1 Cleared Completed 2 Pending Pending 3 Pending Pending 4 Pending Pending 5 Pending Pending 6 Cleared Completed 7 Pending Pending 8 Cleared Completed

This document provides details on the Gurmura and Panari Water Supply Scheme project including: 1) There are 8 overhead water storage reservoirs (OHSRs) included in the project with varying statuses of land clearance and geo-technical investigation completion. 2) The capacities of the ESRs range from 100KL to 400KL and their heights range from 12m to 24m. 3) The scheduled construction duration for the project is 2 years.

Uploaded by

mohit nigam
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
48 views3 pages

1 Cleared Completed 2 Pending Pending 3 Pending Pending 4 Pending Pending 5 Pending Pending 6 Cleared Completed 7 Pending Pending 8 Cleared Completed

This document provides details on the Gurmura and Panari Water Supply Scheme project including: 1) There are 8 overhead water storage reservoirs (OHSRs) included in the project with varying statuses of land clearance and geo-technical investigation completion. 2) The capacities of the ESRs range from 100KL to 400KL and their heights range from 12m to 24m. 3) The scheduled construction duration for the project is 2 years.

Uploaded by

mohit nigam
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3

Name of the Project: Gurmura and Panari Water Supply Scheme

Cluster:
Avail. Duration of ESR Lucknow
:Construction 2 Years

Geo.tech. investigation
SL NO Location status Land clearance Drawing status
status

1 OHSR-2 KOTA CLEARED COMPLETED


2 OHSR-AMMATOLA PENDING PENDING
3 OHSR-TELGURWA PENDING PENDING
4 OHSR-KANOPANI PENDING PENDING
NIL
5 OHSR-GURMURA PENDING PENDING
6 OHSR-PANARI CLEARED COMPLETED
7 OHSR-KHAIRAHI PENDING PENDING
8 OHSR-BAIRPUR CLEARED COMPLETED

# Sensitivity: LNT Construction Internal Use


Type Formwork Material Workmen
Scheduled
Capacity of Formwork
Ht.of staging construction Formwork Workmen
ESR(KL) Intz Flat set
duration set required available
available
250 12 2 Year No No No
400 20 2 Year No No No
200 20 2 Year No No No
125 20 It will finalized 2 Year No No No
after Drawing
200 24 finalization 2 Year No No No
200 24 2 Year No No No
150 24 2 Year No No No
100 24 2 Year No No No

# Sensitivity: LNT Construction Internal Use


Workmen
MEP -pipe , puddle Painting spec
Workmen Hydro test Remarks
flange available finalized
required

No No No No
No No No No
No No No No
No No No No
No No No No
No No No No
No No No No
No No No No

# Sensitivity: LNT Construction Internal Use