المصعد
المصعد
A B C W E
S
TRACTION ELEVATOR ALL DIMENSIONS IN METARS
VERTICAL CIRCULATION CONCRETE SHEAR CODE ITEME SPECIFICATION
D
WALL FINISHING
R.C. SHEAR WALL MIX :12:4 0.25THICKINESS WALLS
DECK STEEL ROOF
0.15m
FINISHING EXTERNALLY WITH . C S RENDERING E.W.F.1 ONE AND HALF RED BRICK THIKNESS (0.30) ON IT PLASTER(1:8)
5.377
EXTERIOR WALL FINISHUNG1 THIKNESS (0.05) ON IT LAYER OF Wall Stone Cladding
MIX1:7 0.020THINKNESS AND WITH LAYER OF E.W.F.2 EXTERIOR WALL FINISHUNG2
ONE AND HALF RED BRICK THIKNESS (0.30) ON
IT PLASTER(1:8) THIKNESS (0.05) ON IT3
E.W.F.3 EXTERIOR WALL FINISHUNG3 ONE AND HALF RED BRICK THIKNESS (0.30) ON IT PLASTER(1:8)
2.000 PAINT LIGHT GRAY COLOR THIKNESS (0.05) ON IT3 COATS OF OILPAINT GRAY COLOR
ONE AND HALF RED BRICK THIKNESS (0.30) ON IT PLASTER(1:6)
4.194
I.W.F.1 INTERIOR WALL FINISHUNG1 THIKNESS (0.05) ON IT3 LAYERS OF MATE WHITEPAINT
2.232 2.415 I.W.F.2 INTERIOR WALL FINISHUNG2 ONE AND HALF RED BRICK THIKNESS (0.30) ON IT PLASTER(1:6)
THIKNESS (0.05) ON IT LAYEREPOXY (ACRYLIC)
INTERIOR WALL FINISHUNG3 ONE AND HALF RED BRICK THIKNESS
( .30) ON IT LEAD(0.01)
I.W.F.3
MACHINE ROOM MACHINE ROOM
0.545
.W.F.4 INTERIOR WALL FINISHUNG4 ONE AND HALF RED BRICK THIKNESS
(0.30) ON IT PLASTER(1:6) THIKNESS
(0.05) ON IT VINYL(0.2)
0.15THICKNESS ACIDRESISTANTCERAMICS WITH DIMENSIONSOF
.
INTERIOR WALL FINISHUNG5 0.10*0.20 WITH LATHE JOINTSFOR EDGESEPOXY 0 .0 2m
1.886
1.886
OVERSPEED OVERSPEED I.W.F.5 SAND LAYER 0.01m EPS INSULATOR0.02mR.C R/ F SLAB 0 .60 m
GOVERNOR GOVERNOR
0.861
ONE AND HALF RED BRICK THIKNESS (0.30) ON IT PLASTER (1:6)
0.861 T.W.F TOILET WALL FINISHUNG THIKNESS (0.05) ON IT MARBLE TILES(0.20M*0.30M*0.08M)
0.20m THICK REINFORCED CONCRETE WITH C:S 1:8 CEMENT MORTOR,
MACHINE DRIVE MACHINE DRIVE S.W SHEAR WALL FINISHED WITH0.05m LAYER OF BITUMIOUSINSULATION
0.821
0.821
FLOOR
(0.60M*0.60M*0.2M) PORCELAIN TILES ,ON TOP OF (0.05M) C.S MORTER ON
1.656
2.105
TOP OF LAYER OF SAND(0.1)
F.F.1 FLOOR FINISHUNG1 ON REIFORCED CONCRETE(0.30)
2.000
(0.30M*0.30M*0.05M) CERAMIC TILES , ON TOP OF (0.05M) MORTERON TOP
F.F.2 FLOOR FINISHUNG2
2.0 2.5
OF LAYER OF SAND(0.1)
LIFT
ON REIFORCED CONCRETE(0.30)
D2
(0.02)THICK RESIN EPOXY ON TOP OF 0.05M LAYER OF 1:6 PORTLAND
F.F.3 FLOOR FINISHUNG3
0.613
CEMENT MORTAR,ON TOP OF A0.30M OF TENSION SLAP
0.613
0.932
0.932
F.F.4 FLOOR FINISHUNG4 ON REIFORCED CONCRETE(0.30)
ELEVATORSHAFT ELEVATORSHAFT
CABLES
MADE FROM STEEL
CABLES
MADE FROM STEEL 2.814 VINYL (0.05)ON TOP OF(0.05M) MORTER ON TOP OF LAYER OF SAND
(0.1)
F.F.5 FLOOR FINISHUNG5 ON REIFORCED CONCRETE(0.30)
0.217 0.494 0.567
0.708 0.494 0.567 CONCRETETILES 0.02m CEMENT MORTAR0.01m
SAND LAYER 0.01mEPS INSULATOR 0.02m
0.708 F.F.6 FLOOR FINISHUNG6 DECK STEEL ROOF0.15m
0.671
COUNTER COUNTER OORS NO W H SPECIFICATION
IWF9 WEIGHT WEIGHT IWF9 CHINA FIR SKELETON CORE WITH HDF BOARD LAMINATED WITH .PVC
D1 3 0.90 2.20
VERTICAL VERTICAL D2 -- 1.50 2.10 CHINA FIR SKELETON CORE WITH HDF BOARD LAMINATED WITH .PVC
CIRCULATION CIRCULATION 2.814 1 SHEET LEAD (1/20) THICK PARTICLE BOARD WITH HARDWOOD
0.500
2.70 2.50
0.500
D3 PERIMETER 11/16 THICK
CONCRETE FCF
CONCRETE D4 4 1.50 SHEET LEAD (1/20) THICK PARTICLE BOARD WITH HARDWOOD
2.0 2.5
2.20
SHEAR WALL FCF
SHEAR WALL PERIMETER 11/16 THICK
FINISHING FINISHING D5 -- CHINA FIR SKELETON CORE WITH HDF BOARD LAMINATED WITH .PVC
D2
2.70 2.50
C. SHEAR WALL R.C. SHEAR WALL D6 -- CHINA FIR SKELETON CORE WITH HDF BOARD LAMINATED WITH .PVC
1.656
0.70 2.20
1.656 1.656
LIFT
2.105
MIX1:2:4 0.25 MIX1:2:4 0.25
2.000
WINDOWS
THICKINESS ELEVATOR CAR ELEVATOR CAR THICKINESS
2.599
2.599
1.80
1.954
WITH C.S WITH C.S W3 -- 0.50 0.50 ALUMINIUM FRAMEWITH SEMI-TRANSPARENT GLASS
RENDERING MIX RENDERING MIX 1.097 W4 1.50 1.50 SEMI -TRANSPARENT GLASS WITHALUMINIUM FRAME
020THINKNESS CAR CAR 0.020THINKNESS W6 2.15 1.50 SEMI -TRANSPARENT GLASS WITHALUMINIUM FRAME
0.417
AND WITH AND WITH W7 0.85 2.70 SEMI -TRANSPARENT GLASS WITHALUMINIUM FRAME
FINISHED WITH 3 1.769 1.769 FINISHED WITH 3 U SHAPE 0.30 0.15 0.015 MORTER FINISHED WITH ROUGH GRANITE
(NON_SLIPPERY )
KEY PLAN: A2
0.0
00
D
(0.1 (0.1
5M* 5M*
AGGOF CO 0.15 AGGOF CO 0.15
REG NCRET M*0 0.0 REG NCRET M*0
ATE E .60M) 00 ATE E .60M)
) (0 (0.2 PAV ) (0 (0.2 PAV
9
7,704
4,11
.1M ) ON ING .1M ) ON ING
) ON TOP STO ) ON TOP STO
COM LAR NE COM LAR NE
PAC GE OF BAS ON PAC GE OF BAS ON
T SAN AGG E TOP T SAN AGG E TOP
D(0. REG LAYER( OF D(0. REG LAYER( OF
- 0.150 R 0,350 1) ATE ME LAY 1) ATE ME LAY
arti R 0,350 ) (0 DIU ER ) (0 DIU ER
sho fical gra
4,429
arti
.15M M
) ON F.F. .15M M
) ON F.F.
