SlideShare a Scribd company logo
Copyright © 2014, Oracle and/or its affiliates. All rights reserved. |
Copyright © 2014, Oracle and/or its affiliates. All rights reserved. |
Safe Harbor Statement
The following is intended to outline our general product direction. It is intended for
information purposes only, and may not be incorporated into any contract. It is not a
commitment to deliver any material, code, or functionality, and should not be relied upon
in making purchasing decisions. The development, release, and timing of any features or
functionality described for Oracle’s products remains at the sole discretion of Oracle.
7/21/2016 Oracle OpenWorld
Copyright © 2015, Oracle and/or its affiliates. All rights reserved. |Copyright © 2014, Oracle and/or its affiliates. All rights reserved. |
Oracle SuperCluster for
Oracle E-Business Suite
Copyright © 2015, Oracle and/or its affiliates. All rights reserved. | Public 4
Typical Enterprise IT Operational Inefficiencies
Copyright © 2015, Oracle and/or its affiliates. All rights reserved. |7/21/2016 Public 5
Typical Enterprise IT Expenditure Distribution
Focus on ongoing expenses, not
purchase price.
Copyright © 2015, Oracle and/or its affiliates. All rights reserved. |
Optimized Engineered
Systems & Cloud
Systems built from
commodity servers, storage,
networking, and softwareMonolithic servers
with custom software
FreedomtoInnovate
20051995 2015
Freedom from Low-level Tasks Drives Innovation
Copyright © 2015, Oracle and/or its affiliates. All rights reserved. |
SuperCluster: Oracle’s Most Powerful Engineered System
7/21/2016 Public 7
• Complete, Integrated Platform
• Servers, storage, networking, virtualization,
operating systems, application & database
templates, specialized management tools, expert
support
• Optimized for Oracle Database
• Ultimate OLTP & batch performance, security,
reliability, horizontal & vertical scalability
• Runs Any Standard Application
• Runs any standard application, from Oracle
including Oracle E-Business Suite, and 3rd party
apps to custom Java, C++, Ruby-on-Rails, Python
and more.
Copyright © 2015, Oracle and/or its affiliates. All rights reserved. |
SuperCluster: Oracle E-Business Suite Customers
Copyright © 2015, Oracle and/or its affiliates. All rights reserved. |
SuperCluster: Oracle E-Business Suite Implementations
Engineered and Optimized for Performance on Oracle SuperCluster
7/21/2016 Public 9
2x faster patching
E-Business suite database
migration in 12 weeks
FormerPlatform
PATCHING
FormerPlatform
Business reports produced
1.7x faster
Reduced operational
costs by 1.8x
SuperCluster Other
EBS RESPONSE TIMES
SuperCluster
5x faster EBS transaction times
3x EBS performance
improvement
SuperCluster Other
EBS TRANSACTIONS
SuperCluster
FormerPlatform
SuperCluster Other
FormerPlatform
Copyright © 2015, Oracle and/or its affiliates. All rights reserved. |
SuperCluster: Oracle E-Business Suite Implementations
Engineered and Optimized for Performance on Oracle SuperCluster
7/21/2016 Public 10
SuperCluster Other
FormerPlatform
EBS AUDIT REPORT
FormerPlatform
DEFECT TRACKING TIME
EBS audit report 5x faster
EBS HR module 149x faster
28 days to deploy
Defect tracking reduced 36x
SuperCluster Other
FormerPlatform
Copyright © 2015, Oracle and/or its affiliates. All rights reserved. | 11
Why Customers Choose SuperCluster for E-Business Suite
Engineered and Optimized for Performance
• Extreme Performance
• High-volume batch, OLTP work-load and cloning performance
• Cost Reduction
• Lower TCO compared to multi-vendor D-I-Y solutions
• Orders of magnitude easier to manage, simpler patching, greater uptime
• Faster Time to Value
• 5X faster to deploy with fully documented Oracle E-Business Suite
consolidation best practices
• Risk Reduction, Security and High Availability
• Pre-tested solution with built-in security and high availability
• Oracle Platinum Support
Copyright © 2015, Oracle and/or its affiliates. All rights reserved. |
SuperCluster: Runs Oracle and Virtually Any Application
• Optimized for E-Business
Suite
• Optimized for Oracle
Database
• Oracle Fusion Middleware
• Oracle Applications
• 3rd Party Applications
• All Oracle Solaris
Applications
• Any Java, Ruby, Spring,
Grails, Groovy, REST, C/C++,
etc.
Copyright © 2015, Oracle and/or its affiliates. All rights reserved. |
 General-purpose Storage
• Virtual Machine and system data
 Unified Ultra-fast Network
• 40GB/s QDR InfiniBand I/O backplane
 Database & Application Servers
• Up to 32 processors and 32 TB of RAM
• Software defined scale up or scale out
 Exadata Storage Servers
 Highly optimized storage for Oracle
Database
 Query processing
 OLTP
 Compression
SuperCluster: Hardware Architecture
Complete | Optimized | Fully Virtualized | Scale-up and Scale-out
SuperCluster M6-32SuperCluster T5-8
Copyright © 2015, Oracle and/or its affiliates. All rights reserved. |
SuperCluster: Integrated Software
Complete | Optimized | Fully Virtualized | Scale-up and Scale-out
SuperCluster M6-32SuperCluster T5-8
Copyright © 2015, Oracle and/or its affiliates. All rights reserved. |
An Obsolete Approach To Managing Data
Production Server
with OLTP Database
Copy DB to
Run Cost
Management
Data Warehouse
Server with
OLAP Database
(Column
Format)
Oracle Business
Intelligence
Server
(Analytics &
Reports)
Periodic
Batch
Processes
Extract,
Transform, Load
Traditional Application
Architecture
SLOW,
COMPLEX
(Row Format)
Copyright © 2015, Oracle and/or its affiliates. All rights reserved. |
SuperCluster: Extreme Performance Innovations
Poor Database Storage I/O Exadata Technology
Public 16
Traditional Performance
Bottlenecks
Complex Multi-vendor Tuning
Poor Scalability
Inefficient Virtualization
Poor Memory Utilization
Poor Compute Performance
Full-stack Tuning & Patching
Linear Scale-up and Scale-out
Zero-overhead Virtualization
Architected for In-memory
Oracle T5 and M6 Processors
SuperCluster innovations
Copyright © 2015, Oracle and/or its affiliates. All rights reserved. |
 BOTH row and column
in-memory formats for
same data/table
 Simultaneously active and
transactionally consistent
 100X Faster Analytics &
reporting: column format
 2X Faster OLTP: row format
7/21/2016 Public 17
The Next Database Performance Leap
Column
Format
Memory
Row
Format
Memory
AnalyticsOLTP
Sales Sales
Oracle 12c Database In-memory
Copyright © 2015, Oracle and/or its affiliates. All rights reserved. |7/21/2016 Public 18
SuperCluster: In-Memory Modules for Oracle Applications
Real-time Cost and Profitability Analysis
 Optimize costs and working capital
 Evaluate COGS and valuations
 Maximize margins and gross profits
1000X Faster
Copyright © 2015, Oracle and/or its affiliates. All rights reserved. |7/21/2016 Public 19
SuperCluster: E-Business Suite In-Memory Cost Management
Real-time Cost and Profitability Analysis
 Optimize costs and working capital
 Evaluate COGS and valuations
 Maximize margins and gross profits
1000X Faster
Than commodity x86 hardware and
regular Oracle Database 12c
Copyright © 2015, Oracle and/or its affiliates. All rights reserved. |
Revolutionary Transformation to Real-Time Enterprise
No More Overnight Batch and Real-time Analytics
• Accelerate Your Business
In-Memory Application
Architecture
INSTANT,
SIMPLE
In-Memory Cost
Mgmt Schema OLTP Schema
In-Memory Everything
Bi/Analytics
Copyright © 2015, Oracle and/or its affiliates. All rights reserved. |
SuperCluster: Maximum Security
Secure Multi-tenant Application and Database Cloud and Consolidation
Secure Java & Middleware
Secure Oracle Database
Secure OS Run-Time
Secure Boot & Firmware
Secure Workload Deployment
Secure VM Templates
Automated Compliance
End-to-End Encryption
Copyright © 2015, Oracle and/or its affiliates. All rights reserved. |
Metering, Limiting and Charging
Web-based Self Provisioning
Dynamic Resource Management
Role Based Access Control
Complete Workload Isolation
SuperCluster: End-to-End Multitenant Architecture
7/21/2016 Public 22
Copyright © 2015, Oracle and/or its affiliates. All rights reserved. |
SuperCluster: Complete Solution for E-Business Suite
Application
Database
Operating
Systems
Virtual
Machines
Storage
Engineered
Systems
Centralized
Management
Services
and
Support
SOLARIS ZONES
SPARC DOMAINS
SOLARIS CLUSTER
SOLARIS CLUSTER
GOEGRAPHIC EDITION
Copyright © 2015, Oracle and/or its affiliates. All rights reserved. |
SuperCluster: Oracle Optimized Solution for E-Business Suite
Engineered, Tested, and Proven from Apps-to-Disk
1,000s of hours of testing across the stack to reduce risk
Sizing and
configuration
optimizations
Load/stress
tests
Performance
and scalability
tests
Real world
workload tests
Patch regression
tests
Fault
injection
tests
Interoperability
tests
End to end functional
validation
Early
development
tests
Identify
integration
opportunities
Full Stack OptimizationsOne Engineering Team
Copyright © 2015, Oracle and/or its affiliates. All rights reserved. |
High Availability
Scale
SuperCluster: High Availability
Oracle E-Business Suite
InfiniBand Network
Oracle Exadata Storage Servers
10 GbE Data Center Network
Node 2
Oracle Solaris
Node 1
Oracle Solaris 11
Database Domain
Application Domain
Oracle
Solaris
Cluster
Oracle
RAC
11g R2
Oracle Solaris
Oracle Solaris 11
Database Domain
Application Domain
Node 2
Isolation
Copyright © 2015, Oracle and/or its affiliates. All rights reserved. |
Oracle Platinum Support
Industry Leading Enterprise Support
7/21/2016 Public 26
Complete. Integrated. Proactive. High Availability Services.
ORACLE PLATINUM SERVICES
1 Covered system must be within an Oracle two-hour service area to receive two-hour response as a
standard service.
• 24/7 support coverage
• Specialized Support Team
• 2-hour onsite response to hardware issues1
• New updates and upgrades for Database,
Server, Storage, and OS software
• Industry-leading response times:
– 5 Minute Fault Notification
– 15 Minute Restoration or Escalation to
Development
– 30 Minute Joint Debugging with Development
• Patch deployment by Oracle engineers
• 24/7 Oracle remote fault monitoring
• Higher support level for Oracle stack
– Server, Storage, Network, Database software
Platinum Services at No Additional Cost
Copyright © 2015, Oracle and/or its affiliates. All rights reserved. |
Oracle Platinum Services Benefits: Real World
•75% fewer sev1 Service Requests
•70% fewer escalations
•37% fewer bugs encountered
•27% shorter avg. SR resolution time
•86% of SRs are opened by Oracle
–Requires an Auto Service Request
connection
Copyright © 2015, Oracle and/or its affiliates. All rights reserved. |
Oracle SuperCluster: Services Provider, Europe
Implements Oracle E-Business Suite Platform
• Produce business reports 70% faster
improving employee productivity
• Cut operational costs and simplified
management
Oracle SuperCluster Oracle Exadata
Copyright © 2015, Oracle and/or its affiliates. All rights reserved. |
• Improved serviceability with 2x faster
patching
• E-Business Suite database migration in
only 12 weeks
Oracle SuperCluster
Oracle SuperCluster: Educational Institutional, North America
Implements Oracle E-Business Suite Platform
Copyright © 2015, Oracle and/or its affiliates. All rights reserved. |
• 5x OLTP performance increase
• 3x performance increase in EBS
manufacturing, planning and
logistics module Oracle SuperCluster Oracle Exalogic
Oracle SuperCluster: Industrial Supplier, North America
Implements Oracle E-Business Suite Platform
Copyright © 2015, Oracle and/or its affiliates. All rights reserved. |7/21/2016 Public 31
FormerPlatform
SuperCluster
• EBS employee audit report 5x faster
• EBS HR module performance 149x faster
• EBS financials reports 6.5x faster
InfiniBand
Oracle SuperCluster: Oil and Gas Provider, UAE
Implements Oracle E-Business Suite Platform
Copyright © 2015, Oracle and/or its affiliates. All rights reserved. |7/21/2016 Public 32
FormerPlatform
SuperCluster
• 28 days to deploy the largest cMRO
implementation in the world
• Defect tracking reduced 36x to 5 seconds
• Advanced Supply Chain Management
savings of 320 person hours per month
Production Disaster Recovery
Oracle Data GuardOracle Data Guard
ZFS Replication
Oracle SuperCluster: Aircraft Manufacturer, UAE
Implements Oracle E-Business Suite Platform
Copyright © 2015, Oracle and/or its affiliates. All rights reserved. |
“
Oracle Confidential – Internal/Restricted/Highly Restricted 33
17x Performance Gains, Rapid
Deployment, 24x7 Oracle Monitoring and
Support with Oracle SuperCluster
“Specialized Bicycles is a brand that innovates. That is why we work with Oracle. It is
about speed, increasing efficiencies, knowing and managing net inventory.
Our proof of concept showed performance gains up to 17x. An account
reconciliation report took 20 hour report ran in 20 minutes on Oracle SuperCluster,
that’s huge.
We were always I/O bound managing 60TB of data. With the full integration ZFS, it
was a huge upgrade for us on top of the flash memory side of the database.
From the time we made out decision, did the POC, we were up tremendously fast
with Oracle SuperCluster in 65 days. Oracle keeps the system up and running 24/7
with out us worrying.”
Ron Polard
CIO
Specialized
17x Performance Gains 65 days to deployment
65
“
17x
Copyright © 2015, Oracle and/or its affiliates. All rights reserved. |
“
Extreme Efficiencies Implementing
SuperCluster Cloud, Cut OPEX by over
80%, Scaled Down Footprint 5x
“The advantages of having the database and applications running
