Supply, installation, storing, jointing, terminations, testing and commissioning of different types of joints
and accessories; as per KAHRAMAA standard Specifications.
13 LVT - joints 4Cx300 mm XLPE - 0.4kV 2Nos
14 LV - pot ends 4Cx300 mm* XLPE - 0.4kV 1Nos
15 MV ST Joint 3Cx240mm? XLPE - 11kV (Provisional) 1Nos
2. BOQ, Specification and Drawings.
Specification compliance relevant to
subcontractor
NOTES:
QCS Section:
Section 6 - Road Works
Part 15 - Road Lighting
Drawing Title:
OCTAGONAL
LIGHTING COLUMN
SD 6-15-601 2
NOTES:
PA
PROJECTS AFFAIRS
QCS Section:
Section 6 - Road Works
Part 15 - Road Lighting
Drawing Title:
TYPICAL FOUNDATION
DETAILS
SD 6-15-602 2
NOTES:
PA
PROJECTS AFFAIRS
QCS Section:
Section 6 - Road Works
Part 15 - Road Lighting
Drawing Title:
SD 6-15-1501 4
NOTES:
QCS Section:
Section 6 - Road Works
Part 15 - Road Lighting
Drawing Title:
FEEDER PILLAR
FOUNDATION DETAILS
SD 6-15-1502 2
NOTES:
QCS Section:
Section 6 - Road Works
Part 15 - Road Lighting
Drawing Title:
STREET LIGHTING
TYPICAL STANDARD
FOUNDATION DETAILS FOR
SERVICE CABINET/METERING UNIT
Approved: Sheet No:
1 OF 1
Date: Scale:
SEPTEMBER 2024 N.T.S.
Drawing Number: Revision:
SD 6-15-1503 0
NOTES:
LEGEND:
PA
PROJECTS AFFAIRS
QCS Section:
Section 6 - Road Works
Part 15 - Road Lighting
Drawing Title:
MISCELLANEOUS DETAILS
SD 6-15-1601 2
1 2 3 4 5 6 7 8 9 10 11 12
A A
B B
GENERAL NOTES:
C C
D D
E E
F F
PA
PROJECTS AFFAIRS
DESIGNS DEPARTMENT
Project Name:
Project Code:
PA 2024 C 046 S
Drawing Title:
UTILITIES
EXISTING AND PROPOSED
EHV NETWORK
GENERAL NOTES
SCHEME NO. 22-233-2024
Drawn: Checked:
A. GABRIEL R. LOLIENKAR
Designed: Approved:
H A. CASTANEDA A. AL EMADI H
Date: Scale:
DECEMBER 2024 N.T.S
Status:
CONTRACT
Drawing Number: Revision:
A A
PROJECT
LOCATION
B B
KEY PLAN
AL
NOTES:
HA
WA
A
IY
Y
AR
A
GH
TH
AL
M AID
C C
- 02
E T
H E
S
LEGEND:
D D
D
AI
M
TH
- 0 1 E
E T IR
E UK
A CA DEC 2024 ISSUED FOR CONSTRUCTION AG RL AA
SH
Rev. Date Revision Details Drawn Chkd. Appd.
W
AL
Public Works Authority
P.O.Box 22188
Tel. : (0974) 44950000
Fax. : (0974) 44950999
www.ashghal.gov.qa Qatar Deserves The Best
F F
PA
TH
PROJECTS AFFAIRS
MA
DESIGNS DEPARTMENT
AL
ID
AD
Project Name:
SID
LW
G
SA IN AL WAAB AREA
G
Project Code:
PA 2024 C 046 S
Drawing Title:
UTILITIES
EXISTING AND PROPOSED
EHV NETWORK
KEYPLAN
SCHEME NO. 22-233-2024
Drawn: Checked:
A. GABRIEL R. LOLIENKAR
Designed: Approved:
H A. CASTANEDA A. AL EMADI H
Date: Scale:
DECEMBER 2024 1:1500 on A1
Status:
CONTRACT
Drawing Number: Revision:
A A
B B
GENERAL NOTES:
C C
D D
E E
F F
PA
PROJECTS AFFAIRS
DESIGNS DEPARTMENT
Project Name:
Project Code:
PA 2024 C 046 S
Drawing Title:
UTILITIES
EXISTING AND PROPOSED
MV NETWORK
GENERAL NOTES
SCHEME NO. 22-233-2024
Drawn: Checked:
A. GABRIEL R. LOLIENKAR
Designed: Approved:
H A. CASTANEDA A. AL EMADI H
Date: Scale:
DECEMBER 2024 N.T.S
Status:
CONTRACT
Drawing Number: Revision:
A A
PROJECT
LOCATION
B B
KEY PLAN
AL
NOTES:
HA
WA
A
IY
Y
AR
A
GH
TH
AL
M AID
C C
- 02
E T
H E
S
LEGEND:
D D
D
AI
M
TH
0 1
T-
E E
EE UK
AIR CA DEC 2024 ISSUED FOR CONSTRUCTION AG RL AA
SH
Rev. Date Revision Details Drawn Chkd. Appd.
