Notes:
1.According to foundation drawings(SUQ001.00),rig well require flattening with cement foundation;
2.Set well center line as a datum, draw longitudinal and transverse center line across well center and position line for all the ground
equipment.;
3. All the spinning pins surface must spread the grease.
4. Rig installation works are alternative. After substructure bottom layer installed , solid control system, mud pump units, diesel generator
room, etc. could be installed separately according to (SUQ001.00) rig plane layout drawing.
5. Safety pin must be installed when connecting pin fixed. Spring gasket must be installed where bolt connection is single nut.
6.Pay attention to the following notes when installing solid control system:
a.After place mud tanks in position and then installing attachments, equipments and process pipeline;
b.After fix all the equipments and then connecting the pipeline;
c.Part of the pipeline cross over platform or handrail,pay attention to installation order during the installation ;
d.Connecting relevant pipeline between tanks;
e.After installation, check every process and attachments from shale shaker tank,make sure that no left and each pipeline connecting
tightness
7. Other items need attention, please refer to “ZJ50/3150DB drilling rig operation manual”.
1 / 143
14087-50DB/6 项目钻机安装指导手册
Place 8 pcs 5000mm x3000mm x210mm steel wood and 26 pcs 4000mm x3000mm x210mm steel wood foundation according to layout
14087 项目钻机安装指导手册
2.Installing bottom base (Left front lower base,Right front lower base )
Before install bottom base,make sure steel wood in position and fixed tightly.
After check the steel wood foundation installation, check the components quantity of bottom base,fill up or repair the components that lost
or deformation
After everything prepared,installing the bottom base according to drawing SUKR112.75.10.00 and pin diagrammatic drawing
a) Place left front lower base, right front lower base on steel wood foundation and make sure well center coincide with well center on the ground
b) Place left back lower base,right back lower base on steel wood foundation and make sure front lower base, back lower connecting pin hole
coincidence, make sure that 8 pcs single taper pin Φ140x280 can be inserted
c) Installing pulling beam1, pulling beam 2, pulling beam 3 in turn and make sure connecting pin hole of pulling beam and lower base
coincidence
iii / 143
14087 项目钻机安装指导手册
(1)Installing left front lower base and right front lower base on the steel wood in turn,make sure the center distance of two belly
board is 7660mm;
iv / 143
14087 项目钻机安装指导手册
(2)Make sure left front lower base and right front lower base well center line that marked on the nameplate coincide with well
3.Installing bottom base(left back lower base,right back lower base) Note:Single taper pin install from outside to inside
3、4
v / 143
14087 项目钻机安装指导手册
(1)Installing left back lower base (NO.1)and Right back lower base(NO.2) on the steel wood,and make sure pin hole of left front base
(2)installing 8 single taper pinsΦ140x280 (NO.3) and 16 shear pins Φ25x160(NO.4 safety pin included),Connect front and back base
vi / 143
14087 项目钻机安装指导手册
1 5、6
Note:After install bottom base,make sure well line nameplate of left, right front lower
vii / 143
14087 项目钻机安装指导手册
(1)Differentiate left and right remark according to pulling beam end, installing pulling beam 1(NO.1) and Pulling beam 2(NO.2) on left
front base and right front base in turns, and installing pulling beam 3 (NO.3)between left back lower base and right back lower base, make
(2)“L” on behalf of left side and “R” on behalf of right side on the end mark
(3)Pin 24 single taper pinsΦ70x225 (NO.5) and 48 shear pinΦ15x75 (NO.6 safety pin included), make sure that before install the pulling
viii / 143
14087 项目钻机安装指导手册
5.Install ground floor(diagonal draw bar) Note:single taper pin installed from up to down
1 2、3
(1) According to the pulling beam end to differentiate left and right mark,install 2 diagonal draw bars (NO.1)in turns and make sure
ix / 143
14087 项目钻机安装指导手册
(2) “L” on behalf of left side and “R” on behalf of right side on the end mark,differentiate same piece by“L1”“R1”“L2”“R2”
(3)Pin 24 single taper pinsΦ60x125 (NO.2) and 8 shear pinΦ15x75 (NO.3 safety pin included)
Before install middle level, count components and parts of middle level and repair transmutative components
After everything prepared,install middle level according to attached drawing SUKR112.75.100.00 and pins schematic diagram and
following steps
a) Install two rear column on base and make sure the pinhole of rear column coincide with front lower base connecting pinhole, and ensure
four taper pins can go through smoothly. Then, put the other end of column on rear lower base.