on SuperCluster are huge, optimized to run Oracle Database, and
Oracle Exalogic.
With Oracle SuperCluster we were able to reduce operational costs
by 80%, and scaled down and consolidate by a factor of 5x.
Quarterly patching was really time saving for my staff. With Oracle
SuperCluster, we have one Partner for the whole stack.”
Hallgrímur G. Sigurðsson
Manager of Engineering
Advania hf
Cut OPEX by over 80% Scaled Down Footprint 5x
Copyright © 2015, Oracle and/or its affiliates. All rights reserved. |
“
Global Services Provider Runs Oracle E-
Business Suite, On SuperCluster, Migrates
from IBM Platform
“ NCR chose Oracle SuperCluster for the best performance for an
Oracle E-Business Suite , Oracle Enterprise Database, and Oracle
Exalogic integrated implementation supported by Oracle Platinum
Services.
The business benefits proven through the Oracle proof of concept
include superior price/performance. NCR will be migrating from an
IBM platform to Oracle SuperCluster, integrated with Oracle
Exadata and used to manage its Global Service business.”
Martin Kawecki
IT Director
NCR
Superior Price Performance Oracle Global Services
Copyright © 2015, Oracle and/or its affiliates. All rights reserved. |7/21/2016 Public 36
SuperCluster: Best Platform for E-Business Suite
Oracle’s Most Powerful Engineered System
• Engineered System: one integrated system with all the
required hardware (servers, network, storage) and
Oracle software
• One Architecture for Oracle E-Business Suite and Oracle
Enterprise Database
• Solves the IT Challenges Faced by Organizations:
• Avoids and removes database and storage silos
• Makes all workloads faster
• Rapid migration
Copyright © 2015, Oracle and/or its affiliates. All rights reserved. |
For More Information
facebook.com/OracleHardware
blogs.oracle.com/hardware
linkedin.com/company/oracle
oracle.com/supercluster
Copyright © 2014, Oracle and/or its affiliates. All rights reserved. |7/21/2016 Public
Copyright © 2014, Oracle and/or its affiliates. All rights reserved. |
Copyright © 2015, Oracle and/or its affiliates. All rights reserved. |
BACKUP SLIDES
7/21/2016 Public 39
Copyright © 2015, Oracle and/or its affiliates. All rights reserved. |
Oracle SuperCluster: Customers by Workload
Oracle E-Business Suite SAP
Siebel
Java/Solaris
FlexCube
PeopleSoft Oracle Database
Copyright © 2015, Oracle and/or its affiliates. All rights reserved. |
Compute
• 8 UCS M4 (256 Cores/4TB)
• 1 UCS 5108 Chassis
• 2 Fabric Interconnects
• Rack Infrastructure
Subtotal
ASP
$194K
$8K
$26K
$2K
$230K
Support/Yr.
$1K
$0K
$1K
$0K
$2K
Storage
• 10 EMC X-Brick 20 (200TB)
• 1 EMC VNX 5600 (80TB)
• EMC Unisphere Unified Suite
Subtotal
$2,805K
$65K
$15K
$2,886K
$0K
$4K
$1K
$5K
Software
• Red Hat Server
• VMware vSphere OC EP
Subtotal
$0k
$41K
$41K
$17k
$10K
$27K
Total $3,157K
ASP
$33K
Support/Yr.
Compute
• 2 T5-8 (256 Cores/4TB)
• 3 InfiniBand Switches
• Rack infrastructure
ASP Support/Yr.
Storage
• 8 Exadata HC Storage (384TB)
• 1 ZS3-ES Storage (80TB)
• ZS3 Cloning & Replication
• Exadata Storage Software
Software
• Oracle Solaris
• Oracle VM for SPARC
• Enterprise Manager
Total $1,048K
ASP
$155K
Support/Yr.
SuperCluster T5-8 Full Rack Comparable Cisco/EMC/VMware/RedHat
Cisco/EMC/VMware/RedHat ASPOracle ASP
SuperCluster: Lower CAPEX than Multi-vendor Systems
3X
More
Expensive
Year 1
Copyright © 2015, Oracle and/or its affiliates. All rights reserved. |
Pay for an Engineered System as a Monthly Service
Oracle IaaS Private Cloud
• SuperCluster for a monthly fee
– Replace CAPEX with OPEX
– Lower total cost than purchase
• Private / On Customer Premise
– Maintain control of business critical data
• Elastic Compute Capacity on Demand
– Pay For peak capacity, only when needed
• Oracle PlatinumPlus Services Included
– Higher level of support including patching
services
7/21/2016 Public 42
$0
$100
$200
$300
$400
$500
$600
0 12 24 36 48 60
CumulativeCost($,000s)
Months
3yearterm
IaaSwith 3 Months
CoDper Year
IaaSnoCoDused
Purchaseplus
AnnualSupport
Copyright © 2015, Oracle and/or its affiliates. All rights reserved. |
SuperCluster: Greater Value than Competition
4X Lower Total Cost of Ownership then IBM POWER7+ Solution
 $15 million in savings
 4X lower five year, Total Cost of Ownership
Greater Value1
SuperCluster Solution
IBM P780+ Solution
4X Savings
5 Year TCO
$5M
$10M
$20M
1Comparing (2) IBM P780s with POWER 7+ processors and 256GB RAM, IBM DS8870 Storage with 512 disks,
Oracle Database Enterprise Edition with (1) Oracle SuperCluster ½ Rack HP, Oracle Database Enterprise
Edition, Oracle Real Application Clusters, Oracle Exadata Storage Software and Oracle Solaris Cluster
$15M
See substantiation slides
Copyright © 2015, Oracle and/or its affiliates. All rights reserved. |
SuperCluster: Save Money Replacing Legacy IBM Systems
2.4X Reduction in 5 year Total Cost of Ownership
Upgrade and Save1
 Save $6.4 million over 5 years
 Return On Investment in >3 years
 30% lower hardware costs
 3X lower floor space costs
 2X lower power and cooling costs
1Based on analysis replacing IBM P595 servers and DS8300 Turbo storage with Oracle
SuperCluster ½ rack
SuperCluster Solution
IBM P595 Solution
2.4X Savings
5 Year TCO
$5M
$10M
See substantiation slides
Copyright © 2015, Oracle and/or its affiliates. All rights reserved. |
SuperCluster: Save Money Replacing Legacy HP Systems
2.7X Reduction in 5 year Total Cost of Ownership
Upgrade and Save1
 Save $10.5 million over 5 years
 Return On Investment in >2 years
 58% lower hardware costs
 3X lower floor space costs
 1.8X lower power and cooling costs
1Based on analysis replacing HP Superdome and EVA8000 storage with Oracle SuperCluster
½ rack
SuperCluster Solution
Superdome Solution
5 Year TCO
2.7X Savings
$5M
$10M
$15M
See substantiation slides
Copyright © 2014, Oracle and/or its affiliates. All rights reserved. |
Substantiation Slides
Solution Comparison Disclaimer
and Methodology
Copyright © 2014, Oracle and/or its affiliates. All rights reserved. |
Statement of Confidentiality & Disclaimers
This presentation and its contents (collectively, "Presentation") are the confidential information of
Oracle. The Presentation may not be reproduced, published, disseminated, or otherwise disclosed
without Oracle's written consent.
The Presentation is designed to provide a rough estimate of the Oracle software and hardware needs for
your company based on high level corporate information, and cannot account for all uses, risks and
other factors that may affect results or performance, or for changes in your business practices or
operating procedures that may be required to realize results or performance that are projected or implied
in the Presentation.
The Presentation may include selected third party data, information, research and/or reference materials
(collectively, "Third Party Information"). The inclusion of the Third Party Information does not constitute
an endorsement of Oracle's products or services by any third party.
The Presentation is provided to You on an “AS IS” basis without warranty (either express or implied),
may be used for informational and general planning purposes only, and is subject to change at Oracle's
sole discretion.
Further, this Presentation is not a commitment to deliver any future material, code, or functionality. The
development, release, and timing of any features or functionality described in this Presentation remains
at the sole discretion of Oracle.
Copyright © 2014, Oracle and/or its affiliates. All rights reserved. |
Safe Harbor Statement
The following is intended to outline our general product direction. It is intended for
information purposes only, and may not be incorporated into any contract. It is not a
commitment to deliver any material, code, or functionality, and should not be relied upon
in making purchasing decisions. The development, release, and timing of any features or
functionality described for Oracle’s products remains at the sole discretion of Oracle.
This model compares the TCO including CAPEX and OPEX of keeping the current environment (i.e. business as usual) versus replacing it with a
proposed architecture plus the associated IT related business benefits.
TCO categories include: Hardware acquisition and service, Software licenses and maintenance, Power and cooling (CO2 emissions calculated but
not monetized), Floor space, and Integration and deployment.
IT related business benefits include: Employee productivity, IT staff productivity, and Planned and unplanned downtime.
Growth: The average utilization rate of equipment is increased based on the growth rate until it reaches the maximum (default maximum = 60%) at
which point additional equipment is acquired. Growth is applied to new proposed equipment deployed during the migration period but is not applied to
equipment that is being ramped down.
Average utilization: Average utilization applies to workload capacity for servers and to storage capacity for storage. Default average utilization range:
initial = 40% and maximum = 60%.
Useful life replace: Useful life replace models the cost of replacing equipment at the end of its useful life with equivalent workload or storage capacity
at an estimated future price point. Software licenses are transferred to the new equipment. Hardware service is recalculated at the new rate.
Future equipment acquisition: The price to acquire equivalent workload or storage capacity is decreased at a default annual erosion rate of 15% per
year starting in year 2 through year 5 based on Moore’s Law.
Migration Period: For large multi-year implementations, proposed equipment is added and current equipment ramped down in equal amounts for
each year of the migration period
Purchase: If equipment is purchased, then the entire hardware acquisition cost (CAPEX cash flow) occurs in the year it is acquired.
Lease: If equipment is leased, then the cash flow is spread over the lease term (default 3 years). At the end of the lease term, equipment is assumed
to be replaced with new equivalent capacity at an estimated future price point recalculating the lease using the same rate.
Methodology
Copyright © 2014, Oracle and/or its affiliates. All rights reserved. |
EBS Sizing Used in Comparisons
High Level IBM Sizing Used for 2000 and 5000 User Comparisons
Source of IBM EBS sizing information: http://public.dhe.ibm.com/common/ssi/ecm/en/ord03011usen/ORD03011USEN.PDF
Copyright © 2014, Oracle and/or its affiliates. All rights reserved. |
Substantiation Slides
SuperCluster Replaces IBM
P595 Solution Comparison
Copyright © 2014, Oracle and/or its affiliates. All rights reserved. |7/21/2016 Oracle OpenWorld
Lowering TCO for EBS Customer 2000 Users
Initial Year 1 Year 2 Year 3 Year 4 Year 5
sh Outflows 0.00 837.00 860.00 1,971.00 2,722.00
sh Outflows 1,335.00 249.00 254.00 1,670.00 497.00
3,000.00
BAU Proposed
Hardware Acquisition 4,370 965 5x
Hardware Service 1,563 524 3x
Software - Hardware License 4,116 2,844 1x
Power and Cooling 297 101 3x
Floor Space 125 39 3x
Integration and Deployment 466 38 12x
Total cash outflows over the next 5 years
BaU = $10,937K
Proposed = $4,512K
TCO Reduction = $6,425K
TCO OVER 5 YEARSPROJECTED CASH FLOWS
Copyright © 2014, Oracle and/or its affiliates. All rights reserved. |
Category Initial Year 1 Year 2 Year 3 Year 4 Year 5
Benefits 0.00 0.00 0.86 0.90 2.02 2.77
Costs -1.34 -0.25 -0.25 -1.67 -0.50 -0.51
3.00
Category Year 0 Year 1 Year 2 Year 3 Year 4 Year 5 Total
TCO Business as Usual (IB) 0 837 860 1,971 2,722 4,546 10,937
TCO Proposed (P) 1,335 249 254 1,670 497 507 4,512
Other Proposed Project Investments (O) 0 0 0 0 0 0 0
Net TCO (IB - P - O) -1,335 588 606 301 2,225 4,039 6,425
Business Benefits (BB) 0 21 44 45 46 47 203
Net Cash Flow (Net TCO + BB) -1,335 609 650 346 2,271 4,086 6,628
Cumulative Net Cash Flow -1,335 -725 -75 271 2,542 6,628
Cumulative Discounted Net Cash Flow
(NPV) -1,335 -778 -236 28 1,607 4,203
Cash Flows And Value Metrics
*Currency USD in Thousands
**Unless otherwise noted, all future cash flows are undiscounted
 Discounted Total Savings (NPV) : $4,203K
 TCO reduction : 59%
 Payback months : 27
 Net Initial Investment : $-1,335K
 ROI based on total project cost (%) : 147
 IRR (%) : 65
 Cost of 3 month delay : $120K
 Cash flow discounting period : Year end
 Cost of Capital : 10%
PROJECTED CASH FLOWS
USD in Thousands, Undiscounted
Copyright © 2014, Oracle and/or its affiliates. All rights reserved. |
Category Component / Sub Component Name Manufacturer
Installed Base
Qty Reqd. Qty
Server, Engineered System
IBM Power 595 Server IBM 2 2
POWER6/5GHz/64GB/4ch/8co IBM 2 2
Disk, Virtual Tape
IBM DS8300 Turbo DISK_VTS 1 IBM 1 1
16 x 300GB FC IBM 24 24
Software - Hardware License
Oracle Database Enterprise Edition Database Oracle
IBM Power 595 - Server IBM 2 2
Oracle Enterprise Edition RAC HLS 1 Oracle
IBM Power 595 - Server IBM 2 2
Installed IT Infrastructure
Copyright © 2014, Oracle and/or its affiliates. All rights reserved. |
Category Component / Sub Component Name Manufacturer
Installed Base
Qty Reqd. Qty
Server, Engineered System
SPARC SuperCluster T5-8 SuperCluster Oracle 0 1
HP Half Rack/13TB+48TB/3.6GHz/2048GB/8ch/128co Oracle 0 1
Software - Hardware License
Oracle Database Enterprise Edition Database Oracle
SPARC SuperCluster T5-8 - SuperCluster Oracle 0 1
Oracle Enterprise Edition RAC RAC Oracle
SPARC SuperCluster T5-8 - SuperCluster Oracle 0 1
Oracle Solaris Cluster Enterprise Edition Cluster Oracle
SPARC SuperCluster T5-8 - SuperCluster Oracle 0 1
