0% found this document useful (0 votes)
64 views1 page

Ecopark Daesung International School: General Sheet Notes - Floor Plans

This document contains general sheet notes for floor plans, including: 1. Letter notes do not imply sequence. 2. Contractor to perform work per required work sequence. 3. All metal stud partitions are 25 gauge steel studs at 600mm centers unless otherwise noted.

Uploaded by

Vũ Việt Dũng
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
64 views1 page

Ecopark Daesung International School: General Sheet Notes - Floor Plans

This document contains general sheet notes for floor plans, including: 1. Letter notes do not imply sequence. 2. Contractor to perform work per required work sequence. 3. All metal stud partitions are 25 gauge steel studs at 600mm centers unless otherwise noted.

Uploaded by

Vũ Việt Dũng
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

GENERAL SHEET NOTES - NO.

DATE ISSUE

FLOOR PLANS 1
2
05/13/2020
06/05/2020
Concept Design Final
SD 50%
0 3 2020/08/07 Concept MP Redesign 1
A- 2 A LETTERED KEY NOTES DO NOT IMPLY SEQUENCE.
23 4 2020/08/11 Concept MP Redesign 2
2 CONTRACTOR TO PERFORM WORK AS REQUIRED PER WORK
SEQUENCE. 7 2020/08/27 Concept MP Redesign 3
B ALL METAL STUD IS 25 GAUGE STEEL STUDS @600mm O.C., 8 2020/09/10 Concept MP Redesign 4
U.N.O. 16 2020/10/13 Schematic Design Rev 7
C ALL PARTITIONS ABOVE GLASS PARTITIONS <LOCATIONS> TO 20 2020/10/23 Schematic Design Rev 11
BE TYPE G01 U.N.O.
D ALL UNFINISHED COLUMNS TO RENDERED WITH FINISH
CONCRETE, U.N.O.
E PATCH AND REPAIR EXISTING WALLS AND PARTITIONS
SCHEDULED TO REMAIN, INCLUDING CORE WALLS AND
COLUMN ENCLOSURES. PREPARE WALLS AS REQUIRED FOR
SCHEDULED FINISHES.
F ALL DIMENSIONS ARE TO FACE OF GYP BOARD U.N.O.
G MAINTAIN DIMENSIONS INDICATED TO BE "CLEAR", "HOLD" OR
"MIN”. REVIEW VARIATIONS ON THESE DIMENSIONS WITH THE
ARCHITECT BEFORE BEGINNING CONSTRUCTION.
H REVIEW DIMENSIONS NOTED WITH "VIF" WITH ARCHITECT
BEFORE BEGINNING CONSTRUCTION.
J LAY OUT ALL PARTITIONS AND DOOR LOCATIONS ON FLOOR,
FOR REVIEW AND ACCEPTANCE BY ARCHITECT PRIOR TO
PROCEEDING WITH CONSTRUCTION.
K PROVIDE BANDING AND BLOCKING AT WALL HUNG EQUIPMENT
AND FURNISHINGS. COORDINATE LOCATIONS WITH
ARCHITECT.
L COORDINATE LOCATIONS OF ACCESS PANELS IN WALL AND
CEILINGS WITH ARCHITECT PRIOR TO INSTALLATION. WHERE
EXISTING ACCESS PANELS CONFLICT WITH NEW WORK,
CONTACT ARCHITECT TO COORDINATE NEW LOCATION FOR
ACCESS PANELS.
M REFER TO AV DRAWINGS FOR MOUNTING HEIGHTS AND
CONDUIT REQUIREMENTS AT LOCATIONS OF MONITORS AND
AV EQUIPMENT.
N REPAIR AND/OR REPLACE DAMAGED EXISTING CONVECTOR SEAL
ENCLOSURES. REPLACE MISSING GRILLE AS REQUIRED.
03
02
O MANUFACTURER'S NAME, TRADEMARK, AND LOGOS SHALL
A-221
NOT BE VISIBLE

