Contents
03 Location
06 Amenities
10 The building
14 Schedule of areas
15 Accommodation
20 Space planning
26 Specification
28 Access
30 Offer
32 Contact
TECHNICALLY
SUPERIOR
5 Churchill Place is a brand new building totalling
313,600 sq ft. Its eight remaining upper floors
totalling 208,482 sq ft, each provide circa
26,000 sq ft of open office space. The floors
benefit from striking views into the heart of
the district.
The building is specified to an enhanced
Canary Wharf standard with additional
resilience to ensure it exceeds modern
business requirements.
These enhancements include three 2 MVA
standby generators, communication rooms,
kitchenettes and unrivalled cooling capacity.
A distinguished addition
to the Canary Wharf
skyline. It provides a new
perspective.
THE HEART OF
CHURCHILL PLACE
5 Churchill Place is within three minutes
walk of Canada Square, Canary Wharf
Underground station, and the Docklands
Light Railway.
Open squares, promenades, shops,
restaurants and bars are abundant
in a district unrivalled for the mix of
retail and offices, enhanced by the
selection of arts and leisure facilities.
03
A panoramic view of
Canary Wharf from the upper
levels of 5 Churchill Place.
50 BANK
STREET
10 UPPER
BANK STREET
20 CANADA
SQUARE
15 CANADA
SQUARE
8 CANADA
SQUARE
5 CANADA
SQUARE25 NORTH
COLONNADE
West India
Quay
WEST INDIA AVENUE
CABOT
SQUARE
CABOT
PLACE
COLOMBUS
COURTYARD
W
ESTFERRY
ROAD
WESTFERRYROAD
TO THE CITY
Westferry
WESTFERRY
CIRCUS
Canary
Wharf
Jubilee
Line
Isle of Dogs
Jubilee
Line
MONTGOMERY
SQUARE
Heron
Quays
Poplar
5 NORTH
COLONNADE
10 CABOT
SQUARE
ONE CABOT
SQUARE
25 CABOT
SQUARE
20 COLUMBUS
COURTYARD
DOCKLANDS MUSEUM
RESIDENTIAL
RESIDENTIAL
CINEMA
HOTEL
1 WESTFERRY
CIRCUS
RIVER THAMES RIVER THAMES
MIDDLE DOCK
NORTH DOCK
SOUTH DOCK
RESIDENTIAL
RESTAURANTS
HEALTH CLUB/
RESTAURANT
RESIDENTIAL
RESIDENTIAL
FOUR
SEASONS
HOTEL
7 WESTFERRY
CIRCUS
11 WESTFERRY
CIRCUS
15 WESTFERRY
CIRCUS
RIVERSIDE
SOUTH
ONE BANK STREET
25 CHURCHILL
PLACE
ONE CHURCHILL
PLACE
20 CHURCHILL
PLACE
FIVE
CHURCHILL
PLACE
33 CANADA
SQUARE
25 CANADA
SQUARE
30 THE SOUTH
COLONNADE
30 NORTH
COLONNADE
PROPOSED CROSSRAIL STATION
10 THE SOUTH
COLONNADE
20 THE SOUTH
COLONNADE
CANADA SQUARE
JUBILEE PARK
ONE
CANADA
SQUARE
CANADA SQUARE
EAST WINTER
GARDEN
WEST WINTER
GARDEN
40 BANK
STREET
25 BANK
STREET
20 BANK
STREET
17 COLUMBUS
COURTYARD
TRAFALGARWAY
BLACKWALL BASIN
PRESTON’SROAD
WEST INDIA AND MILLWALL DOCKS
WOOD WHARF
SOUTH DOCK
CARTIER
CIRCLE
T
H
R
E
E
M
I N
U
T E
W A L K
ACCESS IN TO CANARY WHARF EXISTING BUILDINGS PLANNED BUILDINGS
50 BANK
STREET
10 UPPER
BANK STREET
20 CANADA
SQUARE
15 CANADA
SQUARE
8 CANADA
SQUARE
5 CANADA
SQUARE25 NORTH
COLONNADE
West India
Quay
WEST INDIA AVENUE
CABOT
SQUARE
CABOT
PLACE
COLOMBUS
COURTYARD
W
ESTFERRY
ROAD
WESTFERRYROAD
TO THE CITY
Westferry
WESTFERRY
CIRCUS
Canary
Wharf
Jubilee
Line
Isle of Dogs
Jubilee
Line
MONTGOMERY
SQUARE
Heron
Quays
Poplar
5 NORTH
COLONNADE
10 CABOT
SQUARE
ONE CABOT
SQUARE
25 CABOT
SQUARE
20 COLUMBUS
COURTYARD
DOCKLANDS MUSEUM
RESIDENTIAL
RESIDENTIAL
CINEMA
HOTEL
1 WESTFERRY
CIRCUS
RIVER THAMES RIVER THAMES
MIDDLE DOCK
NORTH DOCK
SOUTH DOCK
RESIDENTIAL
RESTAURANTS
HEALTH CLUB/
RESTAURANT
RESIDENTIAL
RESIDENTIAL
FOUR
SEASONS
HOTEL
7 WESTFERRY
CIRCUS
11 WESTFERRY
CIRCUS
15 WESTFERRY
CIRCUS
RIVERSIDE
SOUTH
ONE BANK STREET
25 CHURCHILL
PLACE
ONE CHURCHILL
PLACE
20 CHURCHILL
PLACE
FIVE
CHURCHILL
PLACE
33 CANADA
SQUARE
25 CANADA
SQUARE
30 THE SOUTH
COLONNADE
30 NORTH
COLONNADE
