Ta3248 CKD C01 Abd.e005.3 - F0

The document outlines a detailed electrical and cable installation plan for various areas, including workshops, storage, and production lines. It specifies the types and specifications of cables to be used, along with their routing through existing conduits and cable ladders. Additionally, it includes references to safety equipment and operational areas such as charging stations and workshops.

Uploaded by

miftah ahsan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
32 views1 page

Ta3248 CKD C01 Abd.e005.3 - F0

The document outlines a detailed electrical and cable installation plan for various areas, including workshops, storage, and production lines. It specifies the types and specifications of cables to be used, along with their routing through existing conduits and cable ladders. Additionally, it includes references to safety equipment and operational areas such as charging stations and workshops.

Uploaded by

miftah ahsan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

KEY PLAN

A.A
EL. -1150 A.F 1. CABLE FO MM 2C
CABLE FRC STP 3(2x1.5mm )
2. CABLE NYFGBY 2x1.5mm
TO MODULE SYMPLEX -GH
c/w PVC CONDUIT 25mm
ON CABLE LADDER EXISTING
( IN DRAINAGE )

ALCOHOL
TANK
LABEL STAGING BATTERY
CHARGING 1
CLEAN
WORKSHOP
CHANGE
PARTS
WASTE
ROOM
BATTERY RM / PPM RM / PPM LVMDP-2
PERFUME
AREA CHARGING 2 AIRLOCK TRANSFER STAGING MVDP ALCOHOL
AIRLOCK TRAFO
STAGING
PORTABLE
EYE WASHER

A.01 CABLE FRC STP 6Cx1.5mm FROM CO2 HANS


TO MODULE SYMPLEX -GH
STORE
ADMIN

WRAPPER
Tube
MACHINE
Line
LVMD-2 IN SECOND FLOOR Emergency
Shower
EL. -1200

IN NEW CABLE LADDER 100 x100


TECHNICAL ROOM

70/min case sealer weigher


case label
CABLE NYFGBY 4x120mm HEATING

NEW PANEL ROOM AT 1st FL


CHAMBER

WORKSHOP ROOM

+NYA 70 mm TO SDB-WWTP SAFETY

EX GS SPV ROOM
Tube Line PRIMARY
SHOWER

70/min PACKAGING

EL. -1200 case sealer weigher


case label
STAGING
12 PP
POWDER
1.CABLE FRC 2x2.5mm
PRODUCTION
STAGING 2. CABLE FRC STP 2x1.5mm
c/w CONDUIT 20mm
Jar/ Btl Line WEIGHING
SOLID
ELECTRIC ROOM
40/min
LP-GENSET FROM HBFA-WWTP TO JBFA - WH
FUEL TANK

case sealer weigher Bottom Coding PRIMARY

E
case label Labeller PACKAGING

3.CABLE FO MM 4C c/w PVC 25 mm


STAGING
12 PP LIQUID

GENSET ROOM
Bottle Line
60/min 4.CABLE FRC STP 6x1.5mm DARI CO2 HANS KE
GENSET ROOM
case sealer weigher
case label Labeller
Bottom Coding
MODULE SYMPLEX
FUEL TANK
FROM SWITCH - GH TO SWITCH -WH
IN NEW CABLE LADDER 100 x100
Roll-on Line
90/min
Bottom Coding LIFT
5.CABLE FRC
H.22 4x120mm + NYA 70mm

CABLE NA2XSR(AL)Y 3x1Cx185mm² (MVMDP)


Labeller

FILLING FROM LVMD2 TO SDP-WWTP


MV
ROOM
INCOMING PACKING
(CAIR, CAIRAN KENTAL, KRIM,
GEL, PASTA)
6.CABLE FO MM 8C

Window
GENERATOR FROM SERVER 2 TO SWITCH -WH
Roll-on Line ON CABLE LADDER 300x100 EXISTING
150/min

Window

TANK AREA
CONDENSAT
RELOCATED
Roll-on Line
150/min WATER GATE THK 20 MM STEEL PLATE
1.CABLE NYFGBY 4x120mm + NYA 70mm
JBFA - 10 OFFICE LT.1 JBFA - NV FROM LVMDB 2 TO SDP-WWTP
2.CABLE NYFGBY 5x4mm c/w PVC Dia 25mm

OUTDOOR CAMERA 1. CABLE FO MM 4C + PVC FROM SDP - GH TO PP-DRIVER SHELTER

COPIER
MUSHOLLA
IN PVC PIPE Ø100

SELASAR
TO SWITCH -GH

-0.03
2. 2x CABLE UTP CAT 6 + CONDUIT 3.CABEL FRC 2x2.5mm & FRC STP 2x1.5mm

KONTROL
STEPPING

RUANG
±0.00
STONE
1.CABLE FRC 2x2.5mm

IMAM
MDSS - PAGA FROM MCFA TO JBFA-WWTP

WUDHU (L)

MIMBAR
TO SWITCH 1-GH CH 15 & CH 16

STEPPING
-0.05

STONE
2.CABLE FRC STP 2x1.5mm

AREA MASUK
IKHWAN
-0.03
3. CABLE UTP CAT 6 + CONDUIT SDP-PROCESS 4.CABLE FRC 2x2.5mm & FRC STP 2x1.5mm

STEPPING
AHU ROOM SECOND FLOOR

STONE
AIR
c/w CONDUIT 20mm LOCK

TO RECEPTION -GH FROM MCFA TO JBFA -WWTP

LANTAI EKSISTING FINISH


UTILITIES

MUSHOLLA
BATU KORAL PUTIH

SELASAR
FROM MCFA GH

-0.03
JBFA -

WUDHU (P)
1 1 1 1

5. 3x CABLE UTP CAT 6

-0.05
2 2

4. 3x CABLE UTP CAT 6 + CONDUIT


2 2
3 3 3 3 CHANGE OVER
ON CABLE LADDER EXISTING
PROCESS TANK

42 Bucket
30 Bucket

24 Bucket
4 4

D
4 4
5 5 FILLER

30 Bucket
5 5
CLEAN DIRTY
TO POLY ROOM -GH FROM SEREVER 2 TO SWITCH WWTP
6 6 6 6
CHEMICAL

CANTEEN
TANK CHEMICAL

STEPPING
7 7 TANK

STONE
7 7

H.9
8 8 8 8
9 9 9

5.2x CABLE UTP CAT 6 + CONDUIT 1.CABLE NYYHY 2x1.5mm 6.CABLE FO MM 4C c/w PVC CONDUIT DIA 20mm

AREA MASUK
10 10 10

AKHWAT
CIP ROOM

-0.03
11
12 AERATION AREA

96 Lid
13
WWTP / RO SYSTEM
c/w CONDUIT 20mm TO JBFA PAGA
WASHING
ON CABLE LADDER EXISTING
Ø2200.0000

TO SWITCH WWTP CP-002

H.8
14
FLOOR DRAIN (GRATING SS)

ON CABLE LADDER EXISTING 2.CABLE UTP CAT6 SOAKING HOBART WASH BASIN
WWTP / RO SYSTEM

H.7
c/w CONDUIT 20mm CIP TANK 1 CIP TANK 2 CIP TANK 3 CIP TANK 4 CIP TANK 5

FISH POND
SERVER 2 TO RECEPTIONIS -GH

NEW AERATION TANK


KALSIBOARD MOVEABLE WALL
SERVER 2

CRMLAB-08

MBBR AREA
CRMLAB-01
IRMLAB-10

IRMLAB-08

H.6

CEMICAL STORAGE
CRMLAB-02

CRMLAB-05
CIP TECHNICAL DIW PLANT

Future Extension-EDI
1x CABLE FRC 2x2.5mm
IRMLAB-09

CRMLAB-04

IRMLAB-12
PP-G C JBFA -WWTP

IRMLAB-06
PP-WWTP

H.5
CRMLAB-07

CRMLAB-06

IRMLAB-13
NEW CABLE NYYHY 2x1.5mm c/w
CRMLAB-03
DRMLAB-04

1x CABLE FRC TP 2x2.5mm SERVER 1


PASS
BOX

IRMLAB-04
NEW DRAINAGE (UC-400)