b) Place two inclined column support on suitable area around pull beam, and install two rear inclined column. Put in two taper pins
Φ100x305, then put free end of rear inclined column on pull beam 2.
c) At last, install two front inclined column and put in two taper pins Φ130x420, at this point, middle-level installation finished.
x / 143
14087 项目钻机安装指导手册
(1) Distinguish the mark left and right side, install #1,#2 column on left front base and right front base successively, ensure column lifting
padeye upside.
(2) Adjust the pinhole between left and right rear column and rear lower base,put in 4 single cone pin Φ130x535(#3) and 8 shear pins
Φ25x140(#4 including safety pin),lay down the left and right rear column(#1 and 2)on left and right rear lower seat.
xi / 143
ZJ14087-50DB/6 rig installation guide manual
2、3
12 / 143
ZJ14087-50DB/6 rig installation guide manual
13 / 143
ZJ14087-50DB/6 rig installation guide manual
2、3
14 / 143
ZJ14087-50DB/6 rig installation guide manual
connected front stand column and left-upper base would be installed for the time being ;
(2)Put right-front stand column down on right-front-bottom base and right-upper base to make sure all pin holes coincide,plug in 2 single
tapper pinsΦ130x420(No.2) in the right-front-bottom base and 4 sheer-pinsΦ25x140(No.3 ,including safety pins),2 single tapper pins Φ130x535
where are connected front stand column and right-upper base would be installed for the time being.
15 / 143
ZJ14087-50DB/6 rig installation guide manual
3、4
16 / 143
ZJ14087-50DB/6 rig installation guide manual
17 / 143
ZJ14087-50DB/6 rig installation guide manual
2、3
18 / 143
ZJ14087-50DB/6 rig installation guide manual
(1) Connect setbacks beam (No.1) with left and right top base and align pin holes;
(2)Plug in 4 single tapper pinsΦ100x225(No.2) and 8 sheer pinsΦ20x120(No.3 ,including safety pin) in setback front beam ;plug in 4
single tapper pinsΦ130x270(No.4) and 8 sheer-pinsΦ25x140 (No.5 ,including safety pin ) .
19 / 143
ZJ14087-50DB/6 rig installation guide manual
3、4
20 / 143
ZJ14087-50DB/6 rig installation guide manual
12. Installation for top layer (RT beam,independent drive device support base ,operation platform)
1 2
6、7
4、5
21 / 143
ZJ14087-50DB/6 rig installation guide manual
22 / 143
ZJ14087-50DB/6 rig installation guide manual
4、5
23 / 143
ZJ14087-50DB/6 rig installation guide manual
24 / 143
ZJ14087-50DB/6 rig installation guide manual
25 / 143
ZJ14087-50DB/6 rig installation guide manual
1
2
26 / 143
ZJ14087-50DB/6 rig installation guide manual
1 2、3
4 3、5、6
No. Name Drawing No. Qty. Remark
1 Back connection beam KR112.75.290.00 1
2 Double taper pin Φ40x95 KRT-04-15 4
3 clip Φ30 KRT-01-01 24
4 BOP rail KR112.22.600.00 2
5 Single taper pin Φ40x95 KRT-03-01 8
27 / 143
ZJ14087-50DB/6 rig installation guide manual
28 / 143
ZJ14087-50DB/6 rig installation guide manual
1 2
29 / 143
ZJ14087-50DB/6 rig installation guide manual
5 4
30 / 143
ZJ14087-50DB/6 rig installation guide manual
31 / 143
ZJ14087-50DB/6 rig installation guide manual
2
1
3 Connecting
device
32 / 143
ZJ14087-50DB/6 rig installation guide manual
33 / 143
ZJ14087-50DB/6 rig installation guide manual
2 5
1
6
11
7
8
9
10
34 / 143
ZJ14087-50DB/6 rig installation guide manual
S05
S06
6 handrail (5) KR112.75.535.00 1 S07
7 handrail (6) KR112.75.537.00 1 S08
8 handrail (7) KR112.75.538.00 1 S09
9 handrail (8) KR112.75.540.00 1 S10
10 handrail (9) KR112.75.549.00 1 S12
11 handrail (10) KR112.75.553.00 1 S13
(1)According to part number,install handrail on the corresponding location withΦ30 safety pin .