Exadata Storage Server Software (any rack size) Exadata Oracle
SPARC SuperCluster T5-8 - SuperCluster Oracle 0 1
Proposed IT Infrastructure
Copyright © 2014, Oracle and/or its affiliates. All rights reserved. |
Key IT Infrastructure Assumptions
Input Installed Base Proposed
Growth assumptions
Growth Type Exponential Exponential
Annual growth rate (%) 20.0% 20.0%
Site licensed software growth rate (%) 0.0% 0.0%
Calculate end of useful life replace Yes Yes
Deployment ramp (new required equipment) (Num) 1 1
Discount assumptions
Hardware discount (%) 0.0% 0.0%
Software discount (%) 0.0% 0.0%
Hardware service discount (%) 0.0% 0.0%
Acquisition Plan
Acquisition method Purchased Purchased
Inflation assumptions
Base inflation rate (%) 5.0% 5.0%
Service inflation rate (%) 5.0% 5.0%
Software inflation rate (%) 0.0% 0.0%
Unit price deflation rate (%) 15.0% 15.0%
Software assumptions
Percent of hardware licensed (%) 100.0% 100.0%
Percent of licenses available to transfer to this hardware (%) 0.0% 0.0%
Keep surplus licenses on maintenance No No
Copyright © 2014, Oracle and/or its affiliates. All rights reserved. |
Key IT Infrastructure Assumptions
Input Installed Base Proposed
Hardware service assumptions
Service level Default Default
Premier Service Rate (%) 12.0% 12.0%
Utilization assumptions
Minimum/initial hardware utilization (%) 40.0% 40.0%
Maximum hardware utilization (%) 60.0% 60.0%
Hours of operation per month (Hours) 720 720
Tape media assumptions
Tape utilization (%) 70.0% 70.0%
Compression ratio (Num) 2 2
Lease Assumptions
1 year lease term monthly rate (Num) 0.051 0.051
2 year lease term monthly rate (Num) 0.040 0.040
3 year lease term monthly rate (Num) 0.029 0.029
4 year lease term monthly rate (Num) 0.023 0.023
5 year lease term monthly rate (Num) 0.020 0.020
Lease Term (Years) 3 3
Oracle On Premise Iaas Assumptions
IaaS term (Years) 5 5
Year 4 & 5 discount (%) 30.0% 30.0%
IaaS COD enablement percentage (%) 0.0% 0.0%
Power assumptions
Power cost per kWh (USD) 0.1 0.1
Copyright © 2014, Oracle and/or its affiliates. All rights reserved. |
Key IT Infrastructure Assumptions
Input Installed Base Proposed
Power assumptions
CO2 (kg/kWh) 0.6078 0.6078
PUE (Power Usage Effectiveness) (Num) 1.8 1.8
Floor space assumptions
Floor space cost (sq ft per month) (USD) 20.000 20.000
Rack height (rack units) (Num) 42 42
Floor space per rack (sq ft) 18.18 18.18
Rack density (%) 100.0% 100.0%
Copyright © 2014, Oracle and/or its affiliates. All rights reserved. |
Substantiation Slides
SuperCluster Replaces HP
SuperDome Solution
Comparison
Copyright © 2014, Oracle and/or its affiliates. All rights reserved. |
Initial Year 1 Year 2 Year 3 Year 4 Year 5
sh Outflows 0.00 1,206.00 1,231.00 2,556.00 4,600.00
sh Outflows 1,335.00 249.00 254.00 1,670.00 497.00
5,000.00
BAU Proposed
Hardware Acquisition 5,338 965 6x
Hardware Service 1,904 524 4x
Software - Hardware License 6,915 2,844 2x
Power and Cooling 186 101 2x
Floor Space 145 39 4x
Integration and Deployment 549 38 14x
TCO OVER 5 YEARSPROJECTED CASH FLOWS
Total cash outflows over the next 5 years
BaU = $15,036K
Proposed = $4,512K
TCO Reduction = $10,524K
Lowering TCO for EBS Customer 2000 Users
Copyright © 2014, Oracle and/or its affiliates. All rights reserved. |
Category Initial Year 1 Year 2 Year 3 Year 4 Year 5
Benefits 0.00 0.00 1.23 1.27 2.60 4.64
Costs -1.34 -0.25 -0.25 -1.67 -0.50 -0.51
5.00
Category Year 0 Year 1 Year 2 Year 3 Year 4 Year 5 Total
TCO Business as Usual (IB) 0 1,206 1,231 2,556 4,600 5,443 15,036
TCO Proposed (P) 1,335 249 254 1,670 497 507 4,512
Other Proposed Project Investments (O) 0 0 0 0 0 0 0
Net TCO (IB - P - O) -1,335 957 977 886 4,103 4,936 10,524
Business Benefits (BB) 0 19 39 40 41 42 182
Net Cash Flow (Net TCO + BB) -1,335 976 1,016 926 4,144 4,979 10,706
Cumulative Net Cash Flow -1,335 -359 657 1,584 5,727 10,706
Cumulative Discounted Net Cash Flow
(NPV) -1,335 -443 404 1,109 3,992 7,154
Cash Flows And Value Metrics
*Currency USD in Thousands
**Unless otherwise noted, all future cash flows are undiscounted
 Discounted Total Savings (NPV) : $7,154K
 TCO reduction : 70%
 Payback months : 17
 Net Initial Investment : $-1,335K
 ROI based on total project cost (%) : 237
 IRR (%) : 96
 Cost of 3 month delay : $184K
 Cash flow discounting period : Year end
 Cost of Capital : 10%
PROJECTED CASH FLOWS
USD in Thousands, Undiscounted
Copyright © 2014, Oracle and/or its affiliates. All rights reserved. |
Category Component / Sub Component Name Manufacturer
Installed Base
Qty Reqd. Qty
Server, Engineered System
HP 9000 Superdome SERVER 1 HP 2 2
PA-8900/1.1GHz/16GB/1ch/2co HP 19 19
Disk, Virtual Tape
HP EVA8000 DISK_VTS 1 HP 2 1
14 x 300GB FC HP 13 13
Software - Hardware License
Oracle Database Enterprise Edition HLS 1 Oracle
HP 9000 Superdome - SERVER 1 HP 2 2
Oracle Enterprise Edition RAC HLS 1 Oracle
HP 9000 Superdome - SERVER 1 HP 2 2
Installed IT Infrastructure
Copyright © 2014, Oracle and/or its affiliates. All rights reserved. |
Category Component / Sub Component Name Manufacturer
Installed Base
Qty Reqd. Qty
Server, Engineered System
SPARC SuperCluster T5-8 SuperCluster Oracle 0 1
HP Half Rack/13TB+48TB/3.6GHz/2048GB/8ch/128co Oracle 0 1
Software - Hardware License
Oracle Database Enterprise Edition Database Oracle
SPARC SuperCluster T5-8 - SuperCluster Oracle 0 1
Oracle Enterprise Edition RAC RAC Oracle
SPARC SuperCluster T5-8 - SuperCluster Oracle 0 1
Oracle Solaris Cluster Enterprise Edition Cluster Oracle
SPARC SuperCluster T5-8 - SuperCluster Oracle 0 1
Exadata Storage Server Software (any rack size) Exadata Oracle
SPARC SuperCluster T5-8 - SuperCluster Oracle 0 1
Proposed IT Infrastructure
Copyright © 2014, Oracle and/or its affiliates. All rights reserved. |
Key IT Infrastructure Assumptions
Input Installed Base Proposed
Growth assumptions
Growth Type Exponential Exponential
Annual growth rate (%) 20.0% 20.0%
Site licensed software growth rate (%) 0.0% 0.0%
Calculate end of useful life replace Yes Yes
Deployment ramp (new required equipment) (Num) 1 1
Discount assumptions
Hardware discount (%) 0.0% 0.0%
Software discount (%) 0.0% 0.0%
Hardware service discount (%) 0.0% 0.0%
Acquisition Plan
Acquisition method Purchased Purchased
Inflation assumptions
Base inflation rate (%) 5.0% 5.0%
Service inflation rate (%) 5.0% 5.0%
Software inflation rate (%) 0.0% 0.0%
Unit price deflation rate (%) 15.0% 15.0%
Software assumptions
Percent of hardware licensed (%) 100.0% 100.0%
Percent of licenses available to transfer to this hardware (%) 0.0% 0.0%
Keep surplus licenses on maintenance No No
Copyright © 2014, Oracle and/or its affiliates. All rights reserved. |
Key IT Infrastructure Assumptions
Input Installed Base Proposed
Hardware service assumptions
Service level Default Default
Premier Service Rate (%) 12.0% 12.0%
Utilization assumptions
Minimum/initial hardware utilization (%) 40.0% 40.0%
Maximum hardware utilization (%) 60.0% 60.0%
Hours of operation per month (Hours) 720 720
Tape media assumptions
Tape utilization (%) 70.0% 70.0%
Compression ratio (Num) 2 2
Lease Assumptions
1 year lease term monthly rate (Num) 0.051 0.051
2 year lease term monthly rate (Num) 0.040 0.040
3 year lease term monthly rate (Num) 0.029 0.029
4 year lease term monthly rate (Num) 0.023 0.023
5 year lease term monthly rate (Num) 0.020 0.020
Lease Term (Years) 3 3
Oracle On Premise Iaas Assumptions
IaaS term (Years) 5 5
Year 4 & 5 discount (%) 30.0% 30.0%
IaaS COD enablement percentage (%) 0.0% 0.0%
Power assumptions
Power cost per kWh (USD) 0.1 0.1
Copyright © 2014, Oracle and/or its affiliates. All rights reserved. |
Key IT Infrastructure Assumptions
Input Installed Base Proposed
Power assumptions
CO2 (kg/kWh) 0.6078 0.6078
PUE (Power Usage Effectiveness) (Num) 1.8 1.8
Floor space assumptions
Floor space cost (sq ft per month) (USD) 20.000 20.000
Rack height (rack units) (Num) 42 42
Floor space per rack (sq ft) 18.18 18.18
Rack density (%) 100.0% 100.0%
Copyright © 2014, Oracle and/or its affiliates. All rights reserved. |
Substantiation Slides
SuperCluster Solution and IBM
P780+ Solution Comparison
Copyright © 2014, Oracle and/or its affiliates. All rights reserved. |
Initial Year 1 Year 2 Year 3 Year 4 Year 5
ve Proposal 8.33 0.70 0.86 3.22 2.68
sh Outflows 1.64 0.32 0.32 2.06 0.62
Competitive
Proposal Proposed
Hardware Acquisition 7.52 0.96 8x
Hardware Service 1.64 0.52 3x
Software - Hardware License 9.67 3.94 2x
Power and Cooling 0.18 0.10 2x
Floor Space 0.06 0.04 2x
Integration and Deployment 0.48 0.04 12x
TCO OVER 5 YEARSPROJECTED CASH FLOWS
Total cash outflows over the next 5 years
Competitive Proposal = $19.6M
Proposed = $5.6M
TCO Reduction = $14.0M
Lowering TCO for EBS Customer 5000 Users
Copyright © 2014, Oracle and/or its affiliates. All rights reserved. |
Category Initial Year 1 Year 2 Year 3 Year 4 Year 5
Benefits 0.00 0.00 0.00 0.00 0.00 0.00
Costs -0.00 -0.00 -0.00 -0.00 -0.00 -0.00
Category Year 0 Year 1 Year 2 Year 3 Year 4 Year 5 Total
TCO Competitive Proposal (CP) 8.33 0.70 0.86 3.22 2.68 3.77 19.56
TCO Proposed (P) 1.64 0.32 0.32 2.06 0.62 0.63 5.60
Other Proposed Project Investments (O) 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Net TCO (CP - P - O) 6.68 0.39 0.53 1.16 2.06 3.14 13.96
Business Benefits (BB) 0 0.03 0.06 0.07 0.07 0.07 0.30
Net Cash Flow (Net TCO + BB) 6.68 0.42 0.60 1.23 2.12 3.21 14.26
Cumulative Net Cash Flow 6.68 7.10 7.70 8.93 11.05 14.26
Cumulative Discounted Net Cash Flow
(NPV) 6.68 7.06 7.56 8.50 9.98 12.01
Cash Flows And Value Metrics
*Currency USD in Millions
**Unless otherwise noted, all future cash flows are undiscounted
 Discounted Total Savings (NPV) : $12.01M
 TCO reduction : 71%
 Payback months : 0
 Net Initial Investment : $6.68M
 ROI based on total project cost (%) : 254
 IRR (%) : 1,000,000,000,000
 Cost of 3 month delay : $0.12M
 Cash flow discounting period : Year end
 Cost of Capital : 10%
PROJECTED CASH FLOWS
USD in Millions, Undiscounted
Copyright © 2014, Oracle and/or its affiliates. All rights reserved. |
Category Component / Sub Component Name Manufacturer
Installed Base
Qty Reqd. Qty
Server, Engineered System
IBM Power+ 780 SERVER 1 IBM 0 2
POWER7+/3.72GHz/256GB/4ch/32co IBM 0 2
Disk, Virtual Tape
IBM DS8870 DISK_VTS 1 IBM 0 1
256x146GB SAS 15K RPM IBM 0 2
Software - Hardware License
Oracle Database Enterprise Edition HLS 1 Oracle
IBM Power+ 780 - SERVER 1 IBM 0 2
Competitive Proposal IT Infrastructure
Copyright © 2014, Oracle and/or its affiliates. All rights reserved. |
Category Component / Sub Component Name Manufacturer
Installed Base
Qty Reqd. Qty
Server, Engineered System
SPARC SuperCluster T5-8 SERVER 1 Oracle 0 1
HC Half Rack/64TB+48TB/3.6GHz/2048GB/8ch/128co Oracle 0 1
Software - Hardware License
Oracle Database Enterprise Edition HLS 1 Oracle
SPARC SuperCluster T5-8 - SERVER 1 Oracle 0 1
Oracle Enterprise Edition RAC HLS 1 Oracle
SPARC SuperCluster T5-8 - SERVER 1 Oracle 0 1
Exadata Storage Server Software (any rack size) HLS 1 Oracle
SPARC SuperCluster T5-8 - SERVER 1 Oracle 0 1
Proposed IT Infrastructure
Copyright © 2014, Oracle and/or its affiliates. All rights reserved. |
Key IT Infrastructure Assumptions
Input Competitive Proposal Proposed
Growth assumptions
Growth Type Exponential Exponential
Annual growth rate (%) 20.0% 20.0%
Site licensed software growth rate (%) 0.0% 0.0%
Calculate end of useful life replace Yes Yes
Deployment ramp (new required equipment) (Num) 1 1
Discount assumptions
Hardware discount (%) 0.0% 0.0%
Software discount (%) 0.0% 0.0%
Hardware service discount (%) 0.0% 0.0%
Acquisition Plan
Acquisition method Purchased Purchased
Inflation assumptions
Base inflation rate (%) 5.0% 5.0%
Service inflation rate (%) 5.0% 5.0%
Software inflation rate (%) 0.0% 0.0%
Unit price deflation rate (%) 15.0% 15.0%
Software assumptions
Percent of hardware licensed (%) 100.0% 100.0%
Percent of licenses available to transfer to this hardware (%) 0.0% 0.0%
Copyright © 2014, Oracle and/or its affiliates. All rights reserved. |
Key IT Infrastructure Assumptions
Input Competitive Proposal Proposed
Software assumptions
Keep surplus licenses on maintenance No No
Hardware service assumptions
Service level Default Default
Premier Service Rate (%) 12.0% 12.0%
Utilization assumptions
Minimum/initial hardware utilization (%) 40.0% 40.0%
Maximum hardware utilization (%) 60.0% 60.0%
Hours of operation per month (Hours) 720 720
Tape media assumptions
Tape utilization (%) 70.0% 70.0%
Compression ratio (Num) 2 2
Lease Assumptions
1 year lease term monthly rate (Num) 0.051 0.051
2 year lease term monthly rate (Num) 0.040 0.040
3 year lease term monthly rate (Num) 0.029 0.029
4 year lease term monthly rate (Num) 0.023 0.023
5 year lease term monthly rate (Num) 0.020 0.020
Lease Term (Years) 3 3
Oracle On Premise Iaas Assumptions
IaaS term (Years) 5 5
Year 4 & 5 discount (%) 30.0% 30.0%
Copyright © 2014, Oracle and/or its affiliates. All rights reserved. |
Key IT Infrastructure Assumptions
Input Competitive Proposal Proposed
Oracle On Premise Iaas Assumptions
IaaS COD enablement percentage (%) 0.0% 0.0%
Power assumptions
Power cost per kWh (USD) 0.1 0.1
CO2 (kg/kWh) 0.608 0.608
PUE (Power Usage Effectiveness) (Num) 1.8 1.8
Floor space assumptions
Floor space cost (sq ft per month) (USD) 20.000 20.000
Rack height (rack units) (Num) 42 42
Floor space per rack (sq ft) 18.18 18.18
Rack density (%) 100.0% 100.0%
Copyright © 2014, Oracle and/or its affiliates. All rights reserved. |

