Carefree Cables
DROPS summer top with cables in “Muskat”. Size S – XL.
DROPS Extra 0-36
Size: S/M-M/L-XL
Finished measurements:
Chest measurements: 84-78-82 cm = 33"-30¾"-32¼"
Full length: 41-43-46 cm = 16⅛"-17"-18"
All measurements in charts are in cm.
Materials: DROPS Muskat from Garnstudio
200-250-250 g color no 36, jeans blue
DROPS pointed needles size 4 MM = US 6 - or size needed to get 21 sts x 42 rows in garter st on
needle size 4 MM = US 6 = 10 x 10 cm = 4" x 4".
DROPS crochet hook size 4 MM = US 6
Garter st, back and forth on needle: K all rows.
Pattern: See diagram M.1. First row in diagram is worked from WS. English explanations to the
diagrams are given at the bottom of this page.
Hole for straps: K2, *K2 tog, K1 *, repeat from *-*, and make 1 YO over dec st on next row.
Decreasing tip: K tog the 2 middle sts in cable before dec for armhole and neckline.
Front piece: Cast on 86-90-96 sts (includes 1 edge st each side) on needle size 4 MM = US 6
and K 1 row from RS. Continue as follows: 5-7-10 garter sts, M.1 on the next 76 sts (= 7
cables), 5-7-10 garter sts. Continue in pattern like this with 5-7-10 garter sts each side.
Remember the knitting gauge! When piece measures 3 cm = 1⅛" inc 1 st each side on every 3-
2.5-2 cm = 1⅛"-1"-¾" a total of 6-9-11 times = 98-108-118 sts. Work inc sts in garter st.
When piece measures 25-27-28 cm = 9¾"-10⅝"-11" bind off for armhole each side on every
other row – see decreasing tip: 4 sts 0-1 1 time, 3 sts 1-2-2 times, 2 sts 1-2-3 times and 1 st
10-6-7 times. At the same time when piece measures 28-30-31 cm = 11"-11¾"-12¼" dec 1 st
on each of the middle 3 cables. On next row slip the middle 17 sts on a stitch holder for neck
and complete each side separately. Bind off to shape the neckline at the beg of every row from
mid front: 3 sts 1 time, 2 sts 2 times, 1 st 2-2-4 times = 15 sts left on shoulder. K 1 row on all
sts, at the same time K tog the 2 middle sts on each cable. Piece now measures approx 30-32-
34 cm = 11¾"-12½"-13⅜". Make 4 holes – see above – on the remaining 14 sts. Work 1 row
stockinette st on all sts and bind off
Back piece: Cast on and work like front piece.
Assembly: Sew side seams inside 1 edge st. Pick up approx 30-35 sts (incl sts on stitch holder)
on needle size 4 MM = US 6 along neckline on front piece – beg and finish in garter st row below
the holes. P 1 row as seen from RS and bind off. Crochet a row of sc with crochet hook size 4
MM = US 6 along the edge – beg and finish with 1 sl st by the row of holes. Repeat along
neckline on back piece. Crochet a round of sc round armholes – beg and finish with 1 sl st by the
garter st row below the holes each side.
Crochet 6 ch-strings measuring approx 70-80 cm = 27½"-31½" each. Make 2 pleats (3 strings
in each). 1 pleat = 1 strap. Thread a strap through the 4 holes on one side of front piece and
then through the same holes on back piece. Crochet tog the 2 ends with 1 sl st = 2 straps on
each shoulder Repeat the other side.
English explanation to pattern diagram:
Rett = RS
Vrang = WS
Diagram explanations
=K
=P
= slip 2 sts on cable needle in front of piece, K2, K2 from cable needle
Have you made this or any other of our designs? Tag your pictures in social media with
#dropsdesign so we can see them!
Do you need help with this pattern?
You'll find 21 tutorial videos, a Comments/Questions area and more by visiting the pattern on garnstudio.com.
Have you purchased DROPS yarn to make this pattern? Then you are entitled to receive help from the store that
sold you the yarn.
© 1982-2024 DROPS Design A/S. We reserve all rights. This document, including all its sub-sections, has copyrights. Read more about
what you can do with our patterns at the bottom of each pattern on our site.