Rebar Material Requisition for Jafurah
Rebar Material Requisition for Jafurah
APPROVED
FIRST SUBMISSION
DATE REVIEWED BY
6000000615 BAR; REINFORCING TYPE, STEEL, SASO SSA 2, ASTM A615, UNCOATED REBAR,
CERTIFIED MILL TEST REPORT AND MECHANICAL PROPERTIES CERTIFICATES,
APPROVED
PREPARED CHECKED REVIEWED CHECKED REVIEWED
DESCRIPTION BY
REV. ISSUED DATE BY BY BY BY BY
(Project
(ENG) (LEAD ENG) (PEM) (PQCS/QAM) (PPM)
Manager)
Plant Doc. Disc. Doc. Rev.
No. Index Code Type No.
MATERIAL REQUISITION N93 Q CV MR A1
FOR REBAR
CV-N93-MR-6004
SECTION 1: INDEX
Plant Doc. Disc. Doc. Rev.
No. Index Code Type No.
MATERIAL REQUISITION N93 Q CV MR A1
FOR REBAR
CV-N93-MR-6004
SECTION 1: INDEX
Sr.
Description Yes No NA Remarks
No
1. Is 9 Com number mentioned? X Refer Page 1
Is the applicable RVL (Regulated Vendor List)
2. X Refer Section 5
mentioned?
3. Approved Saudi Manufacturers X Refer Section 5
4. Is Potential bidder list mentioned? X Refer Section 5
Are Applicable standards (SAMSS, SAES, and
5. X Refer Section 8
SAEP) including Revision dates referred?
Plant Doc. Disc. Doc. Rev.
No. Index Code Type No.
MATERIAL REQUISITION N93 Q CV MR A1
FOR REBAR
CV-N93-MR-6004
Sr.
Description Yes No NA Remarks
No
Are applicable SA-175 inspection requirement
6. X Refer Section 8
forms specified and referred?
Any other applicable Company specifications
7. (SAER, standard drawings, packing X Refer Section 7
specifications) referred?
Other applicable Project specific Specifications
8. X Refer Section 7
referred?
9. Whether Order of Precedence specified? X Refer Section 4.8
10. Are datasheets attached? X
11. Whether inspection level specified? X Refer above table
12. Are applicable NMR forms referred? X Refer Section 9.4 & 12.1
Whether Quality section in MR refers to Supplier /
13. Sub supplier compliance for Schedule “Q” X
Requirements.
Are requirements of ISO 9001 Quality
14. X Refer Section 10.4 & 10.6
Management systems specified?
COMPANY & PURCHASER right to access
15. Supplier, Sub-supplier/ manufacturer work X
facilities.
Whether note on Integrated ITP requirement Refer Section 10.22, 10.23
16. X
specified? & 10.24
Whether Supplier final dossier requirements Refer Section 10.26, 12.4
17. X
specified + Disposition report? & 12.5
Supplier to provide the documents pertaining to
18. Inspection Assignment Package in-line with X
Schedule “Q”
Refer Section 8 – Other
19. Whether Vendor deviations requests specified? X
Annexures
20. Whether start up spare requirements specified? X
Whether Operating spare parts requirement
21. X
specified?
Whether Operating material requirements
22. X
specified?
Whether Capital spare material requirements
23. X
specified?
Whether Spare Part Data Package (SPDP)
24. X
requirements referred?
Plant Doc. Disc. Doc. Rev.
No. Index Code Type No.
MATERIAL REQUISITION N93 Q CV MR A1
FOR REBAR
CV-N93-MR-6004
Sr.
Description Yes No NA Remarks
No
Whether spare material requirements specified
25. X
for testing of Equipment at Yard / Offshore?
Whether requirement of Special tools & tackles
26. X
specified?
Manufacturer compliance for continuous supply of
27. X
spares for next 10 years?
Whether Incidental services viz. Supervision,
28. X
consultation referred?
Whether Not to Exceed (NTE) weight,
29. Dimensions and Electrical load details for the X
package/ equipment specified?
Whether note referred specifying Vendor P&IDs
30. X
requirement in SPPID?
Whether applicable coating/ painting requirement
31. X
specification referred?
Is Life Cycle Cost requirement applicable for this
32. X
equipment?
Whether Equipment handling & preservation
33. X
requirement specified?
34. Are Service and Operating conditions specified? X
35. Inclusion of the Special notes to the specification X Refer Section 4.6.6
36. Foundation bolt requirement X
Whether note on source inspection for sub
37. X Refer Section 9.8.6
vendor’s inspectable items is specified?
