By: Shaikh Saif
NECESSITY OF COAL HANDLING SYSTEM
 A 600MW Power Plant handles about 7200 tons of coals per
day.
 Coal handlings are to be flexible, reliable & capable of
handling large quantities in less time than even before.
 Coal plays a vital role in electricity generation worldwide.
Coal-fired power plants currently fuel 41% of global
electricity.
Shaikh Saif
REQUIREMENT OF GOOD COAL HANDLING
PLANT
 It should have minimum maintenance
 It should be simple.
 It should be reliable
Shaikh Saif
COAL HANDLING SYSTEM
Coal Delivery
Unloading
Transfer
Outdoor Storage
Covered Storage
Inplant Handling
Weighing
Furnace Firing
Preparation / Weighing
Shaikh Saif
OUT-PLANT HANDLING.(COAL DELIVERY)
 Out plant handling means transfer of Coal from mine or
port to storage of coal at plant site.
1. Transportation by Rail: 4000 to 13000 tons/trip.
2. Transportation by Ships: 45 million tons/year.
3. Transportation by Roads: Trucks etc.
4. Transportation by belt & conveyors.
5. Transportation of Coal by Pipe line.
Shaikh Saif
FACTS
 Daqin Railway coal trains—20,000 t, 3.2 km, 210
wagons(China).
 The longest train there was recorded in 1986, carrying
Kuzbass coal in 439 cars, for the train length of 6500
meters and total weight of 43,500 tonnes (Russia).
 one litre of fuel moves 24 ton/km on road, 85 ton/km on
rail and 105 ton/km on water.
Shaikh Saif
UNLOAD OF COAL AT SITE
 Unload from Rail cars
 Unloading from Ships
1. Unloading equipment.
2. Self unloading ship.
o Unloading from trucks (lifting trucks)
Shaikh Saif
RAIL CAR UNLOADING
 Rail car unloading featuring
bottom dump by unloading
bridge.
 Rail car unloading
by means of Rotary
Drum
Shaikh Saif
SHIP UNLOADING SYSTEM
 Self Unloading Ships
 Unloading Equipment's.
Shaikh Saif
TRANSPORTATION BY PIPELINE
Shaikh Saif
Ultra-high-molecular-weight polyethylene
TRANSPORTATION THROUGH ROPE & BELT
CONVEYORS
 Transfer of coal by rope, belt & conveyor is also used if
the distance between the mines & power station is less
than 10 km
 Conveying capacity was 600 tonnes per hour. The line
was 270 meters long, with a vertical rise of 23 meters. It
eliminated 115,000 truck journeys.
Shaikh Saif
COAL WEIGHING
 All of our train weighing systems involves "Load Cell"
technology which is the only genuinely recognized
method of long term accurate & reliable train weighing &
uses the exact principal as weighbridges, truck scales &
every other general scale is based upon.(onboard coal
weighing)
Shaikh Saif
COAL STORAGE
 Storage of coal is undesirable because it costs more as
there is,
 Risk of spontaneous combustion.
 Weathering.
 Possibility of loss deterioration during storage.
 Interest on capital cost of coal lying dormant.
 Cost of protecting the stored coal from deteriorating & so
on.
Shaikh Saif
PURPOSE OF STORAGE OF COAL
 To store the coal for a period of 30 – 80 days so that
plant is never required to be shut-down.
 Storage of coal allows the purchaser to take the
advantage of seasonal market fluctuation in prices of
coal.
Shaikh Saif
OUTDOOR STORAGE (DEAD STORAGE)
 The coal is usually kept on ground in the form of pile
exposed to outside weather.
 The coal is required to be protected from deterioration &
weathering
 This is a long term storage i.e. 10% of annual
consumption.
Shaikh Saif
CLOSED OR LIVE STORAGE
 In the closed or live storage the coal is stored for one or
two days requirement of the power plant.
 This storage is used for the purpose of supplying the coal
to the combustion equipment with negligible handling
 The coal is usually stored in the vertical cylinder bunkers
or coal bins.
Shaikh Saif
INPLANT COAL HANDLING
 The In-Plant coal handling
system deals with feeding of
coal from live storage to the
furnace.
 It includes various equipment's
for transfer of coal like belt
conveyor, screw conveyor etc.
& the equipment needed to
weigh the quantity of coal for
feed.
 In case of pulverized coal firing
system, it requires large no. of
equipment’s like chutes,
pulverized mills, feeders,
weighing machine, hoppers &
automatic scales.
Shaikh Saif
POINTS TO REMEMBER.
 Simple & sound, requiring minimum operations &
transportation.
 No double handling of coal in plant.
 Handling unit should be centralized to facilitate inspection
& maintenance.
 Electric motors can be used as driver of mechanism.
 Working parts should be enclosed to avoid abrasion &
corrosion.
 System should be able to supply required quantity of coal
as per demand.
Shaikh Saif
COAL PREPARATION
Shaikh Saif
CRUSHING OF COAL
 Crushers are used to reduce the coal to optimum size.
 It is crushed into pieces of 25-30mm for stoker firing and
10-20mm for pulverized coal firing.
Shaikh Saif
VIBRATING SEPARATOR
 Size of vibrating separator is fitted after crusher to
screen the coal crushed below set size.
 Oversized coal is returned to crusher for further proper
crushing.
Shaikh Saif
TRANSFER OF COAL.
Different equipment’s of coal transfer.
1. Belt conveyors.
2. Screw conveyors.
3. Bucket elevators.
4. Grab bucket elevators.
5. Flight conveyors or scrapers.
6. Skip hoist.
Shaikh Saif
BELT CONVEYORS
 It consist of endless belt of suitable material running over
pair of end drums supported at regular interval by series
of rollers(idler).
 Max Inclination: 20degree.
 Running Speed: 400-500 RPM.
 Transport Capacity: 50-100ton/hour over long distance
Shaikh Saif
BELT CONVEYORS (CONT.)
Advantages
1. Low cost & power consumption.
2. Smooth & clean operation.
3. Cheap maintenance.
4. Controlled rate of coal transfer.
Shaikh Saif
SCREW CONVEYORS
 It is used for shorter distance(30m).
 Totally enclosed from atmosphere.
 Coal dust can also be transferred easily.
 Diameter: 15-50cm.
 Speed: 70-120 rpm.
 Transfer Capacity: 100tons/hour.
Shaikh Saif
SCREW CONVEYORS
Shaikh Saif
 Advantages
1. Cheap
2. Requires small space, simple & tight.
3. Dust tight.
 Disadvantages
1. High power consumption per ton of coal transfer
2. Wear and tear of screw is high. Shorter life
BUCKET ELEVATOR
 Coal is lifted vertical or
near vertical direction.
 It carries the buckets
fixed to a chain.
 Buckets are loaded
with coal at bottom &
discharges at the top.
Shaikh Saif
Limitation:
 The lift of coal is limited to about 30m.
 Inclination is limited to 60 degree with horizontal
 Transfer Capacity: 60 tons/hour.
GRAB BUCKET ELEVATOR
 It lifts & transfer coal on a single rail or track from
one point to the other.
 It can be used with crane or tower.
 Transfer Capacity: 50 tons/hour
Advantages:
1. Requires less power for operation and minimum
maintenance.
2. Used when other arrangements are not possible.
3. Lesser operating cost.
Disadvantages:
1. Initial cost is high.
Shaikh Saif
FLIGHT CONVEYOR OR SCRAPERS
 It is generally used for transfer of coal when filling of no.
of storage bin under the conveyor is required.
 The coal is discharged in the bottom of trough.
 Transfer Capacity: 10-100 tons/hour.
 Advantage:
1. Low capital cost.
2. It can transfer both coal & ash.
3. It can vary easily the rate of coal discharge.
o Disadvantages:
1. High energy consumption & maintenance cost.
2. High wear and tear due to dragging action.
Shaikh Saif
Shaikh Saif