PROPOSED CROSSRAIL STATION
10 THE SOUTH
COLONNADE
20 THE SOUTH
COLONNADE
CANADA SQUARE
JUBILEE PARK
ONE
CANADA
SQUARE
CANADA SQUARE
EAST WINTER
GARDEN
WEST WINTER
GARDEN
40 BANK
STREET
25 BANK
STREET
20 BANK
STREET
17 COLUMBUS
COURTYARD
TRAFALGARWAY
BLACKWALL BASIN
PRESTON’SROAD
WEST INDIA AND MILLWALL DOCKS
WOOD WHARF
SOUTH DOCK
CARTIER
CIRCLE
T
H
R
E
E
M
I N
U
T E
W A L K
ACCESS IN TO CANARY WHARF EXISTING BUILDINGS PLANNED BUILDINGS
THE HEART OF CHURCHILL PLACE
06
Canary Wharf gives immediate
access to a wealth of
entertainment and leisure
with over 200 shops, bars
and restaurants.
Churchill Place retail mall is
the location for Jamie's Italian
and Rocket.
Contents
03 Location
06 Amenities
10 The building
14 Schedule of areas
15 Accommodation
20 Space planning
26 Specification
28 Access
30 Offer
32 Contact
09
5 Churchill Place is positioned next
to Cartier Circle and within three
minutes of Canada Square – areas
with an abundance of retail,
restaurants, bars and open spaces.
THE HEART OF CHURCHILL PLACE
The prominent entrance is framed
by stainless steel pillars and a
generous canopy. This is accentuated
by the natural curve of the double
height reception providing a strong
but welcoming entrance.
MAKING AN
ENTRANCE
11
13
The reception has real
presence and provides
a clean open space.
The stone, wood, glass
and marble combine to
create a coordinated
solution.
MAKING AN ENTRANCE
Level
12
11*
10*
09
08
07
06
05
Use
Office
Office
Office
Office
Office
Office
Office
Office
Sq ft
26,059
26,059
26,059
26,058
26,068
26,067
26,055
26,057
208,482
Sq m
2,421.0
2,421.0
2,421.0
2,420.9
2,421.8
2,421.7
2,420.6
2,420.8
19,368.8
CLEANERS
STORAGE
SECURITY
ROOM
SECURITY
ROOM
LIFT LOBBY
LIFT LOBBY
CORRIDOR
WC
CLOAK
ROOM
COURIER
ROOM
CHURCHILL PLACE CAR PARK
5 CHURCHILL PLACE & BARCLAYS’
LOADING BAYS
CHURCHILL PLACE
SHOPPING MALL
DELIVERIES
COURIER
ROOM
LET
SWITCHROOM
FIRE LIFT
LOBBY
STAIRWELL
AWC
RECEPTION
RECEPTIONDESK
ACCESS TO
CAR PARK
DELIVERY BAY
SCHEDULE
OF AREAS (NIA)
		 Ground Reception 5,317 sq ft/494.0 sq m
Not to scale. For identification purposes only
1514
All areas have been independently measured on site by Plowman Craven
*Lease from the building owners
L E T T O M F G L O B A L
L E T T O M F G L O B A L
L E T T O M F G L O B A L
L E T T O M F G L O B A L
L E T T O M F G L O B A L
TOTAL AVAILABLE
MALE WC
FEMALE WC
22 m
23 m
11 m
Typical lower floor (Level 05) 26,057 sq ft/2,420.8 sq m
Not to scale. For identification purposes only
16
LEVEL NINE
AWC
MALE WC
FEMALE WC
Typical upper floor (Level 09) 26,058 sq ft/2,420.9 sq m
17
LEVEL 2
MALE WC
FEMALE WC
MALE WC
FEMALE WC
Net Internal Area	 26,057 sq ft (2,420.8 sq m)
Total Headcount	 348
Meeting Rooms	 5
Offices	 16
Occupancy Ratio	 1:75 sq ft (1:7 sq m)
Level 05 CorporateLevel 05 Financial Net Internal Area	 26,057 sq ft (2,420.8 sq m)
Total Headcount	 203
Meeting Rooms	 5
Offices	 23
Occupancy Ratio	 1:128 sq ft (1:12 sq m)
Not to scale. For identification purposes only
2120
EFFECTIVE AND EFFICIENT
L NINE
MALE WC
AWC
FEMALE WC
Level 09 Cellular Net Internal Area	 26,058 sq ft (2,420.9 sq m)
Total Headcount	 137
Meeting Rooms	 8
Offices	 34
Occupancy Ratio	 1:190 sq ft (1:18 sq m)
Net Internal Area	 26,058 sq ft (2,420.9 sq m)
Total Headcount	 188
Meeting Rooms	 5
Offices	 39
Occupancy Ratio	 1:139 sq ft (1:13 sq m)
Level 09 Corporate
Not to scale. For identification purposes only
2322
LEVEL NINE
MALE WC
AWC
FEMALE WC
EFFECTIVE AND EFFICIENT
View looking west.