More Related Content

What's hot (20)

PPTX
Tendencias Storage
Fran Navarro
 
PDF
Oracle Solaris Application-Centric Lifecycle and DevOps
OTN Systems Hub
 
PPTX
Simplify IT: Oracle SuperCluster
Fran Navarro
 
PPTX
Virtual Compute Appliance Oracle IaaS
Fran Navarro
 
PPTX
Sparc SuperCluster
Fran Navarro
 
PDF
New Generation of SPARC Processors Boosting Oracle S/W Angelo Rajadurai
Orgad Kimchi
 
PDF
Omaha rug customer 2 cloud customer facing hcm ppt aug 2014
tecrecruiter
 
PDF
Představení produktové řady Oracle SPARC S7
MarketingArrowECS_CZ
 
PDF
Oracle Solaris Software Integration
OTN Systems Hub
 
PDF
Security a SPARC M7 CPU
MarketingArrowECS_CZ
 
PDF
Představení Oracle SPARC Miniclusteru
MarketingArrowECS_CZ
 
PPT
Eci sparc
Fran Navarro
 
PPTX
Super cluster oracleday cl 7
Claudio Osvaldo Vargas Farfan
 
PPTX
Presentation oracle super cluster t5-8 technical deep dive
solarisyougood
 
PPTX
Big data oracle_introduccion
Fran Navarro
 
PPTX
Managing Oracle Solaris Systems with Puppet
glynnfoster
 
PDF
Oracle develop in virtual box deploy to the cloud
OTN Systems Hub
 
PDF
Oracle Maximum Availability Architecture
MarketingArrowECS_CZ
 
PDF
Oracle Storage a ochrana dat
MarketingArrowECS_CZ
 
PDF
Solaris 11.2 What's New
Orgad Kimchi
 
Tendencias Storage
Fran Navarro
 
Oracle Solaris Application-Centric Lifecycle and DevOps
OTN Systems Hub
 
Simplify IT: Oracle SuperCluster
Fran Navarro
 
Virtual Compute Appliance Oracle IaaS
Fran Navarro
 
Sparc SuperCluster
Fran Navarro
 
New Generation of SPARC Processors Boosting Oracle S/W Angelo Rajadurai
Orgad Kimchi
 
Omaha rug customer 2 cloud customer facing hcm ppt aug 2014
tecrecruiter
 
Představení produktové řady Oracle SPARC S7
MarketingArrowECS_CZ
 
Oracle Solaris Software Integration
OTN Systems Hub
 
Security a SPARC M7 CPU
MarketingArrowECS_CZ
 
Představení Oracle SPARC Miniclusteru
MarketingArrowECS_CZ
 
Eci sparc
Fran Navarro
 
Super cluster oracleday cl 7
Claudio Osvaldo Vargas Farfan
 
Presentation oracle super cluster t5-8 technical deep dive
solarisyougood
 
Big data oracle_introduccion
Fran Navarro
 
Managing Oracle Solaris Systems with Puppet
glynnfoster
 
Oracle develop in virtual box deploy to the cloud
OTN Systems Hub
 
Oracle Maximum Availability Architecture
MarketingArrowECS_CZ
 
Oracle Storage a ochrana dat
MarketingArrowECS_CZ
 
Solaris 11.2 What's New
Orgad Kimchi
 

Viewers also liked (7)

PDF
Oracle vm engineered for open cloud
OTN Systems Hub
 
PDF
Oracle engineered systems executive presentation
OTN Systems Hub
 
PDF
Oracle Solaris Cloud Management and Deployment with OpenStack
OTN Systems Hub
 
PDF
Oracle Solaris Overview
OTN Systems Hub
 
PDF
Oracle business continuity for virtualization and cloud infrastructure
OTN Systems Hub
 
PDF
Oracle Solaris Secure Cloud Infrastructure
OTN Systems Hub
 
PDF
Oracle Solaris Build and Run Applications Better on 11.3
OTN Systems Hub
 
Oracle vm engineered for open cloud
OTN Systems Hub
 
Oracle engineered systems executive presentation
OTN Systems Hub
 
Oracle Solaris Cloud Management and Deployment with OpenStack
OTN Systems Hub
 
Oracle Solaris Overview
OTN Systems Hub
 
Oracle business continuity for virtualization and cloud infrastructure
OTN Systems Hub
 
Oracle Solaris Secure Cloud Infrastructure
OTN Systems Hub
 
Oracle Solaris Build and Run Applications Better on 11.3
OTN Systems Hub
 
Ad

Similar to Oracle super cluster for oracle e business suite (20)

PPTX
Infraestructura oracle
Fran Navarro
 
PPTX
Sesion covergentes 2016
Fran Navarro
 
PDF
PDoolan Oracle Overview
Peter Doolan
 
PPTX
Keynote from Cloud Expo West, November 2010
Mohamad Afshar
 
PDF
C4 optimizing your_application_infrastructure
Dr. Wilfred Lin (Ph.D.)
 