20. Install A frame
SUKR111.52.890.00。A frame shall be assembled an integral whole and connected with left-right-front-lower seat via shell pin to make
sure backlash uniformity.Note:lifting loads see schematic diagram.
35 / 143
ZJ14087-50DB/6 rig installation guide manual
2、3
3、4
36 / 143
ZJ14087-50DB/6 rig installation guide manual
11
10
12
9
13
8
7
14
37 / 143
ZJ14087-50DB/6 rig installation guide manual
38 / 143
ZJ14087-50DB/6 rig installation guide manual
39 / 143
ZJ14087-50DB/6 rig installation guide manual
40 / 143
ZJ14087-50DB/6 rig installation guide manual
section.N
4、5
3
41 / 143
ZJ14087-50DB/6 rig installation guide manual
42 / 143
ZJ14087-50DB/6 rig installation guide manual
22. Stand column and left&right top base connecting pin before installing
The connecting part of front stand column and left&right top base has 4 pcs KRT130-03-03 pyramid pinΦ130x535(No.1), 8 pcs KRT-02-05
sheer-pinΦ25x140(No.2 including safety pin )
43 / 143
ZJ14087-50DB/6 rig installation guide manual
3、4、5
44 / 143
ZJ14087-50DB/6 rig installation guide manual
45 / 143
ZJ14087-50DB/6 rig installation guide manual
46 / 143
ZJ14087-50DB/6 rig installation guide manual
2 3、4
47 / 143
ZJ14087-50DB/6 rig installation guide manual
(2)According to part No., lifting up right section III (No. 2), align connecting pad eye pin hole, and insert 4 pieces of double taper
pinΦ60x145 (No. 3), and 8 pieces of shear pinΦ15x75 (No. 4 including safety pin).
26. Install pull rod and steel frame
2 1
4
5、6 7、8
3
48 / 143
ZJ14087-50DB/6 rig installation guide manual
(1)According to part No., lifting up steel frame(5) (No. 1), steel frame (4)(No. 2) successively, align steel frame connecting pad eye pin
hole according to drawing, and insert 8 pieces of shell pin Φ50x170 (No. 5), 8 pieces of shear pin Φ10x55 (No. 6 including safety pin);
(2)According to part No., lifting up inclined pull rod assembly (1)(No. 3), inclined pull rod (5) (No. 4) successively, align steel frame
connecting pad eye pin hole according to drawing, and insert 6 pieces of double taper pin Φ40x100 (No. 7), 12 pieces of shear pin Φ10x55 (No.
6 including safety pin)
49 / 143
ZJ14087-50DB/6 rig installation guide manual
2
Put lower support holding on second joint of mast
sectionIII
50 / 143
ZJ14087-50DB/6 rig installation guide manual
section IV (No. 1), align pad eye connection pin hole, and insert 4 pieces of doublr taper pinΦ60x145 (No. 3), and 8 pieces of shear pinΦ15x75
(No. 4 including safety pin);
(2)Lifting load is shown as lifting schematic diagram SUKR111.52.820.00. According to part No., lifting up right section IV (No. 2),
align pad eye connection pin hole, and insert 4 pieces of double taper pinΦ60x145 (No. 3), and 8 pieces of shear pinΦ15x75 (No. 4 including
safety pin)
51 / 143
ZJ14087-50DB/6 rig installation guide manual
3 2 1 5、6 6、7
52 / 143
ZJ14087-50DB/6 rig installation guide manual
(1)Lifting load is shown as lifting schematic diagram SUKR111.52.860.00. According to part No., lifting up right steel frame (3) (No.
