Plans 23e00176
Plans 23e00176
GENE RYAN A. ALTEA MELQUIADES H. STO. DOMINGO GERALD A. PACANAN, CESO III
OIC-CHIEF, PLANNING AND DESIGN DIVISION OIC-ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS DETAILED ENGINEERING DESIGN PLAN FOR: GLEN AILEN O. OJENAR
REGION IV-B ENGINEER II (COS)
CONSTRUCTION OF ROXAS BY-PASS ROAD, MONTREXIS T. TAMAYO GENE RYAN A. ALTEA MELQUIADES H. STO. DOMINGO GERALD A. PACANAN,CESO III G 1
OFFICE OF THE REGIONAL DIRECTOR INDEX OF SHEETS PREPARED:
ENGINEER III OIC-CHIEF, PLANNING AND DESIGN DIVISION OIC-ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR 1 10 30
EDSA, DILIMAN QUEZON CITY LIANA MARIZ L. OLEGA
ROXAS, ORIENTAL MINDORO ENGINEER II
DATE: DATE: DATE: DATE:
THIS SITE
THIS SITE
LOCATION MAP
K E Y M A P
VICINITY MAP
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS DETAILED ENGINEERING DESIGN PLAN FOR: GLEN AILEN O. OJENAR
REGION IV-B ENGINEER II (COS)
CONSTRUCTION OF ROXAS BY-PASS ROAD, MONTREXIS T. TAMAYO GENE RYAN A. ALTEA MELQUIADES H. STO. DOMINGO GERALD A. PACANAN,CESO III G 2
OFFICE OF THE REGIONAL DIRECTOR LOCATION MAP PREPARED:
ENGINEER III OIC-CHIEF, PLANNING AND DESIGN DIVISION OIC-ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR 2 10 30
EDSA, DILIMAN QUEZON CITY LIANA MARIZ L. OLEGA
ROXAS, ORIENTAL MINDORO ENGINEER II
DATE: DATE: DATE: DATE:
SURVEY SPECIFICATION
I. REFERENCE
III. SURVEY DATUM
DPWH DGCS VOLUME 2B - ENGINEERING SURVEY VOL. III, 2015 EDITION
HORIZONTAL DATUM
IN ACCORDANCE WITH EXECUTIVE ORDER NO. 45, SERIES OF 1993, AS AMENDED BY EO 321 AND EO 280,
II. GENERAL SERIES OF 2000 AND 2004, RESPECTIVELY, THE PHILIPPINE REFERENCE SYSTEM OF 1992 (PRS92) SHALL
THE DPWH SURVEYOR IS REQUIRED TO PROVIDE A THREE-DIMENSIONAL MATHEMATICAL REPRESENTATION BE THE STANDARD REFERENCE SYSTEM FOR ALL SURVEYS AND MAPPING IN THE PHILIPPINES. THE PRS92
(MODEL) OF THE SITE UPON WHICH GEOMETRIC DESIGN, ANALYSIS AND COMPUTATION CAN BE BASED. WAS THE GEODETIC DATUM ESTABLISHED DURING THE IMPLEMENTATION OF THE AUSTRALIAN
GOVERNMENT-FUNDED NATURAL RESOURCES AND MANAGEMENT AND DEVELOPMENT PROJECT
SUFFICIENT MEASUREMENTS ARE REQUIRED TO ENSURE ALL POINTS IN THE DIGITAL MODEL ACCURATELY REFLECT (NRMDP) IN 1989-1992 USING GLOBAL NAVIGATION SATELLITE SYSTEM (GNSS)-BASED POSITIONING
THEIR TRUE IN-SITU GEOMETRIC SHAPES AND LOCATIONS, INCLUSIVE OF CHANGES IN THE VERTICAL AND TECHNOLOGY, SPECIFICALLY THE GLOBAL POSITIONING SYSTEM.
HORIZONTAL DIRECTIONS WITHIN ROAD PAVEMENTS AND THE GENERAL TERRAIN.
