100% found this document useful (1 vote)
163 views2 pages

3rd Assessment Test

This document contains a summative test for a Technical Drafting course. The test has three sections - multiple choice questions about drafting terms, true/false statements, and a section to draw electrical symbols. The multiple choice questions cover topics like structural elements, electrical, lighting and plumbing plans, and abbreviations. The true/false statements relate to elements found in different plans. The symbol drawing section asks to draw symbols for electrical devices.

Uploaded by

MaCel VM
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
163 views2 pages

3rd Assessment Test

This document contains a summative test for a Technical Drafting course. The test has three sections - multiple choice questions about drafting terms, true/false statements, and a section to draw electrical symbols. The multiple choice questions cover topics like structural elements, electrical, lighting and plumbing plans, and abbreviations. The true/false statements relate to elements found in different plans. The symbol drawing section asks to draw symbols for electrical devices.

Uploaded by

MaCel VM
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

TLE ICT 9 – TECHNICAL DRAFTING

SUMMATIVE TEST
THIRD ASSESSMENT
FIRST QUARTER

Name : ______________________________Grade & Section :________________Score :____________

Direction: Choose the correct answer from the choices given below. Write your answer on the blank
provided each number.
_____1. Structural excavation that holds the building
a. Foundation b. footing c. beam d. none of these
_____2. Complete structural detail of a common or typical truss of a building
a. a. baluster b. stairwell b. truss d. none of these
_____3. Electrical plan that shows the flow of house lightings
a. electrical system b. lighting lay out c. sewage system plan d. none of these
_____4. Consist of lighting plan, power layout and specification details of the house
a. electrical plan b. foundation plan c. Plumbing plan d. none of these
_____5. Depository of human excreta and a drainage reservoir for all washing done in the kitchen and
bathroom.
a. Electrical plan b. foundation plan c. plumbing plan d. none of these
____6. Part of the foundation directly supporting the column or post of a house
a. Beam schedule b. footing c. wall d. none of these
____7. A small drawings or pictograms, used to represent various electrical devices in a diagram or plan
of an electrical circuit.
a. Electrical symbols b. lighting layout c. plumbing plan d. none of these
____8. A plan that shows the flow of convenience outlet and other auxiliary outlet in the floor plan
a. Electrical layout b. lighting layout C. power and auxiliary layout
____9. Refers to the drawing of flow of water in the house from main water source
a. Electrical layout b. lighting layout c. sewage system plan d. none of these
____10. Refers to the complete drawing detail of water and sewerage distribution.
a. Electrical plan b. foundation plan c. plumbing plan d. none of these
____11. Abbreviation of Air Conditioning Unit
a. ACU b. ARCU c. ARU d. none of these
____12. Denotation for WP in electrical abbreviation
a. Water pipe b. water proof c. water proof outlet d. none of these
____13. Sub-complete detail of wall footing, lintels, beams and other required structure features
present in the plan
a. Construction notes b. general notes c. footings d. none of these
____14. Abbreviation for circuit breaker
a. CB b. CBRK c. BRKR d. none of these
____15. Abbreviation for power
a. POWR b. PWR c. PR d. none of these
II. TRUE OR FALSE
Directions : Write T if the statement is correct. Otherwise, write F, Place your answer in the blank
provided each number.
______1. Water sewerage system is part of the floor plan.
______2. The circuit breaker of the house usually found at the entrance of the house.
_____3. The plan that computes the total load of the appliances and fixture is electrical plan.
_____4. General notes is a complete specification & legend of structural features presented in the plan.
_____5. Truss detail is part of the roof plan.

III. Draw the symbol of the following

1. Fuse
2. Service entrance
3. 3 gang wall switch
4. Incandescent light
5. Air conditioning outlet