英文版套标机说明书
英文版套标机说明书
Manual
For
Automatic
Label
Inserting
Machine
Products!
1
Contents
Chapter1Preamble 3
Chapter2Safety criterion and regulations 3
2-1Safety requirement on installation 3
2-2Safety measures on maintenance and repair 4
2-3Pre-inspection 5
2-4Notice on electric parts 6
Chapter3 Preparation before operation 6
3-1Operation precautions 6
3-2Installation and cleaning 6
Chapter4 Structure and function of each mechanism 7
4-1Interface diagram of feeding line of the main machine 7
4-2Identification of drawings and functions of each part 8
Chapter5 Installation of label film material 10
5-1Diagrammatic representation 10
5-2Testing of cutting operation 11
Chapter6 Adjustment and setting of electric eye rack location 11
6-1Location adjustment of electric eye rack during volume label cutting 11
6-2Setting of sensitivity of the electric eye 11
Chapter7Positioning detection of label insertion 12
7-1Principle of label insertion 12
7-2Diagrammatic representation of electric eye adjustment way 12
7-3Detection description on electric eye for bottle monitor 12
7-4Main point on adjustment 13
Chapter8 Dismantling and assembling of cutter head 14
Chapter9Operation and control description of human machine interface 15
9-1Operation description 15
9-2Explanation of the graphic menu 16
9-3Common abnormal situations and troubleshooting 18
Chapter10 Adjustment of other units(optional accessories) 19
10-1Specification 19
Chapter11Lubrication and maintenance 20
11-1Daily routine check items 21
Chapter12 Equipment circuit 22
Chapter 1 Preamble
Thank you for choosing automatic shrinkable label inserting machine from company . In order to
fully exert the performance of various parts of this machine,and for proper and safe operation by
operators, please make sure to read this manual carefully before operation .We believe that this
manual will assist to acquaint you with this machine soon and will be more and more satisfied with
the operation.
The body of this label inserting machine adopts a great deal of aluminium alloy, combined with
2
anode treatment and 304 stainless steel, enabling the overall structure of the machine to be more
robust and durable ,As for mechanical performance ,its modular and hnman-oriented design ensures
easier operation circuit and it is easy to learn .The excellent circuit design further ensures the label
inserting speed of this machine to be in the leading position internationally .Due to its completely new
design concept ,not only lots of mechanical adjustment has been eliminated ,but also the accuracy of
label cutting and production speed has been further enhanced .The followings will be the detailed
description on mechanical operation of this machine.
Chapter 2 Safety criterion and regulations.
2-1 Safety requirement on installation
Upon arrival at the site and before installation and operation ,check the machine to see if there is
any damage .Check if the frame is distorted ,if the electric cabinet is affected with damp,particularly
check if there is any damage mark (for example collision mark) on any parts of the machine ,in case
of being unable to determine ,please verify it with the manufacturer, in case if any damage ,please
inform the carrier immediately.
Before complete positioning of the machine ,do not remove the package . Forklift can be used for
handling this machine .Insert the fork from the bottom of the front side of the machine .Do not use
wire rope for lifting and handling .Strict compliance with the above requirement is the precondition of
safety installation ,otherwise it may result in personal injury and damage to the machine.
Do not cover or block the ventilation fan motor in the electric cabinet with anything to ensure
proper heat dispersion.otherwise overheating of electric elements may result in damage to or unstable
operation of the machine.
Make sure the power supply complies with working power of this machine .and inconsistent
voltage may damage the electric elements.
2-2 Safety measures on maintenance and repair
The operator handling operation of the electric and mechanical assemblies shall be subject to
training and authorization.
Only trained and authorized personnel can carry out maintenance of the electric and
mechanical assemblies of the machine, who shall be professional familiar with mechanical
installation and electric repair with certain level of experience.
Carry out overhaul and maintenance of the machine regularly to find possible safety hidden
trouble and remove it immediately to avoid possible big losses.
Maintenance and repair operation on the machine with power on is absolutely forbidden.
◆Maintenance and repair operation of the electric elements can only be carried out after switching
off the breaker for overall circuit in the cabinet and turning off the power supply of the machine.
*Attention:
●Even though the power of the machine is turned off,there are some electric elements in the circuit
charged with electricity.
●Check all assemblies and transmission system of the machine at least once a year.In case of
operation in serious rusty environment,the check frequency shall be increased.
Safety measures on repair
All installed parts shall be maintained by dedicated persons to avoid damage to the machine and
personal injury .In case of any defect ,the machine shall be repaired immediately and the authorized
technician shall remove the defect in time .After each repair,check the safety protection device of the
3
machine before start of running.
Do not use welding or flame to cut any parts of the machine ,unless under the condition that the
cutting will not lead to fire and it will not damage any other parts.
Relevant protection measures shall be taken for the machine.In case of fire situation,fire
extinguisher shall be available.
●Do not climb on the machine,and safe platform or scaffold shall be used.
●During lifting or handling of the parts with mechanical equipment(crane etc.),make sure to be
careful even for very light components because there still exists risk of slipping down or losing
balance.