W
AL
Public Works Authority
P.O.Box 22188
Tel. : (0974) 44950000
Fax. : (0974) 44950999
www.ashghal.gov.qa Qatar Deserves The Best
F F
PA
TH
PROJECTS AFFAIRS
MA
DESIGNS DEPARTMENT
AL
ID
AD
Project Name:
SID
LW
G
SA IN AL WAAB AREA
G
Project Code:
PA 2024 C 046 S
Drawing Title:
UTILITIES
EXISTING AND PROPOSED
MV NETWORK
KEYPLAN
SCHEME NO. 22-233-2024
Drawn: Checked:
A. GABRIEL R. LOLIENKAR
Designed: Approved:
H A. CASTANEDA A. AL EMADI H
Date: Scale:
DECEMBER 2024 1:1500 on A1
Status:
CONTRACT
Drawing Number: Revision:
WAAB 269
I/D S/S
MATCHLINE-B
EN6
A EN6 A
EN6
EN6
MATCHLINE-A
S/STN. 40726
AL WAAB 310
I/D 02
S/STN.
01
40064 AL EN6
WAAB 285
EN6 I/D S/S S.STN
40797 AL
WAAB 313
I/D
S/STN. 40532
AL WAAB 304
I/D
B B
KEY PLAN
EN6 NOTES:
3C240 XLPE
EN3
3C240 XLPE
9E EN2
9L5P
LEGEND:
1X4
4
2 420-
1
4142 34C
4142 4142-14959
AL WAAB-30
C OutDoor C
S/STN. 40533 AL
WAAB 305 I/D
S/S - 40346
TO S/S - 39961
D D
TO S/S - 39937
S/STN - 40057
S/STN. 40124
AL WAAB 283
AL WAAB 287
I/D
TO S/S-4034
E E
NOTE:
PWA CONTRACTOR TO VERIFY ACTUAL LEVEL ON SITE.
EN6 CA DEC 2024 ISSUED FOR CONSTRUCTION AG RL AA
IF THERE IS A CHANGE IN FINAL ROAD LEVEL, PWA CONTRACTOR SHALL
BE RESPONSIBLE TO RESTORE THE LEVEL OF THE UNDERGROUND Rev. Date Revision Details Drawn Chkd. Appd.
F F
PA
PROJECTS AFFAIRS
TO S/S-4037
DESIGNS DEPARTMENT
Project Name:
9
Project Code:
PA 2024 C 046 S
Drawing Title:
S/S-40379 S/S-40351 UTILITIES
EXISTING AND PROPOSED
MV NETWORK
TO S/S-39886 TO S/S-40491
SHEET 01
SCHEME NO. 22-233-2024
Drawn: Checked:
A. GABRIEL R. LOLIENKAR
Designed: Approved:
H A. CASTANEDA A. AL EMADI H
S/STN - 40491
Date: Scale:
AL WAAB 301 DECEMBER 2024 N.T.S
IND MATCHLINE-B Status:
CONTRACT
Drawing Number: Revision:
FOR CONTINUATION SEE SHEET 01
PA 2024 C 046 S-P00-PWA-EL-2001 CA
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
3C240 XLPE
OutDoor
PE EN6
3C240 XL EN4
ND
NCB-CABE
S/STN. 39276
A AL WAAB 247 I/D A
S/STN. 39835 AL
WAAB 263 I/D
MATCHLINE-A
02
S/S
01
3C240 XLPE
4104-20539
S/STN. 40139
AL WAAB 288 I/D
GRID : 225970,389050 S/STN.
39869 AL
WAAB 265
S/STN - 39779 AL WAAB I/D S/STN. 39988
261 IND AL WAAB 277
S/STN. 39770
B O/D B
AL WAAB 260
O/D
KEY PLAN
S/STN. NOTES:
39860 AL EN6
WAAB 264
I/D EN6
E
24 0 XLP
BEND 3C
NC B-CA LEGEND:
PE
3C240 XL
ND
NCB-CABE
C C
S/S - 39556
S/STN.
39489
NCB-CABEND
3C240 XLPE
AL WAAB
255
S/STN.
D S/STN. 39871 39952 D
AL WAAB AL WAAB
266 I/D 274
EN4
3C240 XLPE
E I/D E
S/STN. 39531 AL
WAAB 258 I/D S/STN. 39323
S/STN. AL WAAB 252 I/D EN4
39784 AL
WAAB 262
NCB-CABEND
CA DEC 2024 ISSUED FOR CONSTRUCTION AG RL AA
3C240 XLPE
I/D
Rev. Date Revision Details Drawn Chkd. Appd.
NOTE:
PWA CONTRACTOR TO VERIFY ACTUAL LEVEL ON SITE.
