SAUDI ARAMCO INSPECTION CHECKLIST
Geotechnical Investigation Requirements SAIC-A-1007 3-Jul-18 CIVIL-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?
SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
The geotechnical investigation Scope of Work (SOW) shall be
approved by the Supervisor, Civil Engineering Unit, Consulting
SAES A-113
A1 Services Department, prior to initiation of any field work. Submission
Sec. 6.1
of a Scope of Work for approval shall follow SAEP-61. Scope of Work
shall be produced using the SOW template provided by CSD.
The geotechnical investigation and engineering shall be conducted
SAES A-113
A2 by a Contractor on the Consulting Services Department list of SAEP-
Sec. 7.1.1
383 Approved Geotechnical Engineering Offices.
A site-specific geotechnical investigation is required for all new
SAES A-113
A3 onshore structures, foundations, major roads , pipelines etc. unless
Sec. 5.1
exempt by paragraph 5.2.
Geotechnical investigations are not required when all of the following
conditions have been met; a. when the footprint of the structure is
less than 4x4m (guard houses, sun shelters etc), b. the net bearing
pressure on the foundation does not exceed 100 kPa (2000 psf), c.
SAES A-113
A4 the foundation will not be subjected to vibratory or dynamic loads, d.
Sec. 5.2
the supported equipment or structure is not settlement sensitive, e.
unusual soil conditions, such as subkha or expansive clay are not
present or observed in nearby borings, f. no other special
considerations apply.
The geotechnical contractor shall submit a statement endorsing the
adequacy of the proposed investigation program or submit suggested SAES-A-113
A5
modifications prior to commencement of the field works as per Sec. 7.1.2
SAEP-61.
A risk assessment study, for potential underground cavities is
SAES-A-113
A6 required for all Type A and B projects or grass-root plants in the areas
Sec. 5.5
of predominantly limestone geology
The geotechnical contractor shall comply with all aspects of the
SAES-A-113
A7 Saudi Aramco Construction Safety Manual and all safety programs
Sec. 8.1.1
and policies of Saudi Aramco.
REMARKS:
Saudi Aramco: Company General Use
REFERENCE DOCUMENTS:
1- SAES-A-113 -- Geotechnical Engineering Requirements, 27 March 2017
Contractor / Third-Party Saudi Aramco
Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:
QC Inspector PID Representative
Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:
QC Supervisor Proponent and Others
Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:
*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED