0% found this document useful (0 votes)
48 views31 pages

Cluster-XXII - CE Meeting 12.02.25

The Mega Lift Irrigation Project in Cluster XXII, executed by the Department of Water Resources, Odisha, involves 13 lift irrigation schemes across Angul and Dhenkanal districts, covering a total command area of 19,242 Ha. The project, valued at Rs. 586.80 Crore, is set to commence on November 9, 2023, and is expected to be completed by November 8, 2026, with a 15-year operation and maintenance period. Key components include various civil, mechanical, and electrical works, along with extensive supply and pipe laying activities.

Uploaded by

Abhijit panda
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
48 views31 pages

Cluster-XXII - CE Meeting 12.02.25

The Mega Lift Irrigation Project in Cluster XXII, executed by the Department of Water Resources, Odisha, involves 13 lift irrigation schemes across Angul and Dhenkanal districts, covering a total command area of 19,242 Ha. The project, valued at Rs. 586.80 Crore, is set to commence on November 9, 2023, and is expected to be completed by November 8, 2026, with a 15-year operation and maintenance period. Key components include various civil, mechanical, and electrical works, along with extensive supply and pipe laying activities.

Uploaded by

Abhijit panda
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 31

MEGA LIFT IRRIGATION PROJECT

CLUSTER XXII

Department of Water Resources,


Government of Odisha

Date : 12th Feb 2025


Sensitivity: Unclassified
PROJECT OVERVIEW
Agreement No EPC - 01/2023-24
Execution of 13 Nos of Lift Irrigation schemes with Intake Points in Manjore reservoir, Brahmani river,
Rengali right main canal and Rengali left main canal having command area between 500 Ha to 2000 Ha
Project Description in Cluster XXII in the districts of Angul & Dhenkanal including its distribution network, upto1 Ha Chak
having Total Planned Culturable Command area of 19,242 Ha. On “ EPC – Turn Key” Basis Including
Power System Connectivity and Operation & Maintenance of Complete Commissioned Schemes for
fifteen years.
Location Dhenkanal (09 Schemes) & Angul (04 Schemes)
Client Dept. of Water Resources, Govt of Odisha
PEC WAPCOS Ltd.
TPIA IR CLASS Pvt. Ltd.
PMC Aarvee Associate Pvt. Ltd.
Date of Commencement 09-Nov-2023
Date of Completion 08-Nov-2026
Contractual Duration (Months) 36 Months
For EPC Rs. 543.20 Crore (INR)
Contract Value CV : 586.80 Crore (INR)
For O&M Rs. 43.60 Crore (INR)
Contract Type EPC – Turnkey Basis
O & M Period 15 years after commissioning (Including 5 years DLP)
Invoice Completion 22.89 % ( 124.39 Crs)
Sensitivity: Unclassified
TYPICAL SCHEMATIC DIAGRAM :
Typical OMS BOX @ CCA varying from
20 Ha Chak 500 to 2000 Ha

HDPE No. of Schemes – 13 No’s


Total CCA – 19242 Ha
Scope of Pipe-Line:
PUMP HOUSE cum MCC Room MS – 14.1 KM
DI – 140.5KM
HDPE – 2173 KM
River RCC – 0.565 KM
Transmission Line – 75 KM

RCC Intake MS/DI


Pipe/App Channel
DISTRIBUTARY HDPE
MAIN
Intake Well Main Step-Down SUB-DISTRIBUTARY
Distribution Substation MAIN

Delivery outlet @ 1 Ha Chak

Transmission Lines Power Source

Sensitivity: Unclassified
PROJECT AYACUT DETAILS
CCA (Ha)
No. of villages
SL NO Scheme As per CCA(Ha) Block District Intake Source
covered
Contract
1 Kalada 1980 1202 10
2 Patharakhamba 1000 1028 6 Parjang Rengali left Canal
3 Chandrapur 1200 1674 10
4 Gotamara 1800 1998 14
. Gondia
5 Tentulihata 1800 1998 19 Dhenkanal

6 Chattia II 1980 2000 32


Odapada Rengali Right Canal
7 Babandh 1980 2000 14

8 Lambodarpur 1980 1997 22 Dhenkanal Sadar

9 Chittalpur 700 1094 15


Banarpal Brahmani River
10 Gopalpur 721 872 26
Angul
11 Sana Rohila 1751 1383 13
Kishore Nagar Manjore Reservoir
12 Raniakata 850 1477 14