IF THERE IS A CHANGE IN FINAL ROAD LEVEL, PWA CONTRACTOR SHALL Public Works Authority
3C240 XLPE
S/STN. BE RESPONSIBLE TO RESTORE THE LEVEL OF THE UNDERGROUND P.O.Box 22188
39494 CABLES, SERVICE CABINETS AND ANY OTHER KM ASSETS THAT ARE Tel. : (0974) 44950000
AL WAAB IMPACTED BY THE PROJECT. Fax. : (0974) 44950999
257 www.ashghal.gov.qa Qatar Deserves The Best
F I/D F
ALL WORKS MUST BE CARRIED OUT IN ACCORDANCE WITH KM
NA-NA
S/S-39997
AL WAAB
278 I/D S/S
STANDARD.
PA
PROJECTS AFFAIRS
Project Code:
PA 2024 C 046 S
Drawing Title:
UTILITIES
EXISTING AND PROPOSED
MV NETWORK
TO S/S-40491
EN6 SHEET 02
SCHEME NO. 22-233-2024
Drawn: Checked:
A. GABRIEL R. LOLIENKAR
S/STN. 39873 AL WAAB
S/STN. Designed: Approved:
H S/STN. 39875 267 I/D S/STN - 39283 A. CASTANEDA A. AL EMADI H
39886 AL
WAAB 269 AL WAAB 268 I/D AL WAAB 267 Date: Scale:
I/D S/S I/D DECEMBER 2024 N.T.S
S/STN. 39981 Status:
AL WAAB 276 I/D CONTRACT
Drawing Number: Revision:
MATCHLINE-B
EN6
A EN6 A
EN6
EN6
MATCHLINE-A
02
01
EN6
EN6
B B
KEY PLAN
EN6 NOTES:
EN3
EN2
4142
4142
AL WAAB-30
C OutDoor LEGEND: C
D D
E E
F F
PA
PROJECTS AFFAIRS
DESIGNS DEPARTMENT
Project Name:
Project Code:
PA 2024 C 046 S
Drawing Title:
UTILITIES
EXISTING AND PROPOSED
EHV NETWORK
SHEET 01
SCHEME NO. 22-233-2024
Drawn: Checked:
A. GABRIEL R. LOLIENKAR
Designed: Approved:
H A. CASTANEDA A. AL EMADI H
Date: Scale:
DECEMBER 2024 1:500 on A1
MATCHLINE-B Status:
CONTRACT
Drawing Number: Revision:
FOR CONTINUATION SEE SHEET 01
PA 2024 C 046 S-P00-PWA-EL-1001 CA
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
EN6 20539
EN4
AL WAAB-225
OutDoor
A A
MATCHLINE-A
02
01
B B
KEY PLAN
NOTES:
EN6
EN6
C LEGEND: C
D D
EN4
EN6
FOR CONTINUATION SEE SHEET 01
E E
EN4
NOTE:
Public Works Authority
ASHGHAL TO CONFIRM IF THERE WILL BE ANY CHANGE IN THE ROAD P.O.Box 22188
LEVEL AS PART OF THIS PROJECT. IF THERE IS CHANGE IN THE FINAL Tel. : (0974) 44950000
Fax. : (0974) 44950999
ROAD LEVEL, ASHGHAL SHALL CONDUCT AND SUBMIT IMPACT www.ashghal.gov.qa Qatar Deserves The Best
DESIGNS DEPARTMENT
Project Name:
Project Code:
PA 2024 C 046 S
Drawing Title:
UTILITIES
EXISTING AND PROPOSED
EHV NETWORK
EN6 SHEET 02
SCHEME NO. 22-233-2024
Drawn: Checked:
A. GABRIEL R. LOLIENKAR
Designed: Approved:
H A. CASTANEDA A. AL EMADI H
Date: Scale:
DECEMBER 2024 1:500 on A1
Status:
CONTRACT
Drawing Number: Revision:
A A
B GENERAL NOTES: B
C C
D D
E E
F F
PA
PROJECTS AFFAIRS
DESIGNS DEPARTMENT
Project Name:
Project Code:
PA 2024 C 046 S
Drawing Title:
UTILITIES
EXISTING AND PROPOSED
LV NETWORK
GENERAL NOTES
SCHEME NO. 22-233-2024
Drawn: Checked:
A. GABRIEL R. LOLIENKAR
Designed: Approved:
H A. CASTANEDA A. AL EMADI H
Date: Scale:
DECEMBER 2024 N.T.S
Status:
CONTRACT
Drawing Number: Revision:
A A
PROJECT
LOCATION
B B
KEY PLAN
AL
NOTES:
HA
WA
A
IY
Y
AR
A
GH
TH
AL
M AID
C C
- 02
E T
H E
S
LEGEND:
D D
D
AI
M
TH
0 1
T-
E E
EE UK
AIR CA DEC 2024 ISSUED FOR CONSTRUCTION AG RL AA
SH
Rev. Date Revision Details Drawn Chkd. Appd.
