Hsiidc-S-0001-Plan at Basement-6 Level-R0-10-08-2023
Hsiidc-S-0001-Plan at Basement-6 Level-R0-10-08-2023
3035
750
P3 P3 P3 DETAIL-C P3 P3 P3 LEGENDS:- 2
3
P2 THROUGHOUT WALL / COLUMN
4
7
601 WALL / COLUMN STOPS
P1
P3
P2 P2 P2 P2 P2 5
2400
2060
6
P3 NEW WALL / COLUMN
P1
7000
7200
P3
3530 NOTES
EQ 500
P3 P3 P3 P3 P3
603 P3
EQ
P3 P3 P3 P3
EQ
P3
EQ
P3
27200
8400
209.950
P3
EQ
TOC P3
P3
EQ
EQ
P3 DETAIL-A P3
EQ
EQ
P3 P3 P3
604
500
P3 P3 P3 P3 P3
EQ
X1 X1
P1
P3 P3
HINES INDIA
7000
3040
P3 PELLI CLARKE PELLI ARCHITECTS
P1
X2
P3 DESIGNPLUS ARCHITECTURE
DETAIL-B
605 2590
1525
2400
2500
P3
P3 P3 P3 F10 P3
SWA
WPM
P2 P2 P2 P2 P1 P2
P3 HWA
DETAIL-D P3 P3 P3 P3
UNFACTORED VERTICAL LOADS ON PILES
375 TRANSFERING FROM B3,B2 AND B1 LEVEL SLAB ARE. VDA
X2 3035
PILE @700/C/C
AECOM
8400 8400 8400 8400 4625 4080 3235
AECOM
6B 6C 6D 6E 6F 6F.1 6G 6H AECOM
BES CONSULTANTS
DESIGN THESE PILES FOR EARTH RETENTION AND MAY INCREASE REBARS, DIAMETER OF PILES,
LENGTH OF PILE AS IT IS DESIGN AND BUILT WITH ALL THE RESPONSIBILITY REST ON VENDOR. DRAWING TITLE NORTH