2), steel frame (2) (No. 4) successively , align steel frame connection pad eye pin hole, and insert 8 pieces of shell pin Φ50x170 (No. 6), and 8
pieces of shear pin Φ10x55 (No. 6 including safety pin);
(2)Lifting load is shown as lifting schematic diagram SUKR111.52.870.00.According to part No., lifting up inclined pull rod (4) (No. 1),
inclined pull rod (3) (No. 3), align section connecting pad eye pin hole, and insert 4 pieces of double taper pinΦ40x100 (No. 7), and 8 pieces of
shear pinΦ10x55 (No. 6 including safety pin).
53 / 143
ZJ14087-50DB/6 rig installation guide manual
3、4
54 / 143
ZJ14087-50DB/6 rig installation guide manual
pin Φ60x145 (No. 3) , 8 pieces of shear pin Φ15x75 ( No. 4 including safety pin);
30. Install steel frame and pull rod
1
2 6、7
3
7、8
55 / 143
ZJ14087-50DB/6 rig installation guide manual
56 / 143
ZJ14087-50DB/6 rig installation guide manual
Note:upper support should hold on the second joint of mast section V Note:To avoid mast deformation,two cranes should cooperate to lift simultaneously.
Put the upper support holding on the second joint of mast section V.
57 / 143
ZJ14087-50DB/6 rig installation guide manual
2, 3, 4, 5, 6
58 / 143
ZJ14087-50DB/6 rig installation guide manual
59 / 143
ZJ14087-50DB/6 rig installation guide manual
(1)According to part No., lifting up each parts of counter weight device (No.1 ) successively, connect wirerope and balance bucket with 3
pieces of (DX6.5t-7/8) D type shackle, and 2 pieces of wire rope assembly cross 3 pieces of KR111.05.321.00 snatch block of mast section III
60 / 143
ZJ14087-50DB/6 rig installation guide manual
3, 4
4, 5, 6
1 2
Note:Whenever mast installation ,mast rising or mast down, monkey board is not be used as support.
61 / 143
ZJ14087-50DB/6 rig installation guide manual
62 / 143
ZJ14087-50DB/6 rig installation guide manual
6 5
1 2 3 4
7、8
63 / 143
ZJ14087-50DB/6 rig installation guide manual
64 / 143
ZJ14087-50DB/6 rig installation guide manual
65 / 143
ZJ14087-50DB/6 rig installation guide manual
3, 4
66 / 143
ZJ14087-50DB/6 rig installation guide manual
Note:Number in figure stands for stringing step,arrow stands for stringing direction.
Drawworks
drum
Crown block main
sheaves set
Travelling
Deadline anchor block
67 / 143
ZJ14087-50DB/6 rig installation guide manual
procedure 1 2 3 4 5-14 15
Come out from
Wind between
last sheave of
from wire line Wind A-frame fast crown block main
Drilling line Wind crown block Wind travelling crown block,
spooler tow rope line boom sheave, sheave group and
fast line sheave block, leading to leading to
drum, leading to leading to crown travelling block
(tow rope group, leading to crown block main deadline anchor,
A-frame fast line block fast line successively, on 6
stringing) travelling block sheave group connecting to
boom sheave sheave group sheaves from top
drilling line on
to bottom
spooler
68 / 143
ZJ14087-50DB/6 rig installation guide manual
38.Put main body of generator house trailer in position Generator house trailer axis
78’-10 3/4”(24045mm)
3 2
5 4
55’-3”(16840mm)
69 / 143
ZJ14087-50DB/6 rig installation guide manual
70 / 143
ZJ14087-50DB/6 rig installation guide manual
1 2
3
4 5
71 / 143
ZJ14087-50DB/6 rig installation guide manual
1
4 5 6
21’-5 1/2”(6540mm)
78’-10 3/4”(24045mm)
2
72 / 143
ZJ14087-50DB/6 rig installation guide manual
73 / 143
ZJ14087-50DB/6 rig installation guide manual
74 / 143
ZJ14087-50DB/6 rig installation guide manual
20’-4”(6200mm)
1 2
3
86’-11 1/2”(26505mm)
4
75 / 143
ZJ14087-50DB/6 rig installation guide manual
76 / 143
ZJ14087-50DB/6 rig installation guide manual
77 / 143
ZJ14087-50DB/6 rig installation guide manual
78 / 143
ZJ14087-50DB/6 rig installation guide manual
1、2、3
79 / 143
ZJ14087-50DB/6 rig installation guide manual
80 / 143
ZJ14087-50DB/6 rig installation guide manual
Note:During the mast raising , should have one person command , pay
81 / 143
ZJ14087-50DB/6 rig installation guide manual
position smoothly.