W
AL
Public Works Authority
P.O.Box 22188
Tel. : (0974) 44950000
Fax. : (0974) 44950999
www.ashghal.gov.qa Qatar Deserves The Best
F F
PA
TH
PROJECTS AFFAIRS
MA
DESIGNS DEPARTMENT
AL
ID
AD
Project Name:
SID
LW
G
SA IN AL WAAB AREA
G
Project Code:
PA 2024 C 046 S
Drawing Title:
UTILITIES
EXISTING AND PROPOSED
LV NETWORK
KEYPLAN
SCHEME NO. 22-233-2024
Drawn: Checked:
A. GABRIEL R. LOLIENKAR
Designed: Approved:
H A. CASTANEDA A. AL EMADI H
Date: Scale:
DECEMBER 2024 1:1500 on A1
Status:
CONTRACT
Drawing Number: Revision:
WAAB 269
I/D S/S
MATCHLINE-B
A A
MATCHLINE-A
S/STN. 40726
AL WAAB 310
I/D 02
S/STN. 01
40064 AL
WAAB 285
I/D S/S S.STN
40797 AL
WAAB 313
I/D
S/STN. 40532
AL WAAB 304
I/D
B B
KEY PLAN
NOTES:
T LEGEND:
C C
S/STN. 40533 AL
WAAB 305 I/D
S/S - 40346
D D
S/STN - 40057
S/STN. 40124
AL WAAB 283
AL WAAB 287 MU
I/D
E E
F F
PA
PROJECTS AFFAIRS
DESIGNS DEPARTMENT
Project Name:
U
M
PE
S/STN - 40424 AL WAAB I/D T
G 299 IND G
Project Code:
PA 2024 C 046 S
Drawing Title:
UTILITIES
EXISTING AND PROPOSED
LV NETWORK
SHEET 01
SCHEME NO. 22-233-2024
Drawn: Checked:
A. GABRIEL R. LOLIENKAR
Designed: Approved:
H A. CASTANEDA A. AL EMADI H
S/STN - 40491
Date: Scale:
AL WAAB 301 DECEMBER 2024 1:500 on A1
IND MATCHLINE-B Status:
CONTRACT
Drawing Number: Revision:
FOR CONTINUATION SEE SHEET 01
PA 2024 C 046 S-P00-PWA-EL-3001 CA
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
S/STN. 39276
A AL WAAB 247 I/D A
S/STN. 39835 AL
WAAB 263 I/D
MATCHLINE-A
02
S/S
01
S/STN. 40139
AL WAAB 288 I/D
GRID : 225970,389050 S/STN.
39869 AL
WAAB 265
S/STN - 39779 AL WAAB I/D S/STN. 39988
261 IND AL WAAB 277
S/STN. 39770
B O/D B
AL WAAB 260
O/D
KEY PLAN
S/STN. NOTES:
39860 AL
WAAB 264
I/D
LEGEND:
C C
S/S - 39556
S/STN.
39489
AL WAAB
255
S/STN.
D S/STN. 39871 39952 D
AL WAAB AL WAAB
266 I/D 274
S/STN. 40124
AL WAAB 287 MU
I/D
E I/D E
S/STN. 39531 AL
WAAB 258 I/D NOTE: S/STN. 39323
S/STN. AL WAAB 252 I/D
39784 AL PWA CONTRACTOR TO VERIFY ACTUAL LEVEL ON SITE.
WAAB 262 IF THERE IS A CHANGE IN FINAL ROAD LEVEL, PWA CONTRACTOR SHALL
I/D CA DEC 2024 ISSUED FOR CONSTRUCTION AG RL AA
BE RESPONSIBLE TO RESTORE THE LEVEL OF THE UNDERGROUND Appd.
Rev. Date Revision Details Drawn Chkd.
CABLES, SERVICE CABINETS AND ANY OTHER KM ASSETS THAT ARE
IMPACTED BY THE PROJECT.
Public Works Authority
S/STN. ALL WORKS MUST BE CARRIED OUT IN ACCORDANCE WITH KM P.O.Box 22188
39494 STANDARD. Tel. : (0974) 44950000
AL WAAB Fax. : (0974) 44950999
257 www.ashghal.gov.qa Qatar Deserves The Best
F I/D F
S/S-39997
AL WAAB
278 I/D S/S PA
PROJECTS AFFAIRS
Project Code:
PA 2024 C 046 S
Drawing Title:
UTILITIES
EXISTING AND PROPOSED
LV NETWORK
SHEET 02
SCHEME NO. 22-233-2024
Drawn: Checked:
A. GABRIEL R. LOLIENKAR
S/STN. 39873 AL WAAB
S/STN. Designed: Approved:
H S/STN. 39875 267 I/D S/STN - 39283 A. CASTANEDA A. AL EMADI H
39886 AL
WAAB 269 AL WAAB 268 I/D AL WAAB 267 Date: Scale:
I/D S/S I/D DECEMBER 2024 1:500 on A1
S/STN. 39981 Status:
AL WAAB 276 I/D CONTRACT
Drawing Number: Revision:
www.saturnqa.com
The prime objective of the manage-
ment and employees of SATURN Trad-
ing and Contracting is to provide the
clients our best services taking in con-
sideration the price, the quality and
the time limitation, keeping the busi-
ness ethics as our prime standard, and
keeping health and safety (HSEQ) as
our priority.
