The Agile PMP Teaching an Old Dog New Tricks
Introductions Product consultant and agile evangelist for VersionOne Previously a Senior Project Manager for CheckFree and John Harland Company PMP, CSM, DSDM Agile Project Leader Board member of APLN and the current Treasurer.  Founder APLN Atlanta
Why  are we  here today ?
What is Agile? Umbrella term to describe a family of methodologies Engineering best practices Leadership philosophy  Project management methodology
What is Project Management? When will the project be done?  How much will it cost?  Do we all agree on what done looks like? What are the risks to delivering time and on schedule? How will we mitigate these risks so we can get done
Let’s take a look at Traditional  Project Management
Balancing the Triple Constraints There is a dynamic relationship between time, cost, and scope When one of the three variables change, there is necessarily a change in one or more of the other two Understanding and managing the relationship between these variables the primary job of the Project Manager
Managing Project Scope Project scope is the set of deliverable the project is approved to build Defined at a high level in the business case or project charter Defined in greater detail in a product requirements document or a work break down structure
Managing Project Costs Project cost is the sum of all capital expenditures, contractor expenses, and internal cost of labor Project managers track project expenses in relationship to the budget Responsible for making sure the project is spending money at the right rate and time
Managing the Schedule The project schedule defines when all the deliverables should be completed and who is going to do them The project schedule also defines the order of the deliverables and is used to track physical percent complete.
Building the Project Schedule Scope for the project is defined and the size of the deliverables are estimated Deliverables are sequenced and resource needs are calculated Based on the size, available budget, dependencies, and constraints; the project timeline can be calculated
Traditional Waterfall Scheduling
What  always  happens when we approach  the business  with our  project schedule ?
Add more resources (crashing)
De-scope or phase the project
Overlapping Phases (fast tracking)
Project Baseline and Critical Path Once the project sponsors agree to the schedule, the schedule is locked and becomes the baseline Once the project has a baseline, the project manager will calculate the critical path and begin tracking earned value Earned value measures how much the project is spending relative to time and deliverables
What  about uncertainty ?
Project Risk Assessment What are the factors that could impact our ability to meet our project objectives Risk can be categorized by likelihood of occurrence, impact severity, and ability to detect The project managers prioritizes risk and create mitigation strategies
Primary Traditional Project Constraints Scope is typically the primary driver… time and cost are calculated based on the size of the project Assumes an ability to accurately predict scope, cost, and schedule
So… what’s new about Agile  Project Management?
Primary Agile Project Constraints Time and cost are the real drivers… scope has to be able to vary Agile is a framework, a new way of looking at product development, that gives the project team the ability to inspect outcomes and adapt accordingly Scope Time Cost Scope
A Fundamental Paradigm Shift Not all projects are predictable Market uncertainty drives change The less certain we are about our requirements, the more we need to plan to adapt
Agile  embraces uncertainty !
Agile  is a  risk mitigation  technique when our  assumptions about predictability  do not hold
The Cost of Change Cost of traditional change management is too high in many project contexts Change control is bureaucratic and slow We become resistant to change when we should embrace change
How often to we really take  process cost  into  consideration  when  planning our projects ?
Still answering the five questions… When will the project be done?  How much will it cost?  Do we all agree on what done looks like? What are the risks to getting done on time and on schedule? How will we mitigate these risks so we can get done
… but taking a difference approach Deliver working product in short cycles Keep the evolving product highly visible Inspect outcomes frequently  Change our product or processes as we learn more to ensure acceptable outcomes Do less work that will change
… and a shift in focus Focus less on predictive up front planning Focus more on delivering value Focus more on collaboration with the business Focus more on engaging the team
Moving away  from  activity based  Project Management  toward value based  Project Management …
Not all  value based  project management is  agile …
Proto-Iteration Planning
Iterative Planning
Predictive Feature Based
Agile Project Management
Agile  and the  PMBOK
Agile and the PMI process groups Initiation Planning Execute Monitor Control Closing
 
