SlideShare a Scribd company logo
3G Drive Test
Procedure
Contents
1 Introduction
2 Drive test tools
3 Drive test type
4 Site Verification
5 Rigging Audit
6 Cluster Drive Test Optimization
Introduction:
Objectives:
The purpose of the drive test to perform the RF design verification, identify any
coverage and quality problems to optimise WCDMA network performance.
At this stage, the main focus is on fundamental end-to-end service accessibility
target (e.g. Calls set up and drop rates) and on performance targets such as
coverage related targets (such as CPICH RSCP and CPICH Ec/No), and
HSDPA/HSUPA speed performance.
For this case it was needed each other from drive test data collection and also
Physical site changes like tilting, antenna orientation and antenna height.
RF Solution Department
Drive Test Tools:
Hardware:
• 1x Laptop
• 2x/3x/4x Smart Phones (2G/3G/LTE)
• 1x FDD Data Dongle (should be supporting 3G 42M)
• 1x GPS (G-Star IV)
• 1x Car DC/AC Inverter
• 1x Car.
• 4x SIM Cards (Data & Normal) Software:
• TEMS Investigation 16.1
• Map Tools (Map Info & Google Earth)
• Cell File
• Actix 5.0.1
RF Solution Department
Drive Test Type
Site Verification
Individual cell verification test : To investigate detail of site performance by
checking all single sectors with AMR call and Throughput test. In addition also
required to perform small area dedicated test for Intra/Intercell HO.
Cluster Optimization Normal Drive
To frame the potential area of the new site planned. Also to improve the important
neighboring sites for which the handover to be defined.
Cluster Optimization Dedicated Drive
Performed call to the test number and drive to the potential area given to determine
i) call set up time
ii) call set up success
iii) drop call
iv) SHO
v) HSDPA ( Average & Maximum) Speed
vi) Coverage Status ( Technology)
vii) Pilot polution
RF Solution Department
When the site is completely integrated, Drive tester team will start to perform site
investigation.
The detail sub-activities are outlined below:
1. Rigging Audit
2. Site Verification
3. Site corrective action (cross feeder, inconsistent data, functionality problem, etc.)
4. Acceptance Test
The site has been built and integrated as planned and that the planned coverage has
been achieved
Site Verification:
RF Solution Department
All Tests Clear?
Corrective Actions
No
Yes
New On Air Site Flow
New Site Integration
1. Consistency Check
2. Rigging Audit
3. Site Verification
Site Acceptance
Site Verification:
RF Solution Department
• Voice/vedio calls
• Verify on per cell basis for all
carriers:
• RSCP
• EC/No
• Scrambling Code
• LAC / RAC
• Cell ID
• Etc.
• Frequency
• Data / Throughput test
• HSDPA and HSUPA / Internet
Browsing
• Verify on per cell basis for all
carriers:
• RSCP
• EC/No
• Scrambling Code
• LAC / RAC
• Cell ID
• Max/Ave Speed
• Etc.
Site Verification:
RF Solution Department
Static test (Per Sector / Cell)
At the best radio location required to perform for all carriers
1. Voice call to determine if any call failure or block calls
2. Video call to determine if any call failure or block calls
3. Throughput R99/ HSDPA/HSUPA/Latency test using http / fttp and
speed test.
4. Internet browsing successful
5. SMS
Mobility Test
1. Scanning the CPICH BY 3 MS (Lock by 3 Frequency as F1, F2, F3) & S4
Modem or Data Card DC HSDPA by Downloading High volume of Data
2. Long Call use by 3 MS (Lock by 3 Frequency as F1, F2, F3) MS4 Modem or
Data Card Lock F1, HSDPA by Downloading High volume of Data
3. Idle use by 3 MS (Lock by 3 Frequency as F1, F2, F3) MS4 Modem or Data
Card Lock F2, HSUPA by Downloading High volume of Data.
4. MS1 Lock F1 Short Call & MS2 Modem or Data Card DC HSDPA by
Downloading High volume of Data
5. MS1 Lock F2 Short Call & MS2 Modem or Data Card DC HSUPA by
Downloading High volume of Data
Site Verification:
RF Solution Department
Rigging Audit
Test Items in Rigging Audit:
Antenna Installation Verification
- Azimuth
- Height
- Location
- Cross-feeder/s
Rigging Tools :
- Safety Belt
- Compass
- GPS
- Measurement tape
- Digital Inclinometer
Site Audit required from the Rigger
1. Panoramic photos surrounding sites including antenna sectors/objective area
2. Ensure no blocking sectors from the main beam antenna
3. Antenna mechanical/electrical tilt was in correct value
4. Antenna was in correct orientation for the objective/target area
5. Site Height
6. Site Coordinates
RF Solution Department
• Cluster Definition, Site Information Data and Site Location Map
• With Site/Cell ID, Site name, Primary SC, Neighbor list, RNC ID and
Cluster border highlighted
• Prepare Route Map for Drive Testing
• Perform drive test either Idle mode or Dedicated mode
• Identify Problematic Areas
• The result from the data will showing of Network performance such as
1. Drop call rate
2. Accessibility – mobile originated/terminated call set up success rate
3. Coverage – RSCP and Ec/No
Cluster Drive test Optimization:
RF Solution Department
Cluster Drive test Optimization:
RF Solution Department
• The area which doesn't meet the criteria below is defined as "Problematic Area“
• Coverage Problem Area
• Dominance Problem Area
• Pilot Pollution
Best Server’s CPICH RSCP < - 99 dBm
Best Server’s CPICH Ec/No < -14 dB
4th Best Server’s CPICH RSCP > - 99 dBm
Cluster Drive test Optimisation:
RF Solution Department
Thank You

