This document contains notes for a construction project involving concrete beams and walls. It specifies new 9" beams being added to existing 14" walls. The notes provide information on concrete mixes, reinforcement, dimensions, and construction details like curing times. Reinforcement is specified as high yield deformed bars with minimum cover requirements for different elements.

Uploaded by

Parth K Patel
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
99 views4 pages

Structural Renovation Plan

This document contains notes for a construction project involving concrete beams and walls. It specifies new 9" beams being added to existing 14" walls. The notes provide information on concrete mixes, reinforcement, dimensions, and construction details like curing times. Reinforcement is specified as high yield deformed bars with minimum cover requirements for different elements.

Uploaded by

Parth K Patel
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

NOTES:

NEW 9" BEAM ON EXITING 14" WALL WALL-1 WALL-1 1. ALL DIMENSIONS & LEVELS ARE IN FEET-INCHES
2. COLUMN, BEAM, SLAB, LINTEL, STAIR : CONCRETE MIX M25
B1 B1 B1 FOUNDATION : CONCRETE MIX M20
3. ALL CONCRETE SHALL BE MACHINE MIXED & MACHINE VIBRATED.
4. CLEAR COVER

NEW 9" BEAM ON EXITING 14" WALL

WALL-1
FOOTING - 2" RCC WALL - 1" COPING BEAM - ¾""

B2
COLUMN - 1½" SLAB - ¾"" WAIST SLAB - ¾""

WALL-1
BEAM - 1" LINTEL - ¾"" CHAJJA - ¾""

B2
5. H=INDICATES HIGH YIELD STRENGTH DEFORMED BARS Fe 500 WITH 0.2% PROOF STRESS
500 N/mm².
6. STEEL CHAIRS SHALL BE PROVIDED TO KEEP TOP STEEL IN PROPER POSITION.

B4
7. ALL DIMENSIONS & LEVELS SHALL BE CHECKED WITH ARCH. DWG. ANY AMBIGUITY IF
FOUND SHALL BE BROUGHT TO THE NOTICE OF THE CONSULTING ENGINEERS
WALL-1
BEFORE EXECUTION OF THE WORK.
B2 8. LAP LENGTH IN INCHES SHALL BE 2 TIMES DIA. OF BARS. OR 50 TIMES DIA.OF BARS IN MM.
9. CURING OF CONCRETE MEMBERS SHALL BE CARRIED OUT FOR A MINIMUM PERIOD OF
12 DAYS AFTER CASTING BY PONDING OR COVERING SURFACE BY JUTE BAGS KEPT
A CONSTANTLY WET OR SUCH OTHER MEANS.
10. PROVIDE M10 GRADE PCC 4" THICK UNLESS OTHERWISE SPECIFIED.

B8 : 14" X 1"
11. S.B.C CONSIDERED AS 15 T/m². AT 6' DEPTH FROM N.G.L.
B3 B3
LEGENDS
TYP - TYPICAL

NEW 9" BEAM ON EXITING 14" WALL


NGL - NATURAL GROUND LEVEL
THK - THICKNESS

NEW 9" BEAM ON EXITING 14" WALL


B4
3-HX

1'-6"
B4
NEW 9" BEAM ON EXITING 14" WALL NEW 9" BEAM ON EXITING 14" WALL
3-HX
B5 B5

TYP. SECTION OF BEAM


(SCALE-1:25)

WALL-1

B10
VIEW-C
B6

45°
B

d
10
WALL-1
B6 B6

B7

WALL-1
B1
d CLEAR

WALL-1
COVER

B10
WALL-1
COLUMN TO BE JACKETED
B1 d = DIA. OF BAR
WALL-1

WALL-1

TYP DETAIL OF HOOP AND

B7
CROSS TIE

B1
(SCALE-1:50)

WALL-1 WALL-1
B9 B9 B1

NOTE : ALL WALL-1 ARE LOAD BEARING 9" WALL


SHALL BE CONSTRUCTED FROM FOUNDATION
BEAM AND WALL LAYOUT AT TERRACE LEVEL R0 ISSUED FOR CONSTRUCTION
(SCALE-1:40)
ISSUED

3" 3" NO. DATE DESCRIPTION


FOR
DRAWN CHECKED

BEAM REINFORCMENT TABLE H12-12NOS


REVISION
ARCHITECT
-
REINFORCEMENT SCHEDULE
3"

BEAM SIZE
BEAM NO. PROJECT
SHSHIBHAI HOME
TITLE
B1 9" 18" H12-3 NOS H12-2 + H16-1 NOS H8 @ 5"
H8-4" C/C RING RENOVATION
B2 9" 18" H10-3 NOS H12-3 NOS H8 @ 6"
DRG.NO.

B4/B5/B7 9" 18" H12-3 NOS H12-3 NOS H8 @ 6" M2201-DD-01-R0


3"

CHECKED APPROVED
B6 9" 18" H12-1 + H16-2 NOS H16-3 NOS H8 @ 5" KALANA DESIGNS PKP PKP
14'' 12" H12-3 NOS H12-3 NOS H8 @ 5" STRUCTURAL APPLICATION & DESIGN CONSULTANT
B8 DATE DRAWN

B9/B10 9'' 18" H12-3 NOS H16-3 NOS H8 @ 5" EXISTING COLUMN JACKETING A-307, TROGON-2
BYPASS CIRCLE, RADHANPUR RD.
MEHSANA - 384002
Parth.K.Patel
B.Tech Civil (Birla Vishvakarma Mahavidyalaya)
18-02-2022 JPP
ISSUE
B3 9'' 18" H12-1 + H16-2 NOS H16-3 NOS H8 @ 5" M.Tech. Structures (Dharmsinh Desai University) SCALE
(SCALE 1:40) e-mail : [email protected]
www.kalanadesigns.in Mobile : +91 - 94270-31192 R- 0 NTS

SHEET SIZE : A2
NOTES:
1. ALL DIMENSIONS & LEVELS ARE IN FEET-INCHES
H12-6 NOS NEW SLAB TOP LEVEL 2. COLUMN, BEAM, SLAB, LINTEL, STAIR : CONCRETE MIX M25
LVL.+13'6" FOUNDATION : CONCRETE MIX M20

6" 1'-6" 1'


3. ALL CONCRETE SHALL BE MACHINE MIXED & MACHINE VIBRATED.
BEAM B7 4. CLEAR COVER
2-H12+1-H16
NEW SLAB TOP LEVEL H8-5" C/C RING FOOTING - 2" RCC WALL - 1" COPING BEAM - ¾""
LVL.+13'6" COLUMN - 1½" SLAB - ¾"" WAIST SLAB - ¾""

1'-6" 1'-6"
H8-6 NOS BEAM - 1" LINTEL - ¾"" CHAJJA - ¾""
NEW BEAM B6
EXISITNG SLAB TOP LEVEL 5. H=INDICATES HIGH YIELD STRENGTH DEFORMED BARS Fe 500 WITH 0.2% PROOF STRESS
LVL.+10'6" 500 N/mm².
3-H16
H8-5" C/C RING 6. STEEL CHAIRS SHALL BE PROVIDED TO KEEP TOP STEEL IN PROPER POSITION.
7. ALL DIMENSIONS & LEVELS SHALL BE CHECKED WITH ARCH. DWG. ANY AMBIGUITY IF
EXISITNG SLAB TOP LEVEL FOUND SHALL BE BROUGHT TO THE NOTICE OF THE CONSULTING ENGINEERS
LVL.+10'6" ISHVARBHAI HOME 1'-2" SHASHIBHAI HOME BEFORE EXECUTION OF THE WORK.
8. LAP LENGTH IN INCHES SHALL BE 2 TIMES DIA. OF BARS. OR 50 TIMES DIA.OF BARS IN MM.
EXISTING BEAM 9. CURING OF CONCRETE MEMBERS SHALL BE CARRIED OUT FOR A MINIMUM PERIOD OF
12 DAYS AFTER CASTING BY PONDING OR COVERING SURFACE BY JUTE BAGS KEPT
ISHVARBHAI HOME SHASHIBHAI HOME CONSTANTLY WET OR SUCH OTHER MEANS.
10. PROVIDE M10 GRADE PCC 4" THICK UNLESS OTHERWISE SPECIFIED.
NEW ARRANGEMENT : AT SECTION B-B 11. S.B.C CONSIDERED AS 15 T/m². AT 6' DEPTH FROM N.G.L.

(SCALE 1:40)
NEW ARRANGEME: AT SECTION A-A LEGENDS
(SCALE 1:40) TYP - TYPICAL
NGL - NATURAL GROUND LEVEL
THK - THICKNESS

TO BE BREAK HERE
EXISITNG SLAB TOP LEVEL
LVL.+10'6"
BUILD A TOILET WALL BEFORE BREAK HERE
EXISITNG SLAB TOP LEVEL
LVL.+10'6"
ISHVARBHAI HOME SHASHIBHAI HOME
ISHVARBHAI HOME SHASHIBHAI HOME

EXISTING COMMON WALL : AT SECTION B-B


(SCALE 1:40) EXISTING COMMON WALL : AT SECTION A-A
(SCALE 1:40)

NEW SLAB TOP LEVEL


LVL. + 13'-6"
9"

6"
6"

NEW SLAB BOTTOM LEVEL


1'-6"

LVL. + 13'-0"

1'
NEW 9" X 18" RCC BEAM AS PER DETAILS NEW 9" X 18" RCC BEAM AS PER DETAILS
3'

NEW 14" THK. BRICK MASONARY TO BE DONE


EXISITNG WALL TOP LEVEL
LVL.+10'0"

10'
10'

NEW 9" THK. BRICK MASONARY TO BE DONE

EXISTING 14" WALL MASONARY TO BE


REMAIN AS IT IS

H8-6 NOS
NEW FLOOR LEVEL

6"
LVL. + 3'-0"
H8-6" C/C LINK
3'0" SOIL FILLING TO RAISE PLINTH
3'

R0 ISSUED FOR CONSTRUCTION

4'-6"
ISSUED
NO. DATE DESCRIPTION DRAWN CHECKED
FOR

REVISION
ARCHITECT
EXISTING FLOORING LVL 1'-2" -
LVL. ± 0'-0"

9" 1'-6"
4" THIK.PCC
PROJECT
SHSHIBHAI HOME
TITLE

TYPICAL CROSS SECTION OF WALL-1 FROM FOUNDATION RENOVATION


TYPICAL CROSS SECTION OF BEAM OVER EXISTING WALL (SCALE 1:40) DRG.NO.
(SCALE 1:40) M2201-DD-01-R0
CHECKED APPROVED
KALANA DESIGNS PKP PKP
STRUCTURAL APPLICATION & DESIGN CONSULTANT
DATE DRAWN
A-307, TROGON-2
BYPASS CIRCLE, RADHANPUR RD. Parth.K.Patel 18-02-2022 JPP
MEHSANA - 384002 B.Tech Civil (Birla Vishvakarma Mahavidyalaya)
ISSUE SCALE
M.Tech. Structures (Dharmsinh Desai University)
e-mail : [email protected]
www.kalanadesigns.in Mobile : +91 - 94270-31192 R- 0 NTS

SHEET SIZE : A2
NOTES:
1. ALL DIMENSIONS & LEVELS ARE IN FEET-INCHES
2. COLUMN, BEAM, SLAB, LINTEL, STAIR : CONCRETE MIX M25
FOUNDATION : CONCRETE MIX M20
3. ALL CONCRETE SHALL BE MACHINE MIXED & MACHINE VIBRATED.
4. CLEAR COVER
FOOTING - 2" RCC WALL - 1" COPING BEAM - ¾""
COLUMN - 1½" SLAB - ¾"" WAIST SLAB - ¾""
BEAM - 1" LINTEL - ¾"" CHAJJA - ¾""
5. H=INDICATES HIGH YIELD STRENGTH DEFORMED BARS Fe 500 WITH 0.2% PROOF STRESS
500 N/mm².
6. STEEL CHAIRS SHALL BE PROVIDED TO KEEP TOP STEEL IN PROPER POSITION.
7. ALL DIMENSIONS & LEVELS SHALL BE CHECKED WITH ARCH. DWG. ANY AMBIGUITY IF
FOUND SHALL BE BROUGHT TO THE NOTICE OF THE CONSULTING ENGINEERS
BEFORE EXECUTION OF THE WORK.
NEW SLAB LEVEL (SHASHIBHAI)
8. LAP LENGTH IN INCHES SHALL BE 2 TIMES DIA. OF BARS. OR 50 TIMES DIA.OF BARS IN MM.
LVL. + 3'-0" 9. CURING OF CONCRETE MEMBERS SHALL BE CARRIED OUT FOR A MINIMUM PERIOD OF

1'-6"
12 DAYS AFTER CASTING BY PONDING OR COVERING SURFACE BY JUTE BAGS KEPT
NEW 9" X 18" BEAM : B6 CONSTANTLY WET OR SUCH OTHER MEANS.
10. PROVIDE M10 GRADE PCC 4" THICK UNLESS OTHERWISE SPECIFIED.
11. S.B.C CONSIDERED AS 15 T/m². AT 6' DEPTH FROM N.G.L.

LEGENDS

1'-6"
MASONARY WORK TYP - TYPICAL
NGL - NATURAL GROUND LEVEL
EXISTING SLAB LEVEL(ISHVARBHAI) THK - THICKNESS
LVL. + 3'-0"
OLD BEAM TO BE RETAINED

1'
3'

1
7'-102"

WALL-1 FROM FOUNDATION OPEN DOOR WALL-1


BETWEEN TWO FROM
HOME FOUNDATION

9'
EXISTING 14" WALL EXISTING 14" WALL

NEW FLOOR LEVEL (SHASHIBHAI)


LVL. + 3'-0"

6"
STEPS 1'-2"

OLD FLOOR LEVEL(ISHVARBHAI)

MINIMUM 2'
LVL. + 0'-0"

FOUNDATION
FOUNDATION

VIEW : C : COMMON ENTRY BETWEEN BOTH HOME


(SCALE 1:40)
R0 ISSUED FOR CONSTRUCTION

ISSUED
NO. DATE DESCRIPTION DRAWN CHECKED
FOR

REVISION
ARCHITECT
-
PROJECT
SHSHIBHAI HOME
TITLE
RENOVATION

DRG.NO.
M2201-DD-01-R0
CHECKED APPROVED
KALANA DESIGNS PKP PKP
STRUCTURAL APPLICATION & DESIGN CONSULTANT
DATE DRAWN
A-307, TROGON-2
BYPASS CIRCLE, RADHANPUR RD. Parth.K.Patel 18-02-2022 JPP
MEHSANA - 384002 B.Tech Civil (Birla Vishvakarma Mahavidyalaya)
ISSUE SCALE
M.Tech. Structures (Dharmsinh Desai University)
e-mail : [email protected]
www.kalanadesigns.in Mobile : +91 - 94270-31192 R- 0 NTS

SHEET SIZE : A2
NOTES:
1. ALL DIMENSIONS & LEVELS ARE IN FEET-INCHES
2. COLUMN, BEAM, SLAB, LINTEL, STAIR : CONCRETE MIX M25
FOUNDATION : CONCRETE MIX M20
3. ALL CONCRETE SHALL BE MACHINE MIXED & MACHINE VIBRATED.
4. CLEAR COVER
FOOTING - 2" RCC WALL - 1" COPING BEAM - ¾""
COLUMN - 1½" SLAB - ¾"" WAIST SLAB - ¾""
BEAM - 1" LINTEL - ¾"" CHAJJA - ¾""
5. H=INDICATES HIGH YIELD STRENGTH DEFORMED BARS Fe 500 WITH 0.2% PROOF STRESS
500 N/mm².
6. STEEL CHAIRS SHALL BE PROVIDED TO KEEP TOP STEEL IN PROPER POSITION.

1'
A A 7. ALL DIMENSIONS & LEVELS SHALL BE CHECKED WITH ARCH. DWG. ANY AMBIGUITY IF
FOUND SHALL BE BROUGHT TO THE NOTICE OF THE CONSULTING ENGINEERS
3'-4" 3'-4" C
2'
BEFORE EXECUTION OF THE WORK.
1'-8" 1'-8" 1'-8" 8. LAP LENGTH IN INCHES SHALL BE 2 TIMES DIA. OF BARS. OR 50 TIMES DIA.OF BARS IN MM.
B B
A 9. CURING OF CONCRETE MEMBERS SHALL BE CARRIED OUT FOR A MINIMUM PERIOD OF
2'
12 DAYS AFTER CASTING BY PONDING OR COVERING SURFACE BY JUTE BAGS KEPT
CONSTANTLY WET OR SUCH OTHER MEANS.
10. PROVIDE M10 GRADE PCC 4" THICK UNLESS OTHERWISE SPECIFIED.

1'-6"
11. S.B.C CONSIDERED AS 15 T/m². AT 6' DEPTH FROM N.G.L.

LEGENDS
TYP - TYPICAL

1'-6"
NGL - NATURAL GROUND LEVEL

3'-8"
THK - THICKNESS
B

1'
B8 : 14" X 1"

1'-10"
3'-8"
3'
1'-8" B
1'-8" 1'-8" D
B
A

3'

1'-10"
1'-8"
3'

1'-8" 1'-8" D
1'-8" B
B
A

1'-8"
1'-8"

2' 2'

1'-3"
A B
B
1'-8" 1'-8"

1'-8"

C
1'-6" 1'-6"

B C
1'-3"

A A

R0 ISSUED FOR CONSTRUCTION

ISSUED
NO. DATE DESCRIPTION DRAWN CHECKED
FOR
SLAB REINFORCEMENT LAYOUT REVISION
SLAB REINFORCMENT TABLE (SCALE-1:40)
ARCHITECT
-
BAR MARK REINFORCEMENT REMARK PROJECT
SHSHIBHAI HOME
A H8 @ 6"c/c ALT. BENT UP
B H8 @ 12"c/c TOP EXTRA TITLE
RENOVATION
C H8 @ 6"c/c TOP/BOTTOM JALI
D H10 @ 6"c/c CANTILEVER CHAJJA DRG.NO.
M2201-DD-01-R0
ALL SLAB : 6" THICKNESS
CHECKED APPROVED
KALANA DESIGNS PKP PKP
STRUCTURAL APPLICATION & DESIGN CONSULTANT
DATE DRAWN
A-307, TROGON-2
BYPASS CIRCLE, RADHANPUR RD. Parth.K.Patel 18-02-2022 JPP
MEHSANA - 384002 B.Tech Civil (Birla Vishvakarma Mahavidyalaya)
ISSUE SCALE
M.Tech. Structures (Dharmsinh Desai University)
e-mail : [email protected]
www.kalanadesigns.in Mobile : +91 - 94270-31192 R- 0 NTS

SHEET SIZE : A2

You might also like