The Importance of Language Companies don’t change over night People need to bridge the old language to the new Help teams understand new concepts within the old model
Understanding  Agile  in the  context  of the  PMI knowledge  areas…
Project Time Define deliverables not activities Strive to reduce dependencies between deliverables Prioritize don’t sequence.  Work from the top of the list. Estimate based on relative size Releases and iterations always end on time.  Time Management Activity definition Activity sequencing Activity resource estimating Activity duration estimating Schedule development Schedule control
Project Cost  Cost is defined by your willingness to invest Cost estimates are the product of the team size and project duration Cost Management Cost estimating Cost budgeting Cost control
Project Scope Scope is defined at progressive levels of detail. Plan scope, deal with project realities, and make tradeoffs. Allow room for scope negotiation when planning project scope Collaboration and frequent interaction Scope Management Scope Planning Scope Definition Create WBS Scope Verification Scope Control
Project Risk Business Risk, Technical Risk, and Logistical Risk Risk management is built into the structure of the project Risks are constantly visible and managed through iterations Risk lists, response planning, and mitigation strategies Risk Management Risk management planning Risk identification Qualitative risk analysis Quantitative risk analysis Risk response planning Risk monitoring and control
Project Quality Quality is not an afterthought Test first design Test driven development Continuous integration Continuous testing Quality Management Quality planning Perform quality assurance Quality control
Project Communication Communication planning can be thought of in the traditional sense when looking outside the project team Collocation Information radiators Osmotic communication Communication Management Communications planning Information  distribution Performance reporting Manage stakeholders
Project Integration Agile has room for a Charter or a Vision statement Project management plans and approach statements More empowering style of management based on individual accountability Change control is built into the process. Tradeoffs managed in real time. Integration Management Charter Scope statement Project Management Plan Direct and Manage Project Execution Monitor and Control Project work Integrated change control Close project
Project Procurement Agile does not deal much with procurement Approach contracts with adaptability in mind Build relationships based on trust Create win-win agreements Time  Management Plan purchases and acquisitions Plan contracting Request seller responses Select sellers Contract administration Contract closure
Project Human Resources Staffing based on available people and willingness to invest Build your team around motivated people Give them what they need to be successful and remove impediments Allow teams to self-organize Human Resource  Management Human resource planning Acquire project team Develop project team Manage project team
What  Can  I Do  Today ?
Agile Project Management Plans Explain agile processes in the context of an agile project management plan Build agile principles into the project charter or project definition document
Feature Based Deliverables Stop putting activities in your project plan Focus on outcomes… what are we going to build? What capabilities need to be in the system by when? Let’s start actually Earning Value
Iterative Planning Do detailed planning on iterative cycles Use the data gathered in the planning to do a reality check on your schedule Keep a higher level plan, maybe a milestone plan in a traditional PM tool
Daily Stand-up Meetings Increase visibility Establish a sense of team work and collaboration Shared accountability
Agile PM Model Project Manager as the center of the project Project manager as an enabler PM Team Team Team Team Team Team Team Team PM
Incorporate  agile values  and  principles
Empowerment Create the context Manage the process not the people
Self-Organization " Simple, clear purpose and principles give rise to complex and intelligent behavior. Complex rules and regulations give rise to simple and stupid behavior.”  Dee Hock, Founder and Former CEO of Visa International
Trust Expect the best out of people Elevate the individual, give them respect Value people and encourage relationships
Accountability Measure results, not processes or steps Focus on value Inspect the process  Create a culture of accountability
True Agile Project Planning
Know where  you are …  Know where  you are going … Know what else you  need to do to get there…
Great  Project  Managers take  input  from  reality  and  deal  with it
Resources Traditional Project Management http://www.pmi.org Agile Project Management and Leadership http://www.versionone.com http://www.apln.org http://www.agilealliance.org http://www.scrumalliance.org http://www.dsdm.org http://www.agilemanifesto.org How to contact me email:  [email_address] Blog:  http://blog.versionone.com Blog:  http://www.leadingagile.com   Presentation:  http://www.linkedin.com/in/cottmeyer
Simplifying Software Delivery

More Related Content

PPT
The Agile PMP Workshop
PDF
Agile Practice Guide Notes
PPTX
Importance of Adaptive Planning in Agile
PPTX
PMI-ACP - Agile Framework
PDF
Agile Project Management - An introduction to Agile and the new PMI-ACP
PDF
Agile project management using scrum
PDF
Guide to Project Portfolio Management
PPTX
PMI-ACP Training Deck
The Agile PMP Workshop
Agile Practice Guide Notes
Importance of Adaptive Planning in Agile
PMI-ACP - Agile Framework
Agile Project Management - An introduction to Agile and the new PMI-ACP
Agile project management using scrum
Guide to Project Portfolio Management
PMI-ACP Training Deck

