0% found this document useful (0 votes)
200 views6 pages

Control System Architecture - Rev.A PDF

The document outlines the control system architecture for the 60 MLD Valenzuela Sewage Treatment Plant project, commissioned by Maynilad Water Services and consulted by CTI. It includes a cover sheet, table of contents, and a detailed section on the control system architecture spanning four pages. The document is proprietary to VA TECH WABAG and cannot be copied or lent without permission.

Uploaded by

Jose John
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
200 views6 pages

Control System Architecture - Rev.A PDF

The document outlines the control system architecture for the 60 MLD Valenzuela Sewage Treatment Plant project, commissioned by Maynilad Water Services and consulted by CTI. It includes a cover sheet, table of contents, and a detailed section on the control system architecture spanning four pages. The document is proprietary to VA TECH WABAG and cannot be copied or lent without permission.

Uploaded by

Jose John
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 6

PROJECT : Design and Build of 60 MLD Valenzuela Sewage Treatment Plant

CLIENT : MAYNILAD WATER SERVICES

CONSULTANT: CTI
Discipline : INSTRUMENTATION
Document Title:

CONTROL SYSTEM ARCHITECTURE

Client Doc No : 28P8-J0010-011 Rev No : A


WABAG Doc No : 10P88-J0010-011
DRAWING / DOCUMENT REVIEW STATUS

A 23.04.2018 ISSUED FOR APPROVAL AAP SAK DM


Rev No Date Description Prepared Checked Approved
Total No. of Sheets (Including this Cover Sheet): 6

THIS DOCUMENT IS THE PROPERTY OF M/S VA TECH WABAG AND


MUST NOT BE COPIED IN WHOLE OR PART OR LENT OUT WITHOUT THEIR WRITTEN PERMISSION
CONTROL SYSTEM ARCHITECTURE

PROJECT: DESIGN AND BUILD OF 60MLD VALENZUELA SEWAGE TREATMENT PLANT

CLIENT: MAYNILAD WATER SERVICES

CONSULTANT: CTI

TABLE OF CONTENT
S.NO. DESCRIPTION NO. OF PAGES
1 COVER SHEET 1

2 TABLE OF CONTENT 1

3 CONTROL SYSTEM ARCHITECTURE 4

You might also like