82 / 143
ZJ14087-50DB/6 rig installation guide manual
2 3、4
83 / 143
ZJ14087-50DB/6 rig installation guide manual
Note:Note:During the mast raising , should have one person command , pay
84 / 143
ZJ14087-50DB/6 rig installation guide manual
4、5
2、3、4
85 / 143
ZJ14087-50DB/6 rig installation guide manual
2、3
86 / 143
ZJ14087-50DB/6 rig installation guide manual
55. Install top drive guide rail fixed device ( guide rail 1)
2、3、4 5、6
7、8
87 / 143
ZJ14087-50DB/6 rig installation guide manual
88 / 143
ZJ14087-50DB/6 rig installation guide manual
2 3 1 2
1
No. Name Drawing Qty. Remark
1 hydraulic cat head YM-16B 2
2 5T air winch XJFH-5/35KZS 2
3 Man riding winch FA150KGiMR12A1-A-CE 1
89 / 143
ZJ14087-50DB/6 rig installation guide manual
1 1
90 / 143
ZJ14087-50DB/6 rig installation guide manual
91 / 143
ZJ14087-50DB/6 rig installation guide manual
2 3 4
1
92 / 143
ZJ14087-50DB/6 rig installation guide manual
93 / 143
ZJ14087-50DB/6 rig installation guide manual
4、5、6、7
94 / 143
ZJ14087-50DB/6 rig installation guide manual
95 / 143
ZJ14087-50DB/6 rig installation guide manual
8
7
6
4 5
15
2
16
17
18 14
1
20 19
13
96 / 143
ZJ14087-50DB/6 rig installation guide manual
21
22 23 24
27 26
25
97 / 143
ZJ14087-50DB/6 rig installation guide manual
98 / 143
ZJ14087-50DB/6 rig installation guide manual
2-5
17 Platform P KR113.84.233.00 2-2 1
18 Platform N KR113.84.232.00 2-1 1
19 Platform M KR113.84.231.00 1-4 1
20 Platform H KR113.84.227.00 1-1 1
21 Support rod1 KR113.84.216.00 1-22~1-24 3
22 Support rod2 KR113.84.217.00 1-2、1-3 2
1-1、1-4~1-7、1-13~1-15、
23 Support rod3 KR113.84.218.00 1-17~1-19 28
2-1~2-9、2-13~2-20
1-8~1-13
24 Support rod4 KR113.84.219.00 2-10~2-12 11
7-1、7-2
25 Support rod5 KR113.84.238.00 1-20、1-21 2
26 Tear plate 720×670 t6 KR113.84.215.12 1
27 Tear plate 540×480 t6 KR113.84.215.14 1
99 / 143
ZJ14087-50DB/6 rig installation guide manual
12
62. Handrail installation 7 14 15
6 11
5 8 9 10 13 16
17
4
2
25 18
29 28 27 19
26
30 31 32
24
23
22
33
21 20
100 / 143
ZJ14087-50DB/6 rig installation guide manual
101 / 143
ZJ14087-50DB/6 rig installation guide manual
7-6、7-7、7-9、7-10
13 Handrail 13 KR113.84.105.00 2-10 1
14 Handrail 14 KR113.84.106.00 2-9 1
15 Handrail 15 KR113.84.107.00 3-16 1
16 Handrail 16 KR113.84.108.00 3-14、3-15 2
3-4
4-5、4-15
17 Handrail 17 KR113.84.109.00 5-5、5-15 8
6-5、6-15
7-11
4-6、4-14
18 Handrail 18 KR113.84.110.00 5-6、5-14 6
6-6、6-14
19 Handrail 19 KR113.84.111.00 4-10 1
20 Handrail 20 KR113.84.112.00 7-5 1
21 Handrail 21 KR113.84.113.00 7-4 1
22 Handrail 22 KR113.84.114.00 7-3 1
3-2
4-2、4-18
23 Handrail 23 KR113.84.115.00 5-2、5-18 9
6-2、6-18
7-2、7-14
3-1、3-3
4-3、4-4、4-16、4-17
24 Handrail 24 KR113.84.116.00 16
