KYOVA FREIGHT PLANNING EFFORTS
KYOVA FREIGHT SUMMIT – FEBRUARY 17, 2016
SALEEM A. SALAMEH KYOVA INTERSTATE PLANNING COMMISSION
HUNTINGTON,WV-KY-OH URBANIZED AREA TRANSPORTATION
MANAGEMENT AREA
 TMA designation in July 18, 2012
 TMA Population – 202,637 (urbanized)
 MSA Population – 365,000
 KYOVA Planning Boundary grew
 Now includes Boyd and Greenup counties in
Kentucky and Putnam County in WestVirginia
 RIC, the MPO in Charleston is taking lead in planning responsibilities
for Putnam County
2
TMA REQUIREMENTS – WHAT’S BEEN DONE
 Congestion Management Process
 Completed January 2013
 Integrated MTP
 In progress
 Expectations: strong emphasis on Freight Planning
 Expected by Spring 2017
 Integrated TIP
 Completed April 2015
 5310/5307/5339/5340 Designated Recipient
 Integrated Travel Demand Model
 Certification Review – April 19-20, 2016 3
FEDERAL NATIONAL GOALS
Goal AreaGoal Area National GoalNational Goal
Safety Reduce fatalities & serious injuries on all public roads
Infrastructure condition Maintain a state of good repair
Congestion reduction Significantly reduce congestion on the NHS
System reliability Improve the efficiency of the surface system
Freight movement &
economic vitality
Improve the national freight network, access of rural
communities to markets, & economic development
Environmental
sustainability
Enhance system performance while protecting and
enhancing the environment
Reduced project delivery
delays
Accelerate project completion by eliminating delays in the
project delivery process 4
5
FREIGHT PLANNING
PAST FREIGHT PLANNING EFFORTS
6
 2040 MTP
 Assessed movement of freight and
developed recommendations for future
growth
 Integrated MTP will include Kentucky
counties of Boyd and Greenup
 Emphasis on ITS strategies and non-
recurring congestion mitigation strategies
 Huntington IntermodalTransportation
Planning Study for Huntington Tri-State
Airport
 Completed in 2009
KYOVA FREIGHT PLANNING AND INTEGRATION
 Congestion Management Process (CMP)
 SHRP2
 Workshop in November 2015
 Gathered stakeholders to discuss performance measures
 Outcome will be Action Plan to aid in project evaluation
 Could incorporate into freight planning process
 Should be completed by June 2016
 SDSS
 Stores transportation system attribute and performance data
 Performs technical analyses that identify/quantify congestion and
assess the effectiveness of congestion reduction/mitigation
strategies
 Provides themes maps and system performance reports for
stakeholders and decision makers
 Integrated 2040 MTP
 IntegratedTravel Demand Model
7
KYOVA CMP PERFORMANCE MEASURES
 Intensity
 Volume-to-Capacity Ratio
 Level of Service
 TravelTime Index
 Duration
 Extent
 Number of Vehicle MilesTraveled at LOS E or F
 Total Delay
 Variability
 Crash Rate
 Planning Time Index
 Multimodal
 Fixed-Route Transit Coverage
 Bicycle/Pedestrian Routes/Facilities
 Proportion of CMP Network that Includes Fixed-Route
Transit or Bicycle/Pedestrian Routes/Facilities
8
FOUR MAJOR DIMENSIONS OF CONGESTION
9
• Intensity (How bad?)
• Duration (How long?)
• Extent (How far?)
• Variability (How does it
change?)
TWO TYPES OF CONGESTION
10
 Recurring
 Demand exceeds capacity
 System choke points
 Predictable  Reliability
 Non-recurring
 Incidents
 Work zones
 Weather
 Can be predictable (to an extent)
KYOVA SPATIAL DECISION SUPPORT SYSTEM (SDSS)
MAP FIGURES MAP FIGURES
KYOVA Transportation Management Area Boundary Volumes from Traffic Model Assignments
CMP Network Capacities from Traffic Model Assignments
Major River Crossings V/C Ratios from Traffic Model Assignments
Fixed Route Transit Coverage Levels of Service
Computed Crash Rates Compared to Statewide Average Travel Time Indices
Congested Locations from Stakeholder Workshops Planning Time Indices
Downtown Railroad Underpass/Viaduct Locations
11
KYOVA 2040 MTP PRIORITIZATION CRITERIA
 Efficiency
 Reduction in Delay
 Reduction in Excess Demand
 Support of Freight Priorities
 Support of Transit Service
 Support of Bicycle and Pedestrian Mobility
 Safety
 Growth Management
 Economic Development
 Existing Deficiency
 Cost Effectiveness
 State Priority
12
KYOVA 2016 FREIGHT EXPECTATIONS
 WV Statewide FreightTAC Committee
 Continued coordination
 Freight Summit – February 2016
 Annual or Biennial Summit
 Freight Advisory Committee
 KYOVA Freight Plan
 FY 2018
13
CONTACT INFORMATION
For questions or more information please contact:
Saleem Salameh, Ph.D., P.E.
Technical Study Director/Deputy Executive Director
KYOVA Interstate Planning Commission
ssalameh@kyovaipc.org
14

More Related Content

PPTX
Performance Measures for Highway Capacity Decision Making
PPTX
WV State Freight Plan
PPTX
Congestion management process presentation updated
PPT
2040 Metropolitan Transportation Plan and Downtown Huntington Access Study
PPTX
Oarc slides c02 assessment workshop
PPTX
Bernadette kyova freight summit (fast act and freight)
PPTX
KYTC Freight
PDF
Boosting Active Transportation at the Regional Level: Setting and Meeting Per...
Performance Measures for Highway Capacity Decision Making
WV State Freight Plan
Congestion management process presentation updated
2040 Metropolitan Transportation Plan and Downtown Huntington Access Study
Oarc slides c02 assessment workshop
Bernadette kyova freight summit (fast act and freight)
KYTC Freight
Boosting Active Transportation at the Regional Level: Setting and Meeting Per...

What's hot (20)

PPTX
I-66 Inside the Beltway Framework Document
PPTX
I-395 Express Lanes Extension
PDF
SMCTA 101 Corridor Managed Lanes 092816
PDF
LAAEP CEQA Seminar: SB 743 In Practice
PDF
LAAEP CEQA Seminar: Impact Analysis Under SB 743
PDF
LAAEP CEQA Seminar: Impacts Under SB 743
PPTX
Silver Line Phase 1-Status Report: May 6, 2014
PPTX
Agenda Item 6: Update Intelligent Transportation Systems (ITS) for Fairfax Co...
PPT
Fairfax County Taxicab Regulation: 2015 Certificate Demand Analysis
PPTX
North Kings Highway (VA 241) Intersection Improvement Study
PDF
2015 March 16 ASCE TTG - I-405 Improvement Project
PDF
Countywide Transit Network Study: Introductory Public Meeting
PPTX
Fixing America's Surface Transportation (FAST) Act
DOCX
Relief Line - Draft Evaluation Process and Criteria
PDF
Alaska Transportation Agency Signs Term Contract with Quantm
PDF
Kp rail visionevent_18nov2015
PPTX
Transit Network Plan Update and Financial Strategy
PPTX
Permian Basin I-20 Briefing
PPTX
Pavement Asset Management
PDF
Evaluation process and criteria june 2 2015 final
I-66 Inside the Beltway Framework Document
I-395 Express Lanes Extension
SMCTA 101 Corridor Managed Lanes 092816
LAAEP CEQA Seminar: SB 743 In Practice
LAAEP CEQA Seminar: Impact Analysis Under SB 743
LAAEP CEQA Seminar: Impacts Under SB 743
Silver Line Phase 1-Status Report: May 6, 2014
Agenda Item 6: Update Intelligent Transportation Systems (ITS) for Fairfax Co...
Fairfax County Taxicab Regulation: 2015 Certificate Demand Analysis
North Kings Highway (VA 241) Intersection Improvement Study
2015 March 16 ASCE TTG - I-405 Improvement Project
Countywide Transit Network Study: Introductory Public Meeting
Fixing America's Surface Transportation (FAST) Act
Relief Line - Draft Evaluation Process and Criteria
Alaska Transportation Agency Signs Term Contract with Quantm
Kp rail visionevent_18nov2015
Transit Network Plan Update and Financial Strategy
Permian Basin I-20 Briefing
Pavement Asset Management
Evaluation process and criteria june 2 2015 final
Ad

Similar to KYOVA Freight Presentation (20)

PPTX
Kyova cert review_presentation
PDF
IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...
PDF
Caltrans District 7 Connected Corridors Pilot on I-210
PPTX
myRide: A Real-Time Information System for the Carnegie Mellon University Shu...
PPT
Barbados Road Pp Ps Mauricio Ribeiro Final Version3
PDF
San Francisco Transportation Plan - May 30, 2013 Board Workshop Presentations
PPTX
Johnson gilmer presentation
PPTX
A New Vision for State Rail “Transportation Action Plans”
PPTX
April 7, 2021 CTAC Virtual Workshop
PDF
ENHANCING URBAN ROAD NETWORK EFFICIENCY IN KERALA, INDIA: A COMPREHENSIVE ANA...
PDF
Miami-Dade Accessibility Based Needs Assessment presentation
PPTX
Moving Ahead for Progress in the 21st Century Act and Beyond
PDF
2022-10_advisory-council-program-update.pdf
PDF
Transportation Improvement Program 2014 - 2019
PDF
MTC core capacity transit study
PPTX
Synergy GIZ and Counterparts
PPTX
Partnering for Performance with State DOTs: North Carolina
PDF
Vadakpat-UAV Intelligent Transportation Workshop Slides
PPTX
April 12, 2021 TPC Virtual Workshop
Kyova cert review_presentation
IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...
Caltrans District 7 Connected Corridors Pilot on I-210
myRide: A Real-Time Information System for the Carnegie Mellon University Shu...
Barbados Road Pp Ps Mauricio Ribeiro Final Version3
San Francisco Transportation Plan - May 30, 2013 Board Workshop Presentations
Johnson gilmer presentation
A New Vision for State Rail “Transportation Action Plans”
April 7, 2021 CTAC Virtual Workshop
ENHANCING URBAN ROAD NETWORK EFFICIENCY IN KERALA, INDIA: A COMPREHENSIVE ANA...
Miami-Dade Accessibility Based Needs Assessment presentation
Moving Ahead for Progress in the 21st Century Act and Beyond
2022-10_advisory-council-program-update.pdf
Transportation Improvement Program 2014 - 2019
MTC core capacity transit study
Synergy GIZ and Counterparts
Partnering for Performance with State DOTs: North Carolina
Vadakpat-UAV Intelligent Transportation Workshop Slides
April 12, 2021 TPC Virtual Workshop
Ad

Recently uploaded (20)

PPTX
GROWTH MINDSET AND OVERALL HOLISTIC DEVELOPMENT (1).pptx
PDF
Overview of Fundamentals of Project Management
PDF
Ch-5.pdf important formulas requires for class 12
PPTX
Enterprise Network Design and Implementation Project using Cisco ASA, FortiGa...
PPTX
Ruth Week 2 - Redemption Is Coming 08-31-2025.pptx
PPTX
Where is the Best Place to Invest in Real Estate.pptx
PPTX
The Electronic Technocracy (Electric Paradise) - Built on the Legal Reality o...
PPTX
RP Virtual Session One intro to workplace readiness
PPTX
Basics of Stereotypes and Prejudice(1).pptx
PPTX
2025-08-31 Joseph 05 (shared slides).pptx
PPTX
Ease_of_Paying_Taxes_Act_Presentation.pptx
PPTX
Prevention of sexual harassment at work place
PDF
Echoes of AccountabilityComputational Analysis of Post-Junta Parliamentary Qu...
PDF
_INVITATIONS AND REPLIES.pdffhihgushfuhug
PPTX
08mendelian-genetics-punnett-square.pptx
PPTX
Special Occasion Speech by NBA YoungBoy.pptx
PPTX
ECO VAULT AUTOMATIC DIAPER DISPENSER AND SHREDDER
PPTX
The Power of Communication & Overcoming
PDF
WEEK-2-Models-of-CommunicationCommunication-Ethics.pdf
PPTX
HRPTA PPT 2024-2025 FOR PTA MEETING STUDENTS
GROWTH MINDSET AND OVERALL HOLISTIC DEVELOPMENT (1).pptx
Overview of Fundamentals of Project Management
Ch-5.pdf important formulas requires for class 12
Enterprise Network Design and Implementation Project using Cisco ASA, FortiGa...
Ruth Week 2 - Redemption Is Coming 08-31-2025.pptx
Where is the Best Place to Invest in Real Estate.pptx
The Electronic Technocracy (Electric Paradise) - Built on the Legal Reality o...
RP Virtual Session One intro to workplace readiness
Basics of Stereotypes and Prejudice(1).pptx
2025-08-31 Joseph 05 (shared slides).pptx
Ease_of_Paying_Taxes_Act_Presentation.pptx
Prevention of sexual harassment at work place
Echoes of AccountabilityComputational Analysis of Post-Junta Parliamentary Qu...
_INVITATIONS AND REPLIES.pdffhihgushfuhug
08mendelian-genetics-punnett-square.pptx
Special Occasion Speech by NBA YoungBoy.pptx
ECO VAULT AUTOMATIC DIAPER DISPENSER AND SHREDDER
The Power of Communication & Overcoming
WEEK-2-Models-of-CommunicationCommunication-Ethics.pdf
HRPTA PPT 2024-2025 FOR PTA MEETING STUDENTS