N
1 02 01
A-321 A-322 A-322

KEY PLAN

1045 Huai Hai Middle Road


Huai Hai Plaza
38th Floor, Suite 3803
Shanghai 200031 China
T. + 86 21 6252 1040
Student Reception / TOILET (W)
Waiting / Resource 3700
10 Owner:
3.8.3.2 2-RUN STAIR 14.6 m²
27.6 m²
US Staff Workroom
3.8.6.2 Van Giang Commerce and Tourism Township, Xuan
G11 G11 G11 G11 G11 G11 MARKUP LEGEND
7800

68.5 m² Quan Commune, Van Giang district, Ecopark, Vietnam


Offices 3.1.6 3.1.6 3.1.6 3.1.6 3.1.6 3.1.6
3.8.3.1 75 m² 75 m² 75 m² 75 m² 75 m² 76.1 m²
Offices UP Construction Manager:
3.8.3.1 14.4 m² TOILET (M)
10
PARTITION
14.4 m²
8.7 m²
Stair Wall Partition Rw+c ≥ 39dB
10
29.8 m²
Civil / Site:
Wall Partition Rw+c ≥ 47dB
4200

Corridor
10
222.5 m² Wall Partition Rw+c ≥ 56dB
Landscape:
MDF US Tech Off.
5.4.1 5.3.3 US Tech Off.
30.2 m² 8 m² 5.3.3
8.4 m² CMU WALLS
US Staff Lounge Conf. Rm
01 US Tech Off. STORAGE Wall Partition Rw+c ≥ 49dB
9000

3.8.6.1 3.8.6.3 DB Vestibule Structural:


Student Reception / 5.3.3 4
A-222 93.4 m² 23.3 m² 10 10.1.1
Waiting / Resource 8.4 m² 12.3 m² 2500
3 m²
IT Storage, Repair, 5.3.3 16.2 m²
Production
5.3.1 UP Common Space
36.5 m² Wall Partition Rw+c ≥ 60dB

1200
40.9 m² 10 Director Office
Pantry 43.6 m² 5.3.4 MEP:
3.8.6.4 10.2 m²
9.6 m² LINING

A-222
02
IDF
10
Lining
4200

3 m²

CC GLASS PARTITION PROJECT TITLE:


Open Office & 3.8.2.6
02 15.6 m² Girl's Toilet
Reception 3.3.4 Glazing Partition Rw+c ≥ 37dB
A-212
ECOPARK DAESUNG
3.8.2.3 19.5 m²
59 m²
UP
G12 G12 G12 G12 G12 G12 Glazing Partition Rw+c ≥ 47dB
INTERNATIONAL
7800

3.1.7 3.1.7 3.1.7 3.1.7 3.1.7 3.1.7


73.4 m² 73.4 m² A-1.1
73.4 m² 73.4 m² 73.4 m² 73.4 m²
R/S MTG PS Prin PS APO Boy's Toilet
DOOR
3.8.2.4
13 m²
3.8.2.5
19.6 m²
3.8.2.1
25.6 m²
3.8.2.2
19.5 m²
3.3.4
21.4 m² SCHOOL
Stair Door Rw+c ≥ 30dB
800

10
36.3 m²
Door Rw+c ≥ 34dB HANOI, VIETNAM
4200

Door Rw+c ≥ 40dB

Double door Rw+c ≥ 45dB PROJECT No: 82630


8400 8400 8400 8400 8400 8400 8400 8400 4200
DRAWING TITLE:

LEVEL 4 ZONE B
82630_ARCH_2020_detached.rvt

SCALE: 1 : 200
A-J A-K A-L A-M A-N A-O 01 A-P A-Q A-R A-S A-T

A-142
A-221
11/6/2020 7:54:42 PM

A-U

L4 - ZONE B SCHEMATIC DESIGN


1 1 : 200
2020.11.06

You might also like