38. Whether SASO applicability identified? X Refer Section 10.30
The Project Scope under this Contract, Jafurah Field Development - Export Pipelines (BI-10-
14329), includes, but is not limited to, detail design & engineering, procurement, construction,
testing, pre-commissioning and commissioning support of:
a) All works related to 56” Sales Gas Export Pipeline from JFGP (Jafurah Gas Plant) to UBTG-
1, UBTG-3, UBTG-4 and UJNGL-1, KM 101 fenced area close to Abqaiq including
Launcher/Receiver Traps, Vents, Drains, Burn Pits and MLIVs (Main Line Isolation Valves)
etc.
b) All works related to 24” C2+NGL Export Pipeline from JFGP (Jafurah Gas Plant) to the existing
MLIV of SHBABNGL-1 pipeline at KM 541.292 including Launcher/Receiver Traps, Vents,
Drains etc.
c) All works related to 36” Condensate Export Pipeline from JFGP (Jafurah Gas Plant) to
Ju’aymah Tank Farm (JTF), with intermediate Scrapers Station at UBTG-1 KM-101 fenced
area near Abqaiq, Jump-over lines with existing Abqaiq to RTT stabilized Condensate Pipeline
(ARTCL-1) including Launcher/Receiver Traps, Vents, Drains and MLIVs (Main Line Isolation
Valves) etc.
d) All works related to 10” Temporary Fuel Gas Tie-in connection (pipeline) to COGEN.
e) All works related to FOC cables, inter/intra building/outside plant cabling shall be installed,
tested and commissioned as per SAES-T-624.
Material requisition includes this document along with all included attachments.
Plant Doc. Disc. Doc. Rev.
No. Index Code Type No.
MATERIAL REQUISITION N93 Q CV MR A1
FOR REBAR
CV-N93-MR-6004
4.2 PURPOSE
This requisition together with the specification and other documents enclosed/ referred herein,
defines the minimum requirements for design, engineering, procurement of materials & bought out
items, inspection, testing & delivery of rebar on site as per material specification SAES-Q-001, 09-
SAMSS-106 & 12-SAMSS-027 and as per scope listed in clause 4.6 below for Jafurah Export
Pipeline Project, including documentation in accordance with engineering standards, specification
& datasheets enclosed or referred.
Selected Bidder shall totally be responsible to supply all required materials and services for
satisfying the functional / operational requirements stated in this requisition, its attachments and
annexure.
4.3 DEFINITIONS
4.4 TERMS
The following terms are used in this document:
“Shall” is used in as imperative sense
“Should” indicates strong recommendations.
“May” is used in a permissive sense to state authority or permission to do the act prescribed or
provide the function being defined in the prescribed manner, and the words “no person may…” or
“a person may not…” mean that no person is required, authorized or permitted to do the act
prescribed, and the words “a…may not…” mean that the item being described is not required,
authorized or permitted in the prescribed manner “Includes” means includes but not limited to.
Plant Doc. Disc. Doc. Rev.
No. Index Code Type No.
MATERIAL REQUISITION N93 Q CV MR A1
FOR REBAR
CV-N93-MR-6004
4.5 ABBREVIATION
AISC : American Institute of Steel Construction
ANSI : American National Standards Institute
AOC : Aramco Overseas Company
API : American Petroleum Institute
ASCE : American Society of Civil Engineers
ASTM : American Society for Testing and Materials
AWS : American Welding Society
BEDD : Basic Engineering Design Data
GA : General Arrangement
HSS : Hollow Structural Section
ISF : Industrial Support Facilities
JFGP : Jafurah Gas Plant
PIP : Process Industry Practices
SABP : Saudi Aramco Best Practices
SAEP : Saudi Aramco Engineering Procedures
SAER : Saudi Aramco Engineering Report
SAES : Saudi Aramco Engineering Standards
SAMSS : Saudi Aramco Material System Specifications
SASD : Saudi Aramco Standard Drawing
SEI : Structural Engineering Institute
AISC : American Institute of Steel Construction
ANSI : American National Standards Institute
AOC : Aramco Overseas Company
API : American Petroleum Institute
ASCE : American Society of Civil Engineers
ASTM : American Society for Testing and Materials
AWS : American Welding Society
BEDD : Basic Engineering Design Data
GA : General Arrangement
HSS : Hollow Structural Section
ISF : Industrial Support Facilities
JFGP : Jafurah Gas Plant
PIP : Process Industry Practices
SABP : Saudi Aramco Best Practices
SAEP : Saudi Aramco Engineering Procedures
Plant Doc. Disc. Doc. Rev.
No. Index Code Type No.
MATERIAL REQUISITION N93 Q CV MR A1
FOR REBAR
CV-N93-MR-6004
4.6 SCOPE
This Requisition defines the minimum requirements of reinforcement steel uncoated bar, epoxy coated
bar, FRP bar and mesh reinforcing to be installed on the JAFURAH FIELD DEVELOPMENT PKG#5-
EXPORT PIPELINES project.
BIDDER scope shall include but not limited to design, manufacturing & supply of Reinforcement steel
bar and mesh for onshore scope which includes inspection, testing, marking, packing and forwarding as
detailed in these requisition & attached specifications.
Following item shall be supplied under this MR. VENDOR to refer to the requirements specified
in this MR and its attachments for details. Any approval by CONTRACTOR does not absolve the
VENDOR or Subcontractors from the responsibility to meet all contractual requirements.
Uncoated Rebar
• Uncoated reinforcing steel bars shall be deformed steel in accordance with ASTM
615/615M, Grade 420.
FRP REBAR
• Fiber reinforced polymer (FRP) reinforcement shall conform to the requirements of 12-
SAMSS-027 and ASTM D7957/D7957M.