What's hot (20)

PDF
20210618 PMI XC 2021 Conf Business Agility: What Got You Here Won't Get You T...
PPTX
The Agile PMO: Ensuring visibility and governance
PPTX
Understanding Agile Project Management (APM)
PDF
Fundamentals of Agile Methodologies - Part I
PDF
Lean Project Management PowerPoint Presentation Slides
PPTX
Lean-Agile PMO
PPTX
PDF
Requirements & scope
PPTX
Why Project Managers (Understandably) Hate the CMMI -- and What to Do About It
PDF
Michael Nir The Agile PMO keynote
PPT
Best Practices When Moving To Agile Project Management
PPTX
Agile Scrum Lean & Kanban explained in a flash
PPTX
Agile Continuous improvement
PPTX
Agile Project Management (Workshop)
PDF
The Agile Way with PMI-ACP
PDF
Metrics in Agile: SCRUM, XP and Agile Methods
PPTX
360 Lean Project Management 05.11.15
PPTX
Project Management to Enterprise Agile Product Delivery
PPTX
Introduction to Agile Project Planning and Project Management
20210618 PMI XC 2021 Conf Business Agility: What Got You Here Won't Get You T...
The Agile PMO: Ensuring visibility and governance
Understanding Agile Project Management (APM)
Fundamentals of Agile Methodologies - Part I
Lean Project Management PowerPoint Presentation Slides
Lean-Agile PMO
Requirements & scope
Why Project Managers (Understandably) Hate the CMMI -- and What to Do About It
Michael Nir The Agile PMO keynote
Best Practices When Moving To Agile Project Management
Agile Scrum Lean & Kanban explained in a flash
Agile Continuous improvement
Agile Project Management (Workshop)
The Agile Way with PMI-ACP
Metrics in Agile: SCRUM, XP and Agile Methods
360 Lean Project Management 05.11.15
Project Management to Enterprise Agile Product Delivery
Introduction to Agile Project Planning and Project Management
Ad

Similar to The Agile PMP: Teaching An Old Dog New Tricks (90 minutes) (20)

PPT
APLN Project Manager Talk
PPT
Project management presentation
PPTX
project management concepts
PPT
ICT4GOV PROJECT MANAGEMENT
PPT
6396901
PPTX
PROJECT MANAGEMENT Challenges, Valuable.
PPT
Project management
PPT
Project management 02112009
PPT
A/E Project Management Optimization-Part Two
PDF
CRG DevCo’s advantages of outsourcing Project Management
PPTX
Unit 1.pptx
PPTX
P3O - The Value Adding PMO - from Strategy to Projects
PPTX
Setting up a project framework phase 1 june 20162
PPT
Project Management Overview
PPT
Projectmanagement Refresher for Trainees
PPT
Project Plan Development - A FlackVentures Training Example
DOCX
What are the essential things a Project Manager must consider?
PDF
Natalia Renska: Вступ до Delivery Management. Визначення ролі Delivery Manage...
PPTX
Project plan overview
PPT
Project Management: More Caught Than Taught
APLN Project Manager Talk
Project management presentation
project management concepts
ICT4GOV PROJECT MANAGEMENT
6396901
PROJECT MANAGEMENT Challenges, Valuable.
Project management
Project management 02112009
A/E Project Management Optimization-Part Two
CRG DevCo’s advantages of outsourcing Project Management
Unit 1.pptx
P3O - The Value Adding PMO - from Strategy to Projects
Setting up a project framework phase 1 june 20162
Project Management Overview
Projectmanagement Refresher for Trainees
Project Plan Development - A FlackVentures Training Example
What are the essential things a Project Manager must consider?
Natalia Renska: Вступ до Delivery Management. Визначення ролі Delivery Manage...
Project plan overview
Project Management: More Caught Than Taught
Ad

More from Mike Cottmeyer (20)