D2 cru ck me ss sho fical gra 6 6
E .W geo shed mdranand san
0.70
2.20 cru ck me ss
ON pre textile stone e d infi geo shed mdranand san arti
ON K
BRICE AN
THD HA
.F.2 par
ed memb dus
gro
and
und rane t
l
R 0,350
- 0.300 R 0,350
pre textile stone e
par
ed memb dus
gro
and
und rane t
d infi
l R 0,350
sho fical gra
cru ck me ss
geo shed mdranand san
TH
7
LA IKN IT IKNES LF 2,461 pre textile stone e - 0.150
4,61
d infi
WHYERS ESS (0.PLAS S (0.RED
par and
ed memb dus l
8
gro
ITE 05 TE 30 und rane t
2,41
PAINOF ) ONR(1: )
1
R 0,350 R 0,350
0,85
1
T GLOS IT 3 )
3,26
SY 0.0
R 0,350 00 R 0,350
1.0 R 0,350
00
0
- 0.300
1,98
1
0.0 W3
4,55
00 0.50
0.50
R 0,350
1,406 R 0,350
arti 2,19 arti
sho fical gra 9 sho fical gra
4
arti
0,314
D2 cru ck me ss cru ck me ss sho fical gra
8,15
E .W R 0,350
0,94
00
0.70
geo shed mdranand san geo shed mdranand san
7
0,318
W3
2.20 cru ck me ss
ON pre textile stone e pre textile stone e geo shed mdranand san
4.6
.F.2
0.50
d infi d infi
BR E 4,15
0.50
0,308
par
ed memb dus
and l par
ed memb dus
and l pre textile stone e d infi
ON ICK AND ONE T.W
AND .F gro
und rane t 4 R 0,350 gro
und rane t
par
ed memb dus
and l
0,335
TH TH HA SH D2 THIKRED
gro
AFT ON NESSBRICHALF
und rane t
LA IKN IT IKNES LF
0.70 K
(1:6) IT PLAS(0.30
0,308
,989
2.20
0
(0.05THIK TER )
WHYERS ESS (0.PLAS S (0.RED
W3
0,95
MAR NESS
(0.20 BLE) ON IT
0.50
0.90 2.20
0.0
0.50
0,308
05 TE 30
*0. TILES
ITE 00
D1
PAINOF ) ONR(1: )
*0.08 D3
10
I.W.
)
6
0,335
0.750
T GLOS IT 3 )
1.50 2.10
6,89
F1
D2
8,28
0.750
0.70
0,308
F.F 6
3
SY 2.20
0
CER
AMI .2
5,83
0,308
D4 ONE 2,67
0,20
4
BAS (30* C ON AND
6,01
I.W 1.50 2.20 OF ED 30*0 TILE LAY IT PLA HAL I.W 8
I.W
.F1 ON STAON .08) S ERS STE F
.F1
0,385
ON
THI E
ON MOR NE
LAY
CON REIF TER(0.6) ER
OF R(1:RED
MAT 6) BRIC R 0,350
.F1
E WHITHIK K
(1:6 KNEAND CRE ORC (0.2) THIK
TEPANESS NES
LAY ) THISS (0.3HAL TE ED
(0.20 INT (0.05 S arti
0,406
ERS KNE 0) F
FLOOR FINISHING
) ON (0.30
sho fical gra
0,203
)
0,203
OF SS ON RED IT 3 ) 2,00
(0.1
MA (0.0 IT PLA BRI
TE 5)
0 5M* cru ck me ss
WH ON STE CK AGGOF CO 0.15 geo shed mdranand san
I.W
R M*0
0,406
ITEP
0.75
REG NCRET pre textile stone e
AIN I.W ATE E .60M) par
d infi
E .W
T and
0,203
.F1
.F1 ed memb dus l
0
) (0 (0.2 PAV
.1M ) ON ING gro
ON ) ON TOP STO und rane t
0,406
BR E .F.2 ONE 2,65
8
COM LAR NE
PAC GE OF BAS ON
0,203
ON ICK AND
ON AND
W6 LAY IT PLA HAL I.W T SAN AGG E TOP
TH TH HA
ERS STE F
.F1 D(0. REG LAYER( OF
0,406
1.50 OF R(1:RED
LA IKN IT IKNES LF
2.15 MAT 6) BRIC 1) ATE ME LAY
E WHITHIK K
0,203
) (0 DIU ER
WHYERS ESS (0.PLAS S (0.RED R 0,350
THIK
4
0.75 D3 TEPANESS NES .15M M
F.F.
0,46
ON INT (0.05 S ) ON
05 TE 30
0,406
ITE 0 1.50 2.10 ) ON (0.30
6
19
TH E
2,02
PAINOF ) ONR(1: ) PO IT 3 ) 9
0,203
T GLOS IT 3 ) LA RC (1: IKN AND
Pre YER ELAIN LAYE6) THESS (0. HALF I.W
R 0,350
:- 0.3m flame
5,2
0.0
0,406
SY cas OF 00
I.W
t co ST TILES RS IKNES30) .F
0,203
ncretANE F. OF ON RED 1
e tile(0.6) (60*60 F1
1,85
MA S (0. IT PL
.F1
R 0,350
0,406
8
TE 05) ASBRICK
0,203
2,68 s wi ON *0.2) WH ON TE
.F1 0
th thiMO BA ITEPA IT R arti
0,406
cknRTER SED sho fical gra
dia
0.750 INT 3 1,52
cru ck me ss
0,203
I.W 3,85
ess (0.2) ON 5
3
0.2 geo shed mdranand san
0,406
0 pre textile stone e
3
d infi
5,03
12
par
I.W and
0,203
38
ed memb dus l
.F1
gno
.F1 2,00 gro
13
und rane t
11,6
ONE
0,406
ON AND 0
D3
14 I.W LAY IT PLA HAL I.W
0,203
21
1.50 2.10 ERS STE F
OF R(1:RED .F1
retardant neoprene
1,51
15
,55
0 MAT 6) BRIC
I.W
0,406
E WHITHIK K (0.1
5M*
16
THIK
.F1 TEPANESS NES AGGOF CO 0.15
5
0,203
11 1,93
stic
17
10
POR I.W INT (0.05 S
) ON (0.30 2 REG NCRET M*0
ATE E .60M)
.F1
0,406
LAY CEL PO D5 IT 3 )
Pre ER AIN ) (0 (0.2 PAV
18
LAY RCE
cast OF 2.702 I.W
0,203
9 .1M ) ON ING
con STA TILES Pre ER LAIN ) ON TOP STO
.F1
19
cret NE F.F cas OF
t con STA TILES .50 COM LAR NE 0.0
0
8
0,406
e tiles(0.6 (60*60 1 PAC GE OF BAS ON
0,60
20
) cret NE F.F 2,19 00
x 0,29 2
witON MO *0.2 e tile(0.6 (60*60 1 T SAN AGG E TOP
22G x 0,15
6
7 ONE 0
) BAS
0,086
h thic RTE ) ON *0.2 PO ON AND D(0. REG LAYER( OF
21
6 2,00
kne R(0 ED 6,96 s wit MO ) BAS ON LA RC I.W LAY IT PLA HAL 1) ATE ME LAY
0,174
.F1
I.W
Pre YER ELAIN
0 h thic ERS STE F
TH E
0,385
23R
W6
0,203
ss 0.20.2) ON ) (0 DIU ER
22
7 RTE 6,50 OF R(1:RED
23 5 kne R(0 ED
ss 0.2.2) ON (1: IKN AND
1
cas OF
t con ST TILES
1.50
2.15 E WHI
MAT 6) BRIC
THIK
.15M M
) ON F.F.
