0% found this document useful (0 votes)
2K views1 page

Answer Violation Ecc

The Municipal Mayor of Sablayan, Occidental Mindoro wrote a letter to the Regional Director of the DENR-EMB regarding a Notice of Violation issued to the LGU Slaughterhouse. The letter informs that the slaughterhouse master completed training as a Pollution Control Officer to comply with requirements. It also explains that while applications have been submitted for required permits, the slaughterhouse has not received updates on permit status and needs to continue operations due to public demand and power outages. The Mayor assures that they are working to comply with ECC conditions.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
2K views1 page

Answer Violation Ecc

The Municipal Mayor of Sablayan, Occidental Mindoro wrote a letter to the Regional Director of the DENR-EMB regarding a Notice of Violation issued to the LGU Slaughterhouse. The letter informs that the slaughterhouse master completed training as a Pollution Control Officer to comply with requirements. It also explains that while applications have been submitted for required permits, the slaughterhouse has not received updates on permit status and needs to continue operations due to public demand and power outages. The Mayor assures that they are working to comply with ECC conditions.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

Republic of the Philippines

Province of Occidental Mindoro


MUNICIPALITY OF SABLAYAN
OFFICE OF THE MUNICIPAL MAYOR

January 23, 2023

MR. JOE AMIL M. SALINO


Regional Director, DENR-EMB
6th Floor, DENR By the Bay Bldg.
Roxas, BLVD., Ermita, Manila

Dear, Director Salino:

Greetings!

This has reference to the Notice of Violation dated December 27, 2022 for the LGU
Slaughterhouse with ECC-OL-R4B-2022-0089 issued on May 31,2022 for violations of
the ECC conditions. (Copy of the Notice of Violation, attached as enclosed).

May I inform you that our slaughterhouse master in the person of Ms. Julie Anne Buhay
finished her training as Pollution Control Officer on _____________ to be able to
comply with DAO No. 2 Series of 2014 which requires the ECC holders to establish an
Environmental Unit with a Pollution Officer within 60 days from the issuance of the
ECC.

Anent the issue of Violation of R.A 8749 (Operating an Air Pollution Source Equipment
without Permit to Operate); Violation of RA 9275 (Operating without Discharge
Permit); Violation of RA 6969 (Failure to register as hazardous waste generator to this
office through online), we regret to inform you that we have submitted the application
but up to date we have not receive any status update. In addition due to the heavy
brownout and the demand, we are constrained to continue unhampered operation for
the demand of the greater public.

Please be assured that we are doing everything that we can to comply with the
requirements of ECC Certificate.

Best Regards,

WALTER B. MARQUEZ
Municipal Mayor

You might also like