Architectural and
Facade lighting
COMPANY OFFICIAL DOCUMENTS &
ISO CERTIFICATES
ISO 9001:2015
BOARD OF DIRECTORS
MANAGING DIRECTOR
PROJECTS MANAGER
PROCUIRMENT TRANSPORTATION
ENGINEER DEPARTMENT
DEPARTMENT DEPARTMENT
FOREMAN
TECHNICIAN
LABOURS
ASHGHAL & KM APPROVALS
MAJOR TOOLS & TESTING EQUIPEMNTS
Mini Excavator
Skid loader
CIVIL
Dump truck
EQUIPMENTS
Cable detector
5 Battery System
14 MV Cable Termination
15 Foundation work
[email protected],
[email protected]
www.saturnqa.com
3A. About us
About us
Overview
Saturn Trading and Contracting is a leading well-established company at Qatar
since 2010 dealing in wide range Substation works (Erection of Generators,
Transformers, Panel and cable support fabrication & Installation and All type of
Power and control cable laying, MICC cable installation and termination works.,
etc.…) Electro mechanical work (Factory, and Commercial & Residential building
services). We are proud to have our services to many clients in big projects - Qatar.
We create sustainable solutions and aim to be a leader in quality, work safety and
business ethics.
MANAGING DIRECTOR
PROJECTS MANAGER
PROCUIRMENT TRANSPORTATION
ENGINEER DEPARTMENT
DEPARTMENT DEPARTMENT
FOREMAN
TECHNICIAN
LABOURS
Project Organization Chart
MANAGING DIRECTOR
MR.C.K BIJU
MOB:55092652
[email protected]
GENERAL MANAGER
MR.JEYAPRAKASH SELVARAJ
MOB:55836984
[email protected]
PROJECT MANAGER
MR.RAVIBHARATH
Mob: 66991857
[email protected]
QA/QC
SAFETY OFFICER
MR.VIGNESH
MR. VAISAKH
Mob: 74798229
Mob: 74792997
DESIGN
MR. SUKU
Mob: 77174350
[email protected]
ELECTRICAL ELECTRICAL
ELECTRICAL
SL FOREMAN
FOREMAN
TEAMS TEAMS
7. Manpower & List of Equipment/
Machineries
SATRN TRADING & CONTRACTING WLL
EMPLOYEE'S DETAILS-2025
S.N Emp NAME PROFESSI NATIONALITY PP NO QID
O No ON
1 STC1 VASANTH STC PROJECT MANAGER INDIAN 28135645
60 785
2 STC1 GANESH STC PROJECT MANAGER INDIAN 26635624
70 985
3 STC1 RAVIBHARATH STC PROJECT MANAGER INDIAN 28935646
85 RAJENDRAN 468
4 STC1 SURESH MURUGAN STC PROJECT ENGINEER INDIAN 29535633
20 786
5 STC1 SYED OMAR QASIM STC PROJECT ENGINEER INDIAN 28935627
43 095
6 STC1 VINODH KUMAR STC PROJECT ENGINEER INDIAN 28435643
18 RAJA 307
7 STC1 NITHEESH STC SL ENGINEER INDIAN 29035626
77 023
8 STC1 SRINIVASAN STC ELECTRICAL INDIAN 27835656
45 ENGINEER 355
9 STC1 VIJAY VALMURUGAN STC ELECTRICAL INDIAN 29435623
63 ENGINEER 011
10 STC1 ABINESH STC SITE ENGINEER-CIVIL INDIAN 29635637
55 863
11 STC1 VIGNESH CHINNAN STC SITE ENGINEER-CIVIL INDIAN 30035619
65 948
12 STC1 AMRISH STC CIVIL SUPERVISOR INDIAN 29935618
87 090
13 STC1 KALAI SELVAN STC ELECTRICIAL INDIAN 29735608
03 SUPERVISOR 657
14 STC1 SURESH STC ELECTRICAL INDIAN 27535652
57 SOMASUNDARAM FOREMAN 147
15 STC1 RAJ KUMAR SUNAR STC ELECTRICIAL NEPAL 28652413
02 FOREMAN 235
16 STC1 VAISAKH STC HSC OFFICER INDIAN 29335636
51 KOLATHODAN 905
17 STC1 MIDHULAJ PALORA STC SAFETY OFFICER INDIAN 29635631
80 MAMMOOTTI 299
18 STC1 ADNAN KHAN STC SAFETY OFFICER PAKISTAN 30458606
82 SARFARAZ KHAN 654