.F1
K THIK
I.W LAYE6) THESS (0. HALF 6
8
0,406
4 TEPANESS NES
(60 F.F1
1,66
WN
0 2,00
creteANE
0,186
DO
.F1 INT (0.05 S
2
.F1
2,22
1
RS IKNES30)
5,30
) ON (0.30
tile(0.6) ON*60*0.
3
0.75 ON RED
1,517
IT 3 )
contact cement
2,01 I.W OF s wi
MA S (0. IT PL th thiMO 2) BA I.W
2 2
0
1,460
TE 05) ASBRICK
LAB
POR
cknRTER SED .F 1
WITH
UP 1 LAYE CELA
Preca R IN D1 1,10
WH ON TE 9
ED
OF
st conc
0
STANTILE
FINISH
0.90 2.20
ITEPA IT R ess (0.2) ON
0,60
(60*6 F.F
S
I.W
0
rete E (0.6)
D4 tiles ON 0*0.2 1 0.2
1.50
1,517
with MOR )
.F INT 3 0
0,380
2.0 BASE
thick TER(
1 0,90
0 W6
1,460
4
ness 0.2)D
0.75 1.50
0.20
I.W
3,19
2.15
1,238
T.W 0,82
0
0 ONE
0,60
.F1 AND .F 0.75 6
0
0,17
THIRED
2.415 2.415
0
ON KNE BRICKHALF
I.W
4
0,312 0,91
0,271
(1:6 IT PLASS 9
CER F.F .2 0.750 .F1
0
(0.3
I.W
2,00
2,43
(0.0) THIKNESTE 0)
0.20m
FINISH THICK
1
chut MAR 5) R AM
.F1
I.W
ED
1,274 REINFO
WITH
S .W (0.2 BLE ON SS BAS (30*30*IC TIL
7
I.W .F1 1,55
0.05m RCED
6,41
0*0. TILEIT D1
OF ED ON 0.08
00
D4
LAYER CONCR
30*0 S ES 3
.F1 I.W 3,025.08) COONON REIMOSTARTENE (0.6LAY))ER
0.75
8
OF ETE 0,60
applied on 0.01m
.F1
0.90 2.20
0,09
1.50 BITUM WITH
I.W
2,83 2.
0,346 IOUS C:S
INSULA
0 0
8
.F1
1:8
0,41
8
TIONCEMEN 0,60
I.W
0,92
1,08
D3 T MORTO
0 1 NCR FOR R(0. PO
2) 4
SAM 0.750 ETE (0.2CED0) LAY RCE
R,
0,91
2
1.50 2.10 D1
0
Pre ER LAIN
0,97
.F1
3
0,90
1,28
4
PLES cas OF
t con STA TILES
0.90 2.20 .F1
7
0,60 1,67
0,94
1,66 0,95
1 cret NE F.F
e tile(0.6 (60*60 1
I.W 6
3
I.W 0,60
0 0 0,90 ) ON *0.2
s wit
2,37 PO
LA RC W6
I.W
6
0.750 .F 0
I.W
D2
lob
3,02 MO ) BAS
1 Pre YER ELAIN
h thic
chAN 1.50
7
.20m
0,80 0,95 3 RTE 0.75 0,96 D3
ELEVATORPIT ELEVATORPIT
1,91
THICK 0,13 2.15 ONE
0.70 2.20 kne R(0 ED
0
PO 1 0 6
cas OF
.F1
REINFO
0 9 ON AND
.F1
S .W ss 0.2.2) ON t con ST TILES I.W
3,91
LA RC
ROGING
0.05m RCED
D1 1.50 2.10
8, LAY IT PLA HAL
.F1
D2
1,406
PrecYER ELAIN (60 F.F1 380
.F1
LAYER CONCR
0 .F1 ERS STE F
creteANE
0.20m 0,307
FINISH THICK OF ETE
BITUM WITH 0,95 0.90 2.20 OF R(1:RED
0,314
1,42
OM
ED
0.70 2.20
tile(0.6) ON*60*0.