PPT
Oracle OpenWorld 2010大会发布的新公告及关键信息
slidethanks
 
PPT
Oracle Database 11g Lower Your Costs
Mark Rabne
 
PDF
Oracle Cloud
MarketingArrowECS_CZ
 
PDF
Arrow hw barcelona_2012-18-12_v2
Fran Navarro
 
PDF
Oracle Software.Hardware.Complete positioning versus competition - Shahin Tar...
ORACLE USER GROUP ESTONIA
 
PDF
Keynote oracle days final 16x9 v3.alain
Doina Draganescu
 
PDF
Why Oracle on IBM POWER7 is Better Than Oracle Exadata - The Advantages of IB...
miguelnoronha
 
PPTX
Presentation oracle optimized solutions
solarisyougood
 
PPTX
Oracle_DB_sobre_Oracle
Fran Navarro
 
PDF
Implementing Private Database Clouds
Roland Slee
 
PDF
Oracle Systems _ David Baker _ Best Practices for Simplifying Implementation ...
InSync2011
 
PDF
1. data infrastructure keynote october 2010 alain
Doina Draganescu
 
PPT
PDoolan Oracle Overview PPT Version
Peter Doolan
 
PDF
Michał Wawrzyński @ "Oracle Systems jako infrastruktura dla chmur prywatnych"...
Ewa Stepien
 
PPTX
Eng systems oracle_overview
Fran Navarro
 
Infraestructura oracle
Fran Navarro
 
Sesion covergentes 2016
Fran Navarro
 
PDoolan Oracle Overview
Peter Doolan
 
Keynote from Cloud Expo West, November 2010
Mohamad Afshar
 
C4 optimizing your_application_infrastructure
Dr. Wilfred Lin (Ph.D.)
 
Oracle OpenWorld 2010大会发布的新公告及关键信息
slidethanks
 
Oracle Database 11g Lower Your Costs
Mark Rabne
 
Oracle Cloud
MarketingArrowECS_CZ
 
Arrow hw barcelona_2012-18-12_v2
Fran Navarro
 
Oracle Software.Hardware.Complete positioning versus competition - Shahin Tar...
ORACLE USER GROUP ESTONIA
 
Keynote oracle days final 16x9 v3.alain
Doina Draganescu
 
Why Oracle on IBM POWER7 is Better Than Oracle Exadata - The Advantages of IB...
miguelnoronha
 
Presentation oracle optimized solutions
solarisyougood
 
Oracle_DB_sobre_Oracle
Fran Navarro
 
Implementing Private Database Clouds
Roland Slee
 
Oracle Systems _ David Baker _ Best Practices for Simplifying Implementation ...
InSync2011
 
1. data infrastructure keynote october 2010 alain
Doina Draganescu
 
PDoolan Oracle Overview PPT Version
Peter Doolan
 
Michał Wawrzyński @ "Oracle Systems jako infrastruktura dla chmur prywatnych"...
Ewa Stepien
 
Eng systems oracle_overview
Fran Navarro
 
Ad

Recently uploaded (20)

PPT
Confined Space.ppth. Bbbb. Bbbbbbbbbbbbbbbbbbbbbbbnnnjjj
eshaiqbal7
 
PPT
it_14.ppt using atharva college of engineering
shkzishan810
 
PPT
Computer Hardware and Software Hw and SW .ppt
MuzaFar28
 
PPTX
原版澳洲莫道克大学毕业证(MU毕业证书)如何办理
Taqyea
 
PPTX
Series.pptxvvggghgufifudududydydydudyxyxyx
jasperbernaldo3
 
PPT
(1) Chemotherapeutic drugs Antimicrobials.ppt
mkurdi133
 
PPTX
英国学位证(LTU毕业证书)利兹三一大学毕业证书如何办理
Taqyea
 
PPTX
怎么办StoutLetter美国威斯康星大学斯托特分校本科毕业证,Stout学历证书
Taqyea
 
PPTX
Dock Line Organization Made Easy – Discover AMARREX, the Mooring Line Holder ...
Seawatt
 
PPTX
哪里购买澳洲学历认证查询伊迪斯科文大学成绩单水印ECU录取通知书
Taqyea
 
PPTX
diagnosisinfpdpart1-200628063900 (1).pptx
JayeshTaneja4
 
PPTX
Flannel graphFlannel graphFlannel graphFlannel graphFlannel graph
shareesh25
 
PDF
Development of Portable Spectometer For MIlk Qulaity analysis
ppr9495
 
PPTX
Contingency-Plan-and-Reminders-from-the-PMO.pptx
PrincessCamilleGalle1
 
PPTX
ualities-of-Quantitative-Research-1.pptx
jamjamkyong
 
PDF
Elevator Maintenance Checklist with eAuditor Audits & Inspections
eAuditor Audits & Inspections
 
PPTX
一比一原版(UoB毕业证)布莱德福德大学毕业证如何办理
Taqyea
 
PPTX
西班牙维尔瓦大学电子版毕业证{UHU毕业完成信UHU水印成绩单}原版制作
Taqyea
 
PPTX
英国学位证(PSU毕业证书)普利茅斯大学毕业证书如何办理
Taqyea
 
PDF
Utility Software hshdgsvcjdgvbdvcfkcdgdc
imeetrinidadfuertesa
 
Confined Space.ppth. Bbbb. Bbbbbbbbbbbbbbbbbbbbbbbnnnjjj
eshaiqbal7
 
it_14.ppt using atharva college of engineering
shkzishan810
 
Computer Hardware and Software Hw and SW .ppt
MuzaFar28
 
原版澳洲莫道克大学毕业证(MU毕业证书)如何办理
Taqyea
 
Series.pptxvvggghgufifudududydydydudyxyxyx
jasperbernaldo3
 
(1) Chemotherapeutic drugs Antimicrobials.ppt
mkurdi133
 
英国学位证(LTU毕业证书)利兹三一大学毕业证书如何办理
Taqyea
 
怎么办StoutLetter美国威斯康星大学斯托特分校本科毕业证,Stout学历证书
Taqyea
 
Dock Line Organization Made Easy – Discover AMARREX, the Mooring Line Holder ...
Seawatt
 
哪里购买澳洲学历认证查询伊迪斯科文大学成绩单水印ECU录取通知书
Taqyea
 
diagnosisinfpdpart1-200628063900 (1).pptx
JayeshTaneja4
 
Flannel graphFlannel graphFlannel graphFlannel graphFlannel graph
shareesh25
 
Development of Portable Spectometer For MIlk Qulaity analysis
ppr9495
 
Contingency-Plan-and-Reminders-from-the-PMO.pptx
PrincessCamilleGalle1
 
ualities-of-Quantitative-Research-1.pptx
jamjamkyong
 
Elevator Maintenance Checklist with eAuditor Audits & Inspections
eAuditor Audits & Inspections
 
