The document summarizes a laboratory experiment to determine the tensile strength of cement. Mortar samples were created with a 1:3 mix of cement and sand, and tested after 1 day. The tensile strength was calculated by dividing the failure load by the cross-sectional area. The results were then compared to Iraqi standard specifications to determine if the cement passed requirements for its tensile strength after 1 day.
Related topics: