Site Information
Antenna Antenna Antenna Tilt
Site ID Cell ID Latitude Longitude
Height(m) Azimuth Electrical
54105857 23.43661 78.58183 45 90 2
MC2638 54105858 23.43661 78.58183 45 190 2
54105859 23.43661 78.58183 45 340 2
Site Information
Antenna Tilt Bandwidth
EARFCN PCI Antenna Model Number
Mechanical (MHz)
2 1501 117 HWXX-6516DS-VTM
2 1501 118 10 MHz HWXX-6516DS-VTM
2 1501 119 HWXX-6516DS-VTM
MT 1 MT 2
ET 1 ET 2
SEC 1 SEC 2
Tower Pic
MT 3
ET 3
SEC 3
Si
Site Id MC2638 Site Name: PIPLIYA
New Site: New Site Connected to EPC:
No. Activity/Process
1 MNC
2 MCC
3 LAC
4 TAC
Idle 5 EUARFCN
6 PCI
7 Pa & Pb values for RS power
8 RSRP (Average Value)
9 SINR (Average Value)
10 Session set up success rate
Session 11 Session abnormal release rate
12 Session establishment time(ms)
13 TCP DL
Downlink and Uplink Peak a CQI, Downlink Peak MCS & Peak RB Allocation
user throughput b CQI, Uplink Peak MCS &Peak RB Allocation
21.3 TCP UL
15 Intra Site
16 Inter Site
a TDD <-> FDD
Handover Success rate b TDD/FDD <-> 3G /2G
RRC Configuration Message Snap related to A1, A2, A3,
c A5, B2, B1, Blind Redirection
which clearly states the thresholds at which events
happened
Handover Delays 17 Handover delay/ Interruption time
FDD/TDD LTE to 3G/2G(ms)
TDD to FDD (ms)
FDD to TDD(ms)
Idle Mode & Reselection 18 3G to LTE FDD/TDD(ms)
2G to LTE FDD/TDD
Verfiy the SIB scheduled in LTE and its defintion as per LMS
Reselection Priorities in Respective RAT's
Network attach time(ms)
Network attach success rate
Attach and Detach 19 UE Capability Information Mesaage FGI Bits
Network Detach time(ms)
Network Detach Success rate
Delays 20 Round trip time or Latency(ms)
CSFB and VoLTE: MO call set up time
Originate calls when device was in RRC_Idle and
RRC_connected mode and capture the callsetup time in
both scenario
CSFB and VoLTE: MT call set up time
Terminate calls when device was in RRC_Idle and
RRC_connected mode and capture the callsetup time in
both
CSFB scenario
success rate
CSFB 21
CSFB abnormal release rate , drop rate . Mention the
cause code of abnormal release
CSFB 21
Verify that all features/functionality are working to reduce
the CSFB call setup time such as No LAU during CSFB call-
right LA/TA mapping , Deffered Measurement of non
mandatory sibs, ISR ( if implemented)
Fast Return to LTE and the return priority defined in case
of multiple LTE carriers in the circle
Subscriber service restoration time after BS reboot
Number of RACH Attempts for each call attempts
RA/LA update during CSFB call
Others 22
TAU Success during Fast Return ( 3G to 4G redirection)
Fast Return Time(ms)
Fast Return Priorities ( TDD, FDD )
drive
map
RSRP coverage map per site
Remarks (Comments):
SP Signature Bharti Signature:
Single Cell Function Test (SCFT)
Cell ID: 54105857
Target cell 1 cell 2 cell 3
plan Check plan Check plan Check
93 93 93
404 404 404
984 984 984
584 584 584
1501 1501 1501
117 118 119
dB3, 1 dB3, 1 dB3, 1
-77 -79 -74
12 18 24
100% 100.00% 100.00% 100.00%
0% 0.00% 0.00% 0.00%
150 86 1 1
34.41 30.82 39.4
14,22,50 13,22,50 15,25,50
14,24,40 12,30,38 15,30,40
20.99 20.99 20.56
NO Yes Yes
NO NO NO
NA NA NA
Only 2G Only 2G Only 2G
A2,A3,A5
2 3 NA
600 99.9999999999943 500
NA NA NA
NA NA NA
NA NA NA
503 -7009 303
YES Yes Yes
FDD FDD FDD
998 783 594
100% 100.00% 100.00% 100.00%
Yes Yes Yes
51 90 100
100% 100.00% 100.00% 100.00%
64 67 76
Less than 7 Sec 6200 7207 6597
Less than 7 Sec 5404 5411 5608
100% 100.00% 100.00% 100.00%
Less than 0.2% 0% 0% 0%
NO LAU NO LAU NO LAU
Yes Yes Yes
YES Yes Yes
1 1 1
YES Yes Yes
YES YES YES
194 712 183
FDD FDD FDD
ature:
54105857 54105858 54105859
result Remarks
Snap Attached
RRC Connection Request to RRC Connection Setup Complete S
Snap Attached
Snap Attached
Snap Attached
Snap Attached
Snap Attached
Measurement reports to RRC Connection Reconfiguration com
Measurement Report to Handover Utran Complete
Snap Attached
Attached Request to Attached complete
Snap Attached
Detach Request to Detach accept
Snap Attached
Extended Service Requect to Alerting(Snap Attached)
Extended Service Requect to Alerting(Snap Attached)
Snap Attached
RRC Connection release in 3G to TA Update in 4G, Snap Attached