1 0 U P P E R B A N K S T R E E T 2 0 C H U R C H I L L P L A C E 5 C H U R C H I L L P L A C E 1 C H U R C H I L L P L A C E
technically
superior
26
Summary
n Substantial enhancements unrivalled in the London market
n Three 2 MVA standby generators with the provision for a fourth set
n Two 1,500 KVA UPS systems including a system providing
1000kVA/800kW @ N+1 redundancy to Floors 5-12
n Enhanced floor to ceiling height and raised floors throughout
n Additional tech rooms and kitchenettes installed as part of base build
1. Structure
Foundations	 Bored piles and cast in-situ reinforced concrete
Substructure	 Steel frame and concrete core supporting metal deck/reinforced 		
	 concrete slab
Slab to slab	 Floors 1–6 4,010mm
	 Floors 7-12 3,860mm
Structural grid	Structural grid varies between 9,000mm and 3,000mm but generally
accommodates 1,500mm
Floor loading	 4.0 kN/sq m + 1.0 kN/sq m partition load
	 Level 6 a total imposed load of 6.0 kN/sq m. Zone approx 3m wide
	 around core that is enhanced to support up to 7.5 kN/sq m.
External cladding
Walls 	 High quality natural stone and/or architectural metal prefabricated
	 cladding system with integrated windows. Windows are double glazed at
	 all office levels and for the lobbies. Window cleaning is undertaken by roof
	 mounted façade access cranes.
	
Dimensions
Floor to ceiling height	 Levels 1 to 6 of 2.9m
	 Levels 7 to 12 of 2.8m
Raised floor void	 Levels 1 to 6 of 250mm (overall)
	 Levels 7 to 12 of 200mm (overall)
Planning grid	 Typically 1.5m
2. Finishes
Entrance hall
Walls	 Polished selected natural stone
Ceilings	 Recessed light fittings set within a ceiling with decorative features
Floors	 Honed selected natural stone sealed to enhance slip resistance
Office areas
Walls	 Typically painted plasterboard on metal stud partitioning
Ceilings	 Suspended 1350 x 450mm metal ceiling tile
Floors	 600 x 600mm medium duty raised floor tiles
Lighting	 Cat A lighting scheme that enables LG7 compliance
Windows	 Roller blinds provided on all elevations
Toilet areas
Ceilings	 Suspended metal tile or drylining with lighting over basins,
	 urinals and lavatories
Floors	 Non slip natural stones
Walls	 Polished natural stone
Cubicles	 Hardwood veneer partitions with high quality wood veneer doors
Lift lobbies
Walls	 Clad plasterboard and painted
Ceilings	 Fibrous plaster with modular access ceiling tiles
Floors	 600 x 600mm medium duty raised floor tiles
Passenger lift cars	 Standard appropriate with a first class office and compatible with
	 entrance lobby finishes
Escape stairs
Walls	 Painted masonry or drylining
Stair	 Painted metal with precast terazzo treads and landings
	 with integral anti-slip strips
Ballustrade/handrail	 Painted tubular steel with welded joints ground smooth
Lighting	 Wall mounted fluorescent fixtures at floor and intermediate landings
3. Mechanical and Electrical services
Air conditioning 	
Offices	 High level four pipe ECDC fan coil unit cooling and heating for
	 6 x 4.5m perimeter zones
	 High level two pipe ECDC fan coil unit cooling for internal spaces
	 at a density of 1/35 sq m on Levels 1 to 6 and 1 per 50 sq m
	 on Levels 7 to 9 and 12
	 2 port valve control on chilled water and LTHW systems
Design parameters	 External conditions		 Winter	 -4ºC
				 Summer	29ºC dry bulb, 21ºC wet bulb
	 Internal conditions		 Winter	 22ºC db ± 1ºC
				 Summer	22ºC db ± 1ºC
Cooling capacity	 Lighting		 12 w/sq m
	 Small power		 32 w/sq m
				 100 w/sq m (trading floor)
Occupancy	 Office floors	 1 person/10 sq m
	 Floors (Levels 5-6)	 1 person/7 sq m
Ventilation rates	 Fresh air quantities of 16 litres/second/person. The supply air to
	 offices and toilets is as required by the defined load densities and
	 building envelope. Exhaust ventilation rate of toilet area 10 air
	 changes per hour.