REQUIREMENTS
VENDOR shall submit the necessary documents as a minimum to LTHSC / COMPANY for
review and acceptance as given below, but is not limited to the following only:
a) Certified test reports for all materials specified.
b) Inspection and test plan (ITP) and QA\ QC procedures. (For approval)
Plant Doc. Disc. Doc. Rev.
No. Index Code Type No.
MATERIAL REQUISITION N93 Q CV MR A1
FOR REBAR
CV-N93-MR-6004
VENDOR to procure all items in line with 9 com provided in Annexure-1. VENDOR shall not use
defected material. The same is subjected to approval from LTHSC and COMPANY.
Submission of progress charts, bar charts, planning and scheduling of all activities for completion
of the entire job is to be done by VENDOR.
Any other item, not mentioned in above scope of work but required for successful completion of
work shall also be in the VENDOR scope of work without any additional implication of cost and
schedule.
VENDOR shall be completely responsible for the compliance to Code and attached specification
requirements, materials and workmanship of the equipment as per the stipulations of the
requisition and its annexures. In this regard, it may be noted that review by LTHSC shall not
relieve the VENDOR of his responsibility of meeting all requirements and ensuring satisfactory
performance.
VENDOR shall, during the execution of the work, always maintain and ensure the specified
quality of the Work.
VENDOR shall make necessary testing and inspections to confirm the specified quality and
performance of the work and Contractor /Contractor TPIA & Company will be carrying out the
Inspection & Testing as per approved inspection procedures and Saudi Aramco standards.
Validate all tolerances, perform all quality and dimension control for concrete by VENDOR.
Vendor to issue a work execution plan for LTHSC's review within 2 weeks after placement of PO.
Delivery of reinforcement bars shall be in the order needed for casting. Members damaged by
handling, transporting, or storing shall be evaluated to determine their reparability. Members
deem un-reparable by Contractor /Contractor TPIA & Company representative shall be rejected
and replaced with undamaged members.
Members shall be always kept free of mud and other damaging materials and shall be stored at
the jobsite on non-staining wooden pallets or platforms in such a manner to ensure drainage and
drying when exposed to the elements.
Store and transport members in a manner to prevent the occurrence of excessive stresses,
distorting, warping, cracking or staining. Lift and support units at the designate lifting and support
points only.
Vendor is responsible for delivering all materials and documentation to the job site in good
condition. All material and documentation will be inspected immediately upon receipt by Buyer
to determine that all items included in the Bill of Materials have been supplied, to assure that all
documentation has been received, and to check for any damage.
All materials designated for the care, custody and control of the Erector shall be received,
unloaded, stored, and otherwise handled in a manner that will prevent distortion, deterioration,
or damage. Saudi Aramco reserves the right to reject all damaged or substandard material or
documentation.
• Bidder to provide compliance to all clauses of Material Requisition for concrete and all its
attachments and annexures. Bidder shall submit all the attached forms duly filled & signed as
applicable.
• Bidder to refer Clause 4.6 for Detailed Scope of work and supply.
• Bidder must submit all details/ documents/ drawings/ calculations as specified in relevant
Specifications.
• Bidder to note that all Sub-Vendors or lower tier Sub Vendor shall be Saudi Aramco approved.
Bidder to provide the name of its Sub-Vendors or lower tier Sub Vendor at the bidding stage.
Bidder to indicate country of origin for all items offered.
• VENDOR participation at Contractor's office/Sub-vendor office for meetings including but not
limited to attend kick-off meeting, schedule review meeting. Any modifications/alterations
required within Vendor's scope of supply as a result of above meetings and recommendations
Plant Doc. Disc. Doc. Rev.
No. Index Code Type No.
MATERIAL REQUISITION N93 Q CV MR A1
FOR REBAR
CV-N93-MR-6004
shall be implemented by Vendor as part of his scope of work at no cost and schedule
implications.
Sl.
Applicable code Edition / Year Description
No
Specifications for Tolerances for
1. ACI 117M 2010 Concrete Construction and
materials, 2010
Specifications for Structural
2. ACI 301-10 2010
Concrete
Guide to Concrete Floor and Slab
3. ACI 302.1R 2015
Construction, 2015
Guide to Hot Weather Concreting,
4. ACI 305R 2010
2010
Building Code Requirements for
5. ACI 318M 2014 Structural Concrete and
Commentary, 2014
Guide for the Design and
Construction of Concrete
6. ACI 440.1R 2015
Reinforced with
FRP Bars
Plant Doc. Disc. Doc. Rev.
No. Index Code Type No.
MATERIAL REQUISITION N93 Q CV MR A1
FOR REBAR
CV-N93-MR-6004
Sl.
Applicable code Edition / Year Description
No
Sl.
Applicable code Edition / Year Description
No
Plain and Reinforced Concrete
1. STS03001 2017
Specification
Plant Doc. Disc. Doc. Rev.
No. Index Code Type No.
