DRP001-OUF-GAL-PRO-Q-000-067 Rev-S1
DRP001-OUF-GAL-PRO-Q-000-067 Rev-S1
DUQM REFINERY
Company Approval Status
Status :
Signed :
Dept :
Date :
COMMENT STATUS CODE: A-Accepted; B-Accepted With Comments
C-Reviewed with Comments; D-No Comments; E-Rejected
Reviewing Engineer’s Full Name (IN BLOCK LETTERS), Sign and Date
Purchaser’s review of this document does not relieve Vendor of the responsibility for correctness under the Subcontractor Order.
Permission to proceed does not constitute acceptance of design, detail and calculations, test methods or materials developed or selected
by the Subcontractor and does not relieve the Subcontractor from full compliance with the Subcontractor Order or any other
obligations, nor detract from any of the Purchaser’s rights.
C31/1620
Client : Petroleum Development Oman LLC. Contract No.
Off Plot Mechanical Contract-
Contractor: Galfar Engineering & Contracting SAOG Contract Title Qarnalam Area
Welding Procedure
PQR Details WPS-PDO
Specification Details
approval status
Test Coupon Size Qualification Range Welding consumable Remarks
WPS No: Impact PWHT Max C.E/
S.No PQR No Dia Thickness Process Thickness (mm) Dia Material Specification MDMT Service Joint type AFQ/ Approval
Test Temp PREN AWS Class Manufacture Brand name
(inch) (°C) Code
inch mm (°C) min max AFC
AFC - Approved for Construction, AFQ - Approved for Qualification, TBN - To be noted.
GALFAR ENGINEERING & CONTRACTING SAOG PDO
Sign: Sign:
Name: Name:
Date: Date:
7/17/2022
GALFAR ENGINEERING AND CONTRACTING SAOG Page 1 of 3
70-80 deg.
7 8 9
5 6
3 4
Pipe/Fitting/Flange 2 Pipe
1 0.7-2.3mm
2.4-3.2mm
Butt Joint
2.4-3.2mm
WOL
9 6
8 10 65-75 deg. 5 3
4 6 4 2 1 0-3mm
1 2 3 5 7 11
0.7-2.3mm Pipe
Fillet Welds
Branch Connection
70-80 deg.
7 8 9
5 6
3 4
Pipe/Fitting/Flange 2 Pipe
1 0.7-2.3mm
2.4-3.2mm
2.4-3.2mm
Butt Joint
WOL
9
8 65-75 deg.
10 6
4 6 5 3
1 2 3 5 7 11 4 2 1 0-3mm
0.7-2.3mm Pipe
Fillet Welds
Branch Connection
NOTES:
1 This WPS is applicable for butt, branch and fillet welds.
2 Preheat to 50º C if required for moisture removal or when metal temperature is <15°C.
3 Welding shall not be performed when the weather or degree of protection does not provide satisfactory welding.
4 When interruption of welding is unavoidable the weld shall be wrapped in dry thermal insulating blanket for slow cooling. Minimum 3 passes
or 1/2 of the joint thickness whichever is higher shall be deposited before any interruption.
5 Welding consumables shall be handled as per approved consumable handling procedure & certificate shall be EN 10204 Type 3.1
and shall include both chemical and mechanical test results.
6 Arc strikes shall be ground smooth & MT/PT & thickness checked.
7 When applicable preheating shall be done for a minimum distance of 75mm on both sides of the joint.
8 Welding gas shall comply AWS A5.32/ BS EN ISO 14175 requirements
9 GTAW welding machines shall have HF arc start capability..
Duqm Refinery and Petrochemical Industries
Galfar Engg. & Contracting SAOG Petrofac/ Samsung Engineering Company LLC
Approved for Construction
Sign: Sign: Sign:
ISTIAQ AHMED
Name: Welding Engineer
Name: Name:
GEC # 107384
Date: 03.07.22 Date: Date:
GQA/WPS/917 (Job#860)