Acoustics
General office areas	 NR 35 except NR38 within 3m of a plantroom
Electrical
Lighting	 Lighting levels to office areas between 400 to 500 lux in
	 accordance with CIBSE code for interior lighting
Small power	 32 w/sq m (office floors)
Standby power	 In addition to the dual 11kV supplies a tertiary level of redundancy is
	 provided by emergency generators. Three generators, providing
	 2 MVA each, provide back up for all building essential operations.
UPS	 The building is served by two 1,500 kVA UPS systems which are
	 configured as two stand alone systems to provide 1,000 kVA at
	 N+1 resiliency. System 2- Floors 1 to 4 (leased to MFG) and system
	 1 - Floors 5 to 12.
	
Technology rooms	 Two technology rooms per floor complete with two
	 8kw upflow units on an N+1 basis
	 Pre action sprinkler protection on the technology rooms
	 VESDA detection systems at high and low level within the
	 technology rooms
Low level power distribution	 Low level power distribution utilising sub floor busbars on a
	 notional 4.5m grid
Vending areas	 Drainage and cold water provision capped off and ready for
	 use on each floor
Lifts
Passenger lifts	 Eight 1,600 kg (21 person) lifts - travel speeds between
	 2.5m/s and 3.5 m/s
	 Three additional 1,800 kg (24 person) passenger lifts installed		
	 serving Levels 1-4 inclusive (leased to MFG)
Goods lifts	 One 3,000 kg and one 1,800 kg lifts - travel speeds between
	 1.6 m/s and 2.5 m/s
Fireman’s lifts	 Two 630 kg (8 person) lifts - travel speed 1.6 m/s
4. Environmental rating
BREEAM 2006	 The building has achieved a BREEAM rating of 'Excellent'.
Tower Hill
Liverpool Street
Monument
Tower Gateway
Greenwich
North Kent
Shenfield
Canary
Wharf
Canada Water
London Bridge
Thameslink
R I V E R T H A M E S
Bank
Stratford
Olympics 2012
Waterloo
Embankment
Westminster
Bond Street
Green Park
Cannon Street
New Cross
Canning TownCharing
Cross Shadwell
Whitechapel
Heathrow Airport
Gatwick Airport
London City Airport
Luton Airport
Poplar
CENTRAL LINE
NORTHERN LINE
EAST LONDON LINE
DISTRICT LINE
CIRCLE LINE
DLR
BAKERLOO LINE
PICCADILLY LINE
JUBILEE LINE
WATERLOO  CITY
THAMESLINK
CROSSRAIL (PROPOSED)
Heathrow Airport
Euston King’s Cross St Pancras
Bermondsey
Stansted Airport
New Cross
Gate
Shoreditch High Street
London Bridge	 7 minutes/3 stops
Waterloo	 11 minutes/5 stops
Westminster	 11 minutes/6 stops
Bank	 11 minutes/4 stops
Bond Street	 17 minutes/8 stops
Stratford	 16 minutes/4 stops
King’s Cross	 24 minutes/8 stops
City Airport	 15 minutes
Gatwick	 47 minutes
Heathrow	 50 minutes
Luton	 58 minutes
*(Travel times are approximate only and are according to TFL 2005)
29
Left:
Proposed Isle of Dogs
Crossrail station
Right:
London City Airport
WELL
CONNECTED
Getting to and from Canary Wharf could
not be easier - international connections
from City Airport in 14 minutes, access
to the City in 11 minutes and the
West End in 15 minutes. The Jubilee Line
has the capacity to increase passenger
volumes in the future.
THE OFFER
Offices from approximately 26,000 sq ft are
available which are held for a term until August
2029 on levels 5-9 and level 12.
30
Views towards
The O2 Arena on the
Greenwich Peninsula
For further information contact
Chris Vydra
020 7861 1324
chris.vydra@knightfrank.com
Dan Gaunt
020 7861 1314
dan.gaunt@knightfrank.com
For further information contact
Steve Johns
020 7152 5123
steve.johns@eur.cushwake.com
Bill Peach
020 7152 5373
bill.peach@eur.cushwake.com
MISREPRESENTATION ACT 1967  DECLARATION Knight Frank and Cushman  Wakefield where applicable for themselves and for the vendors or lessor of this property for whom they act, give notice that: i) these particulars are a general outline
only, for the guidance of prospective purchasers or tenants, and do not constitute the whole or any part of an offer or contract; ii) Knight Frank and Cushman  Wakefield cannot guarantee the accuracy of any description, dimensions, references
to condition, necessary permissions for use and occupation and other details contained herein and prospective purchasers or tenants must not rely on them as statements of fact or representations and must satisfy themselves as to their accu-
racy; iii) rents quoted in these particulars maybe subject to VAT in addition; (iv) Knight Frank and Cushman  Wakefield will not be liable, in negligence or otherwise, for any loss arising from the use of these particulars; and v) the reference to any
plant, machinery, equipment, services, fixtures or fittings at the property shall not constitute a representation (unless otherwise stated) as to its state or condition or that it is capable of fulfilling its intended function. Prospective purchasers/
tenants should satisfy themselves as to the fitness of such items for their requirements. vi) no employee of Knight Frank and Cushman  Wakefield (and its subsidiaries and their Joint Agents where applicable) has any authority to make or give
any representation or warranty or enter into any contract whatever in relation to the property;
October 2010 Subject to Contract. Designed and produced by Sutton Young (SYO20748)
Developer
Canary Wharf Group
Architects
HOK
Engineers
Roger Preston  Partners
 
Interior Architects
Swanke Hayden Connell Architects
 
Contractor
Canary Wharf Contractors
32
View from
5 Churchill Place
WWW.5CHURCHILLPLACE.COM

5 Churchill Place

  • 2.