REINFO
WITH
S .W IOUS
0 MAT 6) BRIC
I.W
ast OF
C:S
2
mR
by
INSULA I.W
0.05m RCED 1:8 0,318
E WHITHIK K
concSTANTILES
LAYER CONCR TIONCEMEN
D2 2,29 THIK
s wi TEPANESS NES
0.170 0.170
T MORTO 0,308
I PO
R, 0,335
0.70 2.20
vinyl sheet on a
IOUS C:S
) ON (0.30
3
INSULA1:8
LA RC thicknRT SE
1,89
0,308
TIONCEMEN
0.7 IT 3 )
00
tile 6) ON*60*0 cont 0.750 essER(0.2)D ON
5
Pre YER ELAIN
.F1 4,03
50
T MORTO
I.W
0,308
s wi
W3
D1 ON
1.0
R,
th thiMO .2) BA
cas OF 0.2
rol .F1 TH E
0.50 0,335
ON
I.W
0
(1: IKN AND
0,308
0.90 2.20
3
.F.4
RTER SE TH E creteANE (60 F.F1
0.750 I.W
5,41
ckne W3
kitc
0.50
0.718 0.718
pha
ss 0.2 0,20 LAYE6) THESS (0. HALF
0.50
S.W
0 LEAD
AFT
2)
0
F.F
0 0 .F1 h thiMORT ON RED
1,92
4.6 W3
RS IKNES30) MOR (0.05 .4 BA OF
ON RED MA S (0. IT PL
hen
ON TER ) ON ckn ER SED G 0.75
0.50
OF
SH
RO ING 0 I.W TE 05) ASBRICK
0.50 I.W
MA S (0. IT PL REIF ON TOP
ess (0.2) ON
rma
TE 05) ASBRICK
ORC TOP OF(0
OF 0.2
OM .F1 WH ON TE
em
ED .05M
x
0
3,18 WHITEON ITTER
CON LAYE )
I.W ITEPAINIT 3R
ray-
D5 CRE R
2.702 PO 3,20 TE(0 OF SAN
.F D3
7
8 PAINT 3 .30)
2,84
LA RC I.W 1
(D0.1)
.50 I.W.F1 5 I.W T 1.50 2.10
PrecYER ELAIN
cy
2,76 ONE .F.4 .F.4
4
erg
ast OF ON AND
0.05m asphalt
W6 0.75
concSTANTILES
IT LEAD
1.50 LEA HALF 0 F.F
I.W
rete E (0. (60 F.F1
0
2.15 MOR (0.05 .4
2,00
D(0.0 RED
4
ONE ON TER ) ON
I.W
6,83
ON AND 1) BRI
I.W
5
.F1
.F1
2
tile 6) ON*60*0 LAY IT PLA HAL THI ORC TOP
4,25
OF(0
s wi ERS STE F
OF R(1:RED .F1 KNE ED OF .05M
th thiMO .2) BA
enc
MAT 6) BRIC SS
( .30) CON LAYE )
VIN
3,50
x
I.W
CRE R
E WHITHIK K TE(0 OF SAN
ray-
ON YL (0.0 RT THIK
0.7 ckne ER(0.SED
ONE
TEPANESS NES .30)
9 3,62 (D0.1)
ON AND
REIFO 5)O LAYERIT PLASTHALF
I.W INT (0.05 S
I.W
F.F. 8
.F1
)
RCEDN TO .F1 50 ss ) ON (0.30 0,59
I.W
0.2 2) ON
3 S OF ER(1:RED
ON .F.4
2
MATE 6) BRICK
IT 3 ) 2
0,80
I.W
COP OF(0.0 5 .F1
THIKN
TH E 0
WHIT THIKN
0,77
ONE .F.4
EPAINESS ONE
(1: IKN AND
y
ESS
NC T (0.05) (0.30) ON AND 6
RETE(5M) ON
LAY IT PLA HAL I.W D3
LAYE6) THESS (0. HALF
IT 3
AND
0.30)MORT .F1 ON
3
ERS STE F
0
1.50 2.10
4,24
0,51
IT
ER
OF R(1:RED LEA HALF 1,47
RS IKNES30) MAT 6) BRIC D(0.0 RED 0.75