More Related Content

PPSX
3G Drive test procedure by Md Joynal Abaden@ Myanmar
Md Joynal Abaden
 
PPSX
3G drive test procedure (SSV) by Md Joynal Abaden
Md Joynal Abaden
 
PDF
wcdma-drive-test-analysis-ppt-libre
Narcisse FOIDIENG
 
PPT
Wcdma rno parameters optimization
Akaninyene Uko III
 
PDF
Telecom Project Services - Pre-launch SSD / SSV
Amar Uppalapati
 
PDF
Drive test analysis
ducnm1977
 
PPTX
3 g drive-test
Aniekhan
 
PDF
AZQ Android 2G/3G/4G Test Tool Presentation 2014
Don Plooksawasdi
 
3G Drive test procedure by Md Joynal Abaden@ Myanmar
Md Joynal Abaden
 
3G drive test procedure (SSV) by Md Joynal Abaden
Md Joynal Abaden
 
wcdma-drive-test-analysis-ppt-libre
Narcisse FOIDIENG
 
Wcdma rno parameters optimization
Akaninyene Uko III
 
Telecom Project Services - Pre-launch SSD / SSV
Amar Uppalapati
 
Drive test analysis
ducnm1977
 
3 g drive-test
Aniekhan
 
AZQ Android 2G/3G/4G Test Tool Presentation 2014
Don Plooksawasdi
 

What's hot (19)

PPTX
WCDMA optimization & Drive test analysis
TABREZ KHAN
 
PPSX
3G Drive Test Procedure_ @ MYM
Md Joynal Abaden
 
PPT
TEMS PARAMETERS
Tempus Telcosys
 
PPT
08. DRIVE TEST Analysis
Amit vishwakarma
 
PDF
2 g dt and mapinfo
mohammad ali amini
 
PPTX
Drive test
Md Joynal Abaden
 
PDF
Cluster optimization procedure v1
Terra Sacrifice
 
PPTX
3G Drive Test Procedure_ By Md Joynal Abaden
Md Joynal Abaden
 
PDF
Lte drive test parameter introduction
Ray KHASTUR
 
PPT
How to perform trouble shooting based on counters
Abdul Muin
 
DOC
Drive procedure
anil parmar
 
PPTX
Drive Test
Tempus Telcosys
 
PPTX
RSCP RSSI EC/NO CQI
Faraz Husain
 
PPTX
Drive Test Using Tems Investation 16
Md Joynal Abaden
 
PDF
2 g and 3g kpi improvement by parameter optimization (nsn, ericsson, huawei) ...
Jean de la Sagesse
 