    Contents 03 Location 06 Amenities 10The building 14 Schedule of areas 15 Accommodation 20 Space planning 26 Specification 28 Access 30 Offer 32 Contact TECHNICALLY SUPERIOR 5 Churchill Place is a brand new building totalling 313,600 sq ft. Its eight remaining upper floors totalling 208,482 sq ft, each provide circa 26,000 sq ft of open office space. The floors benefit from striking views into the heart of the district. The building is specified to an enhanced Canary Wharf standard with additional resilience to ensure it exceeds modern business requirements. These enhancements include three 2 MVA standby generators, communication rooms, kitchenettes and unrivalled cooling capacity. A distinguished addition to the Canary Wharf skyline. It provides a new perspective.
  • 3.
    THE HEART OF CHURCHILLPLACE 5 Churchill Place is within three minutes walk of Canada Square, Canary Wharf Underground station, and the Docklands Light Railway. Open squares, promenades, shops, restaurants and bars are abundant in a district unrivalled for the mix of retail and offices, enhanced by the selection of arts and leisure facilities. 03 A panoramic view of Canary Wharf from the upper levels of 5 Churchill Place.
  • 4.
    50 BANK STREET 10 UPPER BANKSTREET 20 CANADA SQUARE 15 CANADA SQUARE 8 CANADA SQUARE 5 CANADA SQUARE25 NORTH COLONNADE West India Quay WEST INDIA AVENUE CABOT SQUARE CABOT PLACE COLOMBUS COURTYARD W ESTFERRY ROAD WESTFERRYROAD TO THE CITY Westferry WESTFERRY CIRCUS Canary Wharf Jubilee Line Isle of Dogs Jubilee Line MONTGOMERY SQUARE Heron Quays Poplar 5 NORTH COLONNADE 10 CABOT SQUARE ONE CABOT SQUARE 25 CABOT SQUARE 20 COLUMBUS COURTYARD DOCKLANDS MUSEUM RESIDENTIAL RESIDENTIAL CINEMA HOTEL 1 WESTFERRY CIRCUS RIVER THAMES RIVER THAMES MIDDLE DOCK NORTH DOCK SOUTH DOCK RESIDENTIAL RESTAURANTS HEALTH CLUB/ RESTAURANT RESIDENTIAL RESIDENTIAL FOUR SEASONS HOTEL 7 WESTFERRY CIRCUS 11 WESTFERRY CIRCUS 15 WESTFERRY CIRCUS RIVERSIDE SOUTH ONE BANK STREET 25 CHURCHILL PLACE ONE CHURCHILL PLACE 20 CHURCHILL PLACE FIVE CHURCHILL PLACE 33 CANADA SQUARE 25 CANADA SQUARE 30 THE SOUTH COLONNADE 30 NORTH COLONNADE PROPOSED CROSSRAIL STATION 10 THE SOUTH COLONNADE 20 THE SOUTH COLONNADE CANADA SQUARE JUBILEE PARK ONE CANADA SQUARE CANADA SQUARE EAST WINTER GARDEN WEST WINTER GARDEN 40 BANK STREET 25 BANK STREET 20 BANK STREET 17 COLUMBUS COURTYARD TRAFALGARWAY BLACKWALL BASIN PRESTON’SROAD WEST INDIA AND MILLWALL DOCKS WOOD WHARF SOUTH DOCK CARTIER CIRCLE T H R E E M I N U T E W A L K ACCESS IN TO CANARY WHARF EXISTING BUILDINGS PLANNED BUILDINGS 50 BANK STREET 10 UPPER BANK STREET 20 CANADA SQUARE 15 CANADA SQUARE 8 CANADA SQUARE 5 CANADA SQUARE25 NORTH COLONNADE West India Quay WEST INDIA AVENUE CABOT SQUARE CABOT PLACE COLOMBUS COURTYARD W ESTFERRY ROAD WESTFERRYROAD TO THE CITY Westferry WESTFERRY CIRCUS Canary Wharf Jubilee Line Isle of Dogs Jubilee Line MONTGOMERY SQUARE Heron Quays Poplar 5 NORTH COLONNADE 10 CABOT SQUARE ONE CABOT SQUARE 25 CABOT SQUARE 20 COLUMBUS COURTYARD DOCKLANDS MUSEUM RESIDENTIAL RESIDENTIAL CINEMA HOTEL 1 WESTFERRY CIRCUS RIVER THAMES RIVER THAMES MIDDLE DOCK NORTH DOCK SOUTH DOCK RESIDENTIAL RESTAURANTS HEALTH CLUB/ RESTAURANT RESIDENTIAL RESIDENTIAL FOUR SEASONS HOTEL 7 WESTFERRY CIRCUS 11 WESTFERRY