KYOVA Freight Presentation

  • 1. KYOVA FREIGHT PLANNING EFFORTS KYOVA FREIGHT SUMMIT – FEBRUARY 17, 2016 SALEEM A. SALAMEH KYOVA INTERSTATE PLANNING COMMISSION
  • 2. HUNTINGTON,WV-KY-OH URBANIZED AREA TRANSPORTATION MANAGEMENT AREA  TMA designation in July 18, 2012  TMA Population – 202,637 (urbanized)  MSA Population – 365,000  KYOVA Planning Boundary grew  Now includes Boyd and Greenup counties in Kentucky and Putnam County in WestVirginia  RIC, the MPO in Charleston is taking lead in planning responsibilities for Putnam County 2
  • 3. TMA REQUIREMENTS – WHAT’S BEEN DONE  Congestion Management Process  Completed January 2013  Integrated MTP  In progress  Expectations: strong emphasis on Freight Planning  Expected by Spring 2017  Integrated TIP  Completed April 2015  5310/5307/5339/5340 Designated Recipient  Integrated Travel Demand Model  Certification Review – April 19-20, 2016 3
  • 4. FEDERAL NATIONAL GOALS Goal AreaGoal Area National GoalNational Goal Safety Reduce fatalities & serious injuries on all public roads Infrastructure condition Maintain a state of good repair Congestion reduction Significantly reduce congestion on the NHS System reliability Improve the efficiency of the surface system Freight movement & economic vitality Improve the national freight network, access of rural communities to markets, & economic development Environmental sustainability Enhance system performance while protecting and enhancing the environment Reduced project delivery delays Accelerate project completion by eliminating delays in the project delivery process 4
  • 6. PAST FREIGHT PLANNING EFFORTS 6  2040 MTP  Assessed movement of freight and developed recommendations for future growth  Integrated MTP will include Kentucky counties of Boyd and Greenup  Emphasis on ITS strategies and non- recurring congestion mitigation strategies  Huntington IntermodalTransportation Planning Study for Huntington Tri-State Airport  Completed in 2009
  • 7. KYOVA FREIGHT PLANNING AND INTEGRATION  Congestion Management Process (CMP)  SHRP2  Workshop in November 2015  Gathered stakeholders to discuss performance measures  Outcome will be Action Plan to aid in project evaluation  Could incorporate into freight planning process  Should be completed by June 2016  SDSS  Stores transportation system attribute and performance data  Performs technical analyses that identify/quantify congestion and assess the effectiveness of congestion reduction/mitigation strategies  Provides themes maps and system performance reports for stakeholders and decision makers  Integrated 2040 MTP  IntegratedTravel Demand Model 7
  • 8. KYOVA CMP PERFORMANCE MEASURES  Intensity  Volume-to-Capacity Ratio  Level of Service  TravelTime Index  Duration  Extent  Number of Vehicle MilesTraveled at LOS E or F  Total Delay  Variability  Crash Rate  Planning Time Index  Multimodal  Fixed-Route Transit Coverage  Bicycle/Pedestrian Routes/Facilities  Proportion of CMP Network that Includes Fixed-Route Transit or Bicycle/Pedestrian Routes/Facilities 8
  • 9. FOUR MAJOR DIMENSIONS OF CONGESTION 9 • Intensity (How bad?) • Duration (How long?) • Extent (How far?) • Variability (How does it change?)
  • 10. TWO TYPES OF CONGESTION 10  Recurring  Demand exceeds capacity  System choke points  Predictable  Reliability  Non-recurring  Incidents  Work zones  Weather  Can be predictable (to an extent)
  • 11. KYOVA SPATIAL DECISION SUPPORT SYSTEM (SDSS) MAP FIGURES MAP FIGURES KYOVA Transportation Management Area Boundary Volumes from Traffic Model Assignments CMP Network Capacities from Traffic Model Assignments Major River Crossings V/C Ratios from Traffic Model Assignments Fixed Route Transit Coverage Levels of Service Computed Crash Rates Compared to Statewide Average Travel Time Indices Congested Locations from Stakeholder Workshops Planning Time Indices Downtown Railroad Underpass/Viaduct Locations 11
  • 12. KYOVA 2040 MTP PRIORITIZATION CRITERIA  Efficiency  Reduction in Delay  Reduction in Excess Demand  Support of Freight Priorities  Support of Transit Service  Support of Bicycle and Pedestrian Mobility  Safety  Growth Management  Economic Development  Existing Deficiency  Cost Effectiveness  State Priority 12
  • 13. KYOVA 2016 FREIGHT EXPECTATIONS  WV Statewide FreightTAC Committee  Continued coordination  Freight Summit – February 2016  Annual or Biennial Summit  Freight Advisory Committee  KYOVA Freight Plan  FY 2018 13
  • 14. CONTACT INFORMATION For questions or more information please contact: Saleem Salameh, Ph.D., P.E. Technical Study Director/Deputy Executive Director KYOVA Interstate Planning Commission [email protected] 14

Editor's Notes

  • #5: Heavy Freight component in FAST Act