More Related Content

PPTX
COAL HANDLING PLANT
Bibhudatta Biswal
 
PPTX
Best ppt on Presentation on Coal handling plant
Ronak Thakare
 
PDF
Coal handling plant
Manohar Tatwawadi
 
PPT
Coal Handling Plant
VIVEK TOMAR
 
PDF
Coal and Ash Handling
Vanita Thakkar
 
PPTX
Presentation on coal handling systems
Arnab Chakraborty
 
PPT
Coal Handling Plant
Ashrant Dass
 
PDF
Planning a coal handling plant
PRABIR DATTA
 
COAL HANDLING PLANT
Bibhudatta Biswal
 
Best ppt on Presentation on Coal handling plant
Ronak Thakare
 
Coal handling plant
Manohar Tatwawadi
 
Coal Handling Plant
VIVEK TOMAR
 
Coal and Ash Handling
Vanita Thakkar
 
Presentation on coal handling systems
Arnab Chakraborty
 
Coal Handling Plant
Ashrant Dass
 
Planning a coal handling plant
PRABIR DATTA
 

What's hot (20)

PPTX
ASH HANDLING PLANT
Aditya Anand
 
PDF
Turbine Governing System
Salil Vaidya
 
PPTX
Coal Handling Plant ( CHP )
SHRIKANT KHATING
 
PPT
Coal mill pulverizer in thermal power plants
SHIVAJI CHOUDHURY
 
PPT
Types of turbine
Akshay Jadhav
 
PPTX
Handling of coal in thermal power plant
Dhruv Amin
 
PPTX
Boiler circulation theory
NaumanKalshekar
 
PPTX
Gas turbine power plants
Nishkam Dhiman
 
PPTX
steam turbine govering system
mitravanu mishra
 
PPT
Condenser in thermal power plants
SHIVAJI CHOUDHURY
 
PPT
Super critical boiler
SHIVAJI CHOUDHURY
 
PPTX
Steam turbine
Gaurav Kaushik
 
PPT
Power plant, Power Station and types of power plant
Poornima Group of Institutions, Jaipur
 
PPTX
Gas turbine
naphis ahamad
 
PPTX
Ash handling system
Vvs Pradeep
 
PPTX
Coal and ash handling systems
Ajaykumar Asodariya
 
PPTX
coal pulveriser
Rhitesh Gupta
 
PPTX
Classification of steam Turbine
Showhanur Rahman
 
PDF
COAL BASED POWER PLANT UNIT 1 - POWER PLANT ENGINEERING
Balamurugan Subburaj
 
ASH HANDLING PLANT
Aditya Anand
 
Turbine Governing System
Salil Vaidya
 
Coal Handling Plant ( CHP )
SHRIKANT KHATING
 
Coal mill pulverizer in thermal power plants
SHIVAJI CHOUDHURY
 
Types of turbine
Akshay Jadhav
 
Handling of coal in thermal power plant
Dhruv Amin
 
Boiler circulation theory
NaumanKalshekar
 
Gas turbine power plants
Nishkam Dhiman
 
steam turbine govering system
mitravanu mishra
 
Condenser in thermal power plants
SHIVAJI CHOUDHURY
 
Super critical boiler
SHIVAJI CHOUDHURY
 
Steam turbine
Gaurav Kaushik
 
Power plant, Power Station and types of power plant
Poornima Group of Institutions, Jaipur
 
Gas turbine
naphis ahamad
 
Ash handling system
Vvs Pradeep
 
Coal and ash handling systems
Ajaykumar Asodariya
 
coal pulveriser
Rhitesh Gupta
 
Classification of steam Turbine
Showhanur Rahman
 
COAL BASED POWER PLANT UNIT 1 - POWER PLANT ENGINEERING
Balamurugan Subburaj
 
Ad

Similar to Coal Handling System (20)

PDF
fuel handling equipmentssteampowerplant.pdf
Anonymous5HYsyrddp
 
PPTX
1.Steam Thermal Power Plant and Coal Handling
Nani Thirupathi
 
PPTX
Coal handling stages hiren patel
Hiren Patel
 
PPTX
COAL AND ASH HANDLING this gives knowledge
mohammedasadtanveer
 
PPTX
COAL HANDLING PLANT
pulak126
 
PDF
Lecture 09_PPE_Unit 3: Steam and Gas Power Plants
Rushikesh Sonar
 
PPTX
2_ coal handlng in thermal powerplant.pptx
yagneshJoshi17
 
PPTX
Coal Handling Plants....
Vipul Sinha
 
PPTX
Transportation of coal ppt
Naina Rajput
 
PPTX
Coal Handling process. Brief description about the activities carried out
connelmusau17
 
PDF
Modification of Coal Handling System in Boiler Power Plant
paperpublications3
 