IRMLAB-07

CEMICAL ROOM
DRMLAB-10 DRMLAB-09
PASS
BOX

IRMLAB-11 IRMLAB-05 IRMLAB-03 IRMLAB-02

EMERGENCY
CABLE FRC 2x2.5mm 1x.CABLE FRC STP 2x1.5mmA.12

SHOWER
IRMLAB-01

H.4
CABLE FRC STP 2x2.5mm 1x CABLE NYMHY 2x2.5mm

TOILET
SDP OFF- 2

H.3
ON CABLE TRAY EXISTING IN TRENCH NEW BLOWER

CHANNEL

LAB & CONTROL ROOM


CONDUIT dia 20 mm TO PAGA RELOCATED

CABLE

PL5

PL5
H.2
SDB OFFICE IN THIRD FLOOR

C.01 C.15
RELOCATED
1.CABLE FO MM 8C + PVC CABLE NYFGbY 5x6 mm 1.1x CABLE FO MM 4C TO CH-15

CROSS LINE

H.1
TO SWITCH -WH c/w PVC 32 mm 2. 2x CABLE UTP CAT 6 TO CH-16

H.A

H.B

H.D

H.E

H.G

H.H
H.F
H.C

2. 5x CABLE UTP CAT 6 TO SDP- GH FROM SERVER 2

INSTALLATION BELOW ± 30-40 CM


NYYHY 2x2.5mm TO SWITCH - GH CABLE LADDER 200X100
ON CABLE LADDER EXISTING

NEAREST
A EXISTING

PAGA
c/w CONDUIT 20mm ON CABLE LADDER EXISTING
-0.940

NEAREST
MALE LOCKER
-0.400 FFL. -0.665

MEDIC ROOM
INDUCTION
FFL. -0.665

-2.020 NEW CABLE NYFGBY 5x4mm


ROOM
FFL. -0.665

STREET LIGHTING
-0.800 CORRIDOR
FFL. -0.665
FEMALE LOCKER
FFL. -0.665

00
NEW SECURITY

c/w Pvc dia 25mm FROM SDP - GH


GUARD HOUSE

EL.-1.2
OFFICE
FFL. -0.665

LS
-0.975

NEW DRAINAGE (UC-400)


TOILET
FFL. -0.665

EL-0.700
CB4
SCOPE INSTALLATION BELOW ± 30-40 CM
CYCLE
WAITING ROOM
FFL. -0.665
SECURITY ROOM

CROSS LINE
SECTION 1
FFL. -0.665

MOTOR UNITS
C.G'
PAGA OUTDOOR PARKIN
G 48

NOTE & LEGEND

F
- ALL DIMENSIONS ARE IN MILLIMETERS UNLESS NOTED OTHERWISE.

TO ON CEILING
LP-TRANSFORMER
LVMDP

CONCRETE PEDESTAL
TRANSFORMER
SEE SECTION F-F RELOCATED
DETAIL PONDASI STREET LIGHTING
EL. -1.100

CABLE NYFGBY 5x4mm c/w Pvc dia 25mm NOTED : DETAIL DRAWING
CABLE LADDER 10x100 EXISTING ON CEILING PENEMPATAN LAMPU PJU
MENUNGGU UPDATE GAMBAR CSA
TRAFO
ROOM
EXISTING PIPE RACK

EXISTING PIPE RACK

EXISTING PIPE RACK


NEW CABLE NYFGBY 3x4mm c/w Pvc dia
25mm FROM NEAREST STREET LIGHTING
INSTALLATION BELOW ± 30-40 CM
PUMPHOUSE
REV DATE DRAWN DESCRIPTION
EL. -1.200
CLIENT :
PT BEIERSDORF INDONESIA
C.A' Jl. Raya Randuagung - Singosari KM 75,
Randuagung, Singosari, Malang