THE SURVEY SHALL:
VERTICAL DATUM
1. ESTABLISH PERMANENT BENCHMARKS (BMS) FROM WHICH THE WORKS CAN BE SET OUT.
PROJECT ELEVATIONS SHALL BE REFERRED TO THE MEAN SEA LEVEL AS ESTABLISHED BY THE COAST AND
2. COMPLY WITH THE SPECIFIC REQUIREMENTS DEFINED IN THE DPWH DGCS VOLUME 2B - ENGINEERING GEODETIC SURVEY DEPARTMENT (FORMERLY THE BUREAU OF COAST AND GEODETIC SURVEY) OF THE
SURVEYS, NATIONAL MAPPING AND RESOURCE INFORMATION AUTHORITY (NAMRIA). A NATIONWIDE NETWORK
A. ALL NATURAL AND ARTIFICIAL FEATURES OCCURRING WITHIN THE SURVEY PROJECT AREA ARE CAPTURED OF BENCH MARKS, GENERALLY LOCATED AT ABOUT 1KM INTERVALS ALONG NATIONAL, PROVINCIAL
AND REPRESENTED IN THE DIGITAL MODEL AS POINTS. AND MUNICIPAL ROADS, SERVE AS REFERENCE STATIONS FOR THE MEAN SEA LEVEL VERTICAL DATUM.
B. APPROPRIATE TEXT ANNOTATION IS PROVIDED TO ADEQUATELY DEFINE AND DESCRIBE THE FOLLOWING:
· ROAD/BRIDGE NAMES.
IV. EQUIPMENT USED
· RIVERS, STREAMS OR LAKE OR OTHER WATER COURSE NAMES.
· NAMES AND NUMBERS OF BMS OR ANY OTHER CONTROL USED FOR THE SURVEY OR LOCATED IN STONEX GNSS (GLOBAL NAVIGATION SATELLITE SYSTEM)
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS DETAILED ENGINEERING DESIGN PLAN FOR: GLEN AILEN O. OJENAR
REGION IV-B ENGINEER II (COS)
CONSTRUCTION OF ROXAS BY-PASS ROAD, MONTREXIS T. TAMAYO GENE RYAN A. ALTEA MELQUIADES H. STO. DOMINGO GERALD A. PACANAN,CESO III G 3
OFFICE OF THE REGIONAL DIRECTOR GENERAL NOTES PREPARED:
ENGINEER III OIC-CHIEF, PLANNING AND DESIGN DIVISION OIC-ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR 3 10 30
EDSA, DILIMAN QUEZON CITY LIANA MARIZ L. OLEGA
ROXAS, ORIENTAL MINDORO ENGINEER II
DATE: DATE: DATE: DATE:
GENERAL NOTES
STANDARDS FOR PUBLIC WORKS & HIGHWAYS HIGHWAYS VOL. I & II. LONGITUDINAL GRADIENT OF THE TOP OF SLOPE COVERING WORK.
F) JICA - FINAL REPORT GUIDE III ( GUIDE TO ROAD SLOPE PROTECTION ) ,2007. SLOPE
HYDRAULIC / HYDROLOGIC DESIGN DATA : AFTER THE DETERMINATION OF HEIGHT OF THE SLOPE COVERING WORK, THE SLOPE SHALL BE PLANNED
MATERIAL PROPERTIES :
BASED ON THE FOLLOWING:
CONCRETE COMP. STRENGTH, (fc') =20.7 MPA
STEEL YIELD STRENGTH,(fy) =276 MPA (A) THE SLOPE OF THE REVETMENT SHALL BE THE SAME AS THE DIKE, HENCE, IT SHALL BE 2:1 (HORIZONTAL
CONCRETE UNIT WEIGHT,(ÿc) =24.0KN/M³
AND VERTICAL, RESPECTIVELY) OR MILDER. IN CASE WHEN THE SLOPE OF REVETMENT SHOULD BE STEEPER
BOULDERS UNIT WEIGHT,(ÿb) =20.0KN/M³
EFFECTIVE UNIT WEIGHT,(ÿeff.) =23.40KN/M³ THAN THE DIKE, IT SHALL BE GENTLE AS MUCH AS POSSIBLE FOR STABILITY PURPOSES AND SHALL BE BASED ON
(60% BOULDERS + 50% CONCRETE) THE NATURAL SLOPE OF THE ADJACENT BANK.