DOC
Lte kp is calculation
Klajdi Husi
 
PPT
W(level3) wcdma rno rf optimization-20041217-a-1[1].0
Malik Md Nurani
 
PPSX
TEMS PARAMETER (3G)
Md Joynal Abaden
 
PPTX
NSN NOKIA 3G KPI for Network planning and optimization
Yogender Singh Rana
 
WCDMA optimization & Drive test analysis
TABREZ KHAN
 
3G Drive Test Procedure_ @ MYM
Md Joynal Abaden
 
TEMS PARAMETERS
Tempus Telcosys
 
08. DRIVE TEST Analysis
Amit vishwakarma
 
2 g dt and mapinfo
mohammad ali amini
 
Drive test
Md Joynal Abaden
 
Cluster optimization procedure v1
Terra Sacrifice
 
3G Drive Test Procedure_ By Md Joynal Abaden
Md Joynal Abaden
 
Lte drive test parameter introduction
Ray KHASTUR
 
How to perform trouble shooting based on counters
Abdul Muin
 
Drive procedure
anil parmar
 
Drive Test
Tempus Telcosys
 
RSCP RSSI EC/NO CQI
Faraz Husain
 
Drive Test Using Tems Investation 16
Md Joynal Abaden
 
2 g and 3g kpi improvement by parameter optimization (nsn, ericsson, huawei) ...
Jean de la Sagesse
 
Lte kp is calculation
Klajdi Husi
 
W(level3) wcdma rno rf optimization-20041217-a-1[1].0
Malik Md Nurani
 
TEMS PARAMETER (3G)
Md Joynal Abaden
 
NSN NOKIA 3G KPI for Network planning and optimization
Yogender Singh Rana
 
Ad

Viewers also liked (20)

PDF
wcdma-drive-test-analysis-ppt-libre-150315071837-conversion-gate01
Dieu Tran Hoang
 
PPTX
BDD to the Bone: Using Behave and Selenium to Test-Drive Web Applications
Patrick Viafore
 
PPTX
46640814 3 g-drive-test
Andri Wahyudi
 
PDF
Ana mind map
Rickterz
 
PPT
Drive test final
Yaser Al-Abdali
 
PPTX
3 g drive test
Faisal Ehsaan
 
DOCX
Peperiksaan pertengahan semester 1 ...
shaf
 
DOCX
PT3 Sains Negeri Kedah 2015
DanielAmani
 
DOC
Cover sains t5 pksr1kertas 2 -2016
adnan mohamad
 
DOC
Soalan trial gabung(1)
khairul nisa
 
DOC
Asessment 1 science form2
Nursabiha Che Mazlan
 
DOCX
Pertengahan sc 1
هاليزه رزالي
 
PDF
Home Tuition Malaysia faydtutor.com PT3 Science 2014
Faydtutor
 
PDF
Pt3 kelantan sains
maz marzuki
 
PDF
Modul sains f1 isma 2016
Roslina Abdul Rashid
 
PDF
Hsp sains tingkatan 2
Nas Lin
 
DOCX
PPT sains ting 2 2015
Cikgu Ummi
 
PDF
MODUL-FORM2-SCIENCE-CHAPTER-2
Mudzaffar Shah
 
DOC
structured-questions-science-form-2
farhalina
 
DOC
Mathematics Mid Year Form 2 Paper 2 2010
sue sha
 
wcdma-drive-test-analysis-ppt-libre-150315071837-conversion-gate01
Dieu Tran Hoang
 
BDD to the Bone: Using Behave and Selenium to Test-Drive Web Applications
Patrick Viafore
 