WASH. WEIGHING ROOM


FOR
MALE 1. CABLE FO MM 2C
TOILET

FAMALE
CHANGING ROOM EQUIP. RAW
MATR.
JBFA - HANS 2. CABLE NYFGBY 2x1.5mm
AIRLOCK
CONSTRUCTION MANAGEMENT
PRODUCTION AREA PT BIMATEKNO KARYATAMA
c/w PVC CONDUIT 25mm
CHANGING
ROOM AIR LOCK
JBFA -WH FROM SWITCH 3 -WH
KONSULTAN
Tempo Scan Tower 25th floor
SDP-PH Jl. H.R. Rasuna Said Kav. 3 – 4
( IN DRAINAGE )
RAW MATERIAL

Jakarta Selatan 12950


II
CHANGING

CLOTHES

CABLE FRC 2x2.5mm &


MOTHER
ROOM
AIRLOCK

ROLL
WOUND

CABLE FRC STP 2x1.5mm


PAD

MEETING ROOM
DRESSING KOYO)
CONSTRUCTION MANAGEMENT
MIXING ROOM c/w CONDUIT 20mm 1.CABLE FRC 2x2.5mm PT HASKONING INDONESIA
INSPECTING
FROM JBFA-WWTP 2. CABLE FRC STP 2x1.5mm
Arkadia Green Park, Tower G, 10th
Jl. Let. Jend. TB Simatupang Kav 88,
MOTHER ROLL
KOYO c/w CONDUIT 20mm Kebagusan, Pasar Minggu, South Jakarta,
12520, Indonesia.
SLITTING ROOM FROM JBFA-WWTP TO JBFA - WH T: +62 21 397 11320
SWITCH HUB
PJS PHII

CO2 - HANS SWITCH HUB-WH3


E: [email protected]
DRESSING
3.CABLE FO MM 4C c/w PVC 25 mm
OFFICE WH
MECHANIC
FROM SWITCH - GH TO SWITCH -WH
CONTRACTOR
4.CABLE FO MM 8C c/w PVC 50MM
C02 EQUIPMENT

1.CABLE FO MM 2C HIGH SPEED DOOR


PT CITRA KARSA DINAMIKA
TO CCTV CORNER WAREHOUSE CABLE FO MM 8C
COPIER

FROM SERVER 1 TO SWITCH - WH Design - Manufacturing - Construction - General Trade

Jl. Pangkalan II No.35 RT 04/02


2.CABLE FO MM 4C c/w CONDUIT 20mm
WH &
LOGISTIC
(7/10)

WH &
WH &
LOGISTIC
(8/10)

WH &
ON CABLE LADDER EXISTING Cikiwul, Bantar Gebang - Bekasi Timur
Phone :Telp. (62-021) 86210121
LOGISTIC LOGISTIC
(9/10) (10/10)

HANSAPLAST MANUAL PACKING


FROM SWITCH HUB - GH FROM SERVER 1
LAMINAR WH & WH & WH &
FLOW LOGISTIC LOGISTIC LOGISTIC

Fax. :(62-021) 86210120


CABINET (1/10) (3/10) (4/10)

WH & WH & WH &


LOGISTIC LOGISTIC LOGISTIC
(2/10) (5/10) (6/10)

C.F
PROJECT TITLE :
BEIERSDORF PC MALANG RENOVATION & EXPANSION
A.A A.F 1. CABLE FO MM 2C MAGMA 2 PROJECT
CABLE FRC STP 3(2x1.5mm ) EL. -1150
2. CABLE NYFGBY 2x1.5mm
TO MODULE SYMPLEX -GH
c/w PVC CONDUIT 25mm As-BUILT DRAWING
ON CABLE LADDER EXISTING ( IN DRAINAGE ) ELECTRICAL

