TECHNICAL SPECIFICATION
PRECAST PLINTH, BOLLARDS AND KERBS FOR
COMPACT SUBSTATION (CSU)
Specification No. | KEJ08460:2020 | Revision No. 0
Prepared by Harpreet Singh A/L S Singh
Jurutera Utama (Project Design)
‘Asset Development
Distribution Network, TNB
Mohd Khalid Bin Othaman
Jurutera Utama (Substation System Design)
Engineering Services
Distribution Network, TNB
Approved by | TNB, Distribution Network Division Technical Committee
Dated: 25 February 2020
Menjalanka\ Tugas
Head (Asset Management)
Distribution Network Division, TNB 4Technical Specification
Precast Plinth, Bollards and Kerbs for Compact
Substation (CSU) TENAGA NASIONAL
Specification No. | KEJO8460:2020 Revision No- Page 1 OF 13
‘Approved by ___| TNB, Disiributfon Network Di iston Technical Committee Dated 25 February 2020
1.0 INTRODUCTION
‘This specification for Precast CSU Plinth, Bollards and Kerbs (PPBK) is to be used for the
installation and commissioning of Compact Substations (CSU).
2.0 SCOPE
‘This technical specification covers the design, material, construc
inspection for PPBK.
n, testing and product
3.0 NORMATIVE REFERENCES
‘This specification shall make reference to the following standards and TNB technical specifications
unless otherwise stated.
Standard Title
BS 8110:Part 1 1997 ‘Structural Use Of Concrete
| BS EN 12390-3:2019 ‘Testing Hardened Conerete: Compressive Strength
MS 1462014 Grade 500 | TIO, T12, T16, High Tensile Reinforcement Steel Bar
BS EN 10025 $275 ‘Structural Grade Steel With A Minimum Yield Strength of 275
Nimm?
BS EN ISO 1461:2009 | Hot Dip Galvanized Coatings On Fabricated tron and Steel
Articles. Specifications And Test MethodsTechnical Speciation &
Precast Plinth, Bollards and Kerbs for Compact
Substation (CSU) TENAGA NASIONAL
Spaaciion No [ REVO 020 Reviion No Fage2OT
“Approved by | TNB, Distbation Network Division Technfcal Commies Dated 25 Febrary 2020
4.0 FUNCTIONAL REQUIREMENTS:
‘The PPBK shall be suitable for the installation of CSU equipment. Below are the functional
requirements of the all the components:
Table I: CSU Precast Components and Functions
Item] Component Funetion
1 | Precast Plinth ‘Conerete base support for CSU equipment
2 | Precast Bollard Concrete barrier to protect the CSU plinth from
damage due to vehicular impact
3 | Precast Kerb ‘Conerete segments on the perimeter of CSU land to
mark the boundary and also support the premix.
5.0 DESIGN AND CONSTRUCTION
5.1 Design of PBK
a. The PPBK shall be made of reinforced concrete and shall achieve a concrete
compressive strength of at least 30 MPa.
b. The design drawings of the PPBK shall be endorsed by Civil & Structural
Professional Engineer and submitted to TNB for approval.
©. The precast plinth shall be designed and manufactured as per the dra
Appendix 1. The steel reinforcement drawing for the precast plinth, is as per
drawing in Appendix 2.
4. The plinth shall be provided with slab covers fitted with mild steel angle frames
and sinkable holders. The mild steel components shall be coated with hot dipped
galvanizing. The plinth shall also be provided with weep holes for water drainage,
e. The precast bollards shall be designed and manufactured as per the drawing in
‘Appendix 1. The bollards shall be of removable type fitted in concrete footings
planted into the ground.
f. The precast Kerbs shall be designed and manufactured as per the drawing in
Appendix 1Technical Specification
Precast Plinth, Bollards and Kerbs for Compact
Substation (CSU) TENAGA NASIONAL
Spastcton No. | KETORIGU020 Revision No FTO
“Approved by | TNB, Disibuton Network Division Technical Comoe Date 25 Febrany 1020
5.2. Material and Sizing
‘The material and sizing of the PPBK components are shown in Table 2 below:
Table 2: Material and Sizing of PPBK Components
item] Components | Material Dimensions/Characteristies
1 | Precast Reinforced | 30 MPa compressive strength of concrete
Plinth Concrete | High tensile steel reinforcement bars of sizes T10, T12, T16
Overall size: 6250mm (L) x 2550mm (W) x 1200mm (H)
LY chamber: 1250mm (L) x 250mm (W) x 1200mm (H)
HV chamber: 1000mrn (L) x 2550mm (W) x 1200mm (H)
CSU chamber: 400mm (L) x 2000mm (W) x 120mm (#1)
Slab cover: 180mm (L) x 205mm (W) x 50mm thick
Duet ways: 180mm dia. x 36 nos. cable ducts
Weep holes: 25mm dia. x 3 nos. weep holes
2 | Precast Reinforced | 30 MPa compressive strength of concrete
Bollards Concrete} High tensile steel reinforcement bars of size T10
Bollard size: 150mm dia, x 100mm (L); Quantity=14 nos.