46640814 3 g-drive-test
Andri Wahyudi
 
Ana mind map
Rickterz
 
Drive test final
Yaser Al-Abdali
 
3 g drive test
Faisal Ehsaan
 
Peperiksaan pertengahan semester 1 ...
shaf
 
PT3 Sains Negeri Kedah 2015
DanielAmani
 
Cover sains t5 pksr1kertas 2 -2016
adnan mohamad
 
Soalan trial gabung(1)
khairul nisa
 
Asessment 1 science form2
Nursabiha Che Mazlan
 
Pertengahan sc 1
هاليزه رزالي
 
Home Tuition Malaysia faydtutor.com PT3 Science 2014
Faydtutor
 
Pt3 kelantan sains
maz marzuki
 
Modul sains f1 isma 2016
Roslina Abdul Rashid
 
Hsp sains tingkatan 2
Nas Lin
 
PPT sains ting 2 2015
Cikgu Ummi
 
MODUL-FORM2-SCIENCE-CHAPTER-2
Mudzaffar Shah
 
structured-questions-science-form-2
farhalina
 
Mathematics Mid Year Form 2 Paper 2 2010
sue sha
 
Ad

Similar to 3G Drive Test Procedure_ By Md Joynal Abaden@ MYM (20)

PPTX
3G Drive test procedure by Md joynal Abaden
Md Joynal Abaden
 
DOC
Curriculam Vitea_Hisham Zahoor
Hisham Zahoor
 
DOC
Resume_MS Nishant J
Nishant Jawale
 
DOC
SKK RESUME (1)
Subodh kant kumar
 
DOC
Naqash
Naqash Khalid
 
PPT
FIELD TESTING of 2G 3G Devices.ppt
patrickwang85
 
DOC
YILMA GIRMA 9-18-2015
Girma Yilma
 
DOCX
Adeel Ahmed- CV
ADEEL AHMED
 
DOCX
Adeel Ahmed- CV
ADEEL AHMED
 
DOCX
Updated
AMIT PRATAP SINGH
 
DOCX
Pankaj Patel Resume
pankaj patel
 
DOCX
Usman Ghani Resume LTE
usman ghani
 
DOC
said bacha cv
NGI.SAID BACHA
 
DOC
Anoop_RF_
Anoop Singh
 
DOC
Resume_Sushil Kumar Kushwaha
sushil kuamr kushwaha
 
DOC
Resume_Ajith
Ajith Shetty
 
PDF
SCFT-Training_v8.2-1
mahesh savita
 
PDF
Drive Test and Optimization Tutorial - I.pdf
hamdi_saif
 
DOC
Sandeep Sharma_CV
sandeep sharma
 
DOC
Brijmani_kumar
Brijmani kumar
 
3G Drive test procedure by Md joynal Abaden
Md Joynal Abaden
 
Curriculam Vitea_Hisham Zahoor
Hisham Zahoor
 
Resume_MS Nishant J
Nishant Jawale
 
SKK RESUME (1)
Subodh kant kumar
 
FIELD TESTING of 2G 3G Devices.ppt
patrickwang85
 
YILMA GIRMA 9-18-2015
Girma Yilma
 
Adeel Ahmed- CV
ADEEL AHMED
 
Adeel Ahmed- CV
ADEEL AHMED
 
Pankaj Patel Resume
pankaj patel
 
Usman Ghani Resume LTE
usman ghani
 
said bacha cv
NGI.SAID BACHA
 
Anoop_RF_
Anoop Singh
 
Resume_Sushil Kumar Kushwaha
sushil kuamr kushwaha
 
Resume_Ajith
Ajith Shetty
 
SCFT-Training_v8.2-1
mahesh savita
 
Drive Test and Optimization Tutorial - I.pdf
hamdi_saif
 
Sandeep Sharma_CV
sandeep sharma
 
Brijmani_kumar
Brijmani kumar
 

More from Md Joynal Abaden (20)

PPSX
Presentation
Md Joynal Abaden
 
PDF
Auspicious_Profile_Teletalk(DT)_technical _Proposal
Md Joynal Abaden
 
PDF
Technical Proposal ( Teletalk)
Md Joynal Abaden
 
PPSX
Handover Overview
Md Joynal Abaden
 
PPSX
New Resource
Md Joynal Abaden
 
PPSX
CW Testing
Md Joynal Abaden
 
PPSX
New Resource
Md Joynal Abaden
 
PPSX
3G Drive Test Procedure_ By Md Joynal Abaden@ MYM
Md Joynal Abaden
 
PPTX
Antenna alignment tool
Md Joynal Abaden
 
PPSX
WCDMA Overall
Md Joynal Abaden
 
PPSX
WCDMA Overall
Md Joynal Abaden
 
PPSX
Handover Overview
Md Joynal Abaden
 
PPSX
CW Testing
Md Joynal Abaden
 
PPSX
Cw testing
Md Joynal Abaden
 
PPTX
Pilot Pollution
Md Joynal Abaden
 
PPTX
PCTEL_ By Md Joynal Abaden
Md Joynal Abaden
 
PPSX
WCDMA OverView
Md Joynal Abaden
 
PPSX
Handover Overview
Md Joynal Abaden
 
PPTX
Pctel by md joynal abaden
Md Joynal Abaden
 
Presentation
Md Joynal Abaden
 
Auspicious_Profile_Teletalk(DT)_technical _Proposal
Md Joynal Abaden
 
Technical Proposal ( Teletalk)
Md Joynal Abaden
 
Handover Overview
Md Joynal Abaden
 
New Resource
Md Joynal Abaden
 
CW Testing
Md Joynal Abaden
 
New Resource
Md Joynal Abaden
 
3G Drive Test Procedure_ By Md Joynal Abaden@ MYM
Md Joynal Abaden
 
Antenna alignment tool
Md Joynal Abaden
 
WCDMA Overall
Md Joynal Abaden
 
WCDMA Overall
Md Joynal Abaden
 
Handover Overview
Md Joynal Abaden
 
CW Testing
Md Joynal Abaden
 
Cw testing
Md Joynal Abaden
 
Pilot Pollution
Md Joynal Abaden
 
PCTEL_ By Md Joynal Abaden
Md Joynal Abaden
 
WCDMA OverView
Md Joynal Abaden
 
Handover Overview
Md Joynal Abaden
 
Pctel by md joynal abaden
Md Joynal Abaden
 

3G Drive Test Procedure_ By Md Joynal Abaden@ MYM

  • 2. Contents 1 Introduction 2 Drive test tools 3 Drive test type 4 Site Verification 5 Rigging Audit 6 Cluster Drive Test Optimization
  • 3. Introduction: Objectives: The purpose of the drive test to perform the RF design verification, identify any coverage and quality problems to optimise WCDMA network performance. At this stage, the main focus is on fundamental end-to-end service accessibility target (e.g. Calls set up and drop rates) and on performance targets such as coverage related targets (such as CPICH RSCP and CPICH Ec/No), and HSDPA/HSUPA speed performance. For this case it was needed each other from drive test data collection and also Physical site changes like tilting, antenna orientation and antenna height. RF Solution Department
  • 4. Drive Test Tools: Hardware: • 1x Laptop • 2x/3x/4x Smart Phones (2G/3G/LTE) • 1x FDD Data Dongle (should be supporting 3G 42M) • 1x GPS (G-Star IV) • 1x Car DC/AC Inverter • 1x Car. • 4x SIM Cards (Data & Normal) Software: • TEMS Investigation 16.1 • Map Tools (Map Info & Google Earth) • Cell File • Actix 5.0.1 RF Solution Department
  • 5. Drive Test Type Site Verification Individual cell verification test : To investigate detail of site performance by checking all single sectors with AMR call and Throughput test. In addition also required to perform small area dedicated test for Intra/Intercell HO. Cluster Optimization Normal Drive To frame the potential area of the new site planned. Also to improve the important neighboring sites for which the handover to be defined. Cluster Optimization Dedicated Drive Performed call to the test number and drive to the potential area given to determine i) call set up time ii) call set up success iii) drop call iv) SHO v) HSDPA ( Average & Maximum) Speed vi) Coverage Status ( Technology) vii) Pilot polution RF Solution Department
  • 6. When the site is completely integrated, Drive tester team will start to perform site investigation. The detail sub-activities are outlined below: 1. Rigging Audit 2. Site Verification 3. Site corrective action (cross feeder, inconsistent data, functionality problem, etc.) 4. Acceptance Test The site has been built and integrated as planned and that the planned coverage has been achieved Site Verification: RF Solution Department
  • 7. All Tests Clear? Corrective Actions No Yes New On Air Site Flow New Site Integration 1. Consistency Check 2. Rigging Audit 3. Site Verification Site Acceptance Site Verification: RF Solution Department
  • 8. • Voice/vedio calls • Verify on per cell basis for all carriers: • RSCP • EC/No • Scrambling Code • LAC / RAC • Cell ID • Etc. • Frequency • Data / Throughput test • HSDPA and HSUPA / Internet Browsing • Verify on per cell basis for all carriers: • RSCP • EC/No • Scrambling Code • LAC / RAC • Cell ID • Max/Ave Speed • Etc. Site Verification: RF Solution Department
  • 9. Static test (Per Sector / Cell) At the best radio location required to perform for all carriers 1. Voice call to determine if any call failure or block calls 2. Video call to determine if any call failure or block calls 3. Throughput R99/ HSDPA/HSUPA/Latency test using http / fttp and speed test. 4. Internet browsing successful 5. SMS Mobility Test 1. Scanning the CPICH BY 3 MS (Lock by 3 Frequency as F1, F2, F3) & S4 Modem or Data Card DC HSDPA by Downloading High volume of Data 2. Long Call use by 3 MS (Lock by 3 Frequency as F1, F2, F3) MS4 Modem or Data Card Lock F1, HSDPA by Downloading High volume of Data 3. Idle use by 3 MS (Lock by 3 Frequency as F1, F2, F3) MS4 Modem or Data Card Lock F2, HSUPA by Downloading High volume of Data. 4. MS1 Lock F1 Short Call & MS2 Modem or Data Card DC HSDPA by Downloading High volume of Data 5. MS1 Lock F2 Short Call & MS2 Modem or Data Card DC HSUPA by Downloading High volume of Data Site Verification: RF Solution Department
  • 10. Rigging Audit Test Items in Rigging Audit: Antenna Installation Verification - Azimuth - Height - Location - Cross-feeder/s Rigging Tools : - Safety Belt - Compass - GPS - Measurement tape - Digital Inclinometer Site Audit required from the Rigger 1. Panoramic photos surrounding sites including antenna sectors/objective area 2. Ensure no blocking sectors from the main beam antenna 3. Antenna mechanical/electrical tilt was in correct value 4. Antenna was in correct orientation for the objective/target area 5. Site Height 6. Site Coordinates RF Solution Department
  • 11. • Cluster Definition, Site Information Data and Site Location Map • With Site/Cell ID, Site name, Primary SC, Neighbor list, RNC ID and Cluster border highlighted • Prepare Route Map for Drive Testing • Perform drive test either Idle mode or Dedicated mode • Identify Problematic Areas • The result from the data will showing of Network performance such as 1. Drop call rate 2. Accessibility – mobile originated/terminated call set up success rate 3. Coverage – RSCP and Ec/No Cluster Drive test Optimization: RF Solution Department
  • 12. Cluster Drive test Optimization: RF Solution Department
  • 13. • The area which doesn't meet the criteria below is defined as "Problematic Area“ • Coverage Problem Area • Dominance Problem Area • Pilot Pollution Best Server’s CPICH RSCP < - 99 dBm Best Server’s CPICH Ec/No < -14 dB 4th Best Server’s CPICH RSCP > - 99 dBm Cluster Drive test Optimisation: RF Solution Department