DENSITY OF SEAWATER, (DSW) = 1030KG/M³
(B) IN CASE OF RAPID FLOW STRETCHES WHEREIN FLOODWATER CONTAINS A LARGE QUANTITY OF
DESIGN CRITERIA
BOULDERS OR GRAVELS, THE SLOPE SHALL NOT BE NECESSARILY GENTLE BUT SHALL BE MILDER THAN 0.5:1.
HEIGHT (CREST ELEVATION OF REVETMENT)
THE HEIGHT OF REVETMENT IS DETERMINED BY SETTING THE DESIGN FLOOD LEVEL (DFL). HOWEVER, THE
(C) IN CASE OF JOINT PORTION WITH A ROCK-STREWN SLOPE, THE SLOPE OF REVETMENT SHALL BE
REVETMENT HEIGHT SHALL BE DESIGNED UP TO THE TOP OF RIVERBANK OR CREST OF EMBANKMENT
GRADUALLY CHANGED TO SMOOTHLY CONNECT WITH THE NATURAL SLOPE.
BECAUSE THERE IS A POSSIBILITY OF OCCURRENCE OF FLOODWATERS TO EXCEED THE DFL OR TOP OF THE
BANK. (D) FOR THE RETAINING WALL TYPE REVETMENT, A MAXIMUM SLOPE OF 0.3:1 SHALL BE OBSERVED
THE MARGIN OF THE HEIGHT WHICH DOES NOT ALLOW OVERFLOW. THE FREEBOARD SHALL BE BASED (A) IF THE HEIGHT OF REVETMENT IS MORE THAN 5.0 METERS, BERM (BANQUETTE) MUST BE PROVIDED
AND IS SO DESIGNED IN ORDER TO SEPARATE THE REVETMENT INTO SEGMENTS, AND IN CONSIDERATION
ON THE DESIGN FLOOD DISCHARGE WHICH SHALL NOT BE LESS THAN THE VALUE GIVEN IN TABLE 1.3.3 .
OF SITE CONDITION.
TABLE 1.3.3 MINIMUM REQUIRED FREEBOARD (B) BERM IS PROVIDED FOR STABILITY AND CONSTRUCTION CONVENIENCE OF THE REVETMENT. BERM
3
(m /s) (m) THICKNESS
THE THICKNESS OF REVETMENT IS GENERALLY DECIDED BASED ON THE FLOW VELOCITY, SEDIMENT
500 AND UP TO 2,000 1.00
RUNOFF WHENEVER LIKELY TO OCCUR IN THE PROPOSED IMPROVEMENT STRETCH (, SOIL AND
DEPTH (DEPTH OF TOP OF FOUNDATION) GROUNDWATER PRESSURE AT THE BACK OF REVETMENT AND OTHER ASSOCIATED FACTORS. MINIMUM
OVERALL THICKNESS SHOULD BE 300 MM FOR ALL TYPES OF REVETMENT, EXCEPT FOR REINFORCED
THE DEPTH OF THE FOUNDATION SHALL BE PLACED DEEPER THAN 1.0 M FROM THE MAXIMUM SCOURING
CONCRETE TYPE.
DEPTH. IF IT IS DIFFICULT TO CALCULATE THE MAXIMUM SCOURING DEPTH, IT SHALL BE PLACED DEEPER
THAN 1.0 M FROM THE DEEPEST RIVERBED. THE DETERMINATION PROCESS OF THE TOP ELEVATION OF THE
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS DETAILED ENGINEERING DESIGN PLAN FOR: GLEN AILEN O. OJENAR
REGION IV-B ENGINEER II (COS)
CONSTRUCTION OF ROXAS BY-PASS ROAD, MONTREXIS T. TAMAYO GENE RYAN A. ALTEA MELQUIADES H. STO. DOMINGO GERALD A. PACANAN,CESO III G 4
OFFICE OF THE REGIONAL DIRECTOR GENERAL NOTES PREPARED:
ENGINEER III OIC-CHIEF, PLANNING AND DESIGN DIVISION OIC-ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR 4 10 30
EDSA, DILIMAN QUEZON CITY LIANA MARIZ L. OLEGA
ROXAS, ORIENTAL MINDORO ENGINEER II
DATE: DATE: DATE: DATE:
