0% found this document useful (0 votes)
52 views2 pages

Thrust Pit Layouts

Uploaded by

ch.usama.300
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
52 views2 pages

Thrust Pit Layouts

Uploaded by

ch.usama.300
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

PRODUCED BY AN AUTODESK STUDENT VERSION

7.00 M
NOTE
1 - This drawings shows cross section sectional (TOP)
and (PLAN ) view (BOTTOM ) of Atypical
launching pit.

1.50M
2 - For gravity line , launching pit is preferably
located at down flow site of obstacle.
PLAN 3 - The launching pit to have clear dimensions
11.00*7.00 m at the depth of 1.65 m lower than
product pipe centerline to the top of concrete base slab

1940 MM
4 - Base slab of pit must be protected with clear
dimensions (11.00 m*7.00m) * min 0.20m thickness
concrete slab.

PRODUCED BY AN AUTODESK STUDENT VERSION


PRODUCED BY AN AUTODESK STUDENT VERSION

5 - Top of concrete slab should have the same gradient


of pipeline.

.87M
6 - depth of pit varies depending on natural ground
elevation (NGE)and bottom pipe elevation(BPE)
of pipe

1940 MM
7 - This sheet shows atypical pit in stable ground,
11.00 M

soil rock,clay, clays silts, non-cemented sand, loose


soils,etc required sheet pilling and shoring.
8 -Receiving pit to have clear dimensions 9.00 m* 6.00 m
at the depth enough to recover the machine shield.
Distance between

.87M
RCJ Pipe 9 -Jacking and Receiving shafts should be at the same
direction, on the other word jacking and receiving shaft
should be perpendicular to center line
1940 MM

Saudi Tunneling Company For Contracring

1.50M
Phone : (12)661691.Ext101
Fax : (12)2610481.Ext 106

Typical Thrust pit Layout For

MT-WORKS

Client : Binyah Co.


Project : Installation of DN1600 mm RCJ pipe without liner
Three parallel Tunnels in Qiddiya
PRODUCED BY AN AUTODESK STUDENT VERSION
PRODUCED BY AN AUTODESK STUDENT VERSION

NOTE
1 - This drawings shows cross section sectional (TOP)
and (PLAN ) view (BOTTOM ) of Atypical
launching pit.
2 - For gravity line , launching pit is preferably
Cross Section located at down flow site of obstacle.
3 - The launching pit to have clear dimensions
12.00*7.00 m at the depth of 1.65 m lower than
product pipe centerline to the top of concrete base slab
4 - Base slab of pit must be protected with clear
12.00 M
dimensions (12.00 m*7.00m) * min 0.20m thickness
concrete slab.

PRODUCED BY AN AUTODESK STUDENT VERSION


PRODUCED BY AN AUTODESK STUDENT VERSION

Ground Surface (Cast-insite ) 0.75-0.90 M thickness Ground Surface 5 - Top of concrete slab should have the same gradient
Concrete Thrust -BLOCK
(Cast-insite ) 0.5-0.75 M thickness of pipeline.
Launch Seal Wall
6 - depth of pit varies depending on natural ground
RCJ Pipe DN 1600 mm elevation (NGE)and bottom pipe elevation(BPE)
of pipe
7 - This sheet shows atypical pit in stable ground,
soil rock,clay, clays silts, non-cemented sand, loose
soils,etc required sheet pilling and shoring.
Center of Pipe
8 -Receiving pit to have clear dimensions 9.00 m* 6.00 m
at the depth enough to recover the machine shield.
9 -Jacking and Receiving shafts should be at the same
1.65 M direction, on the other word jacking and receiving shaft
Jack Frame
Distance Between C.L. and
should be perpendicular to center line
Top of Concrete Base Slab

Concrete Base Slab


Saudi Tunneling Company For Contracring
See Note #4

Phone : (12)661691.Ext101
Fax : (12)2610481.Ext 106

Typical Thrust pit Layout For

MT-WORKS

Client : Binyah Co.


Project : Installation of DN1600 mm RCJ pipe without liner
Three parallel Tunnels in Qiddiya

PRODUCED BY AN AUTODESK STUDENT VERSION

You might also like