MATERIAL REQUISITION N93 Q CV MR A1
FOR REBAR
CV-N93-MR-6004
Note:
All industry & international standards and specifications that are referenced in the COMPANY
specifications and not mentioned above shall also be considered applicable Engineering
Standards and Specifications referred in this requisition shall be strictly conformed as listed in
Section 8 of this document.
Plant Doc. Disc. Doc. Rev.
No. Index Code Type No.
MATERIAL REQUISITION N93 Q CV MR A1
FOR REBAR
CV-N93-MR-6004
Sr. Mfr. ID QM
Manufacturer / Supplier Location RVL Inspectable
No. Number System
1. REZAYAT PROTECTIVE
30000797 Saudi Arabia Yes Yes QSAL
COATING COMPANY
2. SAUDI METAL COATING 30000873 Saudi Arabia Yes Yes QSAL
COMPANY
3. ALFAISAL STEEL PRODUCT 30003744 Saudi Arabia Yes Yes MTAA
CO.
4. BRC INDUSTRIAL SAUDIA 30000448 Saudi Arabia Yes Yes MTAA
LIMITED
5. ATTIEH STEEL COMPANY 30007117 Saudi Arabia Yes Yes QSAA
LTD.
6. SOLB STEEL COMPANY 30007501 Saudi Arabia Yes Yes MTAL
7. STEEL PIONEERS FACTORY 30007627 Saudi Arabia Yes Yes MTAA
8. MODERN FACTORY FOR 30007696 Saudi Arabia Yes Yes MTAL
STEEL INDUSTRIES
9. DAMMAM WIRE MESH 30008542 Saudi Arabia Yes Yes MTAL
FACTORY
10. GULF STEEL INDUSTRIES 30000507 Saudi Arabia Yes Yes MTAA
COMPANY
11. BAWAN METAL INDUSTRIES 30008331 Saudi Arabia Yes Yes MTAL
PURCHASER Recommended List from RVL (Appears in RVL but for different 9Com)
Sr. Mfr. ID QM
Manufacturer / Supplier Location RVL Inspectable
No. Number System
1. NA
Vendor /
Sr. Manufacturer / Supplier /
Mfr. ID Location Remarks
No. Local Agent
Number
Plant Doc. Disc. Doc. Rev.
No. Index Code Type No.
MATERIAL REQUISITION N93 Q CV MR A1
FOR REBAR
CV-N93-MR-6004
1. NA
Sr. Mfr. ID QM
Manufacturer / Supplier Location RVL Inspectable
No. Number System
1. BRANCH ISSAM MOHAMMED Saudi Arabia
30009472 Yes Yes MTAL
KHAIRY
PURCHASER Recommended List from RVL (Appears in RVL but for different 9Com)
Sr. Mfr. ID QM
Manufacturer / Supplier Location RVL Inspectable
No. Number System
1. NA
Vendor /
Sr. Manufacturer / Supplier /
Mfr. ID Location Remarks
No. Local Agent
Number
1. NA
Sr. Mfr. ID QM
Manufacturer / Supplier Location RVL Inspectable
No. Number System
1. ZAMIL INDUSTRIAL
10014197 Saudi Arabia
COATINGS FACTORY
PURCHASER Recommended List from RVL (Appears in RVL but for different 9Com)
Sr. Mfr. ID QM
Manufacturer / Supplier Location RVL Inspectable
No. Number System
1. NA
Vendor /
Sr. Manufacturer / Supplier /
Mfr. ID Location Remarks
No. Local Agent
Number
1. NA
Sr. Mfr. ID QM
Manufacturer / Supplier Location RVL Inspectable
No. Number System
1. BAWAN METAL INDUSTRIES
10012606 Saudi Arabia NO NO
CO.
2. AL-ITTEFAQ STEEL
10014095 Saudi Arabia NO NO
PRODUCTS FACTORY
3. SOLB STEEL COMPANY 10051934 Saudi Arabia NO NO
4. HILL METALS EST. 10056317 Saudi Arabia NO NO
5. YAMAMAH CO. FOR
10058403 Saudi Arabia NO NO
REINFORCING STEEL B
6. WATANIA STEEL FACTORY
10061655 Saudi Arabia NO NO
CORP
7. SAUDI NATIONAL STEEL
10065838 Saudi Arabia NO NO
FACTORY CO,
PURCHASER Recommended List from RVL (Appears in RVL but for different 9Com)
Sr. Mfr. ID QM
Manufacturer / Supplier Location RVL Inspectable
No. Number System
1. NA
Vendor /
Sr. Manufacturer / Supplier /
Mfr. ID Location Remarks
No. Local Agent
Number
1. NA
DATA SHEETS
Sl. No. of
Document no. Description Rev Sheet
No
s
1. NA
Plant Doc. Disc. Doc. Rev.
No. Index Code Type No.
MATERIAL REQUISITION N93 Q CV MR A1
FOR REBAR
CV-N93-MR-6004
OTHER DOCUMENTS
Sl. No. of
Document no. Description Rev
No Sheets
1. Schedule Q Project Quality Requirements - 47
Schedule Q
2. Project Quality Requirements - 9
Attachment VI
Plant Doc. Disc. Doc. Rev.
No. Index Code Type No.