Date:
`
PCI
RSRP
RSRQ
SNR
V
DownLoad
Upload
NetPerSec Sec 1 Download
NetPerSec Sec 2 Download
NetPerSec Sec 3 Download
NetPerSec Sec 1 Upload
NetPerSec Sec 2 Upload
NetPerSec Sec 3 Upload
Round trip time or Latency(ms) SEC 1
Round trip time or Latency(ms) SEC 2
Round trip time or Latency(ms) SEC 3
Google setellite View
34.41
30.82
39.4
20.99
20.99
20.56
64
67
76
SEC-1
PA
SEC-2
PA
SEC-3
PA
PB
PB
PB
PCI RSRP SINR
117 -77 12
118 -79 18
119 -74 24
Sector 1 237 323 86
Sector 2 723 724 1
Sector 3 687 688 1
R
Sector 1
Sector 2
Sector 3
SECTOR 1 14,22,50
SECTOR 2 13,22,50
V
SECTOR 3 15,25,50
SCETOR 1 14,24,40
SECTOR 2 12,30,38
SECTOR 3 15,30,40
Events Triggerd
A2
A3
A5
Intra_Site_ Handover
117 118 119 2 2
LTE FDD to 2G
SECTOR 1
Reselection 13.405 14.005 600.00
SECTOR 2 39.069 39.169 100
SECTOR 3 52.095 52.595 500
2G TO LTE FDD
57.597
6.314
V
33.849 34.352 503
50.588 -7009
6.617 303
Sector 1
Sector 2
Sector 2
Sector 2
Sector 3
Sector 3
Sector 3
Sector 1 998
V
Sector 2 783
Sector 3 594
DETACH
Sector 1 51
Sector 2 90
Sector 3 100
PCI MO MT
Sectror 1 MO & MT 117 6200 5404
Sector 2 MO & MT 118 7207 5411
Sector 3 MO & MT 119 6597 5608
\
FGI BITS
Sector 1
Sector 2
Sector 3
Sector 3
Sector 1
Sector 2
Sector 2
Sector 3
Sector 3
26.689
26.883
194
57.597
58.309
712
25.000
727
183
SECTOR 1
SECTOR 2
SECTOR 3
SECTOR 3
KPI's Name
CSFB & VoLTE: MO Call Set up Time
CSFB & VoLTE: MT Call Set up Time
SRVCC Success Rate
VoLTE Setup SR
HO Interrupton Time (Inter)
HO Interrupton Time (Intra)
SRVCC Interruption Time (Inter IRAT)
No Mute/ One Way Audio Observed during VoLTE Calls (Sample> 5s)
Check functioning of VoLTE & call conferencing
Codec Allocation plot/histogram to be submitted for all calls
Volte abnormal release rate, drop rate. Mention the cause
Verification of all the VoLTE/LTE parameters values including LMS are as per guidelines & all features / functionalities are i
Fast Return to LTE post CSFB & the return priority defined as per
MO
MT
SRVCC
VoLTE Successs rate
HANDOVER
RTP Integrity
Conn Call
V
Speech Codec
Volte abnormal release rate, drop rate
Target Value Remarks
2.5 s 2199
2.5 s 454
100% 100%
100% 100%
100 ms NA
80 ms 4.26
200 ms 164
0% 0%
Y Y
YES Plot Attached
<= 1% 0%
compliance report to be submitted
NA
Session set Session
Integration SCFT Date RSRP SINR up abnormal
Site Id Sect ID PCI (Average (Average
date Value) Value) success release
rate rate
54105857 17-Nov-19 20-Nov-19 117 -77 12 100% 0.00%
MPBP3609 54105858 17-Nov-19 20-Nov-19 118 -79 18 100% 0.00%
54105859 17-Nov-19 20-Nov-19 119 -74 24 100% 0.00%
CQI, Downlink CQI, Uplink Peak Handover
Session Peak MCS & MCS & TDD/FDD delay/
establishment TCP DL TCP UL <->
time(ms) Peak RB Peak RB 3G /2G Interruptio
Allocation Allocation n time
86 34.41 14,22,50 14,24,40 20.99 YES 2
1 30.82 13,22,50 12,30,38 20.99 YES 2
1 39.4 15,25,50 15,30,40 20.56 YES 3
Verfiy the
SIB UE
scheduled Reselection Network Capability Network Network
FDD/TDD 3G to LTE 2G to LTE in Priorities Network attach Informatio Detach Detach
LTE to FDD/TDD FDD/TDD in attach
3G/2G(ms) (ms) (ms) LTE and its Respective time(ms) success n time Success
defintion RAT's rate Mesaage (ms) rate
as per LMS FGI Bits
600 NA NA strategy
YES FDD 998 100.00% YES 51 100.00%
100 NA NA YES FDD 783 100.00% YES 90 100.00%
500 NA NA YES FDD 594 100.00% YES 100 100.00%
CSFB and CSFB and
VoLTE: MO VoLTE: MT
call set up call set up
time time CSFB
Originate Terminate Fast Return
calls when calls when abnormal to LTE and TAU Remarks
Round device was device was release the return Success from Nokia
rate , drop
trip time in RRC_Idle in RRC_Idle CSFB rate . priority during Fast Fast Return team
or and and success defined in Return Fast Return Priorities (Justificatio
Latency RRC_conne RRC_conne rate Mention case of ( 3G to 4G Time(ms) (TDD,FDD) n for not
(ms) cted mode cted mode the cause multiple redirection meeting
code of
and and abnormal LTE carriers ) the KPI)
64 6200the capture
capture 5404the 100.00% 0% YES
in the circle YES 194 FDD
callsetup callsetup release
67 7207 5411 100.00% 0% YES YES 712 FDD
time in time in
76 6597
both 5608
both 100.00% 0% YES YES 183 FDD
scenario scenario