GENERAL NOTES
DRAINAGE PIPE / WEEP HOLE
DRAINAGE PIPES/WEEP HOLES SHOULD BE DESIGNED AND PROVIDED FOR BOTH TYPES OF REVETMENT
YIELD STRENGTH
REBAR GRADE SIZE (mm)
fy (MPa)
FOR DIKED AND NON-DIKED RIVERS. DURING FLOOD TIMES, THE RISE OF FLOOD WATER LEVEL IN THE
RIVER IS ALMOST COINCIDING WITH THE RISE OF GROUNDWATER BEHIND THE REVETMENT ESPECIALLY 276
40 16mmØ & BELOW, UNLESS OTHERWISE NOTED
(40 Ksi)
WHEN THE GROUND HAS BEEN ALREADY SATURATED. AFTER THE FLOODS, THE RATE OF SUBSIDENCE
414
60 20mmØ & ABOVE
OF FLOODWATER IN THE RIVER IS USUALLY GREATER THAN THE RECESSION OF GROUNDWATER LEVEL (60 Ksi)
BEHIND THE REVETMENT WITHOUT DRAINAGE PIPES/WEEP HOLES. IF THE DISPARITY BETWEEN THE
SUBSIDING FLOODWATER AND GROUNDWATER STAGES IS SIGNIFICANTLY HIGH, RESIDUAL HYDRAULIC (b) REINFORCING STEEL SHALL BE FREE OF MILL SCALES, OIL OR ANY SUBSTANCES WHICH WILL WEAKEN THE
PRESSURE EXISTS AT BACK OF THE REVETMENT WHICH MIGHT BECOME HIGHER (FIGURE 2.6). WEEP BOND WITH CONCRETE.
(c) REINFORCING STEEL SHALL BE WELDABLE TYPE. WELDING REINFORCING STEEL SHALL CONFORM TO ANSI /
HOLES SHOULD BE PROVIDED IN THE REVETMENT USING 50~75 MM DIAMETER PVC DRAINPIPES,
AWS D1.4.
STAGGEREDLY PLACED IN THE HORIZONTAL DIRECTION AND SPACED 2 METERS CENTER TO CENTER.
ONE OF THE MAIN CAUSES OF CAVING IN OF SOIL PARTICLES BEHIND THE REVETMENT IS THE FLOWING 5. BEDDING/ GRAVEL LAYER
OUT OF FINE BACKFILL MATERIALS THROUGH THE JOINTS OF REVETMENT AND WEEP HOLES. THIS STONES SHOULD BE WELL BLENDED. THE STONES WITH THE LARGEST DIMENSION, GRATER THAN THREE TIMES
PHENOMENON LEADS TO THE COLLAPSE OF THE REVETMENT IN ORDER TO PREVENT THE OUTFLOW OF THE LEAST DIMENSION SHOULD NOT CONSTITUTE MORE THAN 10 PERCENT OF THE TOTAL.
OUTFLOW OF THE BANK MATERIALS THROUGH THE WEEP HOLES. THE LOWEST WEEP HOLES SHALL BE
GRADATION REQUIREMENTS OF THE BEDDING LAYER OF FILTER BLANKET SHALL BE 015 (FILTER)< 5 085
INSTALLED JUST ABOVE THE ORDINARY WATER LEVEL.
(FOUNDATION); i.e, THE DIAMETER EXCEEDED BY THE COARSEST 85 PERCENT OF THE FILTER MATERIAL MUST BE
LESS THAN OR EQUAL TO FIVE TIMES THE DIAMETER EXCEEDED BY THE COARSEST 15 PERCENT OF THE
STRENGTHENING UPPER AND LOWER ENDS
FOUNDATION MATERIAL. QUARRY SPALLS RANGING IN SIZE FROM 0.45 KG TO 23 KG WILL GENERALLY SUFFICE IF
GENERALLY, THE END POINTS OF REVETMENT ARE ALWAYS SUBJECTED TO EXTERNAL FORCES, WHICH
THE BEDDING LAYER IS PLACED ON A FILTER CLOTH OR A COARSE GRAVEL (OR CRUSHED
MAKE THESE PORTIONS OF THE STRUCTURE BECOME WEAK AND PRONE TO DAMAGE OR POSSIBLE
STONE) FILTER LAYER WHICH MEETS THE STATED FILTER DESIGN CRITERIA.
