0% found this document useful (0 votes)
78 views3 pages

01 23 ADCB Fire Pipes Egy Gulf Rev.01

This document is a purchase order from NEXTEP Construction to a mechanical company for fire pipes. It details 9 items being ordered, including the pipe sizes, quantities, unit prices, and total costs. The total cost of the order is 3,789,349.62 LE. The terms require 100% advance payment and

Uploaded by

andrew sobhi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
78 views3 pages

01 23 ADCB Fire Pipes Egy Gulf Rev.01

This document is a purchase order from NEXTEP Construction to a mechanical company for fire pipes. It details 9 items being ordered, including the pipe sizes, quantities, unit prices, and total costs. The total cost of the order is 3,789,349.62 LE. The terms require 100% advance payment and

Uploaded by

andrew sobhi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3

‫‪NEXTEP‬‬

‫‪CONSTRUCTION‬‬ ‫) ‪Cheque / Cash Request ( Mechanical‬‬ ‫‪SN‬‬

‫طلب إصدار شيك ‪ /‬نقدي ( ميكانيكا )‬

‫‪17-May-2023‬‬ ‫الــــــتــــــاريــــــــخ ‪:‬‬

‫‪ADCB‬‬ ‫إســم الــمـشــروع ‪:‬‬

‫الشركه المصريه الخليجيه للصناعات الهندسيه‬ ‫إســـم الـــشـركــة ‪:‬‬

‫‪4,281,965.07‬‬ ‫إجمالي قيمة العقد ‪:‬‬

‫)‬ ‫مستخلص ضـريـبي (‬ ‫)‬ ‫بـــــيــــــان (‬ ‫)‬ ‫بـدون فـاتـورة (‬ ‫فـاتـورة ضريـبـية (√)‬

‫‪Fire Pipes‬‬ ‫نـــــوع األعـــمــــال ‪:‬‬

‫‪P.O #‬‬ ‫‪ADCB- [ 01 ] -23-FF‬‬ ‫‪Rev-01‬‬ ‫بـــيــانـات الـدفـعــة ‪:‬‬

‫‪100%‬‬ ‫نــســـبـة الــسـداد ‪:‬‬

‫‪4,281,965.07‬‬ ‫‪100%‬‬ ‫قــيــمـة الـدفـــعــة ‪:‬‬

‫مــا ســبـق صـرفـه ‪:‬‬

‫‪Procurement Engineer‬‬ ‫‪Head of Department‬‬ ‫‪Cost Control‬‬

‫‪.........................................‬‬
‫‪...............................................................................................................................‬‬ ‫‪...............................................................................................................................‬‬

‫‪ / Cheque‬شيك‬ ‫‪ / Cash‬نقدي‬

‫‪Payment Method‬‬ ‫طريقة الدفع‬

‫‪Cheque Number‬‬ ‫بنك ‪Bank /‬‬

‫مسطر‬ ‫تاريخ الشيك‬


‫‪ :‬تنفيذ‬

‫توقيع الشيك‬ ‫مدير الحسابات‬

‫‪...............................................................................................‬‬ ‫‪...............................................................................................‬‬
NEXTEP
P.O # ADCB-[ 1 ]-23-FF - Rev-01
CONSTRUCTION
PURCHASE ORDER

Project: ADCB Date 15-May-2023


Subject: Fire Pipes
P.O # ADCB- 001 -23-FF
Company: ‫الشركه المصريه الخليجيه للصناعات الهندسيه‬
Attention:
REV 01
Issuer: Paula Nagy NEXTEP TAX ID: 291-062-199
REF

SN Description Code Model QTY Unit Unit Price Total


LE LE
1 ERW Black Steel Pipe ASTM-A53, SCH40 UL FM 3/4" 40002 1800 ML 112.52 202,536.00
2 ERW Black Steel Pipe ASTM-A53, SCH40 UL FM 1" 40009 7290 ML 124.16 905,126.40
3 ERW Black Steel Pipe ASTM-A53, SCH40 UL FM 1.25" 40010 960 ML 168.78 162,028.80
4 ERW Black Steel Pipe ASTM-A53, SCH40 UL FM 1.5" 40011 1182 ML 198.85 235,040.70
5 ERW Black Steel Pipe ASTM-A53, SCH40 UL FM 2" 40012 Jasco 1770 ML 270.63 479,015.10
6 ERW Black Steel Pipe ASTM-A53, SCH40 UL FM 2.5" 40013 822 ML 427.77 351,626.94
7 ERW Black Steel Pipe ASTM-A53, SCH40 UL FM 3" 40014 996 ML 560.66 558,417.36
8 ERW Black Steel Pipe ASTM-A53, SCH40 UL FM 4" 40003 810 ML 779.88 631,702.80
9 ERW Black Steel Pipe ASTM-A53, SCH40 UL FM 6" 40004 318 ML 1466.64 466,391.52

Total Cost L.E Rate 1 3,789,349.62

Total After Discount 0% 3,789,349.62

Total Including Sales Taxes 14% 14% 4,319,858.57

Commercial Profit 1% 1% 37,893.50

Grand Total 4,281,965.07

Payment: 100% DownPayment

Delivery: Stock

- Quantities might be changed according to site condition, and you are committed to supply the same devices and to be on stock.
Note: - Penalties to be applied on us for any delay , so you have to supply all equipments as agreed or any penalities will be reflected on you.

Paula Nagy Sameh Fikry


Procurement Engineer Division Manager

NEXTEP CONSTRUCTION
15 El Kholaffa ST, Safir, Heliopolis Page 2 of 3 Mobile: (+2) 01282802741
[email protected]
SN Project Code Scope Row Year SN
HSBC Headquarters HSBC- -23-HVAC Model 23
Amazon CAI 14 CAI.14- -23-FF Size ( inch )
Afrexim Villa AFRX.VIL- -23-PL Size ( cm )
ADCB ADCB-
White & Case W&C-
BEKO BEKO-