DOCX
Coal handling plant
Rohit Khatri
 
PPTX
STEAM POWER PLANT / THERMAL POWER PLANT
S.Vijaya Bhaskar
 
PPTX
Ppe
Gulam Mustafa
 
PPT
CHP Equipment's & Interlocks Complete PPT
Infopitaara
 
PDF
Unit 4 b nuclear
Anin Vincely
 
PDF
Sourish bhattacharyya
Sourish Bhattacharya
 
PDF
Dankuni Coal Complex
Sourish Bhattacharya
 
PPT
Advanced Automation and Technology in Coal Handling Plants
Infopitaara
 
PPTX
2.Steam Power Plant.pptx Steam power pla
SidDuSai3
 
fuel handling equipmentssteampowerplant.pdf
Anonymous5HYsyrddp
 
1.Steam Thermal Power Plant and Coal Handling
Nani Thirupathi
 
Coal handling stages hiren patel
Hiren Patel
 
COAL AND ASH HANDLING this gives knowledge
mohammedasadtanveer
 
COAL HANDLING PLANT
pulak126
 
Lecture 09_PPE_Unit 3: Steam and Gas Power Plants
Rushikesh Sonar
 
2_ coal handlng in thermal powerplant.pptx
yagneshJoshi17
 
Coal Handling Plants....
Vipul Sinha
 
Transportation of coal ppt
Naina Rajput
 
Coal Handling process. Brief description about the activities carried out
connelmusau17
 
Modification of Coal Handling System in Boiler Power Plant
paperpublications3
 
Coal handling plant
Rohit Khatri
 
STEAM POWER PLANT / THERMAL POWER PLANT
S.Vijaya Bhaskar
 
CHP Equipment's & Interlocks Complete PPT
Infopitaara
 
Unit 4 b nuclear
Anin Vincely
 
Sourish bhattacharyya
Sourish Bhattacharya
 
Dankuni Coal Complex
Sourish Bhattacharya
 
Advanced Automation and Technology in Coal Handling Plants
Infopitaara
 
2.Steam Power Plant.pptx Steam power pla
SidDuSai3
 
Ad

Recently uploaded (20)

PPTX
Inventory management chapter in automation and robotics.
atisht0104
 
PPTX
22PCOAM21 Session 1 Data Management.pptx
Guru Nanak Technical Institutions
 
PDF
Chad Ayach - A Versatile Aerospace Professional
Chad Ayach
 
PDF
settlement FOR FOUNDATION ENGINEERS.pdf
Endalkazene
 
PDF
Activated Carbon for Water and Wastewater Treatment_ Integration of Adsorptio...
EmilianoRodriguezTll
 
PDF
July 2025: Top 10 Read Articles Advanced Information Technology
ijait
 
PPT
Ppt for engineering students application on field effect
lakshmi.ec
 
PPTX
22PCOAM21 Session 2 Understanding Data Source.pptx
Guru Nanak Technical Institutions
 
PPTX
ternal cell structure: leadership, steering
hodeeesite4
 
PDF
dse_final_merit_2025_26 gtgfffffcjjjuuyy
rushabhjain127
 
PDF
LEAP-1B presedntation xxxxxxxxxxxxxxxxxxxxxxxxxxxxx
hatem173148
 
PPT
SCOPE_~1- technology of green house and poyhouse
bala464780
 
PDF
Queuing formulas to evaluate throughputs and servers
gptshubham
 
PPTX
Color Model in Textile ( RGB, CMYK).pptx
auladhossain191
 
PDF
FLEX-LNG-Company-Presentation-Nov-2017.pdf
jbloggzs
 
PPTX
AgentX UiPath Community Webinar series - Delhi
RohitRadhakrishnan8
 
DOCX
SAR - EEEfdfdsdasdsdasdasdasdasdasdasdasda.docx
Kanimozhi676285
 
PDF
The Effect of Artifact Removal from EEG Signals on the Detection of Epileptic...
Partho Prosad
 
PPTX
easa module 3 funtamental electronics.pptx
tryanothert7
 
PPTX
Victory Precisions_Supplier Profile.pptx
victoryprecisions199
 
Inventory management chapter in automation and robotics.
atisht0104
 
22PCOAM21 Session 1 Data Management.pptx
Guru Nanak Technical Institutions
 
Chad Ayach - A Versatile Aerospace Professional
Chad Ayach
 
settlement FOR FOUNDATION ENGINEERS.pdf
Endalkazene
 
Activated Carbon for Water and Wastewater Treatment_ Integration of Adsorptio...
EmilianoRodriguezTll
 