Bollard footing size: 375mm (L) x 375mm (W) x 450mm
(1H); Quantit
Reflector sticker (50mm width) shall be provided that is
14 nos.
water resistance, durable, strong reflectivity and shall stick
permanently on the bollard.
3 | Precast | Reinforced [30 MPa compressive strength of concrete
Kerbs Concrete | Kerb size: 600mm (L) x 150mm (W) x 300mm (H);
Quantity = 36 nos.Technical Specification
Precast Plinth, Bollards and Kerbs for Compact
Substation (CSU)
Speciication No._[ KETO84602020 [Revision No. Paged OF 13
Approved by | TNB, Distribution Network Division Technical Commies Dated 25 February 2020
‘The following are the allowable tolerances* for the above precast components:
‘Component Tolerances
Precast Plinth Length: -13mm; 25mm
Width: +/-19mm
Thickness of wal
Slab Thickness: 4.5mm; +25mm
3: 4.5mm; +25mm
Precast Bollards Length: +-6mm
Diameter: +/-6mm
Precast Kerbs Length: ¥7-1.5mm
Thickness: +/-1.5mm
* Ref, Tolerance Manual for Precast and Pre-Stressed Concrete Construction ~ Precast/Pre-
Stressed Institute, USA (2000).
53 Construetion
a, Precast Plinth
© Excavate pit of 6800mm (L) x 3100mm (W) x 1300mm (D) to accommodate
the precast plinth. The related HIRADC on excavation shall be complied
with.
Lay and compact 200mm thick crusher run followed by a SOmm thick layer
ofrriver sand atthe base of the excavated pit. Ensure that the finished surface
of the compacted material is completely horizontal.
‘© Place the precast plinth in the pit using hoisting equipment of sufficient
capacity. The related HIRADC on hosting shall be complied with,
* Backfill and compact the excavated ground surrounding the plinth
b. Precast Bollards
* Excavate pit of $00mm (L) x 00mm (W) x 550mm (D) to accommodate
each bollard footing.
«Lay and compact 200mm thick crusher run followed by # 50mm thick layer
of river sand atthe base of the excavated pit. Ensure that the finish surface of
the compacted material is completely horizontal.Precast Plinth, Bollards and Kerbs for Compact
Technical Specification
‘Substation (CSU) TENAGA NASIONAL
‘Specification No.
KEIOR#60-2020 Revision No. Pages OF 13
“Approved by
"TNB, Distribution Network Division Technical Committee Dated 25 February 2020
Place the precast bollard footing in the pit, backfill and compact the
excavated ground surrounding the footing.
©. Precast Kerbs
Excavate a trench of 300mm (W) x 150mm (D) throughout the perimeter of
the CSU land,
Spread cement mortar at the base of the trench and place the precast kerb
footing in the pt, backfill and compact the excavated ground surrounding the
footing.
The joints between kerbs shall be sealed with cement mortar.
d. Premix
Excavate ground within the perimeter kerb to suitable level and lay 200mm
thick erusher run.
Lay and compact 60mm thick premix. The final level of the premix shall be
150mm below the precast plinth and match the top level of the precast kerb and
bollard footing.
‘The slots on the CSU plinth in front ofthe LV ad HV component shall be filled
with premi
6.0 INSPECTION AND TESTING
6.1 Product inspection / factory acceptance tests shall be carried out by TNB Quality
Assurance Inspector (QAI) o
appointed quality inspection agent before the PPBK is
allowed to be delivered for site installation.
62 — Manufacturing Routine Test
i, Routine tests shall be carried out by manufacturer on all products in the finished
state or, where appropriate, during the manufacturing process to ensure compliance
to the reference standard requirements.Technical Specification
Precast Plinth, Bollards and Kerbs for Compact
Substation (CSU) TENAGA NASIONAL
‘Speciffeatfon No. | KEI08460:2020 Revision No, Page OF 13
Approved by | TNB, Disiribuifon Network Division Technical Commitee Dated 25 February 2020
All test records will be kept safely and produced for inspection by TNB QAI during
Product Inspection (PI).