ON RED
ON E WHITHIK K 8
OF THIK
TEPANESS NES
(0.1 1) BRI 0 POR
I.W
7
TO
MA S (0. IT PL 5M* CK
6,92
AGGOF CO 0.15 S.W LAY CEL
P OF
.F1
0
ER
.F1 ITEPA ITTER 1,70
1,45
1.80
) (0 (0.2 PAV 1,09 tiles ON 60*0 1
OF
.F1 9
14
.F1
SAN
INT 3 ) ON TOP STO thick TERBAS 0,34
,980 0.750
7
(D0.1 COM ness (0.2)ED 4
4,73
VINY
) LAR NE ONE
PAC GE OF BAS ON
opme inio
ON
I.W
ON L (0.05
REIF )ON
T SAN AGG E TOP
ON AND
LAY IT PLA HAL I.W 0.750 0.20
ORC TOP F.F 7,863
D(0. REG LAYER( OF ERS STE F
.F1 ON
I.W
ED
.5 TH E
5
OF R(1:RED
CON OF(0
.F1
0,73
CRET.05M 1) ATE ME LAY MAT 6) BRIC
(1:6 IKN AND 2,00
E(0.3) MOR
rati r 4
) (0 DIU ER 2
LAY ) THESS (0.3HALF
E WHITHIK K
0) TER
ON
.15M M
) ON F.F. THIK
TEPANESS NES
ERS IKN 0)
D3
I.W
on
INT (0.05 S 1.50 2.10
6
TOP ONE
OF ESS ON RED
VINY
BUFFER BUFFER
) ON (0.30
.F1
ON AND
1,786
OF
2,252 LAYERIT PLASTHALF I.W ON L (0.05
IT 3 )
LAYE 2,543 S OF ER(1:RED .F1 REIF )ON
F.F 0.000 MA (0.0 IT PLA BR POR
0.628
0.628
R OF ORC TOP
MATE 6) BRICK
.5 TE 5) ICK LAY CEL 1,50
0.595
0.595
ED
SAND
(0.1)
THIKN
WHIT THIKN CON OF(0 WH ON STE Prec ER AIN 0
I.W
EPAINESS CRET.05M
ESS
T (0.05) (0.30) E(0.3) MOR ITEPAI IT R ast OF
concSTA TILES
0.600 reteNE (0.6) (60* F.F
ON
NT 3
3
0) TER
on 0.10m aggregate
IT 3
ON tiles ON 60*0 1
.F1
8,475
TOP
I.W
with MOR.2)
I.W
1,42
.F1
OF
1 thick TERBAS
LAYE 4,66
.F18
0
ness (0.2)ED
2 R OF
.F1
4,73
0.7
opme inio
0.20 ON
I.W
3 SAND
4
(0.1)
ON
50
TH E I.W
0.600 (1:6 IKN AND .F1 2,07
R 0,500 LAY ) THESS (0.3HALF
ERS IKN 0) rati r 2
D3
0.150
B1 ONE
OF ESS ON RED
MA (0.0 IT PLA BR
TE 5) ICK
on POR
LAY CEL
1.50 2.10
1,50
0.300 ON 4,81 ON AND
LAY IT PLA HAL I.W WH ON STE
ITEPAI IT R
Prec ER AIN
ast OF
0
I.W
concSTA TILES
TOP
LAR OF 0 ERS STE F
OF R(1:RED .F1 NT 3 reteNE (0.6) (60* F.F
tiles ON 60*0 1
0.450 MAT 6) BRIC
0.000 GE BAS ON
I.W
.F1
E WHITHIK K with MOR.2) 1,40
AGG E TOP
.F1
arti
sho fical gra REG LAY (0.1OF5M*
THIK
TEPANESS NES
I.W 4,88 thick TERBAS
ness (0.2)ED .F1
2
B .F1
ER( INT (0.05 S
cru ck me ss
1) ATE OFME LAY
0.15 0,20 ) ON (0.30 2 0.750 0.20 ON
I.W
AGG CODIU
2
) (0REG NCMER M*0 IT 3 )
opme inio
geo shed mdranand san F.F.
