Conditions of Contract for Plant & Design Build for Electrical & Mechanical Plant, and For Building
and
Engineering Works, Designed by The Contractor
No Content Keterangan
1 General Sequence, Function, General Sequence
Tender (Issue tender
document, submission);
Contractor LoA;
Commencement Date
(Completion, delay of
the project);
Defect Period;
Performance Certificate
Issue.
Di attachment, input sequence
untuk
Payment Event;
Dispute Event.
2 General Content of Contract General Provisions;
Definitions;
The Employer;
The Engineer;
The Contractor;
Design;
Staff and Labour;
Plant, Materials and
Workmanship;
Commencement,
Delays, and Suspension;
Tests on Completion;
Employer’s taking over;
Defects Aftertaking
Over;
Tests After Completion;
Variations and
Adjustments;
Contract Price and
Payment;
Contract Price and
Payment;
Termination by
Employer;
Suspension and
Termination by
Contractor;
Care of the Works and
Indemnities;
Exceptional Events;
Insurance;
Employer’s and
Contractor’s Claims;
Disputes and
Arbitration.
3 Particular Conditions Consist of:
Contract Data;
Special Provisions (i.e:
excercise authority
attributable to the
engineer which
required consent of the
Employer;
4 The Role of the Engineer Can be Person/Legal
Entity;
To supervise the overall
construction, appoint
by the employer;
Acts neutrally when
making determintation;
Nothing in FIDIC stated
Engineer can be an
employer employee,
but: the nature is
blocked due to the the
nature of neutrality;
Can make an instruction
for the execution of
works to the contractor;
Has a duty to review the
programme;
Can ask a recovery
programme or revised
programme (method)
Cost at contractors
risk.
Can as the contractor or
sub or suppliers to
attend a meetings;
Has a right to accept or
withhold any payment
from the contractor
since the actual
progress hasn’t be
achieved Must give
reasons and details; But
contractor can
challenge anything
withheld;
Do Administration of
contract and
supervision of the work;
Responsible for:
- Issuing Instructions;
- Cerifying Payments
(Lump Sum);
- Determining
Completion.
5
6
7
Conditions of Contract for Plant and Design-Build (Yellow Book), dikenal dalam Bahasa Indonesia sebagai
buku kuning, untuk Instalasi Mesin dan Rancang Bangun. Syarat – syarat kontrak pada yellow book
dipergunakan untuk pelaksanaan pembangunan instalasi mekanikal dan instalasi elektrikal maupun juga
untuk desain dan pelaksanaan konstruksi bangunan dan pekerjaan engineering. Design and Build
melakukan pembayaran per termin sesuai kemajuan pekerjaan. Dalam aspek pengawasan, untuk
design and build pemilik proyek dapat melakukan pengawasan dari tahap awal sampai akhir
pekerjaan. Engineer bukan merupakan suatu entitas dengan pemberi kerja, namun merupakan entitas
lain yang membantu pemberi kerja dalam pengawasan pelaksanaan pekerjaan yang dikerjakan oleh
kontraktor. Peran engineer yang ada pada yellow book adalah dimana setiap pelaksanaan pekerjaan
perlu persetujuan dari engineer
PP No 22 Tahun 2020
Employer Contractor
Agreement
Engineer
Contractor shall:
Prepared Performance Security Pelaksanaan seperti Jaminan Penawaran;
Not hired subcontractors if:
Responsible for the design of works. The requirement of the designers are:
Afterwards, the contractor have to submit the name of the designers to the engineer.
The engineer will do an examination, inspection, measurement, or testing to the
Plant/Materials. If the engineer found something which not in accordance with a provisions
within the contract, then the Engineer will give a notice to the Contractor. Then, the Contractor
will promply prepare and submit a proposal for necessary remedial work.