PPTX
The Executives Guide
PPTX
The Three Things You Need to Know to Transform Any Size Organization Into an ...
PPTX
Why Agile Is Failing in Large Enterprises, And What You Can Do About It
PDF
Scrum gathering vegas agile program and portfolio management
KEY
Agile Program and Portfolio Management
KEY
Enterprise Agile Transformation Strategies
PPTX
Exploring Agile Transformation and Scaling Patterns
PPTX
Agile Project Management
PPTX
Scrum and kanban in the enterprise webinar
KEY
PMI Atlanta Agile LIG - Enterprise Agile
KEY
Scrum club progressiveelaboration-bobvincent
PPT
Scrum club progressiveelaboration-bobvincent
PPTX
Agile Requirements & Design
PPTX
Understanding Agile Project Management
PPTX
How to own a really big complex product v3
PPTX
How to Own a Really Big Complex Product v3
PPTX
How to own a really big complex product
PPTX
Scaling Agile Past the Team
PPTX
Getting Started With Agile
PPTX
Agile Past The Team - Pillar Template
The Executives Guide
The Three Things You Need to Know to Transform Any Size Organization Into an ...
Why Agile Is Failing in Large Enterprises, And What You Can Do About It
Scrum gathering vegas agile program and portfolio management
Agile Program and Portfolio Management
Enterprise Agile Transformation Strategies
Exploring Agile Transformation and Scaling Patterns
Agile Project Management
Scrum and kanban in the enterprise webinar
PMI Atlanta Agile LIG - Enterprise Agile
Scrum club progressiveelaboration-bobvincent
Scrum club progressiveelaboration-bobvincent
Agile Requirements & Design
Understanding Agile Project Management
How to own a really big complex product v3
How to Own a Really Big Complex Product v3
How to own a really big complex product
Scaling Agile Past the Team
Getting Started With Agile
Agile Past The Team - Pillar Template

Recently uploaded (20)

PPTX
Week2: Market and Marketing Aspect of Feasibility Study.pptx
PDF
The Impact of Immigration on National Identity (www.kiu.ac.ug)
PDF
Chembond Chemicals Limited Presentation 2025
PPTX
Accounting Management SystemBatch-4.pptx
PDF
IFRS Green Book_Part B for professional pdf
PPTX
Capital Investment in IS Infrastracture and Innovation (SDG9)
PDF
Handouts for Housekeeping.pdfbababvsvvNnnh
PDF
757557697-CERTIKIT-ISO22301-Implementation-Guide-v6.pdf
PPTX
003 seven PARTS OF SPEECH english subject.pptx
PPTX
IndustrialAIGuerillaInnovatorsARCPodcastEp3.pptx
DOCX
Center Enamel Enabling Precision and Sustainability in the Netherlands' Advan...
PPTX
Warehouse. B pptx
DOCX
“Strategic management process of a selected organization”.Nestle-docx.docx
PDF
The Future of Marketing: AI, Funnels & MBA Careers | My Annual IIM Lucknow Talk
PDF
COVID-19 Primer for business case prep.pdf
PPTX
Market and Demand Analysis.pptx for Management students
PDF
Pink Cute Simple Group Project Presentation.pdf
PPTX
Cơ sở hạ tầng công nghệ thông tin trong thời đại kỹ thuật số
PPT
BCG内部幻灯片撰写. slide template BCG.slide template
PPTX
Supply Chain under WAR (Managing Supply Chain Amid Political Conflict).pptx
Week2: Market and Marketing Aspect of Feasibility Study.pptx
The Impact of Immigration on National Identity (www.kiu.ac.ug)
Chembond Chemicals Limited Presentation 2025
Accounting Management SystemBatch-4.pptx
IFRS Green Book_Part B for professional pdf
Capital Investment in IS Infrastracture and Innovation (SDG9)
Handouts for Housekeeping.pdfbababvsvvNnnh
757557697-CERTIKIT-ISO22301-Implementation-Guide-v6.pdf
003 seven PARTS OF SPEECH english subject.pptx
IndustrialAIGuerillaInnovatorsARCPodcastEp3.pptx
Center Enamel Enabling Precision and Sustainability in the Netherlands' Advan...
Warehouse. B pptx
“Strategic management process of a selected organization”.Nestle-docx.docx
The Future of Marketing: AI, Funnels & MBA Careers | My Annual IIM Lucknow Talk
COVID-19 Primer for business case prep.pdf
Market and Demand Analysis.pptx for Management students
Pink Cute Simple Group Project Presentation.pdf
Cơ sở hạ tầng công nghệ thông tin trong thời đại kỹ thuật số
BCG内部幻灯片撰写. slide template BCG.slide template
Supply Chain under WAR (Managing Supply Chain Amid Political Conflict).pptx