MATERIAL REQUISITION N93 Q CV MR A1
FOR REBAR
CV-N93-MR-6004
EQUIPMENT DATASHEETS
Sl. No. of
Document No. Rev Description
No. Sheets
1. 1 NA
Sl. No. of
Document No. Issue Date Description
No. Sheets
25 APR Criteria for Design and Construction of Concrete
1. 1 SAES-Q-001 22
2019 Structures
1. 3 3 MAR
SAEP-303 Engineering Reviews of Project Documentation, 2019 61
2019
25 OCT
2. SAEP-385 Preservation of Project Materials and Equipment 66
2017
4 DEC
3. SAEP-1142 Qualification of Non-Saudi Aramco NDT Personnel 11
2014
23 OCT Inspection Requirements for Contractor
4. 5 SAEP-1151 11
2017 Procured Materials and Equipment
OTHER ANNEXURES
Bidder’s proposal shall be in strict conformity with Purchaser’s requirements. Unless exceptions,
deviations, or alternatives are clearly identified or listed in bidder’s proposal using format attached
to this MR, the requirements and conditions in this MR shall be deemed to be accepted by bidder.
All conflicts between the requirements of this requisition, relevant specification, data sheets,
standards and all the other documents referenced in this Material Requisition shall be raised to the
PURCHASER for clarification resolution. Any deviation providing less than minimum requirements
of this specification and relevant SAUDI ARAMCO STANDARDS and referenced Documents listed
in Section 6, 7 & 8 of this Material Requisition shall be issued separately in the bid in a dedicated
section “Annexure A2: Vendor exception, deviation sheet” for PURCHASER/ COMPANY approval.
Bidder shall provide compliance to the requirements of this separately in the bid in a dedicated
section. Any Clarification (different from Deviation) for requirements that are as minimum
equivalent or superseding this specification and relevant referenced documents listed of this
Material Requisition shall be issued for Purchaser approval. Bidder shall provide compliance to the
requirements of this separately in the bid in a dedicated section “Annexure A3-Supplier
Compliance Sheet” for PURCHASER/ COMPANY Approval.
9.2 SCHEDULE
Delivery/ Destination point of reinforcement will be informed to vendor along with covering letter/
email.
All technical data, standards, specifications, designs, drawings and other details furnished by
Purchaser to the Bidder shall be kept confidential. The technical information imparted and supplied
to the Bidder by Purchaser shall at all times remain the absolute property of Purchaser.
Bidder shall preserve and cause its employees to preserve the secrecy of any confidential
information.
Plant Doc. Disc. Doc. Rev.
No. Index Code Type No.
MATERIAL REQUISITION N93 Q CV MR A1
FOR REBAR
CV-N93-MR-6004
Bidder shall not use or cause to be used any confidential information for any purpose other than
the performance of the Work, and as such Bidder shall not reproduce, copy or use any confidential
information, or disclose to, place at the disposal of, or use on behalf of any third party, or enable
any third party to peruse, copy or use any confidential information unless with prior written consent
of the Purchaser.
All such material together with all reproductions or copies of it shall be returned upon completion
or termination of this order.
Bidder shall maintain record of material certificate, heat number, welding procedures, welding
qualification, heat treatment, NDE and hydrostatic pressure tests. All documents shall be provided
as per approved ITP & NMR 601,602 & 603.
These shall be compiled into dossiers for each system and be available for inspection/ audit at any
time. The Bidder shall ensure that the correct material in all cases and shall transfer identification
marks to cut lengths for future reference.
The Bidder shall ensure that material traceability of wetted parts is maintained, and that material
certification is provided for all materials used. Material certifications shall also be provided for
welding consumables.
The Complete package assembly shall be shipped in export crates suitable for international sea
transport.
All other loose supplied items/ attachments shall be identified/ marked properly for site installation
shall be supplied with seaworthy packing.
Vendor shall include preservation and protection of equipment suitable for long term storage and
for a minimum of 12 months prior to commissioning. Vendor to identify any special requirements
for maintaining the effectiveness of their applied preservation measures.
9.6 GUARANTEES
All materials and equipment shall be guaranteed for the performance as per the environmental
conditions and as per the design requirements. The guarantee shall cover all costs for the
replacement or repair of defective parts materials and for re-commissioning of the system. It shall
also include any visits to site as deemed necessary by the COMPANY for such repairs.
9.7 WARRANTY
BIDDER shall agree that BIDDER and CONTRACTOR understand that CONTRACTOR is
contracting with Bidder for the purchase of goods hereunder for ultimate transfer to, and use by,
the COMPANY (SAUDI ARAMCO) in Saudi Arabia. Therefore, Bidder agrees that, in any event,
all rights of CONTRACTOR for any failure to meet specifications, or any other breach of warranty,
shall run to the benefit of and be fully enforceable by COMPANY.
9.8 SUB-VENDOR
9.8.1 BIDDER shall ensure that relevant information, reference documents and documentation
requirements are transferred to all Sub-Vendors.
9.8.2 BIDDER shall Control, coordinate, expedite and resolve all problems with Sub-Vendors in order to
meet the requirements of the MR.
