVIATE

GARNET

ABBREVIATE

ABBREVIATE

ABRASIVE SIEVE SIZE

30/60

ABBREVIATE

ABBREVIATE

PRESSURE USED

100 psi

ABBREVIATE

ABBREVIATE

CLEANING METHOD
AVE. SURFACE PROFILE
ABRASIVE TYPE

PAINT APPLICATION
EQUIPMENT USED

CONVENTIONAL POT

CONVENTIONAL POT

CONVENTIONAL POT

TIP SIZE

N/A

N/A

N/A

PRESSURE USED

N/A

N/A

N/A

REQUIRED DFT

75 m

25 m

25 m

AVERAGE DFT
PRODUCT NAME
GENERIC TYPE

80 m

30 m

35 m

INTERZINC 22 (G.GREY)

INTERTHERM 50

INTERTHERM 50

Inorganic Zinc Silicate

Silicone Aluminium

Silicone Aluminium

BASE BATCH NO.

SC1138MJ

SC1264MJ

SC2089MP

CURING AGENT BATCH NO.

SC0632MJ

N/A

N/A

THINNER

GTA 803

GTA 007

GTA 007

TIME

0930 AM

1130 PM

1600 PM

WEATHER

SUNNY

SUNNY

SUNNY

DRY BULB TEMPERATURE

32 C

36 C

32 C

WET BULB TEMPERATURE

26 C

30 C

29 C

WEATHER CONDITION

RELATIVE HUMIDITY
DEW POINT

67%

64%

79%

25 C

28 C

28 C

REMARKS :
1) ACCORDING TO PETRONAS PROTECTIVE COATINGS AND LINING VENDOR APPROVED LIST (MARCH 2013)
2) FREE FROM MOISTURE,OIL AND OTHER CONTAMINATION

PREPARED BY :

REVIEWED BY :

EMSB REPRESENTATIVE

CLIENT REPRESENTATIVE

Name

: MUHD RAFIQ

Name

Date

: 04/08/2016

Date

PRESSURE TEST REPORT


PROJECT NAME

INSP.
REPORT

LINE/EQUIP. NO.

SHEET
REPORT NO.

Prepared by;
QA/QC
Name :

Reviewed by;
Client Representative
Name :

DATE

PIPING CLASS

Date :

Date :

DATE

PLANT
AREA

PAINTING REPORT
PROJECT NAME

INSP.
REPORT

LINE/EQUIP. NO.

SHEET
REPORT NO.

Prepared by;
QA/QC
Name :

Reviewed by;
Client Representative
Name :

DATE

PIPING CLASS

Date :

Date :

DATE

PLANT
AREA