19 STC1 RIYAS KHAN STC SAFETY OFFICER INDIAN 30235613
84 363
20 STC1 ARUN STC PROJECT INDIAN 28835625
40 COORDINATOR 476
21 STC1 NABIL ABDULLA STC BUSINESS INDIAN 28535625
69 KUTTI DEVELOPMENT 487
22 STC1 RAVICHANDRAN STC ACCOUNTANT SRI 28814405
30 LANKAN 305
23 STC1 LAMITTO STC DRAFTSMAN INDIAN 28935660
81 NONGATHURUTHY 010
SUDHAKARAN
24 STC1 SUKU YESODHARAN STC DRAFTSMAN INDIAN 27235629
86 920
25 STC1 BHADRA BAHADUR STC ELECTRICIAN NEPAL 28252414
01 001
26 STC1 BK KHUM BAHADUR STC ELECTRICIAN NEPAL 29352418
14 127
27 STC1 ALI RAHUMAN STC ELECTRICIAN PAKISTAN 29758606
23 514
28 STC1 GOPAL DARJI STC ELECTRICIAN NEPAL 27752429
24 745
29 STC1 ISMAIL STC ELECTRICIAN INDIAN 28835638
47 831
30 STC1 HARI BAHADUR STC ELECTRICIAN NEPAL 28352454
53 666
31 STC1 VEERAMANI STC ELECTRICIAN INDIAN 29035657
54 787
32 STC1 DEV NARAYAN STC ELECTRICIAN INDIAN 28335623
56 474
33 STC1 MUHAMMAD KARIM STC ELECTRICIAN PAKISTAN 28458609
62 356
34 STC1 TAJUL ISLAM STC ELECTRICIAN BANGLAD 29405012
68 ESH 373
35 STC1 DINESH STC ELECTRICIAN NEPAL 28552424
72 724
36 STC1 BIKRAM ACHARYA STC CABLE JOINTER NEPAL 28752417
29 519
37 STC1 SAROJ STC CABLE JOINTER NEPAL 28652440
46 538
38 STC1 PADAM BAHADUR STC CABLE JOINTER NEPAL 28352403
88 BAL 947
39 STC1 RANJITH KUMAR STC SENIOR ELECTRICIAN INDIAN 30035616
52 921
40 STC1 BINAM SHRESHTA STC TECHNICIAN NEPAL 28652443
15 340
41 STC1 SANTOSH KAPAR STC HELPER NEPAL 28352448
19 179
42 STC1 KOBIKAN STC HELPER SRI 30314400
36 LANKAN 929
43 STC1 JEEWAN STC HELPER SRI 28814415
37 LANKAN 241
44 STC1 KATHRISAN STC HELPER SRI 30214403
61 LANKAN 437
45 STC1 SINATHAMBI STC HELPER SRI 29314409
78 LANKAN 294
46 STC1 MATHURSHAN STC HELPER SRI 29814407
89 LANKAN 647
47 STC1 PRASANTH STC HELPER SRI
91 LANKAN
48 STC1 SABESAN STC DRIVER SRI 28414403
26 SENATHIRAJA LANKAN 244
49 STC1 SODHI SINGH STC DRIVER INDIAN 26735613
41 105
50 STC1 KAHIR ULLAH STC DRIVER PAKISTAN 29358608
59 772
51 STC1 SHAILENDRA STC DRIVER NEPAL 28552414
64 913
52 STC1 MOHAMMAD ZAMIN STC DRIVER PAKISTAN 26958602
73 369
53 STC1 SULIMAN KHAN STC DRIVER PAKISTAN 30358601
74 822
54 STC1 UMAR AYAS KHAN STC DRIVER PAKISTAN 29058610
76 604
55 STC1 AHMAD REHMAN STC DRIVER PAKISTAN 28258607
83 543
56 STC1 SAMPAT KUMAR STC OPERATOR INDIAN 29935619
79 PARAPATI 894
8. Calibration
. Certificates, Equipment/
Machinery Certificate, Mix
Certificates, Applicator certificate
9. HSE Plan
10. End User Approval & Previous
approvals from Client/Consultant
ASHGHAL Approval
KM Approval
. f'. f'. ::. ...::..,� J\.i...J J o_} ?,
I B C l . �
::::,, ....) . e�:-
S;:tl 7U1<..J'I Trading & Contracting WLL
PO BOX: - 30966, Tel- 44568759. 55092652
Email: [email protected], Website:www.saturnqa.com
I
Compsny N11mc: SA'rURN rRAlll1'G S. C0'(TMAt.:1·1vf; ('f)Mf'A� \
jJ� � .,,_, ,.S - ,.,l,i -,_,, uol.t '<,J,,.s.11 .:.?.r-,11 µI .fa _,..,..;11 1.,. ,.;.,_,, ❖
..:..1,. (415)
-·� '<'4 2022 ...J(2) .-i, w.11 ,�.., u,,- .,._,,,,; µ.\' e--;..,.,,,..;:i '"' ❖
.al,..JJIr _,.,.I;' -'jW I (:.l..l,J,-lJ -,J,,11 .;J.,.JJ ......,.sl 0:.,....