9.8.3 BIDDER shall be responsible for reviewing Sub-Vendor drawing and documents to ensure
compliance with applicable specification.
9.8.4 The BIDDER shall provide the Purchaser at the quotation stage a complete list of inspectable
equipment/items along with a list of the proposed sub-Vendor having clear description of supplied
items, their manufacturing locations, manufacturer ID, 9com details, inspection levels.
9.8.6 PURCHASER/ COMPANY along with Bidder shall perform source inspection for all inspectable
subcomponents per their individual level of inspection before releasing them to main Bidder for
Plant Doc. Disc. Doc. Rev.
No. Index Code Type No.
MATERIAL REQUISITION N93 Q CV MR A1
FOR REBAR
CV-N93-MR-6004
further manufacturing process. Bidder shall be responsible for coordination between sub supplier
& PURCHASER/ COMPANY for such inspection activities.
9.8.7 PURCHASER/ COMPANY shall reserve the Right to Access manufacturer’s facilities and suborder
locations, work documents for inspection and audit.
All literature, documentation, correspondence, and other printed matter pertaining to this Material
Requisition shall be in the English language
Plant Doc. Disc. Doc. Rev.
No. Index Code Type No.
MATERIAL REQUISITION N93 Q CV MR A1
FOR REBAR
CV-N93-MR-6004
10.1 The Inspection level for this Item/ Package shall be as per below table. The definition for
inspection level shall be referred in SAEP-1151, which BIDDER must meet with no exception.
PURCHASER/ COMPANY shall increase the Inspection level to the next highest level if the
Bidder does not meet the specified performance and Quality requirements.
10.2 Bidder shall not place any PO/ sub-PO to any sub-vendor/ manufacturer/ supplier without
prior "No Objection Letter" from the Purchaser/ Company. Bidder to ensure and responsible
to make sure that all sub-vendor/ manufacturer/ supplier shall follow the same minimum
quality requirements as applicable to the Bidder.
10.3 BIDDER shall meet the technical and quality requirements of the work.
10.4 The BIDDER shall implement a quality management system according to the latest version
of ISO 9001 (Quality Management Systems Requirements). Definitions contained in ISO
9000, (Quality Management System Fundamentals and Vocabulary) latest version shall
Plant Doc. Disc. Doc. Rev.
No. Index Code Type No.
MATERIAL REQUISITION N93 Q CV MR A1
FOR REBAR
CV-N93-MR-6004
apply. In case of conflict between ISO 9001 and the project requirements, the requirements
of project shall have precedence.
10.5 BIDDER/ Sub-vendors shall meet COMPANY Schedule “Q” Requirements along with its
relevant Attachments (I through VI), Company Desktop Standards and Project specifications.
10.6 BIDDER shall ensure that all his Sub-vendor’s/ BIDDER set up and maintain equivalent
QA/QC and inspection system and shall provide the relevant ISO 9001:2015 certificates.
10.7 The PURCHASER, or appointed representative, shall reserve the right to carry out quality
audits (if required) at the BIDDER and Sub-vendor’s office and workshop, to verify adherence
to the quality system.
10.8 BIDDER shall establish suitable control mechanisms to ensure quality in all work phases right
from design and development to final delivery. All necessary quality records shall be
maintained for evidence of performing the works as per Procedures.
10.9 Necessary work procedures, instructions and qualified personnel shall be made available at
all work Processes.
10.11 Details of the product, work procedures and instructions, qualified personnel shall be
available. The characteristics of the product must be monitored and measured to verify the
compliance with the specified requirements. BIDDER shall ensure that all QA/QC personnel
certification, procedures, qualifications, specifications and work instructions are available if
required for CONTRACTOR/ COMPANY representative review.
10.12 BIDDER to perform inspection and testing per the applicable FORM-175, Special Form 175
(made by CONTRACTOR in the absence of Form 175 and approved by COMPANY) and
approved Inspection and Test Plan (ITP) as a minimum.
10.13 BIDDER shall submit applicable test procedure at least two months in advance of the actual
date of conducting each test for the PURCHASER’s review / approval. Revised documents
after incorporating PURCHASER/ COMPANY’s comment shall be submitted by BIDDER
within seven days.
Plant Doc. Disc. Doc. Rev.
No. Index Code Type No.
MATERIAL REQUISITION N93 Q CV MR A1
FOR REBAR
CV-N93-MR-6004
10.14 For all witness tests, BIDDER shall give at least one-month prior notice & shall reconfirm the
date of testing at least one week before the schedule date of test.
10.15 BIDDER shall be responsible for arranging all types of inspection as specified in the approved
Inspection and Test plan, procedure. The COMPANY/ PURCHASER and their
representatives shall reserve the right to attend the inspection of any equipment or material,
and to visit a BIDDER's or Sub-vendor's workshop at any time.
10.16 Unless otherwise specified, all the materials supplied shall be furnished with 3.1 inspection
certificates in accordance with EN 10204:2004 as a minimum or as defined in the applicable
specifications / Form SA-175 / Approved ITP / PO.