●In case a damaged component cannot be repaired,it shall be colleted from the manufacturer upon
request (only within the guarantee period).Do not measure and manufacture it by yourself because this
may damage other components due to mismatch with one another.
2-3Pre-inspection
Inspection upon arrival of the machine at the site
Check if the machine is in good condition.In case of damage or incomplete package,please inform
the carrier immediately.
Please check if the recevied machine is the same as you purchased,and check if the model indicated in
the nameplate is the same as purchased.
Please check if all accessories for site installation have been recevied,and if they are complete and
free from damage.
For handling,please consider 3 dimensions and installation clearance to make sure that there will be
sufficient space for all connections and maintenance operations.
●Handle the machine with forslift from specified location,and lifting off is not allowed.
●There shall be enough carrying capacity at the site for installation of the machine ,or at least there
shall be proper tightening measures.
●Proper space shall be left at the left and right sides of the machine to ensure air flow and ventilation
of electric units.
●There shall be enough support points at the right installation locations.
●Pushing,pressing,and prizing the cabinet of the machine are not allowed.the bottom frame of the
machine is the only part carrying the load.
2-4Notice on electric parts
The standard environment to operate label inserting machine shall be as followings:
●Ambient temperature:-10℃to+40℃
●Installation location:indoors
●Ferquency of power supply:50±5hz
●Voltage:1ф210-230vac
●Power:1.5kw
Safety requirement on electric parts
Only professial persons can operate the electric units.particularly,before any handling in the control
cabinet,all power supple to the machine shall be disconnected.the main power supply may be switched
off by disconnecting the main circuit breaker.
●Electric shock risk:even though the main power of the machine is turned off,or the main circuit
bresker is disconnected,there are some electric elements in the circuit charged with electricity.
●Burning risk:the current may lead the electric elements to be temporary or long period hot ,be
4
careful when touching power line cable,contol cable,power supply cable,junction box cover and motor
casing.
●Even the machine is turned off,as long as the breaker of the power supply circuit is closed,the power
line cable is still charged with electricity.for details refer to the electric principle diagram.
●Dust collector shall be used for cleaning the control cabinet.direct cleaning with unfiltered
compressed air is not allowed because water and oil content in the compressed water may lead to
short circuit and reduction of insulation resistance.
Chapter 3 preparation before operation
3-1Operation precautions
Before turning on,check the bolts of each mechanism to see if there is any loose situation.
3-1-1Upon turning on,try to run each mechanism with manual key to see if there is any abnormal
situation,automatic runing can be carried out only under no abnormal situation.
3-1-2When the emergency stop switch is turned on cutting mechanism will search the original point
automatically.before turning on,make sure that the central column has been tightened in the right
position,otherwise the central column and the cutter may be damaged.
3-1-3After replacing the cutter blade,check and see if the blade is too long.too long blade may damage
the cutter.
3-1-4During standby or normal runing situation,do not put hands into the working area of the cutter .
3-1-5Manual label feeding will not work in case the clean-down unit is not turned on.
3-2Installation and cleaning
The main machine,conveyor and shrinking oven etc.shall be adjusted to be in one straight
line.the centre of the conveyor and the cutter head centre of the main machine shall be aligned with
each other and the reference plane shall be adjusted to be level.the foundation bolts of the main
machine shall enter the support ground without any clearance.check and confirm the voltage of the
power supply.enough space shall be left for positioning of the main machine for the convenience of
future spot check and repair.the ambient temperature shall be not higher than 45℃ to avoid defects of
bought out components.the placed location of the main machine shall be free from direct blow of fan
or cold air,and flowing air may impact label inserting.
Power ON Stop
Clean-down OFF
Emergency Stop ON
5
Emergency Stop OFF
Reset to original point
Label feeding
Startup
■Cleaning
Wipe off foreign substance like dust and oil stain etc.left on the machine during transportation and
installation.Wipe with clean cloth the sliding surface of transmission parts of the machine such as
guide bar,guide way,screw and gear slide rest etc.,and apply lubricating oil again.Pay attention that no
oil shall be applied on belt pulley,belt and rubber wheel and electric parts like motor etc.
Chapter 4 structure and function of each mechanism
4-1 Interface diagram of feeding line of the main machine
E plate thickness 2.5 unit:mm
8
5-1-1As showed in above figure,put the label film material on material rack,insert film
material pressing plate and slightly apply pressure before tighten the rack screw.
5-1-2The material comes out along the direction as showed in the figure,and the material feeding
roller opens clockwise so that the film material will pass through the rollers.
5-1-3Pull the label film material through various rollers as per the figure and then pull it the tailplane
of the central column.
5-1-4Open the driving wheel before pulling the film material into the central column,and then hold the
bottom of the central column with left hand lift it up so that the roller of the central column
disengaged slightly from the main driving wheel.pull the film material through the cutting position
with right hand and then pull back the central column with right hand and secure it.
5-1-5After of cutting operation
At the home page of human machine interface,press label cutting button to select label feeding for
cutting operation,repeat the trial cutting for at least five times to remove nonstandard label film
material.note that you have to finally press start button before entering the page of automatic mode.
Chapter 6 adjustment and setting of electric eye rack location
6-1Location adjustment of electric eye rack during volume label cutting
6-1-1The location of slide rest of electric eye rack can be adjusted up and down.
6-1-2In case the higher part of label is too long,adjust slide rest of electric eye rack downward. Carry
out the above adjustment until cutting to the right position.
6-2Setting of sensitivity of the electric eye
6-1-1Since the color,shade and thickness are different for different label film material even though we
have adjusted and set up the machine before dispatch and during installation.too high or too low
sensitivity will result in abnormal insertion of clean-down label during operation.normally too high
sensitivity may lead to shorter label length,while too low sensitivity may lead to the situation that a
series of label film material has been pulled down.in case of the above situations,sensitivity of the
electric eye has to be adjusted so as to meet the condition of the related label film material.
6-1-2Before adjustment of sensitivity,pull the label to be near the electric eye and confirm that the
printing transparent point is at thisposition.check if the red lamp and green lamp on the electric eye
sensor are off.if moving the label up and down cannot make the red lamp off,it means the transparent
9
sensitivity is weak.align the transparent section of the label with the electric eye and adjust the
sensitivity button on electric eye until the red and green lamps are just off,and then adjust backward
until the red lamp is on.
6-1-3In principle both red and green shall be adjusted to lighting.sometimes too strong transparency
of printings etc.on the label film material may lead to misjudgment of detected of electirc
eye,resulting in abnormal insertion of label.
6-1-4In case it remains abnormal after adjustment,repeat the above steps and adjust the sensitivity
knob on the sensor a little bit more or less in order to detect the proper the position of the sensitivity
knob.
Chapter 7 positioning detection of label insertion
7-1 Principle of label insertion
When there are bottles on the conveyor belt passing the electric eye for bottle detection,the driving
unit under servo control will automatically feed one piece of label,at the same time the clean-down
material roller unit will clean down one piece of long label,which will be inserted on the bottle.in case
the positioning detection electric eye does not in the proper position at this time,the label cannot be
successfully inserted to the bottle.
7-2Diagrammatic representation of electirc eye adjustment way
7-2-1Adjust as per the folleowing figure,in case the label inserts to the bottle as showed in figure
A,move the electric eye toward B direction.in case of figure c,move the electirc eye from c towards b
direction,until the label inserts to the bottle like showed in figure b.
Label
A B Bottle
C
OK
11
8-2Description of assembly
8-2-1 In case of replacing the blade ,dismantle the unit as showed in the above figure.
8-2-2When replacing the blade,pay attention to number of remaining lattice of the
original blade,i.e.the length of the blade.the new blade shall have the same length as the
ole one,otherwise the film material may not be broken when cutting the label,or the label
not be cleaned down.
8-2-3When assembling the blade,pay attention to the followings:A.Check if there is a
blade groove on the blade for inserting to the blade rest;B.After determination of the
blade length,do not operate at the blade edge and its sharp end;C.The blade shall be
assembled as per the original assembly direction of the cutter head.
8-2-4After assembly of the blade,pay attention to the marks on the belt and put on the
belt properly to avoid blocking of label fefore normal operation.
8-2-5Be careful to dismantle the blade and avoid getting hurt by the blade.when
dismantling ti with tools,the hands shall be away from the blade area.Hold and tighten
the belt with the left hand before dismantling blade press plate screw.pay attention to
properly tighten the press plate so as to avoid deformation of the press plate .
8-2-6In case the blade angle of each unit is abnormal,or there is abnormal noise,please
notify this company for troubleshooting.
2. Emergency
:use it under abnormal situation.
Stop
3. Reset to Original Point :after turning on the machine,operate Reset to Original Point
Start 13 Stop
Start
:Start automatic mode
Label feeding :Feed the label to the central column waiting for cutting.
Label cutting :Cut off the label that has been sent to the central column.
Production speed :Display the number of bottle fed per minute under automatic mode.
Label length
:Set the label length.(note:in case of entering numerical value in this field,the main
controller will be automatically switched to fixed length mode with unit of min. In case this value is
set to 0, the main controller will consider it as section mode ba default.)
Production quantity
:Record the production quantity.(with function of saving in case of power
off)
Rise
:The machine head rises.
Drop
:The machine head drops.
14
Hairbrush
:start/stop of hairbrush motor.
Bottle carrying
:start/stop of bottle carrying positioning motor
Clean-down
:start/stop of clean-down motor
Material Supply
:supply for one time by material motor.
Troubleshooting(1,2,3,4,6,7)
Display on the touch Related
Reasons Abnormal removed
screen sentor
Key shall be pressed
15
Label feeding servo is After abnormal condition is
1.Sending label is overload or block of removed,press Abnormal removed key.
abnormal label material
No material roll or the Replace material roll,and check feeding roller clamp to
feeding roller is not see if it is closed.check sensor(FX11),press
6.Lack of label
FX11 properly
material Abnormal removed
pressed(FX11) key.
16