COLLAPSE. IN CONSTRUCTING A PIECE-MEAL PROJECT, TEMPORARY PROTECTION WORKS (E.G., BOULDER
AND GABION) SHALL BE PROVIDED. THE END PROTECTION WORK IS INDISPENSABLE TO THE RIGID THE FOLLOWING STANDARD TESTS SHALL BE CONDUCTED TO ESTABLISH MATERIAL DURABILITY:
STRUCTURE TYPE REVETMENTS. THE END PROTECTION SHALL COVER THE EXTENT OF THE COVERING WORK
ABRASION TEST ASTM C-535 OR EQUIVALENT
AND CREST WORK. THE THICKNESS OF THE END PROTECTION WORK SHALL BE FROM THE SURFACE OF
TOUGHNESS TEST ASTM C-170 OR EQUIVALENT
REVETMENT UP TO THE BACKFILL MATERIAL. THE THICKNESS OF THE END PROTECTION SHALL BE MORE
HARDNESS TEST ASTM C-235 OR EQUIVALENT
THAN 50 CM.
APPARENT SPECIFIC GRAVITY AND ABSORPTION TEST ASTM C-127 OR EQUIVALENT
B. MATERIALS SPECIFICATION & CONST. METHODS
1. STONE MASONRY
DESCRIPTION 6. GEOTEXTILE
THIS ITEM SHALL CONSIST OF STONE MASONRY IN MINOR STRUCTURES, IN HEADWALLS FOR CULVERTS, IN
RETAINING WALLS AT THE TOES OF SLOPES, AND AT OTHER PLACES CALLED FOR ON THE PLANS, CONSTRUCTED GEOTEXTILES SHALL BE WOVEN AND/ OR NONWOVEN FABRIC AS SPECIFIED IN THE DRAWINGS SPECIALLY
ON THE PREPARED FOUNDATION BED, IN ACCORDANCE WITH THIS SPECIFICATION AND IN CONFORMITY WITH THE ENGINEERED TO PROVIDE EXCELLENT ROBUSTNESS, UV PROTECTION AND DURABILITY IN MARINE AND HYDRAULIC
LINES, GRADES, SECTIONS, AND DIMENSIONS SHOWN ON THE PLANS OR AS ORDERED IN WRITING BY THE ENGINEER. CONDITION (SEE DRAWINGS AND SPECIFICATIONS). THE GEOTEXTILES TO BE USED SHALL HAVE HIGH MODULUS AND
ALL WORKS SHALL COMPLY WITH ITEM 506 OF THE STANDARD SPECIFICATION FOR HIGHWAYS, BRIDGES AND EXTREMELY HIGH STRENGTH AT LOW STRAIN. IT MUST HAVE A GOOD WATER PERMEABILITY AND IS RESISTANT TO
AIRPORTS 2013 EDITION. CHEMICAL AND BACTERIOLOGICAL ATTACK. PLACEMENT AND MATERIAL STRENGTH IS AS SPECIFIED IN THE SECTION
2. SHEET PILES DRAWINGS.
THIS SHALL CONSIST OF FURNISHING, DRIVING AND CUTTING OFF OF SHEET PILING COVERED BY THE 2013
STANDARD SPECIFICATION FOR HIGHWAYS, BRIDGES AND AIRPORTS. 7. GEOTUBES
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS DETAILED ENGINEERING DESIGN PLAN FOR: GLEN AILEN O. OJENAR
REGION IV-B ENGINEER II (COS)
CONSTRUCTION OF ROXAS BY-PASS ROAD, MONTREXIS T. TAMAYO GENE RYAN A. ALTEA MELQUIADES H. STO. DOMINGO GERALD A. PACANAN,CESO III G 5
OFFICE OF THE REGIONAL DIRECTOR GENERAL NOTES PREPARED:
ENGINEER III OIC-CHIEF, PLANNING AND DESIGN DIVISION OIC-ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR 5 10 30
EDSA, DILIMAN QUEZON CITY LIANA MARIZ L. OLEGA
ROXAS, ORIENTAL MINDORO ENGINEER II
DATE: DATE: DATE: DATE:
CODES AND REFERENCES
3.3 BAR BENDING, SPLICING AND PLACING
3.4 CONCRETE COVER TO REINFORCEMENT
1. DPWH DESIGN GUIDELINES, CRITERIA AND STANDARDS (DGCS) - VOL. III, 2015 ED.
BARS.
