0% found this document useful (0 votes)
34 views1 page

Hsiidc-S-0001-Plan at Basement-6 Level-R0-10-08-2023

Top down construction

Uploaded by

max_29
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
34 views1 page

Hsiidc-S-0001-Plan at Basement-6 Level-R0-10-08-2023

Top down construction

Uploaded by

max_29
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

KEY PLAN

3035

750
P3 P3 P3 DETAIL-C P3 P3 P3 LEGENDS:- 2
3
P2 THROUGHOUT WALL / COLUMN
4
7
601 WALL / COLUMN STOPS

P1
P3
P2 P2 P2 P2 P2 5

2400

2060
6
P3 NEW WALL / COLUMN

602 3530 2740


1

P1
7000

7200

P3
3530 NOTES

EQ 500
P3 P3 P3 P3 P3
603 P3

EQ
P3 P3 P3 P3

EQ
P3

EQ
P3
27200

8400

209.950
P3

EQ
TOC P3
P3

EQ
EQ
P3 DETAIL-A P3

EQ

EQ
P3 P3 P3
604

500
P3 P3 P3 P3 P3

EQ
X1 X1

P1
P3 P3
HINES INDIA
7000

3040
P3 PELLI CLARKE PELLI ARCHITECTS
P1

X2
P3 DESIGNPLUS ARCHITECTURE
DETAIL-B
605 2590

1525
2400

COLACO + OPTIMAL CONSULTANCY SERVICES


P3 P3 P3 P3 P3
ME ENGINEERS
606 P3 P3 P3 P3
2500

2500
P3

P3 P3 P3 F10 P3
SWA

WPM
P2 P2 P2 P2 P1 P2
P3 HWA
DETAIL-D P3 P3 P3 P3
UNFACTORED VERTICAL LOADS ON PILES
375 TRANSFERING FROM B3,B2 AND B1 LEVEL SLAB ARE. VDA
X2 3035
PILE @700/C/C
AECOM
8400 8400 8400 8400 4625 4080 3235
AECOM

6B 6C 6D 6E 6F 6F.1 6G 6H AECOM

BES CONSULTANTS

GENERAL NOTE:- PROTECH CONSULTING

1. READ THIS DRAWING ALONG WITH THE FOLLOWING DRAWINGS:


S002- PILE REINFORCEMENT SECTIONS & DETAILS
S003- BASEMENT-5 LEVEL PLAN OPTIMAL CONSULTANCY SERVICES
S004- TYPICAL SECTIONS X1-X1 & X2-X2 ADD:- A-49, GROUND FLOOR, SECTOR-2
NOIDA, UTTAR PRADESH - 201301
S005- TYPICAL DETAIL OF PILE TEL:- +91 120 4216630 / 4268733
EMAIL:- [email protected]
S006- TOP-DOWN CONSTRUCTION SEQUENCE PRINCIPAL CONSULTANT:- NITIN DHARIYAL
2. THE PRESENT BASEMENT LEVEL 5 STRUCTURAL DRAWING IS ATTACHED FOR REFERENCE. THE PRESENT
DIAPHRAGM WALLS ARE DESIGNED FOR EXCAVATION UPTO BASEMENT 5 LEVEL 215.125M ONLY. CLIENT
3. BASEMENT-6 IS REQUIRED FOR STP (49mX31m) APPROXIMATELY PLAN AREA UP TO 209.45m DEPTH. AADARSHINI REAL ESTATE
4. CONTIGUOUS PILES OF DIAMETER 600 ARE PROPOSED TO RETAIN THE FINAL EXCAVATION. REFER BASEMENT 5 DEVELOPERS PRIVATE LIMITED
AND BASEMENT 6 STRUCTURAL PLANS SHOWING THE PROPOSED PILES. PROJECT TITLE
5. THE DISTANCE AT TOP (NORTH) AND BOTTOM (SOUTH) BETWEEN THESES PILES AND DIAPHRAGM WALL IS VERY
CLOSE AND APPROXIMATELY 7.8M AND 5.8M ONLY. ALL THE SOIL PRESSURE BETWEEN SOIL AND DIAPHRAGM ATRIUM PLACE - UDHYOG
WALL SHALL BE TRANSFERRED TO THESE PILES. THE DISTANCE BETWEEN PILES AND DIAPHRAGM WALLS ON VIHAR, GURUGRAM
SIDE (EAST AND WEST) IS SUFFICIENT AND THEREFORE THE PRESSURE BETWEEN SOIL AND EXISTING
DIAPHRAGM WALL SHALL TRANSFER THROUGH THE SOIL FRICTION AND THERE SHALL NOT BE EXTRA FORCE ON REVISION LOG
THESE PILES DUE TO EXISTING DIAPHRAGM WALL. REV DATE DESCRIPTION
6. TO ECONOMIZE CONTIGUOUS PILES, PARTIAL TOP DOWN CONSTRUCTION SEQUENCE IS PROPOSED SO THAT R00 10.08.2023 FIRST ISSUE
THE NET PRESSURE BETWEEN DIAPHRAGM WALL AND SOIL IS REDUCED. THE SEQUENCE OF TOP DOWN
CONSTRUCTION IS LISTED SEPARATELY AND TO BE EXECUTED AT SITE BY MAIN CONTRACTOR.
7. THE SCOPE FOR PILING VENDOR IS LIMITED TO THE FOLLOWING ACTIVITIES:

DESIGN THESE PILES FOR EARTH RETENTION AND MAY INCREASE REBARS, DIAMETER OF PILES,
LENGTH OF PILE AS IT IS DESIGN AND BUILT WITH ALL THE RESPONSIBILITY REST ON VENDOR. DRAWING TITLE NORTH

BASEMENT-6 PILE LAYOUT PLAN


APPROVAL.
BUILDING-6

CONTRACTOR. S-0001 R00


8. SOIL REPORT FOR THE PROJECT IS ALSO ENCLOSED FOR REFERENCE. 1:200 REVISION
DISCIPLINE
9. APART FROM THE CONTIGUOUS PILES, ADDITIONAL PILES AS INDICATED IN DRAWING REQUIRED FOR TOP DOWN
Sunil
CONSTRUCTION ARE ALSO BE PROVIDED BY PILING VENDOR. ND S
10. THE ADDITIONAL TOP DOWN CONSTRUCTION LOAD IS ALSO INDICATED AND THE CONTIGUOUS PILES SHALL BE DRAWING PACKAGE PHASE
DESIGNED FOR THIS ADDITIONAL AXIAL LOADS.
100% CD PACKAGE
1

You might also like