CIRCUS 15 WESTFERRY CIRCUS RIVERSIDE SOUTH ONE BANK STREET 25 CHURCHILL PLACE ONE CHURCHILL PLACE 20 CHURCHILL PLACE FIVE CHURCHILL PLACE 33 CANADA SQUARE 25 CANADA SQUARE 30 THE SOUTH COLONNADE 30 NORTH COLONNADE PROPOSED CROSSRAIL STATION 10 THE SOUTH COLONNADE 20 THE SOUTH COLONNADE CANADA SQUARE JUBILEE PARK ONE CANADA SQUARE CANADA SQUARE EAST WINTER GARDEN WEST WINTER GARDEN 40 BANK STREET 25 BANK STREET 20 BANK STREET 17 COLUMBUS COURTYARD TRAFALGARWAY BLACKWALL BASIN PRESTON’SROAD WEST INDIA AND MILLWALL DOCKS WOOD WHARF SOUTH DOCK CARTIER CIRCLE T H R E E M I N U T E W A L K ACCESS IN TO CANARY WHARF EXISTING BUILDINGS PLANNED BUILDINGS THE HEART OF CHURCHILL PLACE
  • 5.
    06 Canary Wharf givesimmediate access to a wealth of entertainment and leisure with over 200 shops, bars and restaurants. Churchill Place retail mall is the location for Jamie's Italian and Rocket. Contents 03 Location 06 Amenities 10 The building 14 Schedule of areas 15 Accommodation 20 Space planning 26 Specification 28 Access 30 Offer 32 Contact
  • 6.
    09 5 Churchill Placeis positioned next to Cartier Circle and within three minutes of Canada Square – areas with an abundance of retail, restaurants, bars and open spaces. THE HEART OF CHURCHILL PLACE
  • 7.
    The prominent entranceis framed by stainless steel pillars and a generous canopy. This is accentuated by the natural curve of the double height reception providing a strong but welcoming entrance. MAKING AN ENTRANCE 11
  • 8.
    13 The reception hasreal presence and provides a clean open space. The stone, wood, glass and marble combine to create a coordinated solution. MAKING AN ENTRANCE
  • 9.
    Level 12 11* 10* 09 08 07 06 05 Use Office Office Office Office Office Office Office Office Sq ft 26,059 26,059 26,059 26,058 26,068 26,067 26,055 26,057 208,482 Sq m 2,421.0 2,421.0 2,421.0 2,420.9 2,421.8 2,421.7 2,420.6 2,420.8 19,368.8 CLEANERS STORAGE SECURITY ROOM SECURITY ROOM LIFTLOBBY LIFT LOBBY CORRIDOR WC CLOAK ROOM COURIER ROOM CHURCHILL PLACE CAR PARK 5 CHURCHILL PLACE & BARCLAYS’ LOADING BAYS CHURCHILL PLACE SHOPPING MALL DELIVERIES COURIER ROOM LET SWITCHROOM FIRE LIFT LOBBY STAIRWELL AWC RECEPTION RECEPTIONDESK ACCESS TO CAR PARK DELIVERY BAY SCHEDULE OF AREAS (NIA) Ground Reception 5,317 sq ft/494.0 sq m Not to scale. For identification purposes only 1514 All areas have been independently measured on site by Plowman Craven *Lease from the building owners L E T T O M F G L O B A L L E T T O M F G L O B A L L E T T O M F G L O B A L L E T T O M F G L O B A L L E T T O M F G L O B A L TOTAL AVAILABLE
  • 10.
    MALE WC FEMALE WC 22m 23 m 11 m Typical lower floor (Level 05) 26,057 sq ft/2,420.8 sq m Not to scale. For identification purposes only 16 LEVEL NINE AWC MALE WC FEMALE WC Typical upper floor (Level 09) 26,058 sq ft/2,420.9 sq m 17
  • 12.
    LEVEL 2 MALE WC FEMALEWC MALE WC FEMALE WC Net Internal Area 26,057 sq ft (2,420.8 sq m) Total Headcount 348 Meeting Rooms 5 Offices 16 Occupancy Ratio 1:75 sq ft (1:7 sq m) Level 05 CorporateLevel 05 Financial Net Internal Area 26,057 sq ft (2,420.8 sq m) Total Headcount 203 Meeting Rooms 5 Offices 23 Occupancy Ratio 1:128 sq ft (1:12 sq m) Not to scale. For identification purposes only 2120 EFFECTIVE AND EFFICIENT
  • 13.
    L NINE MALE WC AWC FEMALEWC Level 09 Cellular Net Internal Area 26,058 sq ft (2,420.9 sq m) Total Headcount 137 Meeting Rooms 8 Offices 34 Occupancy Ratio 1:190 sq ft (1:18 sq m) Net Internal Area 26,058 sq ft (2,420.9 sq m) Total Headcount 188 Meeting Rooms 5 Offices 39 Occupancy Ratio 1:139 sq ft (1:13 sq m) Level 09 Corporate Not to scale. For identification purposes only 2322 LEVEL NINE MALE WC AWC FEMALE WC EFFECTIVE AND EFFICIENT
  • 14.
    View looking west. 10 U P P E R B A N K S T R E E T 2 0 C H U R C H I L L P L A C E 5 C H U R C H I L L P L A C E 1 C H U R C H I L L P L A C E
  • 15.
    technically superior 26 Summary n Substantial enhancementsunrivalled in the London market n Three 2 MVA standby generators with the provision for a fourth set n Two 1,500 KVA UPS systems including a system providing 1000kVA/800kW @ N+1 redundancy to Floors 5-12 n Enhanced floor to ceiling height and raised floors throughout n Additional tech rooms and kitchenettes installed as part of base build 1. Structure Foundations Bored piles and cast in-situ reinforced concrete Substructure Steel frame and concrete core supporting metal deck/reinforced concrete slab Slab to slab Floors 1–6 4,010mm Floors 7-12 3,860mm Structural grid Structural grid varies between 9,000mm and 3,000mm but generally accommodates 1,500mm Floor loading 4.0 kN/sq m + 1.0 kN/sq m partition load Level 6 a total imposed load of 6.0 kN/sq m. Zone approx 3m wide around core that is enhanced to support up to 7.5 kN/sq m. External cladding Walls High quality natural stone and/or architectural metal prefabricated cladding system with integrated windows. Windows are double glazed at all office levels and for the lobbies. Window cleaning is undertaken by roof mounted façade access cranes. Dimensions Floor to ceiling height Levels 1 to 6 of 2.9m Levels 7 to 12 of 2.8m Raised floor void Levels 1 to 6 of 250mm (overall) Levels 7 to 12 of 200mm (overall) Planning grid Typically 1.5m 2. Finishes Entrance hall Walls Polished selected natural stone Ceilings Recessed light fittings set within a ceiling with decorative features Floors Honed selected natural stone sealed to enhance slip resistance Office areas Walls Typically painted plasterboard on metal stud partitioning Ceilings Suspended 1350 x 450mm metal ceiling tile Floors 600 x 600mm medium duty raised floor tiles Lighting Cat A lighting scheme that enables LG7 compliance Windows Roller blinds provided on all elevations Toilet areas Ceilings Suspended metal tile or drylining with lighting over basins, urinals and lavatories Floors Non slip natural stones Walls Polished natural stone Cubicles Hardwood veneer partitions with high quality wood veneer doors Lift lobbies Walls Clad plasterboard and painted Ceilings Fibrous plaster with modular access ceiling tiles Floors 600 x 600mm medium duty raised floor tiles Passenger lift cars Standard appropriate with a first class office and compatible with entrance lobby finishes Escape stairs Walls Painted masonry or drylining Stair Painted metal with precast terazzo treads and landings with integral anti-slip strips Ballustrade/handrail Painted tubular steel with welded joints ground smooth Lighting Wall mounted fluorescent fixtures at floor and intermediate landings 3. Mechanical and Electrical services Air conditioning Offices High level four pipe ECDC fan coil unit cooling and heating for 6 x 4.5m perimeter zones High level two pipe ECDC fan coil unit cooling for internal spaces at a density of 1/35 sq m on Levels 1 to 6 and 1 per 50 sq m on Levels 7 to 9 and 12 2 port valve control on chilled water and LTHW systems Design parameters External conditions Winter -4ºC Summer 29ºC dry bulb, 21ºC wet bulb Internal conditions Winter 22ºC db ± 1ºC Summer 22ºC db ± 1ºC Cooling capacity Lighting 12 w/sq m Small power 32 w/sq m 100 w/sq m (trading floor) Occupancy Office floors 1 person/10 sq m Floors (Levels 5-6) 1 person/7 sq m Ventilation rates Fresh air quantities of 16 litres/second/person. The supply air to offices and toilets is as required by the defined load densities and building envelope. Exhaust ventilation rate of toilet area 10 air changes per hour. Acoustics General office areas NR 35 except NR38 within 3m of a plantroom Electrical Lighting Lighting levels to office areas between 400 to 500 lux in accordance with CIBSE code for interior lighting Small power 32 w/sq m (office floors) Standby power In addition to the dual 11kV supplies a tertiary level of redundancy is provided by emergency generators. Three generators, providing 2 MVA each, provide back up for all building essential operations. UPS The building is served by two 1,500 kVA UPS systems which are configured as two stand alone systems to provide 1,000 kVA at N+1 resiliency. System 2- Floors 1 to 4 (leased to MFG) and system 1 - Floors 5 to 12. Technology rooms Two technology rooms per floor complete with two 8kw upflow units on an N+1 basis Pre action sprinkler protection on the technology rooms VESDA detection systems at high and low level within the technology rooms Low level power distribution Low level power distribution utilising sub floor busbars on a notional 4.5m grid Vending areas Drainage and cold water provision capped off and ready for use on each floor Lifts Passenger lifts Eight 1,600 kg (21 person) lifts - travel speeds between 2.5m/s and 3.5 m/s Three additional 1,800 kg (24 person) passenger lifts installed serving Levels 1-4 inclusive (leased to MFG) Goods lifts One 3,000 kg and one 1,800 kg lifts - travel speeds between 1.6 m/s and 2.5 m/s Fireman’s lifts Two 630 kg (8 person) lifts - travel speed 1.6 m/s 4. Environmental rating BREEAM 2006 The building has achieved a BREEAM rating of 'Excellent'.