,'II J.,,.� w..J
..:,:,,w.,. ...i. .., ..,..'ti
.,,-'""'""'-'J.:-11 <l.,,.,..,.JI :,,., .,, , •,fol> Ii_,.:JI .- ;a� "' ❖
/4/., --==- ,,
...
1,.t'_....
�••4 � . .,.,,...
• c,,u.:,. la,;-� ..,.,. ,a ta.,. ❖
., \!-
;r,,___• .,, :-.. .
M/s. ASHGHAL M/s. RAVIBHARATH M/s. ITAL CONSULT M/s. JAK CONSTRUCTION
`
METHOD STATEMENT FOR LV CABLE TERMINATION JOINTS
REVIEWER /
APPROVER
REV DATE STATUS REVISION DETAILS
Sub Main
EXTERNA
Con Con
L
0 FA FOR APPROVAL
Status Code:
D : Draft FI : For Information FC : For Construction
* External Authorization
P : Preliminary FA : For Approval
(Client), where required
Distribution:
M/s. ASHGHAL M/s. RAVIBHARATH M/s. ITAL CONSULT M/s. JAK CONSTRUCTION
Table of Contents
1. Scope /Objectives
2. Reference
3. Access/Egress
4. Logistics
5. Health and Safety Hazards
6. Definitions
7. Responsibilities / Supervision
8. Procedures /Method to be Employed
9. Working Hours
10. Requirements, Restriction & Quality Control
11. House keeping
12. Manpower Requirement & Supervision
13. Plant & Equipment Requirement
14. Material Requirement
15. Q.C Approvals and other Documentation
16. Supporting Documentation
17. Distribution
18. Other information
19. Main Contractor’s Safety Approval
20. Attachments (Compulsory)
Risk Assessment
Inspection
Test Plan & Procedure
Testing and Commissioning Checklist
M/s. ASHGHAL M/s. RAVIBHARATH M/s. ITAL CONSULT M/s. JAK CONSTRUCTION
Defined work LV Cable Laying termination joints are in accordance with the project specifications,
QCS 2014 and project quality requirement.
2. REFERENCES
This method statement shall read and refer in conjunction with below references.
Project Specifications
QCS 2014
Construction Drawings
3. ACCESS/ EGRESS
3.1 Access Roads
- shall arrange for, construct, maintain and afterwards remove and reinstate any access
required for and in connection with the execution of the Works.
Reinstatement shall include restoring the area of any route to at least the degree of
safety, stability, drainage, level, contour and landscaping that existed at the time -
Contractor is given possession of site and all such reinstatements shall meet the
minimum requirements of QCS.
- shall maintain always all the traffic signs, lighting, barriers, cones and whatever
additionally required to keep the diversions, temporary roads and pedestrian access in a
very good condition and best workable status.
3.2 Vehicle Access
In the interests of both safety and security, the number of vehicles permitted on work
site shall be minimized. This shall be achieved using vehicle passes, which shall be
approved by the HSE Department upon submission of all required documents.
Where the practicable /separate access and egress gate shall be provided the control
point for access should be located a short distance inside the main gate to a vehicle to
pull off the road before halting to be checked.
A security post shall be provided at each vehicle access point, sited so that the checker
has a clear view of incoming vehicle registration plates and any passengers in the cab.
Security drop bars shall be maintained in the closed position at all vehicle access and exit
point to the site and every vehicle shall be stopped outside the barrier. The barrier should
only be raised after authority has been given to the driver of the vehicle to proceed.
M/s. ASHGHAL M/s. RAVIBHARATH M/s. ITAL CONSULT M/s. JAK CONSTRUCTION
The registration numbers of all vehicles entering and leaving the site shall be recorded.
3.3 Parking
Unauthorized parking shall not be permitted anywhere at the site other than the
designated parking area.
Only cars bearing the permit shall be allowed to park and those authorized visitors.
Site plants and vehicles shall be parked at designated locations only so not cause
obstruction to the site traffic.
4. LOGISTICS
- shall deploy a dedicated team and all necessary equipment, machineries, materials in carrying-
out and complete the works on time and in a safe manner.
M/s. ASHGHAL M/s. RAVIBHARATH M/s. ITAL CONSULT M/s. JAK CONSTRUCTION
be required to wear adequate PPE, which may include, but not limited to safety helmet, safety eye
protection, safety shoes and high visibility vests in worksite and designated hard hat required
area.
M/s. ASHGHAL M/s. RAVIBHARATH M/s. ITAL CONSULT M/s. JAK CONSTRUCTION
6. DEFINITIONS
MS – Method Statement
QCP – Quality Control Procedures
ITP – Inspection and Test Plan
ITA – Independent Testing Agency
QCS – Qatar Construction Specifications.
M/s. ASHGHAL M/s. RAVIBHARATH M/s. ITAL CONSULT M/s. JAK CONSTRUCTION
Shall be responsible to keep all his personnel fully aware of the quality control principles
and shall provide support to Quality Control Department.
Overall responsibility of construction functions related to the project.
Follow-up and update the construction program.