ALCOHOL
TANK
LABEL STAGING BATTERY CLEAN
WORKSHOP
CHANGE
PARTS
WASTE
ROOM
BATTERY RM / PPM RM / PPM LVMDP-2
PERFUME
AREA CHARGING 1 CHARGING 2 AIRLOCK TRANSFER STAGING MVDP ALCOHOL
AIRLOCK TRAFO
PORTABLE
STAGING DRAWING TITLE :
EYE WASHER

A.01 CABLE LADDER,CABLE TRAY AND ELECTRICAL,ELECTRONIC


CABLE FRC STP 6Cx1.5mm FROM CO2 HANS
INSTALLATION
TO MODULE SYMPLEX -GH
STORE
ADMIN

TECHNICAL ROOM
WRAPPER
Tube
MACHINE
Line
LVMD-2 IN SECOND FLOOR Emergency
Shower
EL. -1200
70/min case sealer weigher
case label IN NEW CABLE LADDER 100 x100 CABLE NYFGBY 4x120mm HEATING
CHAMBER

WORKSHOP ROOM
+NYA 70 mm TO SDB-WWTP NEW PANEL ROOM AT 1st FL
SAFETY

EX GS SPV ROOM
Tube Line PRIMARY
SHOWER
DRAWING NUMBER :
70/min PACKAGING

EL. -1200 1.CABLE FRC 2x2.5mm


case sealer weigher STAGING POWDER
case label 12 PP

PRODUCTION
STAGING 2. CABLE FRC STP 2x1.5mm
Jar/ Btl Line
c/w CONDUIT 20mm
WEIGHING
SOLID
ELECTRIC ROOM
40/min
LP-GENSET FROM HBFA-WWTP TO JBFA - WH
FUEL TANK

case sealer weigher Bottom Coding PRIMARY

E
case label Labeller PACKAGING

3.CABLE FO MM 4C c/w PVC 25 mm


STAGING
12 PP LIQUID

DRAWING NUMBER REFERENCE :


GENSET ROOM Bottle Line
60/min 4.CABLE FRC STP 6x1.5mm DARI CO2 HANS KE
GENSET ROOM
case sealer weigher
case label Labeller
Bottom Coding
MODULE SYMPLEX
FUEL TANK
FROM SWITCH - GH TO SWITCH -WH
Roll-on Line
90/min
Bottom Coding
IN NEW CABLE LADDER 100 x100
LIFT
5.CABLE FRC
H.22 4x120mm + NYA 70mm

CABLE NA2XSR(AL)Y 3x1Cx185mm² (MVMDP)


Labeller

PT. CITRA KARSA DINAMIKA PT. HASKONING INDONESIA


FILLING FROM LVMD2 TO SDP-WWTP
MV
ROOM
INCOMING PACKING
(CAIR, CAIRAN KENTAL, KRIM,
GEL, PASTA)
6.CABLE FO MM 8C DRAWN BY: CHECKED BY: APPROVED BY: APPROVED BY:
Window

GENERATOR FROM SERVER 2 TO SWITCH -WH


Roll-on Line
150/min
ON CABLE LADDER 300x100 EXISTING

PT. BEIERSDORF INDONESIA


Window

CONDENSAT
TANK AREA

ACKNOWLEDGE : ACKNOWLEDGE : ACKNOWLEDGE :


Roll-on Line
150/min WATER GATE THK 20 MM STEEL PLATE
1.CABLE NYFGBY 4x120mm + NYA 70mm
JBFA - NV FROM LVMDB 2 TO SDP-WWTP
JBFA - 10 OFFICE LT.1
2.CABLE NYFGBY 5x4mm c/w PVC Dia 25mm
1. CABLE FO MM 4C + PVC FROM SDP - GH TO PP-DRIVER SHELTER
COPIER
MUSHOLLA

IN PVC PIPE Ø100


SELASAR

TO SWITCH -GH SCALE


-0.03

2. 2x CABLE UTP CAT 6 + CONDUIT 3.CABEL FRC 2x2.5mm & FRC STP 2x1.5mm
KONTROL
RUANG
STEPPING

±0.00
STONE

1.CABLE FRC 2x2.5mm


IMAM

SHEET