THE DESIGN OF BRIDGES IS BASED ON THE CONSTRUCTION 2. EMBEDDED BOULDERS FOR THE FACING SHOULD NOT BE LESS THAN THIRTY ( 30mm )
SEQUENCE SHOWN IN THE DRAWING. ANY VARIATION FROM THE APART AND SHALL BE AT LEAST THIRTY ( 30mm ) BELOW THE OUTSIDE.
(5) NOT MORE THAN 50% OF THE BARS AT ANY ONE SECTION SHALL BE
SEQUENCE MUST BE APPROVED BY THE ENGINEEER.
SPLICED.
3.3 CONCRETE COVER TO REINFORCEMENT
CONSTRUCTION SHALL COMPLY WITH 1995 DPWH STANDARD SPECIFICATION UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE REFERRED TO THE CENTER OF
FOR HIGHWAYS, BRIDGES AND AIRPORTS OR MODIFIED BY SPECIAL (6) UNLESS OTHERWISE SHOWN ON DRAWINGS. THE CLEAR DISTANCE BARS AND THE MINIMUM COVERING MEASURED FROM THE SURFACE OF THE CONCRETE TO
PROVISIONS. BETWEEN PARALLEL BARS IN LAYER SHALL NOT BE LESS THAN 1.5 TIMES THE FACE OF ANY BAR SHALL BE 40mm.
THE NOMINAL DIAMETER OF THE BAR NOR LESS THAN 1.5 TIMES THE FOR SUBSTRUCTURE, COVERING SHALL BE
1. DIMENSIONS MAXIMUM SIZE OF COARSE AGGREGATE. THE CLEAR DISTANCE BETWEEN
1. PERMANENTLY EXPOSED TO EARTH AND WEATHEr
LAYERS SHALL NOT BE LESS THAN 25mm NOR ONE BAR DIAMETER. THE
1.1 SECTION, DIMENSIONS AND DISTANCES SHALL NOT BE a. FRESH WATER............................................................... 75
BARS IN THE UPPER LAYER SHALL BE PLACED DIRECTLY ABOVE THOSE IN
SCALED FOR CONSTRUCTION PURPOSES. THE INDICATED b. SALT WATER.................................................................. 100
THE BOTTOM LAYER.
DIMENSION SHALL GOVERN UNLESS OTHERWISE SPECIFIED. 3.4 CONSTRUCTION JOINT
1.2 ALL DIMENSION SHOWN ARE IN MILLIMETERS UNLESS (7) CRANKED SPLICES (1) THE POSITION AND FORM OF ANY CONSTRUCTION JOINT SHALL BE AS SHOWN ON DRAWINGS
OTHERWISE NOTED. OR AS AGREED WITH THE ENGINEER.
MIN : d
VERTICAL OFFSET (2) THE INTERFACE BETWEEN THE FIRST AND SECOND POUR CONCRETES SHALL BE ROUGHENED
1.3 ALL STATIONING ARE IN KILOMETER PLUS METER AND MAX: d + 3 mm
ELEVATION IN METER. WITH AN AMPLITUDE OF 6mm MINIMUM.
d
2. SETTING OUT
18 d MIN
MIN = 15 d DIAMETER =
THE SETTING OUT AND THE ELEVATIONS OF THE DIFFERENT 30 d MAX
MAX =
COMPONENTS OF THE STRUCTURE SHALL BE APPROVED BY THE
ENGINEER PRIOR TO THE START OF ANY CONSTRUCTION WORK. (8) HOOKS AND BENDS
(1) DESIGN OF CONCRETE MIX SHALL MEET THE DESIGN CONCRETE DIMENSIONS FOR STIRRUPS AND TIE HOOKS
STRENGTH GIVEN UNDER ITEM 1 OF MATERIALS.