13 Chadheiragada 1500 519 9 Sukinda Jajpur Damsal & Kharkai Nallah

TOTAL CCA 19,242 19,242 204 Nos 7 Nos 3 Nos


Sensitivity: Unclassified
MAJOR SCOPE OF CIVIL WORKS
SL NO Description UOM Quantity
1 Pump House Nos 13
2 Approach Channel Nos 8
3 Intake Well Nos 5
4 Pre Filter Unit Nos 13
5 Staff Quarters Nos 13
6 MSDSS Nos 9
7 DSS Nos 8
8 Canal Crossing Nos 16
9 Approach Road (tentative) Km 3.2
10 Transmission Line Tower Nos. -

Sensitivity: Unclassified
MAJOR SCOPE OF MECHANICAL WORKS
SL NO Description UOM Quantity
1 VT Pump (617 Cum/Hr – 1854 Cum/Hr) Nos 46
2 EOT Crane Nos 13
3 Outlet Management System (20 Ha Chak) Nos 962

4 Chak Outlet Chamber (1 Ha./2 Ha. Chak) Nos 9621

5 Air Valves Nos 561


6 Butterfly Valve(BFV) / Sluice Valves(SV) /DPCV Nos 475
7 Dismantling Joint Nos Under finalization
8 Expansion Below Nos Under finalization

Sensitivity: Unclassified
MAJOR SCOPE OF ELECTRICAL WORKS
SL NO Description UOM Quantity
1 Transmission line works KM 79
2 DSS Nos 13
3 MSDSS Nos 9

Power Transformer
1 MVA – 2 Nos.
4 1.6 MVA – 6 Nos. Nos 18
3.15 MVA – 8 Nos.
5 MVA – 2 Nos.

Distribution Transformer
5 33/0.433 KV Nos 22

Sensitivity: Unclassified
DESIGN & DRAWING STATUS - CIVIL
SL NO Scheme Pump House Staff Quarters MSDSS

1 Kalada Approved Approved MSDSS-8


2 Chandrapur Approved Approved Under Location Finalization

MSDSS-2
3 Patharakhamba Approved Approved
Under Scrutiny With PEC.
MSDSS-7
4 Chittalpur Approved Approved
. Under Location Finalization
MSDSS-6
5 Gopalpur Approved Approved
Under Location Finalization
6 Gotamara Vetted on 30.01.25 Under Scrutiny With PEC
MSDSS-5
Permission required from Rengali Right Under Scrutiny With PEC.
7 Tentulihata Under Scrutiny With PEC
Canal.
MSDSS-1
8 Chhatia II Under Scrutiny With PEC Approved
Under Scrutiny With PEC
MSDSS-4
9 Babandh Under Scrutiny With PEC Approved
Under Scrutiny With PEC
10 Sana Rohila Vetted by PEC Approved MSDSS-8
11 Raniakata Under Scrutiny With PEC Approved Under Location Finalization

12 Chadheiragada OMC Clearance required OMC Clearance required DSS


MSDSS-9
13 Lambodarpur Under Scrutiny With PEC Under Scrutiny With PEC
Under Location Finalization
Sensitivity: Unclassified
DESIGN & DRAWING STATUS-MECHANICAL
SL
NO Scheme BCL, GAD Command Map L-Section

1 Kalada Approved Approved Approved


2 Patharkhamba Approved Vetted on 09.12.2024 Vetted on 31.01.25
3 Chandrapur Approved Approved Vetted by PEC
4 .
Gotamara Approved Approved Vetted by PEC
5 Tantulihata Approved Under Scrutiny With PEC Under Scrutiny With PEC

6 Chattia II Approved Under Scrutiny With PEC Under Scrutiny With PEC
7 Babandh Approved Approved Under Scrutiny With PEC
8 Lambodharpur Approved Under Scrutiny With PEC Under Scrutiny With PEC
9 Chittalpur Approved Approved Vetted on 30.01.25
10 Gopalpur Approved Approved Under Scrutiny With PEC
11 Sana Rohila Approved Vetted on 21.12.2024 Under Scrutiny With PEC

12 Raniakata Approved Vetted on 20.12.2024 Under Scrutiny With PEC

13 Chadheiragada Approved Vetted by PEC Under Scrutiny With PEC


Sensitivity: Unclassified
DESIGN & DRAWING STATUS-ELECTRICAL
Electrical
Electrical Load sizing Aux. Transformer LT APFC sizing Power & Control Cable sizing Battery & sizing
SL NO Scheme Overall SLD equipment
Cal. sizing cal. cal. cable schedule cal. cal.
layout
1 Kalada Approved Approved Approved Approved Approved Approved Vetted
2 Patharkhamba Vetted and Approved Approved Approved Approved Approved Approved Vetted
Sent to EI
3 Chandrapur Approved Approved Approved Approved Approved Approved Vetted
4 Gotamara Approved Approved Approved Approved Approved Approved Vetted
.
Scrutiny with Under scrutiny with Under scrutiny Under scrutiny Under scrutiny
5 Tantulihata Yet to submit Yet to submit Yet to submit
PEC PEC with PEC with PEC with PEC
Under Under Under Under Under Under Under
Under compliance
6 Chattia II compliance compliance with compliance compliance with compliance compliance compliance with
with EDRC
with EDRC EDRC with EDRC EDRC with EDRC with EDRC EDRC
7 Babandh Approved Approved Approved Approved Approved Approved Approved
Under scrutiny Under scrutiny Under scrutiny
8 Lambodharpur Vetted Vetted Vetted Vetted
with PEC with PEC with PEC
9 Chittalpur Vetted and Approved Approved Approved Approved Approved Approved Vetted
Sent to EI
10 Gopalpur Approved Approved Approved Approved Approved Approved Vetted
11 Sana Rohila Approved Approved Approved Vetted Vetted Vetted Vetted

12 Raniakata Approved Approved Approved Vetted Vetted Vetted Vetted


Scrutiny with Under scrutiny with Under scrutiny Under scrutiny
13 Chadheiragada Yet to submit Yet to submit Yet to submit Yet to submit
PEC PEC with PEC with PEC
Sensitivity: Unclassified
SUPPLY STATUS-MECHANICAL
Sl. Received Balance
NO Item Description UOM Scope Qty Qty Qty Remarks

Inspection and Dispatch is in


1 MS Pipe KM 15.33 4.9 10.43
progress
Inspection and Dispatch is in
2 DI Pipe KM 159.34 125.33 34.01
progress
.
Inspection and Dispatch is in
3 HDPE Pipe KM 2235.99 1999.22 236.71
progress
4 Pump & Motor Nos 12 - -
5 EOT Nos 3 - -
6 Pre-Filter Unit Nos 9 - -
7 Slice Gate Nos 1 - -
8 20 Ha OMS Nos 485 - -
9 2 Ha. Outlet Nos 4941 - -
10 Air Valves Nos 340 - -
Butterfly Valve(BFV) / Sluice
11 Nos 181 - -
Valves (SV) / DPCV
Sensitivity: Unclassified
SUPPLY STATUS-ELECTRICAL
Sl. Received Balance
NO Item Description UOM Scope Qty Qty Qty Remarks

Transmission line
1 Conductors KM 79 - -

2 Tower Material MT - - - -
.
3 Power Transformers Nos 18 - -
4 Distribution Transformers Nos 22 - -
5 HT Panels Set 16 - -
6 LT Panels Set 13 - -
7 Soft Starter Panel Set 46 - -
9 Battery Charger Set 16 - -
9 CT, PT & VCB Set 9 - -

10 PLC & SCADA Set 13 - -


Sensitivity: Unclassified
PIPE LAYING STATUS
MS PIPE LAYING PLAN
SL NO Scheme %OF
SCOPE LAID BALANCE JAN-25 FEB-25 MAR-25 APR-25 MAY-25 JUN-25 TOTAL
COM.
1 Kalada - - - - - - - - - - -

2 Patharkhamba - - - - - - - - - - -

3 Chandrapur - - - - - - - - - - -
4 Gotamara. 2.88 2.88 - - - 0.57 0.65 0.67 0.70 2.59
5 Tantulihata 6.11 6.11 - - - 1.21 1.37 1.43 1.48 5.50

6 Chattia II - - - - - - - - - - -
7 Babandh 5.18 5.18 - - - 1.02 1.16 1.21 1.26 4.66

8 Lambodharpur - - - - - - - - - - -

9 Chittalpur - - - - - - - - - - -
10 Gopalpur - - - - - - - - - - -
11 Sana Rohila - - - - - - - - - - -

12 Raniakata 1.16 - 1.16 - - - 0.23 0.26 0.27 0.28 1.04

13 Chadheiragada - - - - - - - - - - -

TOTAL (Km) 15 0 15 0 0 0 3 3 4 4 14
Sensitivity: Unclassified
PIPE LAYING STATUS
DI PIPE LAYING PLAN
SL NO SCHEMES LAID %OF
SCOPE TILL JAN’25 BALANCE COM. JAN-25 FEB-25 MAR-25 APR-25 MAY-25 JUN-25 TOTAL

1 Kalada 5.96 0.10 5.86 2% 0.00 0.68 0.78 0.96 1.05 1.10 4.66

2 Patharkhamba 8.51 0.17 8.34 2% 0.98 1.11 1.37 1.50 1.56 6.69

3 Chandrapur 16.24 0.00 16.24 0% 1.87 2.11 2.61 2.86 2.98 12.43
4 Gotamara . 10.48 0.00 10.48 0% 1.20 1.36 1.69 1.85 1.93 8.02

5 Tantulihata 6.05 0.00 6.05 0% 0.69 0.79 0.97 1.06 1.11 4.63

6 Chattia II 25.88 0.38 25.50 1% 2.97 3.37 4.16 4.56 4.76 20.20
7 Babandh 13.13 0.79 12.34 6% 0.15 1.51 1.71 2.11 2.31 2.41 10.84

8 Lambodharpur 12.59 0.23 12.36 2% 0.03 1.45 1.64 2.02 2.22 2.31 9.87

9 Chittalpur 10.98 0.00 10.98 0% 1.26 1.43 1.77 1.93 2.02 8.41
10 Gopalpur 12.10 0.00 12.10 0% 1.39 1.58 1.95 2.13 2.22 9.27
11 Sana Rohila 14.44 5.17 9.27 36% 3.95 1.66 1.88 2.32 2.54 2.65 16.23

12 Raniakata 17.47 0.00 17.47 0% 2.01 2.27 2.81 3.08 3.21 13.38

13 Chadheiragada 5.50 0.00 5.50 0% 0.63 0.72 0.88 0.97 1.01 4.21

TOTAL (Km) 159 7 152 - 4 18 21 26 28 29 129

Sensitivity: Unclassified
PIPE LAYING STATUS
HDPE PIPE LAYING PLAN

SL NO SCHEME LAID %OF


SCOPE BALANCE JAN-25 FEB-25 MAR-25 APR-25 MAY-25 JUN-25 TOTAL
TILL JAN’25 COM.

1 Kalada 132.23 80.44 51.79 61% 44.70 11.16 12.56 13.95 15.35 16.74 150.2
2 Patharkhamba 122.53 43.99 78.54 36% 35.30 10.34 11.64 12.93 14.22 15.52 108.64
3 Chandrapur 201.34 100.40 100.94 50% 66.74 17.00 19.12 21.25 23.37 25.50 206.64
4 Gotamara . 227.00 4.16 222.84 2% 0.00 19.16 21.56 23.95 26.35 28.74 123.92
5 Tantulihata 226.49 60.37 166.12 27% 40.57 19.12 21.51 23.90 26.29 28.68 179.87
6 Chattia II 219.53 84.22 135.31 38% 45.18 18.53 20.85 23.16 25.48 27.80 200.04
7 Babandh 224.09 126.73 97.36 57% 72.34 18.92 21.28 23.65 26.01 28.38 244.97
8 Lambodharpur 237.55 34.31 203.24 14% 16.79 20.05 22.56 25.07 27.57 30.08 159.64
9 Chittalpur 123.08 26.34 96.74 21% 10.34 10.39 11.69 12.99 14.29 15.59 91.29
10 Gopalpur 100.17 36.70 63.47 37% 13.03 8.46 9.51 10.57 11.63 12.68 89.55
11 Sana Rohila 168.66 97.40 71.26 58% 42.34 14.24 16.02 17.80 19.58 21.36 186.4
12 Raniakata 185.99 34.66 151.33 19% 24.70 15.70 17.66 19.63 21.59 23.55 132.79
13 Chadheiragada 67.35 31.59 35.76 47% 4.37 5.69 6.40 7.11 7.82 8.53 67.14

TOTAL (Km) 2236 761 1475 - 416 189 212 236 260 283 1941

Sensitivity: Unclassified
PUMP HOUSE WORK STATUS
SL No. Scheme Start Date Completion Date Remarks

1 Patharkhamba 21.10.24 Nov’25 Raft Concrete including footings completed, Sump wall
1st lift shuttering Under progress
2 Kalada 21.10.24 Nov’25 Excavation in progress
3 Chittalpur 17.10.24 Dec’25 Well sinking and piling work in progress
4 Chandrapur 23.11.24 Nov’25 Excavation in progress

5
. Gopalpur Feb’25 Jan’26 Permission from DFO to be received for starting the
work

6 Gotamara Jan’25 Mar’26 Permission received, 11 KV Overhead Cable


Shifting is in progress

7 Tentulihata Feb’25 Apr’26 PH Land Clearance required from Rengali Right Canal
Division
8 Chattia II Jan’25 Mar’26 Excavation in progress
9 Babandh Feb’25 Jan’26 Private land acquisition under Progress
10 Sana Rohila 17.12.24 Nov’25 Excavation in progress
11 Raniakata Jan’25 Dec’25 Excavation in progress
12 Lambodarpur Feb’25 Apr’26 Private land acquisition under Progress
13 Chadheiragada Feb’25 Nov’25 NOC required from OMC

Sensitivity: Unclassified
SITE VISIT PHOTOGRAPHS

Chattia II Scheme – Puja performed in the presence Raniakata Scheme – Puja performed in the
of CE, Addl. CE, EE – Mega Lift with PMC presence of EE Mega Lift.

CE sir’s Site Visit Photos


Sensitivity: Unclassified
PATHARKHAMBA SCHEME

Sensitivity: Unclassified
KALADA SCHEME

Sensitivity: Unclassified
CHANDRAPUR SCHEME

Sensitivity: Unclassified
SANAROHILA SCHEME

Sensitivity: Unclassified
RANIAKATA SCHEME

Sensitivity: Unclassified
CHITTALPUR SCHEME WELL-SINKING WORKS

Sensitivity: Unclassified
CHHATIA II

Sensitivity: Unclassified
SITE PROGRESS PHOTOGRAPHS – HDPE PIPE LAYING

Sensitivity: Unclassified
SITE PROGRESS PHOTOGRAPHS –DI PIPE LAYING

Sensitivity: Unclassified
SITE PROGRESS PHOTOGRAPHS –MS PIPE STACKING

Sensitivity: Unclassified
CONSTRUCTION SCHEDULE
Description Dec'23 Mar'24 Jun'24 Jul'24 Sep'24 Dec'24 Mar'25 Jun'25 Sep'25 Dec'25 Mar'26 Apr'26 Jun'26 Sep'26 Oct'26

Survey

Design & Drawing

Procurement of Pipes & Fittings

Procurement of E&M equipment's

Laying of MS pipeline

Laying of HDPE pipeline

Laying of DI pipeline

Civil works - Pump House

Civil works - Other structures

Erection of E&M equipment's incl.


OMS

Testing & Commissioning

Sensitivity: Unclassified
HINDRANCE
Sl. No. Scheme Description

1 Chittalpur Locals are objecting & stopping the pipe laying works
frequently at site.

Forest clearance required for starting the pump house


2 Gopalpur construction works. Minor irrigation area is overlapping with
our command area.

3 Babandh Part of pump house land falls under private land and land
acquisition in progress.

4 Lambodarpu Part of pump house land falls under private land and land
r acquisition in progress.

Sensitivity: Unclassified
HINDRANCE
Sl.
No. Scheme Description

Clearance required from Odisha Mining Corporation for pipeline &


5 Chadeiragada pump house works

Local villagers objecting to start the pipeline & pump house works.
6 Gotamara Discussion with local authorities are in progress to resolve the issue.

Permission required from CE, Rengali Right Canal to start pump


7 Tentulihata house construction works.

As per the recent requirement from local villagers and subsequent


8 Raniakata recommendation from Central Minister, feasibility study of
additional command area is in progress.