一比一原版(UoB毕业证)布莱德福德大学毕业证如何办理
Taqyea
 
西班牙维尔瓦大学电子版毕业证{UHU毕业完成信UHU水印成绩单}原版制作
Taqyea
 
英国学位证(PSU毕业证书)普利茅斯大学毕业证书如何办理
Taqyea
 
Utility Software hshdgsvcjdgvbdvcfkcdgdc
imeetrinidadfuertesa
 

Oracle super cluster for oracle e business suite

  • 1. Copyright © 2014, Oracle and/or its affiliates. All rights reserved. |
  • 2. Copyright © 2014, Oracle and/or its affiliates. All rights reserved. | Safe Harbor Statement The following is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making purchasing decisions. The development, release, and timing of any features or functionality described for Oracle’s products remains at the sole discretion of Oracle. 7/21/2016 Oracle OpenWorld
  • 3. Copyright © 2015, Oracle and/or its affiliates. All rights reserved. |Copyright © 2014, Oracle and/or its affiliates. All rights reserved. | Oracle SuperCluster for Oracle E-Business Suite
  • 4. Copyright © 2015, Oracle and/or its affiliates. All rights reserved. | Public 4 Typical Enterprise IT Operational Inefficiencies
  • 5. Copyright © 2015, Oracle and/or its affiliates. All rights reserved. |7/21/2016 Public 5 Typical Enterprise IT Expenditure Distribution Focus on ongoing expenses, not purchase price.
  • 6. Copyright © 2015, Oracle and/or its affiliates. All rights reserved. | Optimized Engineered Systems & Cloud Systems built from commodity servers, storage, networking, and softwareMonolithic servers with custom software FreedomtoInnovate 20051995 2015 Freedom from Low-level Tasks Drives Innovation
  • 7. Copyright © 2015, Oracle and/or its affiliates. All rights reserved. | SuperCluster: Oracle’s Most Powerful Engineered System 7/21/2016 Public 7 • Complete, Integrated Platform • Servers, storage, networking, virtualization, operating systems, application & database templates, specialized management tools, expert support • Optimized for Oracle Database • Ultimate OLTP & batch performance, security, reliability, horizontal & vertical scalability • Runs Any Standard Application • Runs any standard application, from Oracle including Oracle E-Business Suite, and 3rd party apps to custom Java, C++, Ruby-on-Rails, Python and more.
  • 8. Copyright © 2015, Oracle and/or its affiliates. All rights reserved. | SuperCluster: Oracle E-Business Suite Customers
  • 9. Copyright © 2015, Oracle and/or its affiliates. All rights reserved. | SuperCluster: Oracle E-Business Suite Implementations Engineered and Optimized for Performance on Oracle SuperCluster 7/21/2016 Public 9 2x faster patching E-Business suite database migration in 12 weeks FormerPlatform PATCHING FormerPlatform Business reports produced 1.7x faster Reduced operational costs by 1.8x SuperCluster Other EBS RESPONSE TIMES SuperCluster 5x faster EBS transaction times 3x EBS performance improvement SuperCluster Other EBS TRANSACTIONS SuperCluster FormerPlatform SuperCluster Other FormerPlatform
  • 10. Copyright © 2015, Oracle and/or its affiliates. All rights reserved. | SuperCluster: Oracle E-Business Suite Implementations Engineered and Optimized for Performance on Oracle SuperCluster 7/21/2016 Public 10 SuperCluster Other FormerPlatform EBS AUDIT REPORT FormerPlatform DEFECT TRACKING TIME EBS audit report 5x faster EBS HR module 149x faster 28 days to deploy Defect tracking reduced 36x SuperCluster Other FormerPlatform
  • 11. Copyright © 2015, Oracle and/or its affiliates. All rights reserved. | 11 Why Customers Choose SuperCluster for E-Business Suite Engineered and Optimized for Performance • Extreme Performance • High-volume batch, OLTP work-load and cloning performance • Cost Reduction • Lower TCO compared to multi-vendor D-I-Y solutions • Orders of magnitude easier to manage, simpler patching, greater uptime • Faster Time to Value • 5X faster to deploy with fully documented Oracle E-Business Suite consolidation best practices • Risk Reduction, Security and High Availability • Pre-tested solution with built-in security and high availability • Oracle Platinum Support
  • 12. Copyright © 2015, Oracle and/or its affiliates. All rights reserved. | SuperCluster: Runs Oracle and Virtually Any Application • Optimized for E-Business Suite • Optimized for Oracle Database • Oracle Fusion Middleware • Oracle Applications • 3rd Party Applications • All Oracle Solaris Applications • Any Java, Ruby, Spring, Grails, Groovy, REST, C/C++, etc.
  • 13. Copyright © 2015, Oracle and/or its affiliates. All rights reserved. |  General-purpose Storage • Virtual Machine and system data  Unified Ultra-fast Network • 40GB/s QDR InfiniBand I/O backplane  Database & Application Servers • Up to 32 processors and 32 TB of RAM • Software defined scale up or scale out  Exadata Storage Servers  Highly optimized storage for Oracle Database  Query processing  OLTP  Compression SuperCluster: Hardware Architecture Complete | Optimized | Fully Virtualized | Scale-up and Scale-out SuperCluster M6-32SuperCluster T5-8
  • 14. Copyright © 2015, Oracle and/or its affiliates. All rights reserved. | SuperCluster: Integrated Software Complete | Optimized | Fully Virtualized | Scale-up and Scale-out SuperCluster M6-32SuperCluster T5-8
  • 15. Copyright © 2015, Oracle and/or its affiliates. All rights reserved. | An Obsolete Approach To Managing Data Production Server with OLTP Database Copy DB to Run Cost Management Data Warehouse Server with OLAP Database (Column Format) Oracle Business Intelligence Server (Analytics & Reports) Periodic Batch Processes Extract, Transform, Load Traditional Application Architecture SLOW, COMPLEX (Row Format)
  • 16. Copyright © 2015, Oracle and/or its affiliates. All rights reserved. | SuperCluster: Extreme Performance Innovations Poor Database Storage I/O Exadata Technology Public 16 Traditional Performance Bottlenecks Complex Multi-vendor Tuning Poor Scalability Inefficient Virtualization Poor Memory Utilization Poor Compute Performance Full-stack Tuning & Patching Linear Scale-up and Scale-out Zero-overhead Virtualization Architected for In-memory Oracle T5 and M6 Processors SuperCluster innovations
  • 17. Copyright © 2015, Oracle and/or its affiliates. All rights reserved. |  BOTH row and column in-memory formats for same data/table  Simultaneously active and transactionally consistent  100X Faster Analytics & reporting: column format  2X Faster OLTP: row format 7/21/2016 Public 17 The Next Database Performance Leap Column Format Memory Row Format Memory AnalyticsOLTP Sales Sales Oracle 12c Database In-memory
  • 18. Copyright © 2015, Oracle and/or its affiliates. All rights reserved. |7/21/2016 Public 18 SuperCluster: In-Memory Modules for Oracle Applications Real-time Cost and Profitability Analysis  Optimize costs and working capital  Evaluate COGS and valuations  Maximize margins and gross profits 1000X Faster
  • 19. Copyright © 2015, Oracle and/or its affiliates. All rights reserved. |7/21/2016 Public 19 SuperCluster: E-Business Suite In-Memory Cost Management Real-time Cost and Profitability Analysis  Optimize costs and working capital  Evaluate COGS and valuations  Maximize margins and gross profits 1000X Faster Than commodity x86 hardware and regular Oracle Database 12c
  • 20. Copyright © 2015, Oracle and/or its affiliates. All rights reserved. | Revolutionary Transformation to Real-Time Enterprise No More Overnight Batch and Real-time Analytics • Accelerate Your Business In-Memory Application Architecture INSTANT, SIMPLE In-Memory Cost Mgmt Schema OLTP Schema In-Memory Everything Bi/Analytics
  • 21. Copyright © 2015, Oracle and/or its affiliates. All rights reserved. | SuperCluster: Maximum Security Secure Multi-tenant Application and Database Cloud and Consolidation Secure Java & Middleware Secure Oracle Database Secure OS Run-Time Secure Boot & Firmware Secure Workload Deployment Secure VM Templates Automated Compliance End-to-End Encryption
  • 22. Copyright © 2015, Oracle and/or its affiliates. All rights reserved. | Metering, Limiting and Charging Web-based Self Provisioning Dynamic Resource Management Role Based Access Control Complete Workload Isolation SuperCluster: End-to-End Multitenant Architecture 7/21/2016 Public 22
  • 23. Copyright © 2015, Oracle and/or its affiliates. All rights reserved. | SuperCluster: Complete Solution for E-Business Suite Application Database Operating Systems Virtual Machines Storage Engineered Systems Centralized Management Services and Support SOLARIS ZONES SPARC DOMAINS SOLARIS CLUSTER SOLARIS CLUSTER GOEGRAPHIC EDITION
  • 24. Copyright © 2015, Oracle and/or its affiliates. All rights reserved. | SuperCluster: Oracle Optimized Solution for E-Business Suite Engineered, Tested, and Proven from Apps-to-Disk 1,000s of hours of testing across the stack to reduce risk Sizing and configuration optimizations Load/stress tests Performance and scalability tests Real world workload tests Patch regression tests Fault injection tests Interoperability tests End to end functional validation Early development tests Identify integration opportunities Full Stack OptimizationsOne Engineering Team
  • 25. Copyright © 2015, Oracle and/or its affiliates. All rights reserved. | High Availability Scale SuperCluster: High Availability Oracle E-Business Suite InfiniBand Network Oracle Exadata Storage Servers 10 GbE Data Center Network Node 2 Oracle Solaris Node 1 Oracle Solaris 11 Database Domain Application Domain Oracle Solaris Cluster Oracle RAC 11g R2 Oracle Solaris Oracle Solaris 11 Database Domain Application Domain Node 2 Isolation
  • 26. Copyright © 2015, Oracle and/or its affiliates. All rights reserved. | Oracle Platinum Support Industry Leading Enterprise Support 7/21/2016 Public 26 Complete. Integrated. Proactive. High Availability Services. ORACLE PLATINUM SERVICES 1 Covered system must be within an Oracle two-hour service area to receive two-hour response as a standard service. • 24/7 support coverage • Specialized Support Team • 2-hour onsite response to hardware issues1 • New updates and upgrades for Database, Server, Storage, and OS software • Industry-leading response times: – 5 Minute Fault Notification – 15 Minute Restoration or Escalation to Development – 30 Minute Joint Debugging with Development • Patch deployment by Oracle engineers • 24/7 Oracle remote fault monitoring • Higher support level for Oracle stack – Server, Storage, Network, Database software Platinum Services at No Additional Cost
  • 27. Copyright © 2015, Oracle and/or its affiliates. All rights reserved. | Oracle Platinum Services Benefits: Real World •75% fewer sev1 Service Requests •70% fewer escalations •37% fewer bugs encountered •27% shorter avg. SR resolution time •86% of SRs are opened by Oracle –Requires an Auto Service Request connection
  • 28. Copyright © 2015, Oracle and/or its affiliates. All rights reserved. | Oracle SuperCluster: Services Provider, Europe Implements Oracle E-Business Suite Platform • Produce business reports 70% faster improving employee productivity • Cut operational costs and simplified management Oracle SuperCluster Oracle Exadata
  • 29. Copyright © 2015, Oracle and/or its affiliates. All rights reserved. | • Improved serviceability with 2x faster patching • E-Business Suite database migration in only 12 weeks Oracle SuperCluster Oracle SuperCluster: Educational Institutional, North America Implements Oracle E-Business Suite Platform
  • 30. Copyright © 2015, Oracle and/or its affiliates. All rights reserved. | • 5x OLTP performance increase • 3x performance increase in EBS manufacturing, planning and logistics module Oracle SuperCluster Oracle Exalogic Oracle SuperCluster: Industrial Supplier, North America Implements Oracle E-Business Suite Platform
  • 31. Copyright © 2015, Oracle and/or its affiliates. All rights reserved. |7/21/2016 Public 31 FormerPlatform SuperCluster • EBS employee audit report 5x faster • EBS HR module performance 149x faster • EBS financials reports 6.5x faster InfiniBand Oracle SuperCluster: Oil and Gas Provider, UAE Implements Oracle E-Business Suite Platform
  • 32. Copyright © 2015, Oracle and/or its affiliates. All rights reserved. |7/21/2016 Public 32 FormerPlatform SuperCluster • 28 days to deploy the largest cMRO implementation in the world • Defect tracking reduced 36x to 5 seconds • Advanced Supply Chain Management savings of 320 person hours per month Production Disaster Recovery Oracle Data GuardOracle Data Guard ZFS Replication Oracle SuperCluster: Aircraft Manufacturer, UAE Implements Oracle E-Business Suite Platform
  • 33. Copyright © 2015, Oracle and/or its affiliates. All rights reserved. | “ Oracle Confidential – Internal/Restricted/Highly Restricted 33 17x Performance Gains, Rapid Deployment, 24x7 Oracle Monitoring and Support with Oracle SuperCluster “Specialized Bicycles is a brand that innovates. That is why we work with Oracle. It is about speed, increasing efficiencies, knowing and managing net inventory. Our proof of concept showed performance gains up to 17x. An account reconciliation report took 20 hour report ran in 20 minutes on Oracle SuperCluster, that’s huge. We were always I/O bound managing 60TB of data. With the full integration ZFS, it was a huge upgrade for us on top of the flash memory side of the database. From the time we made out decision, did the POC, we were up tremendously fast with Oracle SuperCluster in 65 days. Oracle keeps the system up and running 24/7 with out us worrying.” Ron Polard CIO Specialized 17x Performance Gains 65 days to deployment 65 “ 17x