Control of requisitions, provisions of construction materials.
Control of technical issues-review of technical submissions.
7.5 Surveyor
Obtain all data and information required for surveys.
Determine methods to established survey control.
M/s. ASHGHAL M/s. RAVIBHARATH M/s. ITAL CONSULT M/s. JAK CONSTRUCTION
7.7 Foreman
Perform the work as describe in the method statement and cooperate with safety officers
to do the work in a safe but productive manner.
Ensure that the equipment/machineries required are ready and available to do the work
and report any site incident to the Site Engineer.
7.9 Workers
It is their responsibility to use their PPE and follow safety procedures.
M/s. ASHGHAL M/s. RAVIBHARATH M/s. ITAL CONSULT M/s. JAK CONSTRUCTION
QC inspection will be done after each jointing a continuity and insulation will be
conducted
Remove the over sheath and armor according to the dimensions given in Table 1.
FIG(1)
Center the insulating sleeves over the connectors. Shrink them into place starting
at the center and working towards ends fig(2)
FIG(2)
Relay the cores as far as possible. For ease of installation hold them in place with
few layers of PVC tape. Wrap the joint case round the joint and clamp the ends
into the armor wires using screw clips
M/s. ASHGHAL M/s. RAVIBHARATH M/s. ITAL CONSULT M/s. JAK CONSTRUCTION
FIG(3)
Cover the sharp edges of the screw clips with a piece of cable over sheath. Smooth
out the area round the screw clip with filler show in fig(4)
FIG(4)
Clean and degrease the ends of the over sheath for length of about 150 mm. Position
the outer sealing sleeve centrally over the joint area. Start shrinking in the center
working towards the ends as shown in fig(5)
M/s. ASHGHAL M/s. RAVIBHARATH M/s. ITAL CONSULT M/s. JAK CONSTRUCTION
FIG(5)
Joint completed. Allow the joint to cool before applying any mechanical strain.as
shown in fig(6)
FIG(6)
9 WORKING HOURS
All works shall be completed during the designated site hours, wherever necessary to work
extended hours, request and information shall be submitted in advance. During summer period,
all works under direct sun rays shall be
prohibited from 11:30 am to 3:00 pm unless special arrangement is taken to control and ease the
effect of direct tom sunlight. Training shall be given to workers to understand heat stress, how it
affects their health and safety, and how it can be prevented.
11 HOUSEKEEPING
A clean place to work is necessary for safety. Good housekeeping shall be part of the works. To
have a pleasant and safe work place, everyone must do his part to keep the workplace orderly
and clean. Good housekeeping shall protect all employees against slipping, tripping and other
hazards.
M/s. ASHGHAL M/s. RAVIBHARATH M/s. ITAL CONSULT M/s. JAK CONSTRUCTION
Working environment shall be cleared to all unnecessary waste and debris to ensure a first line of
defence against
accidents, injuries, fire, and environmental pollution:
Clean-up shall take place during the work and end of shift (day-to-day clean up).
Any spillage, such as oily rags, greasy and flammable materials shall be cleaned-up
immediately and dispose in approved containers.
Food waste from eating areas will be loaded into rubbish bins, located in the designated
rest areas and shall be removed from the building after each meal and dumped into the
waste vehicle bins.
Any hazardous waste that has been identified will be disposed of in an appropriate
manner in compliance with local Authority regulations.
12 MANPOWER REQUIREMENT
Manpower allocated to this job will be as follows:
Construction Manager
QAQC Engineer/Inspectors
Project/Site Engineer
Foreman
Safety Officer
Skilled Workers
Laborers / Helpers
13 EQUIPMENT REQUIREMENT
M/s. ASHGHAL M/s. RAVIBHARATH M/s. ITAL CONSULT M/s. JAK CONSTRUCTION
Support Materials
Welding machine
Fire blanket
Fire extinguisher (Type A, B, C)
Hand tools
Torch
Crimping Tool
Other miscellaneous materials
PPE
Prior to commencement of work all necessary updated equipment certificates and 3rd party certificates
for the machinery shall be included / in place.
14 MATERIAL REQUIREMENT
CABLE
It shall be as per approved material and should be inspected prior to use. All materials shall be in
compliance with the client/consultant approved list and appropriate standards.
All comments in the material submittal should be coordinated /verified prior to procurement of
material.
Any discrepancies /damages etc. found during the transport to be notified. Material found not
suitable for the site shall be removed from site immediately.
15 QC APPROVAL AND OTHER DOCUMENTARY REQUIREMENTS:
Follow approved Method Statement, ITP, QCP, HSE Plan, Material Approval and Checklist.
16 SUPPORTING DOCUMENTATION
This MS () to be read in conjunction with the below referenced documents:
M/s. ASHGHAL M/s. RAVIBHARATH M/s. ITAL CONSULT M/s. JAK CONSTRUCTION
18 OTHER INFORMATION
Ensure that all the activities have been carried out to suit the site conditions and involved with
Site –in – charge.
20 ATTACHMENT