5-3、5-4、5-16、5-17
6-3、6-4、6-16、6-17
102 / 143
ZJ14087-50DB/6 rig installation guide manual
7-12、7-13
25 Handrail 25 KR113.84.117.00 2-8 1
26 Handrail 26 KR113.84.118.00 2-6 1
1-6
27 Handrail 27 KR113.84.119.00 2
2-5
28 Handrail 28 KR113.84.120.00 2-1 1
29 Handrail 29 KR113.84.121.00 1-7 1
30 Right-angle Buckle KR113.84.123.00 49
31 Handrail buckle KR113.84.92.01 73
32 Bolt M8×70 GB/T 5782-2000 171 Galvanization(unit:set)
33 Safety pin φ50 KRT-01-02 254
103 / 143
ZJ14087-50DB/6 rig installation guide manual
63.Equipment installation
12
11
10 13
0
9 14
8 15
7
6
5
3
4
2
20
1
21 19
18
17
22
16
23
104 / 143
ZJ14087-50DB/6 rig installation guide manual
105 / 143
ZJ14087-50DB/6 rig installation guide manual
64.Poorboy flow
2 5、6
106 / 143
ZJ14087-50DB/6 rig installation guide manual
107 / 143
ZJ14087-50DB/6 rig installation guide manual
5、6、7 8
9
2、3、4
1
21
10
20 13 11、12
17、18、19
14、15、16
108 / 143
ZJ14087-50DB/6 rig installation guide manual
109 / 143
ZJ14087-50DB/6 rig installation guide manual
66.Degasser flow
10、11 12 13
14、15、16、17
6、7、8、9
Suction line
18
2、3、4、5
110 / 143
ZJ14087-50DB/6 rig installation guide manual
111 / 143
ZJ14087-50DB/6 rig installation guide manual
67.Desand flow
11、12、13 14
15、16
25
17
10
18、19、20、21
26
27、28
22、23、24
29
1、2
3、4、5、6
7
8
9
9
112 / 143
ZJ14087-50DB/6 rig installation guide manual
Part
No. Name Drawing no. Qty. Remarks
no.
1 Sand pump fixing assy. 1 KR129.106.00 4
2 Sand pump support 1 KR113.84.41.00 1
3 JGD Flexible rubber connector DN200 1.6MPa 1 Metric & imperial
system for two ends
4 Bolt M20×100 GB/T 5782-2000 8 Galvanization
5 Butterfly valve DN200 1.6MPa 1
6 Stud M20×190 GB/T 901-1988 12 Galvanization
(unit :set)
7 Pipeline 16 1
8 Pipeline 17 1
9 Pipe support 6" KR113.84.29.00 2
10 Pipeline 20 1
11 Blind flange DN200 PN16RF GB/T9123.1-2000 1
12 Flange washer DN200 PN16 GB/T 9126-2008 3
13 Bolt M20×90 GB/T 5782-2000 60 Galvanization
(unit :set)
14 Pipeline 19 1
15 Flange washer DN250 PN16 GB/T 9126-2008 2
16 Bolt M24×100 GB/T 901-1988 24 Galvanization
(unit :set)
17 Pipeline 18 1
18 Shell pin Φ20 KRT-11-01 8
19 Short endless chain Φ4 L=200 JB/T 8108.2-1999 16
113 / 143
ZJ14087-50DB/6 rig installation guide manual
114 / 143
ZJ14087-50DB/6 rig installation guide manual
68.Desilt flow
13 14
15
12
16、17、18、19、20
11
9、10
21
6、7、8
2、3、4、5 1
115 / 143
ZJ14087-50DB/6 rig installation guide manual
116 / 143
ZJ14087-50DB/6 rig installation guide manual
14 15
13
1、2 29
28
3
27
4、5 30
25、26
6
7
12 11
8
9 20、21、22、23、24 31、32、33
10 34
19 16、17、18
117 / 143
ZJ14087-50DB/6 rig installation guide manual
118 / 143
ZJ14087-50DB/6 rig installation guide manual
23 Safety ring Φ4 40