0.731 0.731
.15M
5,00
0 ON
on 0.10m aggregate
RET .60M
3,804
2
ATE
pre textile stone e d infi ) ON) E (0.2 ) PAV TH E
par
ed memb dus
and l
(0.1M )
) ON ING STO 6 (1:6 IKN AND
LAY ) THESS (0.3HALF
rati r
(0.15 gro arti
M*0.
AGGOF CON 15M und rane t R 0,324 sho fical gra
COM
PAC
NE ERS IKN 0)
OF ESS ON RED
A cru ck me ss
REG CRE *0.6
on
T SAN
arti ATE TE 0M) MA (0.0 IT PLA BR
sho fical gra
) (0 (0.2) PAV
.1M) ON ING geo shed mdranand san D(0. TE 5) ICK
ON TOP STO pre textile stone e d infi 4,99 WH ON STE
cru ck me ss COM LAR NE par and ITEPAI IT R
I.W
PAC GE OF BAS ON ed memb dus l
geo shed mdranand san T SAN AGG E TOP
gro 5 NT 3
pre textile stone e d infi D(0.1 REG LAYER(M OF und rane t
C
.F1
par and ) ATE LAY
ed memb dus l ) (0 EDIU ER
I.W
2
5,00
14,7
gro .15M M
F.F
und rane t ) ON
.6 22
.F1
(0.1
0.647
0.000 2,76 5M*
AGGOF CO 0.15
7,612
4
4 12 REG NCRET M*0
6,56
23 ATE E .60M)
0
,713 0.000
1,29
R 0,350 ,226 ) (0 (0.2 PAV
.1M ) ON ING
) ON TOP STO
COM LAR NE
PAC GE OF BAS ON
D
T SAN AGG E TOP
R 0,350 R 0,350 D(0. REG LAYER( OF
1) ATE ME LAY
0.000 ) (0 DIU ER
- 0.150 - 0.150 arti - 0.150
sho fical gra
.15M M
) ON F.F.
cru ck me ss
geo shed mdranand san 3,102
arti
sho fical gra 6
pre textile stone e d infi cru ck me ss
par
ed memb dus
and l geo shed mdranand san
gro pre textile stone e d infi
und rane t par
ed memb dus
and l
- 0.300 gro 0.000
und rane t
0.000
R 0,350 14,369 R 0,324
E
GSPublisherVersion0.0.100.100
GSPublisherVersion 0.0.100.100
GSPublisherVersion 0.17.100.100
FUTURE UNIVERSITY
WORKING DRAWING
HOSPITAL PROJECT
INSULATOR 0.20
A LAYER OF STONES0.30
section part plan
FF5 FF5
0.60m
R.C R/F SLAB0.60m
AGGREGATE0.02m
R.C R/F SLAB0.60m
AGGREGATE0.02m
SCALE 1:50
REINFORCED ASPHALT C
/B 0.02m REINFORCED
CONCRETE
DEEP PILES
VINYL SHEET
0 .02m
ASPHALT C
/B 0.02m
VINYL SHEET
0 .02m
CONCRETE
DEEP PILES
MUSTAFA ALAA ALDEEN
R.N.C CEMENT 0.01m
FOUNDATIO
N
R.N.C CEMENT 0.01m FOUNDATIO
N INDEX:201805028
.
0,506 0,555
C2K
0,444 1,908 0,383
C3K
1,995 0,383
C4K
0,609 0,513
DATE:13\2/2023