10.17 For each item of equipment or Sub-vendor item, the principal manufacturing steps, type of
inspection / test, the controlling procedure, and the acceptance standard shall be defined in
the ITP. The ITP shall include space for PURCHASER/ COMPANY to advise inspection
HOLD/ Witness Points and whether the inspection will be by PURCHASER, Third Party, or
COMPANY.
10.19 BIDDER shall indicate all surveillance Inspections in the ITP that BIDDER will carry out for
Sub-vendor goods.
10.20 BIDDER may use his standard format for ITP provided the content includes (and references)
the information and all requirements of COMPANY FORM-175’s referenced in this
specification.
10.21 BIDDER shall submit Quality Plan (for package items) and the ITP’s & Procedures (for
Individual items) to PURCHASER for review prior to start of production activities. The Quality
Plan and the ITP’s will be discussed with the BIDDER during the pre-inspection meeting
(PIM) at the BIDDER’s approved plant location.
10.22 BIDDER shall prepare detailed ITPs for all assigned equipment and materials in accordance
with all relevant Saudi Aramco Inspection Forms SA-175, Schedule Q and Purchase Order.
10.23 BIDDER shall submit an Integrated ITP (for package items) inclusive of all the sub-items from
Sub-vendors for PURCHASER / COMPANY approval.
Plant Doc. Disc. Doc. Rev.
No. Index Code Type No.
MATERIAL REQUISITION N93 Q CV MR A1
FOR REBAR
CV-N93-MR-6004
• Process Description
• Quality Control Requirements
• Notification Requirements for BIDDER Inspection Witness and HOLD Points
• Responsibilities
• Applicable Procedures
• Acceptance Criteria
• Verifying Documents
• Inspection Points (HOLD, Witness, Review and Surveillance)
• COMPANY Dummy PO No.
• Reference to Sub-supplier ITP (As applicable)
10.25 BIDDER shall compile and transmit to the PURCHASER documents for Inspection
Assignment Package (IAP) in line with Schedule "Q" no later than one month prior to the pre-
inspection meeting and start of any fabrication by Bidder and his major sub-
supplier/vendor/manufacturer.
10.26 BIDDER shall prepare and issue to the PURCHASER an Inspection Disposition Report (IDR)
within one week of acceptance of the material or equipment, this report shall include as a
minimum:
Plant Doc. Disc. Doc. Rev.
No. Index Code Type No.
MATERIAL REQUISITION N93 Q CV MR A1
FOR REBAR
CV-N93-MR-6004
• Narrative details of Quality activities performed during manufacturing and fabrication of the
equipment or material.
• Copies of COMPANY approved waivers to COMPANY's requirements.
• All Inspection Reports.
• Copies of supplier quality records as specified in SA-175.
• Copies of all NCR's with final dispositions and resolutions.
• Outstanding punch list items from pre-shipment inspections.
• Inspection / Shipping Release.
In case where the BIDDER is responsible for the export packing, then the final disposition
report (IDR) shall be prepared after the export packing, duly inspected and accepted by the
PURCHASER.
10.27 Material shall not release with punch list items unless approval is obtained from
PURCHASER/ COMPANY representative.
10.28 In addition to above all, BIDDER to follow Vendor Shop Inspection Procedure QM-873-PL-
9502.
10.29 Bidder shall comply with the relevant Saudi Aramco Inspection Checklist (SAIC).
The applicable SAIC shall be filled by Bidder’s quality team and verified by the PURCHASER/
COMPANY.
10.30 BIDDER-supplied Materials shall comply with Saudi Standards, Metrology, and Quality
Organization (SASO) requirements where applicable. If a SASO certificate is required for
BIDDER supplied Materials, BIDDER shall promptly forward a copy of the SASO approved
certificate to the PURCHASER/ COMPANY.
Plant Doc. Disc. Doc. Rev.
No. Index Code Type No.
MATERIAL REQUISITION N93 Q CV MR A1
FOR REBAR
CV-N93-MR-6004
Sl. No. of
Document No. Description Issue Date
No. Sheets
1 NA - - -
Plant Doc. Disc. Doc. Rev.
No. Index Code Type No.
MATERIAL REQUISITION N93 Q CV MR A1
FOR REBAR
CV-N93-MR-6004
a. NMR 603/ Record books shall include all records and data specified requirements as per the
Vendor Data Requirements (VDR).
c. The electronic copy shall contain all documents included in the hardcopy version.
For NMR
For Final Size
Sr. Approval 603
Documents & Drawings Bid
No.
Due Due
For NMR
For Final Size
Sr. Approval 603
Documents & Drawings Bid
No.
Due Due
2. Technical Specification √ E
For NMR
For Final Size
Sr. Approval 603
Documents & Drawings Bid
No.
Due Due
√: Required, C: Copies, EF: Electronic File. CD: Computer Disc, ‘,V: Weeks
Notes:
1. The required nos. of copies to be submitted at each stage will be as per the forwarding letter /
email.
2. All documents and drawings shall be furnished and arrive at Purchaser’s office within the
document schedule which are counted from date of (√) Letter of Intention or ( ) Purchasing order.