The Agile PMP: Teaching An Old Dog New Tricks (90 minutes)

  • 1. The Agile PMP Teaching an Old Dog New Tricks
  • 2. Introductions Product consultant and agile evangelist for VersionOne Previously a Senior Project Manager for CheckFree and John Harland Company PMP, CSM, DSDM Agile Project Leader Board member of APLN and the current Treasurer. Founder APLN Atlanta
  • 3. Why are we here today ?
  • 4. What is Agile? Umbrella term to describe a family of methodologies Engineering best practices Leadership philosophy Project management methodology
  • 5. What is Project Management? When will the project be done? How much will it cost? Do we all agree on what done looks like? What are the risks to delivering time and on schedule? How will we mitigate these risks so we can get done
  • 6. Let’s take a look at Traditional Project Management
  • 7. Balancing the Triple Constraints There is a dynamic relationship between time, cost, and scope When one of the three variables change, there is necessarily a change in one or more of the other two Understanding and managing the relationship between these variables the primary job of the Project Manager
  • 8. Managing Project Scope Project scope is the set of deliverable the project is approved to build Defined at a high level in the business case or project charter Defined in greater detail in a product requirements document or a work break down structure
  • 9. Managing Project Costs Project cost is the sum of all capital expenditures, contractor expenses, and internal cost of labor Project managers track project expenses in relationship to the budget Responsible for making sure the project is spending money at the right rate and time
  • 10. Managing the Schedule The project schedule defines when all the deliverables should be completed and who is going to do them The project schedule also defines the order of the deliverables and is used to track physical percent complete.
  • 11. Building the Project Schedule Scope for the project is defined and the size of the deliverables are estimated Deliverables are sequenced and resource needs are calculated Based on the size, available budget, dependencies, and constraints; the project timeline can be calculated
  • 13. What always happens when we approach the business with our project schedule ?
  • 14. Add more resources (crashing)
  • 15. De-scope or phase the project
  • 17. Project Baseline and Critical Path Once the project sponsors agree to the schedule, the schedule is locked and becomes the baseline Once the project has a baseline, the project manager will calculate the critical path and begin tracking earned value Earned value measures how much the project is spending relative to time and deliverables
  • 18. What about uncertainty ?
  • 19. Project Risk Assessment What are the factors that could impact our ability to meet our project objectives Risk can be categorized by likelihood of occurrence, impact severity, and ability to detect The project managers prioritizes risk and create mitigation strategies
  • 20. Primary Traditional Project Constraints Scope is typically the primary driver… time and cost are calculated based on the size of the project Assumes an ability to accurately predict scope, cost, and schedule
  • 21. So… what’s new about Agile Project Management?
  • 22. Primary Agile Project Constraints Time and cost are the real drivers… scope has to be able to vary Agile is a framework, a new way of looking at product development, that gives the project team the ability to inspect outcomes and adapt accordingly Scope Time Cost Scope
  • 23. A Fundamental Paradigm Shift Not all projects are predictable Market uncertainty drives change The less certain we are about our requirements, the more we need to plan to adapt
  • 24. Agile embraces uncertainty !
  • 25. Agile is a risk mitigation technique when our assumptions about predictability do not hold
  • 26. The Cost of Change Cost of traditional change management is too high in many project contexts Change control is bureaucratic and slow We become resistant to change when we should embrace change
  • 27. How often to we really take process cost into consideration when planning our projects ?
  • 28. Still answering the five questions… When will the project be done? How much will it cost? Do we all agree on what done looks like? What are the risks to getting done on time and on schedule? How will we mitigate these risks so we can get done
  • 29. … but taking a difference approach Deliver working product in short cycles Keep the evolving product highly visible Inspect outcomes frequently Change our product or processes as we learn more to ensure acceptable outcomes Do less work that will change
  • 30. … and a shift in focus Focus less on predictive up front planning Focus more on delivering value Focus more on collaboration with the business Focus more on engaging the team
  • 31. Moving away from activity based Project Management toward value based Project Management …
  • 32. Not all value based project management is agile …
  • 37. Agile and the PMBOK
  • 38. Agile and the PMI process groups Initiation Planning Execute Monitor Control Closing
  • 39.  
  • 40. The Importance of Language Companies don’t change over night People need to bridge the old language to the new Help teams understand new concepts within the old model
  • 41. Understanding Agile in the context of the PMI knowledge areas…
  • 42. Project Time Define deliverables not activities Strive to reduce dependencies between deliverables Prioritize don’t sequence. Work from the top of the list. Estimate based on relative size Releases and iterations always end on time. Time Management Activity definition Activity sequencing Activity resource estimating Activity duration estimating Schedule development Schedule control
  • 43. Project Cost Cost is defined by your willingness to invest Cost estimates are the product of the team size and project duration Cost Management Cost estimating Cost budgeting Cost control
  • 44. Project Scope Scope is defined at progressive levels of detail. Plan scope, deal with project realities, and make tradeoffs. Allow room for scope negotiation when planning project scope Collaboration and frequent interaction Scope Management Scope Planning Scope Definition Create WBS Scope Verification Scope Control
  • 45. Project Risk Business Risk, Technical Risk, and Logistical Risk Risk management is built into the structure of the project Risks are constantly visible and managed through iterations Risk lists, response planning, and mitigation strategies Risk Management Risk management planning Risk identification Qualitative risk analysis Quantitative risk analysis Risk response planning Risk monitoring and control
  • 46. Project Quality Quality is not an afterthought Test first design Test driven development Continuous integration Continuous testing Quality Management Quality planning Perform quality assurance Quality control
  • 47. Project Communication Communication planning can be thought of in the traditional sense when looking outside the project team Collocation Information radiators Osmotic communication Communication Management Communications planning Information distribution Performance reporting Manage stakeholders
  • 48. Project Integration Agile has room for a Charter or a Vision statement Project management plans and approach statements More empowering style of management based on individual accountability Change control is built into the process. Tradeoffs managed in real time. Integration Management Charter Scope statement Project Management Plan Direct and Manage Project Execution Monitor and Control Project work Integrated change control Close project
  • 49. Project Procurement Agile does not deal much with procurement Approach contracts with adaptability in mind Build relationships based on trust Create win-win agreements Time Management Plan purchases and acquisitions Plan contracting Request seller responses Select sellers Contract administration Contract closure
  • 50. Project Human Resources Staffing based on available people and willingness to invest Build your team around motivated people Give them what they need to be successful and remove impediments Allow teams to self-organize Human Resource Management Human resource planning Acquire project team Develop project team Manage project team
  • 51. What Can I Do Today ?
  • 52. Agile Project Management Plans Explain agile processes in the context of an agile project management plan Build agile principles into the project charter or project definition document
  • 53. Feature Based Deliverables Stop putting activities in your project plan Focus on outcomes… what are we going to build? What capabilities need to be in the system by when? Let’s start actually Earning Value
  • 54. Iterative Planning Do detailed planning on iterative cycles Use the data gathered in the planning to do a reality check on your schedule Keep a higher level plan, maybe a milestone plan in a traditional PM tool
  • 55. Daily Stand-up Meetings Increase visibility Establish a sense of team work and collaboration Shared accountability
  • 56. Agile PM Model Project Manager as the center of the project Project manager as an enabler PM Team Team Team Team Team Team Team Team PM
  • 57. Incorporate agile values and principles
  • 58. Empowerment Create the context Manage the process not the people
  • 59. Self-Organization " Simple, clear purpose and principles give rise to complex and intelligent behavior. Complex rules and regulations give rise to simple and stupid behavior.” Dee Hock, Founder and Former CEO of Visa International
  • 60. Trust Expect the best out of people Elevate the individual, give them respect Value people and encourage relationships
  • 61. Accountability Measure results, not processes or steps Focus on value Inspect the process Create a culture of accountability
  • 62. True Agile Project Planning
  • 63. Know where you are … Know where you are going … Know what else you need to do to get there…
  • 64. Great Project Managers take input from reality and deal with it
  • 65. Resources Traditional Project Management http://www.pmi.org Agile Project Management and Leadership http://www.versionone.com http://www.apln.org http://www.agilealliance.org http://www.scrumalliance.org http://www.dsdm.org http://www.agilemanifesto.org How to contact me email: [email_address] Blog: http://blog.versionone.com Blog: http://www.leadingagile.com Presentation: http://www.linkedin.com/in/cottmeyer

Editor's Notes