  • 34. Copyright © 2015, Oracle and/or its affiliates. All rights reserved. | “ Extreme Efficiencies Implementing SuperCluster Cloud, Cut OPEX by over 80%, Scaled Down Footprint 5x “The advantages of having the database and applications running on SuperCluster are huge, optimized to run Oracle Database, and Oracle Exalogic. With Oracle SuperCluster we were able to reduce operational costs by 80%, and scaled down and consolidate by a factor of 5x. Quarterly patching was really time saving for my staff. With Oracle SuperCluster, we have one Partner for the whole stack.” Hallgrímur G. Sigurðsson Manager of Engineering Advania hf Cut OPEX by over 80% Scaled Down Footprint 5x
  • 35. Copyright © 2015, Oracle and/or its affiliates. All rights reserved. | “ Global Services Provider Runs Oracle E- Business Suite, On SuperCluster, Migrates from IBM Platform “ NCR chose Oracle SuperCluster for the best performance for an Oracle E-Business Suite , Oracle Enterprise Database, and Oracle Exalogic integrated implementation supported by Oracle Platinum Services. The business benefits proven through the Oracle proof of concept include superior price/performance. NCR will be migrating from an IBM platform to Oracle SuperCluster, integrated with Oracle Exadata and used to manage its Global Service business.” Martin Kawecki IT Director NCR Superior Price Performance Oracle Global Services
  • 36. Copyright © 2015, Oracle and/or its affiliates. All rights reserved. |7/21/2016 Public 36 SuperCluster: Best Platform for E-Business Suite Oracle’s Most Powerful Engineered System • Engineered System: one integrated system with all the required hardware (servers, network, storage) and Oracle software • One Architecture for Oracle E-Business Suite and Oracle Enterprise Database • Solves the IT Challenges Faced by Organizations: • Avoids and removes database and storage silos • Makes all workloads faster • Rapid migration
  • 37. Copyright © 2015, Oracle and/or its affiliates. All rights reserved. | For More Information facebook.com/OracleHardware blogs.oracle.com/hardware linkedin.com/company/oracle oracle.com/supercluster Copyright © 2014, Oracle and/or its affiliates. All rights reserved. |7/21/2016 Public
  • 38. Copyright © 2014, Oracle and/or its affiliates. All rights reserved. |
  • 39. Copyright © 2015, Oracle and/or its affiliates. All rights reserved. | BACKUP SLIDES 7/21/2016 Public 39
  • 40. Copyright © 2015, Oracle and/or its affiliates. All rights reserved. | Oracle SuperCluster: Customers by Workload Oracle E-Business Suite SAP Siebel Java/Solaris FlexCube PeopleSoft Oracle Database
  • 41. Copyright © 2015, Oracle and/or its affiliates. All rights reserved. | Compute • 8 UCS M4 (256 Cores/4TB) • 1 UCS 5108 Chassis • 2 Fabric Interconnects • Rack Infrastructure Subtotal ASP $194K $8K $26K $2K $230K Support/Yr. $1K $0K $1K $0K $2K Storage • 10 EMC X-Brick 20 (200TB) • 1 EMC VNX 5600 (80TB) • EMC Unisphere Unified Suite Subtotal $2,805K $65K $15K $2,886K $0K $4K $1K $5K Software • Red Hat Server • VMware vSphere OC EP Subtotal $0k $41K $41K $17k $10K $27K Total $3,157K ASP $33K Support/Yr. Compute • 2 T5-8 (256 Cores/4TB) • 3 InfiniBand Switches • Rack infrastructure ASP Support/Yr. Storage • 8 Exadata HC Storage (384TB) • 1 ZS3-ES Storage (80TB) • ZS3 Cloning & Replication • Exadata Storage Software Software • Oracle Solaris • Oracle VM for SPARC • Enterprise Manager Total $1,048K ASP $155K Support/Yr. SuperCluster T5-8 Full Rack Comparable Cisco/EMC/VMware/RedHat Cisco/EMC/VMware/RedHat ASPOracle ASP SuperCluster: Lower CAPEX than Multi-vendor Systems 3X More Expensive Year 1
  • 42. Copyright © 2015, Oracle and/or its affiliates. All rights reserved. | Pay for an Engineered System as a Monthly Service Oracle IaaS Private Cloud • SuperCluster for a monthly fee – Replace CAPEX with OPEX – Lower total cost than purchase • Private / On Customer Premise – Maintain control of business critical data • Elastic Compute Capacity on Demand – Pay For peak capacity, only when needed • Oracle PlatinumPlus Services Included – Higher level of support including patching services 7/21/2016 Public 42 $0 $100 $200 $300 $400 $500 $600 0 12 24 36 48 60 CumulativeCost($,000s) Months 3yearterm IaaSwith 3 Months CoDper Year IaaSnoCoDused Purchaseplus AnnualSupport
  • 43. Copyright © 2015, Oracle and/or its affiliates. All rights reserved. | SuperCluster: Greater Value than Competition 4X Lower Total Cost of Ownership then IBM POWER7+ Solution  $15 million in savings  4X lower five year, Total Cost of Ownership Greater Value1 SuperCluster Solution IBM P780+ Solution 4X Savings 5 Year TCO $5M $10M $20M 1Comparing (2) IBM P780s with POWER 7+ processors and 256GB RAM, IBM DS8870 Storage with 512 disks, Oracle Database Enterprise Edition with (1) Oracle SuperCluster ½ Rack HP, Oracle Database Enterprise Edition, Oracle Real Application Clusters, Oracle Exadata Storage Software and Oracle Solaris Cluster $15M See substantiation slides
  • 44. Copyright © 2015, Oracle and/or its affiliates. All rights reserved. | SuperCluster: Save Money Replacing Legacy IBM Systems 2.4X Reduction in 5 year Total Cost of Ownership Upgrade and Save1  Save $6.4 million over 5 years  Return On Investment in >3 years  30% lower hardware costs  3X lower floor space costs  2X lower power and cooling costs 1Based on analysis replacing IBM P595 servers and DS8300 Turbo storage with Oracle SuperCluster ½ rack SuperCluster Solution IBM P595 Solution 2.4X Savings 5 Year TCO $5M $10M See substantiation slides
  • 45. Copyright © 2015, Oracle and/or its affiliates. All rights reserved. | SuperCluster: Save Money Replacing Legacy HP Systems 2.7X Reduction in 5 year Total Cost of Ownership Upgrade and Save1  Save $10.5 million over 5 years  Return On Investment in >2 years  58% lower hardware costs  3X lower floor space costs  1.8X lower power and cooling costs 1Based on analysis replacing HP Superdome and EVA8000 storage with Oracle SuperCluster ½ rack SuperCluster Solution Superdome Solution 5 Year TCO 2.7X Savings $5M $10M $15M See substantiation slides
  • 46. Copyright © 2014, Oracle and/or its affiliates. All rights reserved. | Substantiation Slides Solution Comparison Disclaimer and Methodology
  • 47. Copyright © 2014, Oracle and/or its affiliates. All rights reserved. | Statement of Confidentiality & Disclaimers This presentation and its contents (collectively, "Presentation") are the confidential information of Oracle. The Presentation may not be reproduced, published, disseminated, or otherwise disclosed without Oracle's written consent. The Presentation is designed to provide a rough estimate of the Oracle software and hardware needs for your company based on high level corporate information, and cannot account for all uses, risks and other factors that may affect results or performance, or for changes in your business practices or operating procedures that may be required to realize results or performance that are projected or implied in the Presentation. The Presentation may include selected third party data, information, research and/or reference materials (collectively, "Third Party Information"). The inclusion of the Third Party Information does not constitute an endorsement of Oracle's products or services by any third party. The Presentation is provided to You on an “AS IS” basis without warranty (either express or implied), may be used for informational and general planning purposes only, and is subject to change at Oracle's sole discretion. Further, this Presentation is not a commitment to deliver any future material, code, or functionality. The development, release, and timing of any features or functionality described in this Presentation remains at the sole discretion of Oracle.
  • 48. Copyright © 2014, Oracle and/or its affiliates. All rights reserved. | Safe Harbor Statement The following is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making purchasing decisions. The development, release, and timing of any features or functionality described for Oracle’s products remains at the sole discretion of Oracle. This model compares the TCO including CAPEX and OPEX of keeping the current environment (i.e. business as usual) versus replacing it with a proposed architecture plus the associated IT related business benefits. TCO categories include: Hardware acquisition and service, Software licenses and maintenance, Power and cooling (CO2 emissions calculated but not monetized), Floor space, and Integration and deployment. IT related business benefits include: Employee productivity, IT staff productivity, and Planned and unplanned downtime. Growth: The average utilization rate of equipment is increased based on the growth rate until it reaches the maximum (default maximum = 60%) at which point additional equipment is acquired. Growth is applied to new proposed equipment deployed during the migration period but is not applied to equipment that is being ramped down. Average utilization: Average utilization applies to workload capacity for servers and to storage capacity for storage. Default average utilization range: initial = 40% and maximum = 60%. Useful life replace: Useful life replace models the cost of replacing equipment at the end of its useful life with equivalent workload or storage capacity at an estimated future price point. Software licenses are transferred to the new equipment. Hardware service is recalculated at the new rate. Future equipment acquisition: The price to acquire equivalent workload or storage capacity is decreased at a default annual erosion rate of 15% per year starting in year 2 through year 5 based on Moore’s Law. Migration Period: For large multi-year implementations, proposed equipment is added and current equipment ramped down in equal amounts for each year of the migration period Purchase: If equipment is purchased, then the entire hardware acquisition cost (CAPEX cash flow) occurs in the year it is acquired. Lease: If equipment is leased, then the cash flow is spread over the lease term (default 3 years). At the end of the lease term, equipment is assumed to be replaced with new equivalent capacity at an estimated future price point recalculating the lease using the same rate. Methodology
  • 49. Copyright © 2014, Oracle and/or its affiliates. All rights reserved. | EBS Sizing Used in Comparisons High Level IBM Sizing Used for 2000 and 5000 User Comparisons Source of IBM EBS sizing information: http://public.dhe.ibm.com/common/ssi/ecm/en/ord03011usen/ORD03011USEN.PDF
  • 50. Copyright © 2014, Oracle and/or its affiliates. All rights reserved. | Substantiation Slides SuperCluster Replaces IBM P595 Solution Comparison
  • 51. Copyright © 2014, Oracle and/or its affiliates. All rights reserved. |7/21/2016 Oracle OpenWorld Lowering TCO for EBS Customer 2000 Users Initial Year 1 Year 2 Year 3 Year 4 Year 5 sh Outflows 0.00 837.00 860.00 1,971.00 2,722.00 sh Outflows 1,335.00 249.00 254.00 1,670.00 497.00 3,000.00 BAU Proposed Hardware Acquisition 4,370 965 5x Hardware Service 1,563 524 3x Software - Hardware License 4,116 2,844 1x Power and Cooling 297 101 3x Floor Space 125 39 3x Integration and Deployment 466 38 12x Total cash outflows over the next 5 years BaU = $10,937K Proposed = $4,512K TCO Reduction = $6,425K TCO OVER 5 YEARSPROJECTED CASH FLOWS
  • 52. Copyright © 2014, Oracle and/or its affiliates. All rights reserved. | Category Initial Year 1 Year 2 Year 3 Year 4 Year 5 Benefits 0.00 0.00 0.86 0.90 2.02 2.77 Costs -1.34 -0.25 -0.25 -1.67 -0.50 -0.51 3.00 Category Year 0 Year 1 Year 2 Year 3 Year 4 Year 5 Total TCO Business as Usual (IB) 0 837 860 1,971 2,722 4,546 10,937 TCO Proposed (P) 1,335 249 254 1,670 497 507 4,512 Other Proposed Project Investments (O) 0 0 0 0 0 0 0 Net TCO (IB - P - O) -1,335 588 606 301 2,225 4,039 6,425 Business Benefits (BB) 0 21 44 45 46 47 203 Net Cash Flow (Net TCO + BB) -1,335 609 650 346 2,271 4,086 6,628 Cumulative Net Cash Flow -1,335 -725 -75 271 2,542 6,628 Cumulative Discounted Net Cash Flow (NPV) -1,335 -778 -236 28 1,607 4,203 Cash Flows And Value Metrics *Currency USD in Thousands **Unless otherwise noted, all future cash flows are undiscounted  Discounted Total Savings (NPV) : $4,203K  TCO reduction : 59%  Payback months : 27  Net Initial Investment : $-1,335K  ROI based on total project cost (%) : 147  IRR (%) : 65  Cost of 3 month delay : $120K  Cash flow discounting period : Year end  Cost of Capital : 10% PROJECTED CASH FLOWS USD in Thousands, Undiscounted
  • 53. Copyright © 2014, Oracle and/or its affiliates. All rights reserved. | Category Component / Sub Component Name Manufacturer Installed Base Qty Reqd. Qty Server, Engineered System IBM Power 595 Server IBM 2 2 POWER6/5GHz/64GB/4ch/8co IBM 2 2 Disk, Virtual Tape IBM DS8300 Turbo DISK_VTS 1 IBM 1 1 16 x 300GB FC IBM 24 24 Software - Hardware License Oracle Database Enterprise Edition Database Oracle IBM Power 595 - Server IBM 2 2 Oracle Enterprise Edition RAC HLS 1 Oracle IBM Power 595 - Server IBM 2 2 Installed IT Infrastructure
  • 54. Copyright © 2014, Oracle and/or its affiliates. All rights reserved. | Category Component / Sub Component Name Manufacturer Installed Base Qty Reqd. Qty Server, Engineered System SPARC SuperCluster T5-8 SuperCluster Oracle 0 1 HP Half Rack/13TB+48TB/3.6GHz/2048GB/8ch/128co Oracle 0 1 Software - Hardware License Oracle Database Enterprise Edition Database Oracle SPARC SuperCluster T5-8 - SuperCluster Oracle 0 1 Oracle Enterprise Edition RAC RAC Oracle SPARC SuperCluster T5-8 - SuperCluster Oracle 0 1 Oracle Solaris Cluster Enterprise Edition Cluster Oracle SPARC SuperCluster T5-8 - SuperCluster Oracle 0 1 Exadata Storage Server Software (any rack size) Exadata Oracle SPARC SuperCluster T5-8 - SuperCluster Oracle 0 1 Proposed IT Infrastructure