  • 16.
    Tower Hill Liverpool Street Monument TowerGateway Greenwich North Kent Shenfield Canary Wharf Canada Water London Bridge Thameslink R I V E R T H A M E S Bank Stratford Olympics 2012 Waterloo Embankment Westminster Bond Street Green Park Cannon Street New Cross Canning TownCharing Cross Shadwell Whitechapel Heathrow Airport Gatwick Airport London City Airport Luton Airport Poplar CENTRAL LINE NORTHERN LINE EAST LONDON LINE DISTRICT LINE CIRCLE LINE DLR BAKERLOO LINE PICCADILLY LINE JUBILEE LINE WATERLOO CITY THAMESLINK CROSSRAIL (PROPOSED) Heathrow Airport Euston King’s Cross St Pancras Bermondsey Stansted Airport New Cross Gate Shoreditch High Street London Bridge 7 minutes/3 stops Waterloo 11 minutes/5 stops Westminster 11 minutes/6 stops Bank 11 minutes/4 stops Bond Street 17 minutes/8 stops Stratford 16 minutes/4 stops King’s Cross 24 minutes/8 stops City Airport 15 minutes Gatwick 47 minutes Heathrow 50 minutes Luton 58 minutes *(Travel times are approximate only and are according to TFL 2005) 29 Left: Proposed Isle of Dogs Crossrail station Right: London City Airport WELL CONNECTED Getting to and from Canary Wharf could not be easier - international connections from City Airport in 14 minutes, access to the City in 11 minutes and the West End in 15 minutes. The Jubilee Line has the capacity to increase passenger volumes in the future.
  • 17.
    THE OFFER Offices fromapproximately 26,000 sq ft are available which are held for a term until August 2029 on levels 5-9 and level 12. 30 Views towards The O2 Arena on the Greenwich Peninsula
  • 18.
    For further informationcontact Chris Vydra 020 7861 1324 [email protected] Dan Gaunt 020 7861 1314 [email protected] For further information contact Steve Johns 020 7152 5123 [email protected] Bill Peach 020 7152 5373 [email protected] MISREPRESENTATION ACT 1967 DECLARATION Knight Frank and Cushman Wakefield where applicable for themselves and for the vendors or lessor of this property for whom they act, give notice that: i) these particulars are a general outline only, for the guidance of prospective purchasers or tenants, and do not constitute the whole or any part of an offer or contract; ii) Knight Frank and Cushman Wakefield cannot guarantee the accuracy of any description, dimensions, references to condition, necessary permissions for use and occupation and other details contained herein and prospective purchasers or tenants must not rely on them as statements of fact or representations and must satisfy themselves as to their accu- racy; iii) rents quoted in these particulars maybe subject to VAT in addition; (iv) Knight Frank and Cushman Wakefield will not be liable, in negligence or otherwise, for any loss arising from the use of these particulars; and v) the reference to any plant, machinery, equipment, services, fixtures or fittings at the property shall not constitute a representation (unless otherwise stated) as to its state or condition or that it is capable of fulfilling its intended function. Prospective purchasers/ tenants should satisfy themselves as to the fitness of such items for their requirements. vi) no employee of Knight Frank and Cushman Wakefield (and its subsidiaries and their Joint Agents where applicable) has any authority to make or give any representation or warranty or enter into any contract whatever in relation to the property; October 2010 Subject to Contract. Designed and produced by Sutton Young (SYO20748) Developer Canary Wharf Group Architects HOK Engineers Roger Preston Partners   Interior Architects Swanke Hayden Connell Architects   Contractor Canary Wharf Contractors 32 View from 5 Churchill Place
  • 19.