3
(3) FOR CONCRETE DEPOSITED AGAINST THE GROUND. LEAN CONCRETE DESIGN DISCHARGE, Q (100-yr) = 1368.6cu.m. /s
D DESIGN VELOCITY, V (50-yr) = 3.45 m/s
WITH A MINIMUM THICKNESS OF 50mm SHALL LAID FIRST BEFORE
DESIGN VELOCITY, V (100-yr) = 3.53 m/s
INSTALLING THE REINFORCEMENT. THIS LEAN CONCRETE SHALL NOT BE 90° HOOK d d 135° HOOK
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS DETAILED ENGINEERING DESIGN PLAN FOR: GLEN AILEN O. OJENAR
REGION IV-B ENGINEER II (COS)
CONSTRUCTION OF ROXAS BY-PASS ROAD, MONTREXIS T. TAMAYO GENE RYAN A. ALTEA MELQUIADES H. STO. DOMINGO GERALD A. PACANAN,CESO III G 6
OFFICE OF THE REGIONAL DIRECTOR GENERAL NOTES PREPARED:
ENGINEER III OIC-CHIEF, PLANNING AND DESIGN DIVISION OIC-ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR 6 10 30
EDSA, DILIMAN QUEZON CITY LIANA MARIZ L. OLEGA
ROXAS, ORIENTAL MINDORO ENGINEER II
DATE: DATE: DATE: DATE:
SYMBOLS ABBREVIATIONS
IDENTIFICATION
SYMBOL
2
LINE OF SYMMETRY TITLE TARGET
ABT ABOUT kPa KILOPASCAL
OR SIMILARITY
N ABUT ABUTMENT m METER
SHEET No. BEG BEGINNING mm MILLIMETER
BET BETWEEN MAX MAXIMUM
BOTT BOTTOM MFWL MAX. FLOOD WATER LEVEL
NORTH ARROW BR BRIDGE MIN MINIMUM
2a
SUB-TITLE TARGET BRG BEARING MO MIDDLE ORDINATE
CLR CLEAR MPa MEGAPASCAL
cm CENTIMETER N NEWTON
INDICATION OF ELEVATION COL COLUMN NF NEAR FACE
CONC CONCRETE No. NUMBER
2a CONST CONSTRUCTION O.C. ON CENTERS
LIMITS OF DIMENSION SECTION TARGET
CONT CONTINUOUS OWL ORDINARY WATER LEVEL
SECTION IN WATER CTR CENTER PEJ PREMOULDED EXPANSION JOINT
DET DETAIL PVC POLYVINYL CHLORIDE
SECTION IN EARTH 2a DETAIL REFERENCE DIAM DIAMETER PVI POINT OF VERTICAL INTERSECTION
TARGET DIAPH DIAPHRAGM QTY QUANTITY
SECTION IN STRUCTURAL DWG DRAWING R RADIUS
STEEL EA EACH RC REINFORCED CONCRETE
EF EACH FACE RDWY ROADWAY
SECTION IN CONCRETE ELEV ELEVATION REINF REINFORCEMENT
BUNDLED BARS ENGR ENGINEER SDWK SIDEWALK
EQ EQUAL SL SLOPE
STONE MASONRY EW EACHWAY SP SPIRAL
Ø ROUND
EXP EXPANSION SPCD SPACED
SECTION IN EXISTING EXT EXTERIOR SPCS SPACES
SQUARE
CONCRETE STRUCTURE EXIST EXISTING STD STANDARD
@ AT FF FAR FACE STIR STIRRUP
ELASTOMERIC BEARING PAD FTG FOOTING STA STATION
& AND GEN GENERAL STRUCT STRUCTURE
BITUMINOUS WEARING HOR HORIZONTAL SYMM SYMMETRY
SURFACE ON BRIDGES HW HIGH WATER THK THICK
CL CENTERLINE
INT INTERIOR TYP TYPICAL
PL PLATE INTERM INTERMIDIATE VAR VARIABLE
PLAN VIEW AND ELEVATION JT JOINT VERT VERTICAL
OF CUT AND FILL SLOPES L LENGTH VOL VOLUME
L ANGLE SHAPE
LG LONG W WIDTH
PLAN VIEW OF SLOPE kg KILOGRAM W/ WITH
C/C, C to C CENTER TO CENTER
PROTECTION kN KILONEWTON & AND
BENCHMARK
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS DETAILED ENGINEERING DESIGN PLAN FOR: GLEN AILEN O. OJENAR
REGION IV-B ENGINEER II (COS)