3. “Bidder document list and Schedule” shall be submitted in native excel file with one (1) additional
empty column for the application of the company’s document numbering system to each
document after award of order. Bidder to include the numbers indicated in the title block of each
document. Bidder could use their own numbering system, but always making reference to the
company’s document numbering system.
Plant Doc. Disc. Doc. Rev.
No. Index Code Type No.
MATERIAL REQUISITION N93 Q CV MR A1
FOR REBAR
CV-N93-MR-6004
13.1 Requirements laid down in this requisition are the minimum requirements and the same shall
not be interpreted as limiting whereby Vendor is relieved of meeting the specified service
conditions and performance.
13.2 All literature, documentation, correspondence and other printed matter pertaining to this
purchase document shall be in the English language and pages shall be standard 8.5 x 11
inch for binding.
13.4 All drawings, datasheets, certificates, etc., supplied by the Bidder shall show the following
information:
• Purchaser's Name
• PO Number
13.5 Bidder shall prepare a transmittal cover letter identifying all NMR submissions to Purchaser
with the following: Identifying NMR Sub-Item Number of the attached NMR form(s) (i.e.
601.1; 602.1; 603.1 and etc.). Failure to Comply may result in NMR's being returned to
Vendor for proper identification.
13.6 In case of any conflict between the requirements of this document and the attached
specifications or data sheet(s), such information shall be immediately brought to the
PURCHASER's attention for resolution. The deviation/ exception list shall include the
number, name and section of the standard to which reference is made. No work shall proceed
in this regard until written confirmation received from the PURCHASER. If no exceptions,
Plant Doc. Disc. Doc. Rev.
No. Index Code Type No.
MATERIAL REQUISITION N93 Q CV MR A1
FOR REBAR
CV-N93-MR-6004
conflicts or deviation with any standard, Bidder shall state the same. Bidder shall refer to the
typical Deviation list in this section.
13.7 BIDDER shall submit to the PURCHASER a proposed fabrication schedule within 4-8 weeks
after the award of the purchase order. This schedule shall be subject to the PURCHASER 's
approval.
13.8 The items included in this order are subject to inspection by the PURCHASER 's inspector
or his designated representative in accordance with inspection requirements form(s) SA-175
(Refer Section 8).
13.9 The Bidder shall notify the PURCHASER at least fifteen (15) days before the material is
ready for final inspection. The material shall not be shipped until an inspection release has
been obtained, indicating that the material complies with all applicable specifications.
13.10 Bidder shall mark each shipping crate with the purchase order number and line item
number(s) using 50.8 mm (2 inch) high painted letters. Material shall also be marked with
the purchase order number/ line item number(s).
13.11 Any design changes necessary or desired by the BIDDER which will affect this purchase
order and/ or specifications, drawings, etc. shall be brought to the PURCHASER 's attention
for his written approval prior to proceeding with the work.
13.12 Incidental Services (if required). The BIDDER shall provide qualified engineers to provide
technical assistance and oversight during the installation, commissioning and site
acceptance testing of this equipment. The BIDDER shall ensure their company
representative(s) are able to obtain entry visas into the Kingdom of Saudi Arabia according
to the construction schedule to be provided by PURCHASER. The BIDDER shall submit
quotation for these services along with the bid using an hourly/ daily rate plus reimbursable
expenses.
13.13 Bidder shall provide certified/ stamped as-built drawings along with native file.
13.14 Bidder is required to submit Spare Parts Data Package (SPDP) as per Section 11 of this MR.
13.15 Bidder shall include in its quote the prices for the Start-up and Commissioning Spares, if
required as per vendor recommendations.
13.16 The cut-off date of Saudi Aramco Standard shall be May 30, 2019.
Plant Doc. Disc. Doc. Rev.
No. Index Code Type No.
MATERIAL REQUISITION N93 Q CV MR A1
FOR REBAR
CV-N93-MR-6004
13.17 Bidder shall provide original manufacturer source information for all major material and spare
parts supplied on each Purchase Order including, but not limited to, manufacturer's name,
address, sales contact name, telephone number and e-mail address.
13.18 All inspectable and non-inspectable 9COM subcomponents shall be purchased from SA
approved vendor list.
13.19 Bidder shall provide Inspectable and Non-inspectable items from Saudi Aramco approved
supplier/ manufacturer. The inspection level “0” or non-Inspectable proposed for items if any
is for Saudi Aramco. LTHSC shall designate its appointed TPI for performing inspections at
manufacturer location for inspection level “0” or Non-Inspectable Items. All such interventions
shall be finalized during ITP approval.
Bidder shall furnish separate (optional) price for personnel to supervise installation, Site testing,
pre-commissioning, commissioning. Bidder to provide the rates based on per man-day rate
Not applicable.
Plant Doc. Disc. Doc. Rev.
No. Index Code Type No.
MATERIAL REQUISITION N93 Q CV MR A1
FOR REBAR
CV-N93-MR-6004
ANNEXRUE-1
BILL OF MATERIALS
Plant Doc. Disc. Doc. Rev.
No. Index Code Type No.
MATERIAL REQUISITION N93 Q CV MR A1
FOR REBAR
CV-N93-MR-6004