  • 55. Copyright © 2014, Oracle and/or its affiliates. All rights reserved. | Key IT Infrastructure Assumptions Input Installed Base Proposed Growth assumptions Growth Type Exponential Exponential Annual growth rate (%) 20.0% 20.0% Site licensed software growth rate (%) 0.0% 0.0% Calculate end of useful life replace Yes Yes Deployment ramp (new required equipment) (Num) 1 1 Discount assumptions Hardware discount (%) 0.0% 0.0% Software discount (%) 0.0% 0.0% Hardware service discount (%) 0.0% 0.0% Acquisition Plan Acquisition method Purchased Purchased Inflation assumptions Base inflation rate (%) 5.0% 5.0% Service inflation rate (%) 5.0% 5.0% Software inflation rate (%) 0.0% 0.0% Unit price deflation rate (%) 15.0% 15.0% Software assumptions Percent of hardware licensed (%) 100.0% 100.0% Percent of licenses available to transfer to this hardware (%) 0.0% 0.0% Keep surplus licenses on maintenance No No
  • 56. Copyright © 2014, Oracle and/or its affiliates. All rights reserved. | Key IT Infrastructure Assumptions Input Installed Base Proposed Hardware service assumptions Service level Default Default Premier Service Rate (%) 12.0% 12.0% Utilization assumptions Minimum/initial hardware utilization (%) 40.0% 40.0% Maximum hardware utilization (%) 60.0% 60.0% Hours of operation per month (Hours) 720 720 Tape media assumptions Tape utilization (%) 70.0% 70.0% Compression ratio (Num) 2 2 Lease Assumptions 1 year lease term monthly rate (Num) 0.051 0.051 2 year lease term monthly rate (Num) 0.040 0.040 3 year lease term monthly rate (Num) 0.029 0.029 4 year lease term monthly rate (Num) 0.023 0.023 5 year lease term monthly rate (Num) 0.020 0.020 Lease Term (Years) 3 3 Oracle On Premise Iaas Assumptions IaaS term (Years) 5 5 Year 4 & 5 discount (%) 30.0% 30.0% IaaS COD enablement percentage (%) 0.0% 0.0% Power assumptions Power cost per kWh (USD) 0.1 0.1
  • 57. Copyright © 2014, Oracle and/or its affiliates. All rights reserved. | Key IT Infrastructure Assumptions Input Installed Base Proposed Power assumptions CO2 (kg/kWh) 0.6078 0.6078 PUE (Power Usage Effectiveness) (Num) 1.8 1.8 Floor space assumptions Floor space cost (sq ft per month) (USD) 20.000 20.000 Rack height (rack units) (Num) 42 42 Floor space per rack (sq ft) 18.18 18.18 Rack density (%) 100.0% 100.0%
  • 58. Copyright © 2014, Oracle and/or its affiliates. All rights reserved. | Substantiation Slides SuperCluster Replaces HP SuperDome Solution Comparison
  • 59. Copyright © 2014, Oracle and/or its affiliates. All rights reserved. | Initial Year 1 Year 2 Year 3 Year 4 Year 5 sh Outflows 0.00 1,206.00 1,231.00 2,556.00 4,600.00 sh Outflows 1,335.00 249.00 254.00 1,670.00 497.00 5,000.00 BAU Proposed Hardware Acquisition 5,338 965 6x Hardware Service 1,904 524 4x Software - Hardware License 6,915 2,844 2x Power and Cooling 186 101 2x Floor Space 145 39 4x Integration and Deployment 549 38 14x TCO OVER 5 YEARSPROJECTED CASH FLOWS Total cash outflows over the next 5 years BaU = $15,036K Proposed = $4,512K TCO Reduction = $10,524K Lowering TCO for EBS Customer 2000 Users
  • 60. Copyright © 2014, Oracle and/or its affiliates. All rights reserved. | Category Initial Year 1 Year 2 Year 3 Year 4 Year 5 Benefits 0.00 0.00 1.23 1.27 2.60 4.64 Costs -1.34 -0.25 -0.25 -1.67 -0.50 -0.51 5.00 Category Year 0 Year 1 Year 2 Year 3 Year 4 Year 5 Total TCO Business as Usual (IB) 0 1,206 1,231 2,556 4,600 5,443 15,036 TCO Proposed (P) 1,335 249 254 1,670 497 507 4,512 Other Proposed Project Investments (O) 0 0 0 0 0 0 0 Net TCO (IB - P - O) -1,335 957 977 886 4,103 4,936 10,524 Business Benefits (BB) 0 19 39 40 41 42 182 Net Cash Flow (Net TCO + BB) -1,335 976 1,016 926 4,144 4,979 10,706 Cumulative Net Cash Flow -1,335 -359 657 1,584 5,727 10,706 Cumulative Discounted Net Cash Flow (NPV) -1,335 -443 404 1,109 3,992 7,154 Cash Flows And Value Metrics *Currency USD in Thousands **Unless otherwise noted, all future cash flows are undiscounted  Discounted Total Savings (NPV) : $7,154K  TCO reduction : 70%  Payback months : 17  Net Initial Investment : $-1,335K  ROI based on total project cost (%) : 237  IRR (%) : 96  Cost of 3 month delay : $184K  Cash flow discounting period : Year end  Cost of Capital : 10% PROJECTED CASH FLOWS USD in Thousands, Undiscounted
  • 61. Copyright © 2014, Oracle and/or its affiliates. All rights reserved. | Category Component / Sub Component Name Manufacturer Installed Base Qty Reqd. Qty Server, Engineered System HP 9000 Superdome SERVER 1 HP 2 2 PA-8900/1.1GHz/16GB/1ch/2co HP 19 19 Disk, Virtual Tape HP EVA8000 DISK_VTS 1 HP 2 1 14 x 300GB FC HP 13 13 Software - Hardware License Oracle Database Enterprise Edition HLS 1 Oracle HP 9000 Superdome - SERVER 1 HP 2 2 Oracle Enterprise Edition RAC HLS 1 Oracle HP 9000 Superdome - SERVER 1 HP 2 2 Installed IT Infrastructure
  • 62. Copyright © 2014, Oracle and/or its affiliates. All rights reserved. | Category Component / Sub Component Name Manufacturer Installed Base Qty Reqd. Qty Server, Engineered System SPARC SuperCluster T5-8 SuperCluster Oracle 0 1 HP Half Rack/13TB+48TB/3.6GHz/2048GB/8ch/128co Oracle 0 1 Software - Hardware License Oracle Database Enterprise Edition Database Oracle SPARC SuperCluster T5-8 - SuperCluster Oracle 0 1 Oracle Enterprise Edition RAC RAC Oracle SPARC SuperCluster T5-8 - SuperCluster Oracle 0 1 Oracle Solaris Cluster Enterprise Edition Cluster Oracle SPARC SuperCluster T5-8 - SuperCluster Oracle 0 1 Exadata Storage Server Software (any rack size) Exadata Oracle SPARC SuperCluster T5-8 - SuperCluster Oracle 0 1 Proposed IT Infrastructure
  • 63. Copyright © 2014, Oracle and/or its affiliates. All rights reserved. | Key IT Infrastructure Assumptions Input Installed Base Proposed Growth assumptions Growth Type Exponential Exponential Annual growth rate (%) 20.0% 20.0% Site licensed software growth rate (%) 0.0% 0.0% Calculate end of useful life replace Yes Yes Deployment ramp (new required equipment) (Num) 1 1 Discount assumptions Hardware discount (%) 0.0% 0.0% Software discount (%) 0.0% 0.0% Hardware service discount (%) 0.0% 0.0% Acquisition Plan Acquisition method Purchased Purchased Inflation assumptions Base inflation rate (%) 5.0% 5.0% Service inflation rate (%) 5.0% 5.0% Software inflation rate (%) 0.0% 0.0% Unit price deflation rate (%) 15.0% 15.0% Software assumptions Percent of hardware licensed (%) 100.0% 100.0% Percent of licenses available to transfer to this hardware (%) 0.0% 0.0% Keep surplus licenses on maintenance No No
  • 64. Copyright © 2014, Oracle and/or its affiliates. All rights reserved. | Key IT Infrastructure Assumptions Input Installed Base Proposed Hardware service assumptions Service level Default Default Premier Service Rate (%) 12.0% 12.0% Utilization assumptions Minimum/initial hardware utilization (%) 40.0% 40.0% Maximum hardware utilization (%) 60.0% 60.0% Hours of operation per month (Hours) 720 720 Tape media assumptions Tape utilization (%) 70.0% 70.0% Compression ratio (Num) 2 2 Lease Assumptions 1 year lease term monthly rate (Num) 0.051 0.051 2 year lease term monthly rate (Num) 0.040 0.040 3 year lease term monthly rate (Num) 0.029 0.029 4 year lease term monthly rate (Num) 0.023 0.023 5 year lease term monthly rate (Num) 0.020 0.020 Lease Term (Years) 3 3 Oracle On Premise Iaas Assumptions IaaS term (Years) 5 5 Year 4 & 5 discount (%) 30.0% 30.0% IaaS COD enablement percentage (%) 0.0% 0.0% Power assumptions Power cost per kWh (USD) 0.1 0.1
  • 65. Copyright © 2014, Oracle and/or its affiliates. All rights reserved. | Key IT Infrastructure Assumptions Input Installed Base Proposed Power assumptions CO2 (kg/kWh) 0.6078 0.6078 PUE (Power Usage Effectiveness) (Num) 1.8 1.8 Floor space assumptions Floor space cost (sq ft per month) (USD) 20.000 20.000 Rack height (rack units) (Num) 42 42 Floor space per rack (sq ft) 18.18 18.18 Rack density (%) 100.0% 100.0%
  • 66. Copyright © 2014, Oracle and/or its affiliates. All rights reserved. | Substantiation Slides SuperCluster Solution and IBM P780+ Solution Comparison
  • 67. Copyright © 2014, Oracle and/or its affiliates. All rights reserved. | Initial Year 1 Year 2 Year 3 Year 4 Year 5 ve Proposal 8.33 0.70 0.86 3.22 2.68 sh Outflows 1.64 0.32 0.32 2.06 0.62 Competitive Proposal Proposed Hardware Acquisition 7.52 0.96 8x Hardware Service 1.64 0.52 3x Software - Hardware License 9.67 3.94 2x Power and Cooling 0.18 0.10 2x Floor Space 0.06 0.04 2x Integration and Deployment 0.48 0.04 12x TCO OVER 5 YEARSPROJECTED CASH FLOWS Total cash outflows over the next 5 years Competitive Proposal = $19.6M Proposed = $5.6M TCO Reduction = $14.0M Lowering TCO for EBS Customer 5000 Users
  • 68. Copyright © 2014, Oracle and/or its affiliates. All rights reserved. | Category Initial Year 1 Year 2 Year 3 Year 4 Year 5 Benefits 0.00 0.00 0.00 0.00 0.00 0.00 Costs -0.00 -0.00 -0.00 -0.00 -0.00 -0.00 Category Year 0 Year 1 Year 2 Year 3 Year 4 Year 5 Total TCO Competitive Proposal (CP) 8.33 0.70 0.86 3.22 2.68 3.77 19.56 TCO Proposed (P) 1.64 0.32 0.32 2.06 0.62 0.63 5.60 Other Proposed Project Investments (O) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Net TCO (CP - P - O) 6.68 0.39 0.53 1.16 2.06 3.14 13.96 Business Benefits (BB) 0 0.03 0.06 0.07 0.07 0.07 0.30 Net Cash Flow (Net TCO + BB) 6.68 0.42 0.60 1.23 2.12 3.21 14.26 Cumulative Net Cash Flow 6.68 7.10 7.70 8.93 11.05 14.26 Cumulative Discounted Net Cash Flow (NPV) 6.68 7.06 7.56 8.50 9.98 12.01 Cash Flows And Value Metrics *Currency USD in Millions **Unless otherwise noted, all future cash flows are undiscounted  Discounted Total Savings (NPV) : $12.01M  TCO reduction : 71%  Payback months : 0  Net Initial Investment : $6.68M  ROI based on total project cost (%) : 254  IRR (%) : 1,000,000,000,000  Cost of 3 month delay : $0.12M  Cash flow discounting period : Year end  Cost of Capital : 10% PROJECTED CASH FLOWS USD in Millions, Undiscounted
  • 69. Copyright © 2014, Oracle and/or its affiliates. All rights reserved. | Category Component / Sub Component Name Manufacturer Installed Base Qty Reqd. Qty Server, Engineered System IBM Power+ 780 SERVER 1 IBM 0 2 POWER7+/3.72GHz/256GB/4ch/32co IBM 0 2 Disk, Virtual Tape IBM DS8870 DISK_VTS 1 IBM 0 1 256x146GB SAS 15K RPM IBM 0 2 Software - Hardware License Oracle Database Enterprise Edition HLS 1 Oracle IBM Power+ 780 - SERVER 1 IBM 0 2 Competitive Proposal IT Infrastructure
  • 70. Copyright © 2014, Oracle and/or its affiliates. All rights reserved. | Category Component / Sub Component Name Manufacturer Installed Base Qty Reqd. Qty Server, Engineered System SPARC SuperCluster T5-8 SERVER 1 Oracle 0 1 HC Half Rack/64TB+48TB/3.6GHz/2048GB/8ch/128co Oracle 0 1 Software - Hardware License Oracle Database Enterprise Edition HLS 1 Oracle SPARC SuperCluster T5-8 - SERVER 1 Oracle 0 1 Oracle Enterprise Edition RAC HLS 1 Oracle SPARC SuperCluster T5-8 - SERVER 1 Oracle 0 1 Exadata Storage Server Software (any rack size) HLS 1 Oracle SPARC SuperCluster T5-8 - SERVER 1 Oracle 0 1 Proposed IT Infrastructure
  • 71. Copyright © 2014, Oracle and/or its affiliates. All rights reserved. | Key IT Infrastructure Assumptions Input Competitive Proposal Proposed Growth assumptions Growth Type Exponential Exponential Annual growth rate (%) 20.0% 20.0% Site licensed software growth rate (%) 0.0% 0.0% Calculate end of useful life replace Yes Yes Deployment ramp (new required equipment) (Num) 1 1 Discount assumptions Hardware discount (%) 0.0% 0.0% Software discount (%) 0.0% 0.0% Hardware service discount (%) 0.0% 0.0% Acquisition Plan Acquisition method Purchased Purchased Inflation assumptions Base inflation rate (%) 5.0% 5.0% Service inflation rate (%) 5.0% 5.0% Software inflation rate (%) 0.0% 0.0% Unit price deflation rate (%) 15.0% 15.0% Software assumptions Percent of hardware licensed (%) 100.0% 100.0% Percent of licenses available to transfer to this hardware (%) 0.0% 0.0%
  • 72. Copyright © 2014, Oracle and/or its affiliates. All rights reserved. | Key IT Infrastructure Assumptions Input Competitive Proposal Proposed Software assumptions Keep surplus licenses on maintenance No No Hardware service assumptions Service level Default Default Premier Service Rate (%) 12.0% 12.0% Utilization assumptions Minimum/initial hardware utilization (%) 40.0% 40.0% Maximum hardware utilization (%) 60.0% 60.0% Hours of operation per month (Hours) 720 720 Tape media assumptions Tape utilization (%) 70.0% 70.0% Compression ratio (Num) 2 2 Lease Assumptions 1 year lease term monthly rate (Num) 0.051 0.051 2 year lease term monthly rate (Num) 0.040 0.040 3 year lease term monthly rate (Num) 0.029 0.029 4 year lease term monthly rate (Num) 0.023 0.023 5 year lease term monthly rate (Num) 0.020 0.020 Lease Term (Years) 3 3 Oracle On Premise Iaas Assumptions IaaS term (Years) 5 5 Year 4 & 5 discount (%) 30.0% 30.0%
  • 73. Copyright © 2014, Oracle and/or its affiliates. All rights reserved. | Key IT Infrastructure Assumptions Input Competitive Proposal Proposed Oracle On Premise Iaas Assumptions IaaS COD enablement percentage (%) 0.0% 0.0% Power assumptions Power cost per kWh (USD) 0.1 0.1 CO2 (kg/kWh) 0.608 0.608 PUE (Power Usage Effectiveness) (Num) 1.8 1.8 Floor space assumptions Floor space cost (sq ft per month) (USD) 20.000 20.000 Rack height (rack units) (Num) 42 42 Floor space per rack (sq ft) 18.18 18.18 Rack density (%) 100.0% 100.0%
  • 74. Copyright © 2014, Oracle and/or its affiliates. All rights reserved. |