CONSTRUCTION OF ROXAS BY-PASS ROAD, SYMBOLS AND MONTREXIS T. TAMAYO GENE RYAN A. ALTEA MELQUIADES H. STO. DOMINGO GERALD A. PACANAN,CESO III G 7
PREPARED:
OFFICE OF THE REGIONAL DIRECTOR ABBREVIATIONS ENGINEER III OIC-CHIEF, PLANNING AND DESIGN DIVISION OIC-ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR 7 10 30
EDSA, DILIMAN QUEZON CITY LIANA MARIZ L. OLEGA
ROXAS, ORIENTAL MINDORO ENGINEER II
DATE: DATE: DATE: DATE:
SUMMARY OF QUANTITIES
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS DETAILED ENGINEERING DESIGN PLAN FOR: GLEN AILEN O. OJENAR
REGION IV-B ENGINEER II (COS)
CONSTRUCTION OF ROXAS BY-PASS ROAD, MONTREXIS T. TAMAYO GENE RYAN A. ALTEA MELQUIADES H. STO. DOMINGO GERALD A. PACANAN,CESO III G 8
OFFICE OF THE REGIONAL DIRECTOR SUMMARY OF QUANTITIES PREPARED:
ENGINEER III OIC-CHIEF, PLANNING AND DESIGN DIVISION OIC-ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR 8 10 30
EDSA, DILIMAN QUEZON CITY LIANA MARIZ L. OLEGA
ROXAS, ORIENTAL MINDORO ENGINEER II
DATE: DATE: DATE: DATE:
SEA WALL
STONE MASONRY
2.00 3.35 3.35 3.93
REINFORCED CONCRETE
REVETMENT
WD 1
WD 2
WD 3
GEOTUBE 1.5
1.0
VARIES
0.40 WD 1
1.20
WD 2
1.84
WD 3
3.67
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS DETAILED ENGINEERING DESIGN PLAN FOR: GLEN AILEN O. OJENAR
REGION IV-B ENGINEER II (COS)
CONSTRUCTION OF ROXAS BY-PASS ROAD, MONTREXIS T. TAMAYO GENE RYAN A. ALTEA MELQUIADES H. STO. DOMINGO GERALD A. PACANAN,CESO III G 9
TYPICAL DETAIL (1/2) PREPARED:
OFFICE OF THE REGIONAL DIRECTOR ENGINEER III OIC-CHIEF, PLANNING AND DESIGN DIVISION OIC-ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR 9 10 30
EDSA, DILIMAN QUEZON CITY LIANA MARIZ L. OLEGA
ROXAS, ORIENTAL MINDORO ENGINEER II
DATE: DATE: DATE: DATE:
NOTES :
2. EMBEDDED BOULDERS FOR THE FACING SHOULD NOT BE LESS THAN THIRTY ( 30mm ) DIMENSIONS PER PILE
SECTION SECTION
APART AND SHALL BE AT LEAST THIRTY ( 30mm ) BELOW THE OUTSIDE. MOMENT OF
WIDTH HEIGHT THICKNESS SECTIONAL WEIGHT
TYPE INERTIA MODULUS
AREA
B h t A W lx Zx
DESCRIBED BELOW:
STEEL SHEET PILE
100
276
h = 100
40 16mm Ø & Below, Unless Otherwise Noted
(40 Ksi)
100
414
60 20mm Ø & Above
(60 Ksi) B=400
SEAWALL
WD 2
12mm STIRRUPS
SPACED @ 0.20 M O.C.
WITH 100mm. CONCRETE COVER
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS DETAILED ENGINEERING DESIGN PLAN FOR: GLEN AILEN O. OJENAR
REGION IV-B ENGINEER II (COS)
CONSTRUCTION OF ROXAS BY-PASS ROAD, MONTREXIS T. TAMAYO GENE RYAN A. ALTEA MELQUIADES H. STO. DOMINGO GERALD A. PACANAN,CESO III G 10
TYPICAL DETAIL (1/2) PREPARED:
OFFICE OF THE REGIONAL DIRECTOR ENGINEER III OIC-CHIEF, PLANNING AND DESIGN DIVISION OIC-ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR 10 10 30
EDSA, DILIMAN QUEZON CITY LIANA MARIZ L. OLEGA
ROXAS, ORIENTAL MINDORO ENGINEER II
DATE: DATE: DATE: DATE: