28-Oct-2022 Facade Site Daily Report

The site daily report from Zeng ZhiQiang DecorationEngineering Co.,LTD provides details of work completed on October 28th, 2022 at the Rain Rock Apartment construction site in Phnom Penh. On this date, toolbox meetings were held and aluminum mullions were installed on levels 17 through 21. Equipment used included laser leveling machines, safety belts, scaffolding, welding machines, and ladders. The next day's planned activities involve further mullion installation and oversight is provided by a manager, site manager, team leader, and 10 technicians. Materials delivered include 317 aluminum frames.

Uploaded by

2024 gaopan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
110 views2 pages

28-Oct-2022 Facade Site Daily Report

The site daily report from Zeng ZhiQiang DecorationEngineering Co.,LTD provides details of work completed on October 28th, 2022 at the Rain Rock Apartment construction site in Phnom Penh. On this date, toolbox meetings were held and aluminum mullions were installed on levels 17 through 21. Equipment used included laser leveling machines, safety belts, scaffolding, welding machines, and ladders. The next day's planned activities involve further mullion installation and oversight is provided by a manager, site manager, team leader, and 10 technicians. Materials delivered include 317 aluminum frames.

Uploaded by

2024 gaopan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Contractor:

Zeng ZhiQiang DecorationEngineering Co.,LTD SITE DAILY REPORT Project: Rain Rock Apartment
Location: Phnom Penh
Date: 28th-Oct-2022

Equipment
Work Description & Location
Description Quan. Unit Remark
1 Toolbox meeting Laser leveling machine 5 pcs
2 Install mullion L17,L18,L19,L20,L21 Satety belt 8 pcs
3 transfer aluminum frame from Factory Scaffolding 2 set
4 Welding machine 5 pcs
5 Ladder 5 pcs
6 Fire extinguisher 5 pcs
7 Gondola 1 pcs
Tomorrow Activities Manpower on Site
1 Toolbox meeting Description Quan. Unit Remark
2 Install mullion L19,L20,L21,L22,L23 Manager 1 pax
3 Site Manager 1 pax
4 Team Leader 1 pax
5 Technician 10 pax
6 Total worker 8 pax
7 Morning No
Rainy
8 Afternoon No
Material Delivery
Name Quantity Unit Photo Remark

1 Aluminum Frame 317 pcs


2
3
4
5
6
7
Prepared & Checked by:

Name: Vantha Sany


Position: Site Manager
Date: 28th-Oct-2022

Page 1
ACTIVITY PHOTOS

Toolbox meeting L17: Install aluminum mullion L18: Install aluminum mullion

L17: Install aluminum mullion L20: Install aluminum mullion GF: Received material from Factory