24 Pipe support 2 KR113.84.57.00 1
25 JGD Flexible rubber connector DN150 1.6MPa 2 Metric & imperial system for two ends
26 Butterfly valve DN150 1.6MPa 5
27 Pipeline 32 1
28 Pipeline 35 1
29 Pipeline 36 1
30 Hopper 2 KR113.84.62.00 1
31 Chip space 2 assy. KR113.84.63.00 1
32 Support rod KR113.84.34.00 2
33 Shell pin Φ13 KR129.116.02 4
34 Sand pump fixing assy. 1 KR129.106.00 8
119 / 143
ZJ14087-50DB/6 rig installation guide manual
70.Centrifugal process
3
5
7、8、9、10、11
120 / 143
ZJ14087-50DB/6 rig installation guide manual
121 / 143
ZJ14087-50DB/6 rig installation guide manual
10 11
9
7、8
6
5 16、17
4
1、2、3
12
13、14、15
24、25、26、27
23
19
22 20 18
21
122 / 143
ZJ14087-50DB/6 rig installation guide manual
123 / 143
ZJ14087-50DB/6 rig installation guide manual
124 / 143
ZJ14087-50DB/6 rig installation guide manual
Mixing discharge
process
Mixing suction
process
图 14 加重、剪切流程
125 / 143
ZJ14087-50DB/6 rig installation guide manual
9
12
图 1511加重吸浆流程
13、14、15
10
7、8
1、2
6 3
4、5
Mixing suction process
126 / 143
ZJ14087-50DB/6 rig installation guide manual
24
20
23
25
20
22
20
21
图 16 加重放浆流程
20
18
19
16
17
127 / 143
ZJ14087-50DB/6 rig installation guide manual
128 / 143
ZJ14087-50DB/6 rig installation guide manual
129 / 143
14087-50DB rig installation guide manual
73.Suction process
5
3、4
8、9、10
1
11、12、13、14
130 / 143
14087-50DB rig installation guide manual
24
31
18
23
30
19 20
17 22
29
26 25
16 28
27
15 21
Suction tank
32、33、34、35
36
131 / 143
14087-50DB rig installation guide manual
132 / 143
14087-50DB rig installation guide manual
25 Pipeline 71 1
26 Pipeline 59 1
27 Pipeline 72 1
28 Pipeline 65 1
29 Pipeline 66 1
30 Pipeline 67 1
31 Pipeline 68 1
32 JGD flexible rubber connector DN150 1.6MPa 3 Two ends metric and english
33 Bolt M20×90 GB/T 5782-2000 48 Galvanization(unit:set)
34 Butterfly valve DN150 1.6MPa 3
35 Stud M20×170 GB/T 901-1988 24 Galvanization(unit:set)
36 Sand pump fixed assy. KR129.106.00 12
133 / 143
14087-50DB rig installation guide manual
74.Balance Pipeline
7
8
5
4
1
3
2
9
19
15、16、17、18
10、11、12 13、14
134 / 143
14087-50DB rig installation guide manual
135 / 143
14087-50DB rig installation guide manual
4、5、6 7
1 2 3
10、11
Discharge
Pipeline
12
136 / 143
14087-50DB rig installation guide manual
137 / 143
14087-50DB rig installation guide manual
Connect diverter
1 2 3
4
18
17
8、9、10、11
16
15 12、
13
14
138 / 143
14087-50DB rig installation guide manual
139 / 143
14087-50DB rig installation guide manual
140 / 143
14087-50DB rig installation guide manual
79.According to SUQ001.00 layout drawing install high pressure manifold 、 catwalk 、 pipe rack etc, according
toSUQ001.30.00 cable tray assembly to install cable tray.