63. Factory Acceptance Testing / Product Inspection (PI)
Product inspection or factory acceptance tests shall be carried out on sample of PPBK,
‘The product inspection or factory acceptance tests that shall be made on the products
are:
‘Visual inspection on PPBK construction and quality of finishing,
Verification of the dimensions
iii, Concrete Cube Test (BSEN 12390-3:2019 Compressive strength of test
specimens)
iv. Ready mix supplier, must be certified ISO 9001-2015
v. Steel Bar - Mill Cert MS 146:2014 Grade 500 (Specification for Hot Rolled
Steel Bar)
vi, Galvanizing test using ELCO meter
Vii, Calibration report of equipment utilized for test and measurements
64. Thesampling rate for product inspection / factory acceptance tests and acceptance criteria
shall refer to the latest TNB Quality Assurance Guidelines (Terma Serta Syarat
Pengurusan dan Penguatkuasaan Jaminan Kualiti Produk, TNB)
7.0 QUALITY ASSURANCE AND CONTROL
‘The manufacturer is responsible to maintain all quality and test records for a minimum period of
Five (5) years. TNB and /or its appointed agent reserve the right to inspect these records as and
‘when deemed necessary.
8.0 WARRANTY
‘The PPBK shall have a warranty of minimum 1 year from delivery date against any defect in
‘material or workman:
‘The warranty period requit
ay be revised and will be specified in
tender document.‘Technical Specific:
Precast Plinth, Bollards and Kerbs for Compact
Substation (CSU) TENAGA NASIONAL
‘Specification No, | KETOR4G0:2020 Revision No. Page 7 OF 13
‘Approved by
TNB, Disiributfon Network Division Technical Committee Duted 25 February 2020
TECHNICAL SCHEDULE
(To be completed by tenderers)
NO. DESCRIPTION OFFER
Yes!No
10 | Precast Plinth, Bollards, Kerbs (PPBK) Design
TI |The design drawings and dimension of the PPBK endorsed by |
Professional Civil &Struetural Engineer for TNB approval
12 | The precast plinth shall be designed and manufactared as per the
approved drawing. The plinth shall be provided with concrete slab
covers fitted with mild steel angle frames and sinkable holders. The
mild stee] components shall be hot dipped galvanized. The plinth shall
also be provided with weep holes for water drainag;
13 | The precast bollards shall be designed and manufactured as per the
approved drawing. The bollards shall be of removable type fited in
conerete footings planted into the ground.
Ta | The precast Kerbs shall be designed and manufactured as per the
approved drawing. The kerbs shall be planted 150mm into the ground
and joints between kerbs shall be sealed with cement mortar
2.0 | PPBK Construction
2 | Supplier shall have ISO 9001: 2015, Quality Management System
Certification
22 _| The Coniractor shall submit a Method Statement and HIRADC for TNB
approval prior to commencement of the works
13.0 | Inspection & Testing 7
“3 | Manufacturing routine fests shall be carried out by manufacturer on all
products in the finished state or, where appropriate, during the
‘manufacturing process to ensure compliance to the reference standardTechnical Specification
Precast Plinth, Bollards and Kerbs for Compact
Sutstation (CSU) TENAGA NASIONAL
| Specification No. | KEJ08460:2020 ‘Revision No. Page 8 OF 13
‘Approved by | TNB, Distebatton NeOWOrK Division Teshnlcal Commies Dated 25 February 2020
NO. DESCRIPTION OFFER
Yes/No.
requirements. All test records will be Kept salely and produced Tor
inspection by TNB QAI during Product Inspection (PD).
32 | Product inspection or factory acceptance tests shall be carried out on
sample of products in the finished state. The product inspection or factory
acceptance tests that shall be made on the products are;
‘© Visual inspection on PPBK construction and quality of finishing
+ Verification ofthe dimensions
‘© Concrete Cube Test (BSEN 12390-3:2019 Compressive strength)
‘© Ready mix supplier, must be certified ISO 9001:2015
‘© Stee! Bar - Mill Cert MS 146:2014 Grade 500 (Specification for
Hot Rolled Steel Bar)
© Galvanizing test using ELCO meter
‘+ Calibration report of equipment utilized for test and measurements
33 | The sampling rate for product inspection / factory acceptance tests and
acceptance criteria shall refer to the latest TNB Quality Assurance
Guidelines
“4.0 | Quality Assurance & Control
[ar | The manufacturer
fora minimum period of five (5) years. TNB and /or its appointed agent
Tesponsible to maintain all quality and test records
reserve the right to inspect these records as and when deems necessary,
0 | Warranty
The PPBK shall have a warranty of minimum | year from delivery date
against any defect in material or workmanship. The warranty period
required may be revised and will be specified in tender document.Precast Plinth, Bollards and Kerbs for Compact
Substation (CSU) NAGA NASIONAL
Speciation No. [ KEV0B4602020 Revision No Fase VOT
‘Approved by "ENB, Distribution Network Division Technical Committee Dated 25 February 2020
Architectural Drawings for
Precast CSU Plinth, Bollards and Kerb‘Technical Specification G
Precast Plinth, Bollards and Kerbs for Compact
Substation (CSU) TENAGA NASIONAL
Specification No. | KEV0#460:2020 Revision No. Page 10 OF 15,
‘Approved by | TNB, Distribution Network Division Technical Committee Dated 25 February 2020
APPENDIX 2:
Steel Reinforcement Drawings for
Precast CSU Plinth