July 2025: Top 10 Read Articles Advanced Information Technology
ijait
 
Ppt for engineering students application on field effect
lakshmi.ec
 
22PCOAM21 Session 2 Understanding Data Source.pptx
Guru Nanak Technical Institutions
 
ternal cell structure: leadership, steering
hodeeesite4
 
dse_final_merit_2025_26 gtgfffffcjjjuuyy
rushabhjain127
 
LEAP-1B presedntation xxxxxxxxxxxxxxxxxxxxxxxxxxxxx
hatem173148
 
SCOPE_~1- technology of green house and poyhouse
bala464780
 
Queuing formulas to evaluate throughputs and servers
gptshubham
 
Color Model in Textile ( RGB, CMYK).pptx
auladhossain191
 
FLEX-LNG-Company-Presentation-Nov-2017.pdf
jbloggzs
 
AgentX UiPath Community Webinar series - Delhi
RohitRadhakrishnan8
 
SAR - EEEfdfdsdasdsdasdasdasdasdasdasdasda.docx
Kanimozhi676285
 
The Effect of Artifact Removal from EEG Signals on the Detection of Epileptic...
Partho Prosad
 
easa module 3 funtamental electronics.pptx
tryanothert7
 
Victory Precisions_Supplier Profile.pptx
victoryprecisions199
 

Coal Handling System

  • 2. NECESSITY OF COAL HANDLING SYSTEM  A 600MW Power Plant handles about 7200 tons of coals per day.  Coal handlings are to be flexible, reliable & capable of handling large quantities in less time than even before.  Coal plays a vital role in electricity generation worldwide. Coal-fired power plants currently fuel 41% of global electricity. Shaikh Saif
  • 3. REQUIREMENT OF GOOD COAL HANDLING PLANT  It should have minimum maintenance  It should be simple.  It should be reliable Shaikh Saif
  • 4. COAL HANDLING SYSTEM Coal Delivery Unloading Transfer Outdoor Storage Covered Storage Inplant Handling Weighing Furnace Firing Preparation / Weighing Shaikh Saif
  • 5. OUT-PLANT HANDLING.(COAL DELIVERY)  Out plant handling means transfer of Coal from mine or port to storage of coal at plant site. 1. Transportation by Rail: 4000 to 13000 tons/trip. 2. Transportation by Ships: 45 million tons/year. 3. Transportation by Roads: Trucks etc. 4. Transportation by belt & conveyors. 5. Transportation of Coal by Pipe line. Shaikh Saif
  • 6. FACTS  Daqin Railway coal trains—20,000 t, 3.2 km, 210 wagons(China).  The longest train there was recorded in 1986, carrying Kuzbass coal in 439 cars, for the train length of 6500 meters and total weight of 43,500 tonnes (Russia).  one litre of fuel moves 24 ton/km on road, 85 ton/km on rail and 105 ton/km on water. Shaikh Saif
  • 7. UNLOAD OF COAL AT SITE  Unload from Rail cars  Unloading from Ships 1. Unloading equipment. 2. Self unloading ship. o Unloading from trucks (lifting trucks) Shaikh Saif
  • 8. RAIL CAR UNLOADING  Rail car unloading featuring bottom dump by unloading bridge.  Rail car unloading by means of Rotary Drum Shaikh Saif
  • 9. SHIP UNLOADING SYSTEM  Self Unloading Ships  Unloading Equipment's. Shaikh Saif
  • 10. TRANSPORTATION BY PIPELINE Shaikh Saif Ultra-high-molecular-weight polyethylene
  • 11. TRANSPORTATION THROUGH ROPE & BELT CONVEYORS  Transfer of coal by rope, belt & conveyor is also used if the distance between the mines & power station is less than 10 km  Conveying capacity was 600 tonnes per hour. The line was 270 meters long, with a vertical rise of 23 meters. It eliminated 115,000 truck journeys. Shaikh Saif
  • 12. COAL WEIGHING  All of our train weighing systems involves "Load Cell" technology which is the only genuinely recognized method of long term accurate & reliable train weighing & uses the exact principal as weighbridges, truck scales & every other general scale is based upon.(onboard coal weighing) Shaikh Saif
  • 13. COAL STORAGE  Storage of coal is undesirable because it costs more as there is,  Risk of spontaneous combustion.  Weathering.  Possibility of loss deterioration during storage.  Interest on capital cost of coal lying dormant.  Cost of protecting the stored coal from deteriorating & so on. Shaikh Saif
  • 14. PURPOSE OF STORAGE OF COAL  To store the coal for a period of 30 – 80 days so that plant is never required to be shut-down.  Storage of coal allows the purchaser to take the advantage of seasonal market fluctuation in prices of coal. Shaikh Saif
  • 15. OUTDOOR STORAGE (DEAD STORAGE)  The coal is usually kept on ground in the form of pile exposed to outside weather.  The coal is required to be protected from deterioration & weathering  This is a long term storage i.e. 10% of annual consumption. Shaikh Saif
  • 16. CLOSED OR LIVE STORAGE  In the closed or live storage the coal is stored for one or two days requirement of the power plant.  This storage is used for the purpose of supplying the coal to the combustion equipment with negligible handling  The coal is usually stored in the vertical cylinder bunkers or coal bins. Shaikh Saif
  • 17. INPLANT COAL HANDLING  The In-Plant coal handling system deals with feeding of coal from live storage to the furnace.  It includes various equipment's for transfer of coal like belt conveyor, screw conveyor etc. & the equipment needed to weigh the quantity of coal for feed.  In case of pulverized coal firing system, it requires large no. of equipment’s like chutes, pulverized mills, feeders, weighing machine, hoppers & automatic scales. Shaikh Saif
  • 18. POINTS TO REMEMBER.  Simple & sound, requiring minimum operations & transportation.  No double handling of coal in plant.  Handling unit should be centralized to facilitate inspection & maintenance.  Electric motors can be used as driver of mechanism.  Working parts should be enclosed to avoid abrasion & corrosion.  System should be able to supply required quantity of coal as per demand. Shaikh Saif
  • 20. CRUSHING OF COAL  Crushers are used to reduce the coal to optimum size.  It is crushed into pieces of 25-30mm for stoker firing and 10-20mm for pulverized coal firing. Shaikh Saif
  • 21. VIBRATING SEPARATOR  Size of vibrating separator is fitted after crusher to screen the coal crushed below set size.  Oversized coal is returned to crusher for further proper crushing. Shaikh Saif
  • 22. TRANSFER OF COAL. Different equipment’s of coal transfer. 1. Belt conveyors. 2. Screw conveyors. 3. Bucket elevators. 4. Grab bucket elevators. 5. Flight conveyors or scrapers. 6. Skip hoist. Shaikh Saif
  • 23. BELT CONVEYORS  It consist of endless belt of suitable material running over pair of end drums supported at regular interval by series of rollers(idler).  Max Inclination: 20degree.  Running Speed: 400-500 RPM.  Transport Capacity: 50-100ton/hour over long distance Shaikh Saif
  • 24. BELT CONVEYORS (CONT.) Advantages 1. Low cost & power consumption. 2. Smooth & clean operation. 3. Cheap maintenance. 4. Controlled rate of coal transfer. Shaikh Saif
  • 25. SCREW CONVEYORS  It is used for shorter distance(30m).  Totally enclosed from atmosphere.  Coal dust can also be transferred easily.  Diameter: 15-50cm.  Speed: 70-120 rpm.  Transfer Capacity: 100tons/hour. Shaikh Saif
  • 26. SCREW CONVEYORS Shaikh Saif  Advantages 1. Cheap 2. Requires small space, simple & tight. 3. Dust tight.  Disadvantages 1. High power consumption per ton of coal transfer 2. Wear and tear of screw is high. Shorter life
  • 27. BUCKET ELEVATOR  Coal is lifted vertical or near vertical direction.  It carries the buckets fixed to a chain.  Buckets are loaded with coal at bottom & discharges at the top. Shaikh Saif Limitation:  The lift of coal is limited to about 30m.  Inclination is limited to 60 degree with horizontal  Transfer Capacity: 60 tons/hour.
  • 28. GRAB BUCKET ELEVATOR  It lifts & transfer coal on a single rail or track from one point to the other.  It can be used with crane or tower.  Transfer Capacity: 50 tons/hour Advantages: 1. Requires less power for operation and minimum maintenance. 2. Used when other arrangements are not possible. 3. Lesser operating cost. Disadvantages: 1. Initial cost is high. Shaikh Saif
  • 29. FLIGHT CONVEYOR OR SCRAPERS  It is generally used for transfer of coal when filling of no. of storage bin under the conveyor is required.  The coal is discharged in the bottom of trough.  Transfer Capacity: 10-100 tons/hour.  Advantage: 1. Low capital cost. 2. It can transfer both coal & ash. 3. It can vary easily the rate of coal discharge. o Disadvantages: 1. High energy consumption & maintenance cost. 2. High wear and tear due to dragging action. Shaikh Saif