Aircraft maintenance program
Maintenance Steering Group
Conditioning
Monitoring
• Applies to
items that
have neither
Hard Time
limits nor On
Condition
maintenance
as their
primary
maintenance
policies
On –Condition
• A repetitive
inspections
or tests to
determine the
condition of
units or
systems,
comprising
servicing,
inspecting,
testing,
calibrating
and
replacement.
Hard Time limit
• A maximum
interval for
performing
maintenance
tasks on a
part or unit.
Such intervals
apply to
overhaul, but
also to the
total life of
the part or
unit.
Maintenance Steering Group
MSG 2
•Process
Oriented
MSG 3
•Task
Oriented
MSG 2 Analysis
Task that can be
done
Tasks that have
to be done
Tasks that
should be done
MSG 3
0 Task oriented process, analyses through system failure
from the top down.
0 Results in maintenance tasks that are performed for safety,
operational or economic reasons.
0 It involves preventive maintenance, performed before
failure occurs (and is intended to prevent failure) as well
as failure finding tasks.
RCM
• The Reliability Centered
Maintenance (RCM)
concept refined the logic
process leading to MSG-
3.
MSG 3 Rev 1
• This was a refining of
the original MSG-3 in
order to make it user-
friendlier. It led to the
elimination of the
Operating Crew
Monitoring strategy in
the original MSG-3
MSG 3 Rev 2
• This is a revision of the
MSG-3 policy. It provides
additional clarification
and guidelines on
development of
Corrosion Prevention
Control Programs
(CPCP).
MSG 3 Objective
0 To ensure realization of inherent safety and reliability
levels of the equipment
0 To restore safety and reliability to their inherent levels
when deterioration has occurred
0 To obtain the information necessary for the design
improvement of those items whose inherent reliability
proves inadequate
0 To accomplish these goals at minimum total cost, including
maintenance costs and the cost of residual failure
MSG 3 Divided Into 2 Sub Task
Scheduled Task
• Lubrication/servicing
(LU/SV)
• Operational Visual check
(OP/VC)
• Inspection-General
Visual/ Functional check
(GV/FC)
• Detailed Inspection (IN)
• Restoration (RS)
• Discard (DS)
Unscheduled Task
• Scheduled tasks
accomplished at specific
intervals
• Reports of malfunction
(usually originating
from operating crew)
• Data analysis
MSG 3 Flow Analysis
Maintenance Package
Manufacturer
• To provide the operator
with packaging options
for fleet maintenance
program
• Increase the production
efficiency of an
organization
Operator
• Increase aircraft
availability
• Reduce production
costs
Maintenance Package
Considerations
Operational
considerations
• Route structure
• Flight length
• Frequency of flight
Commercial
considerations
• Traffic patterns
• Seasonal
constraints
Technical
considerations
• Maintenance
program
• Manpower skills
• Tooling
Block Packaging
Background
0 This is focused on the principle of grouping all
maintenance tasks that require frequent repetition under
a letter check (i.e. “A”, “B”, “C”, “D” Checks).
0 This method produces a small number of relatively large
work packages having the disadvantage of a relatively long
maintenance ground time.
Block Packaging Conditions
Large airplane
fleet
High utilization
Spare airplane
available
Long range
operation
Flexible
manpower
Non-scheduled
maintenance
Single centrally
located
maintenance base
Utilization varies
with calendar
season
Contract
maintenance
Block Packaging Advantage
Disadvantage
Advantage
• Reduces spare requirements at
out stations
• Increased ground time
• Logistical considerations for
spares are also simplified.
• Accomplishment of
modifications
• Rectification of non-routines
• More efficient sequencing of
long jobs
Disadvantage
• Manpower requirements
• the risk of the airplane
becoming a parts department
• High component removal
Equalized/Phase/Progressive
Package
• Tasks are arranged into many small packages all
having approximately the same ground time, less
than 8 hours
Ground
Time
• Satisfies the availability requirements specified by
airline operations and scheduling
• The larger letter checks are segmented into smaller
but more frequent work packages
Commercial
• Helps to get the maximum life out of life-limited
componentsComponent
Equalized Considerations
Small aircraft
fleet
Low &
Constant
utilisation
No spare
airplane
Short range
operations
Manpower
equalization
Scheduled
operations
Multiple
maintenance
locations
Maintenance
performed in
house
Equalized Benefit & Loss
Advantage
• Simplifies manpower planning
• High aircraft availability
• Reduced ground time
• Frequent visit supports full
component life
• Balanced workload on small fleets
Disadvantage
• High spare requirement at out
stations
• Increase in production planning and
scheduling workload
• Careful planning is required due to
the limited ground time
• There is limited time for the
accomplishment of modifications
• Short jobs are inherently inefficient
• Limited time to identify and rectify
non-routines
Thank You

More Related Content

PPTX
Aircraft maintenance programme
PPTX
Aircraft Maintenance
PDF
Dangerous goods regulations cat 10
PPT
Aircraft inspections
PPT
Safety Management Systems (SMS) Fundamentals: Safety Assurance
PPTX
AIRCRAFT PROPULSION SYSTEM seminar
PDF
Confiabilidad clase 1
PPT
Chicago convention
Aircraft maintenance programme
Aircraft Maintenance
Dangerous goods regulations cat 10
Aircraft inspections
Safety Management Systems (SMS) Fundamentals: Safety Assurance
AIRCRAFT PROPULSION SYSTEM seminar
Confiabilidad clase 1
Chicago convention

What's hot (20)

PPT
Aircraft maintenance program enhancement badawood mamdooh
PPTX
Aircraft maintenance package methods
PPTX
Airworthiness Requirements (ADs, SBs, Maintenance)
PPT
Aircraft Certification and Type of Certificates 3-9-13
PPT
Aircraft Maintenance Records and Airworthiness Directives for General Aviation
PPTX
Continuing airworthiness management organisation
PDF
Car m note
PPT
European Aviation Safety Agency (EASA) - EU Regulation 2042/2003
PPTX
Aircraft Systems and Instruments
PPT
Aircraft ground handling
DOCX
M7 Maintenance Practices essay (CAT A1)
PPT
Aviation Safety Mangement
PPTX
Fly by wire ppt pa1
PDF
Learn how to Manage Aircraft Records
PPTX
Fuel Systems of Aircrafts
PPT
Iata operational safety_audit_(iosa)
PDF
Part145 Slides
PPT
Aircraft basics
PPTX
Aged aircraft maintenance.
PDF
Airside Safety
Aircraft maintenance program enhancement badawood mamdooh
Aircraft maintenance package methods
Airworthiness Requirements (ADs, SBs, Maintenance)
Aircraft Certification and Type of Certificates 3-9-13
Aircraft Maintenance Records and Airworthiness Directives for General Aviation
Continuing airworthiness management organisation
Car m note
European Aviation Safety Agency (EASA) - EU Regulation 2042/2003
Aircraft Systems and Instruments
Aircraft ground handling
M7 Maintenance Practices essay (CAT A1)
Aviation Safety Mangement
Fly by wire ppt pa1
Learn how to Manage Aircraft Records
Fuel Systems of Aircrafts
Iata operational safety_audit_(iosa)
Part145 Slides
Aircraft basics
Aged aircraft maintenance.
Airside Safety
Ad

Viewers also liked (20)

PPT
Aircraft Maintenance Documentation
PPTX
Aircraft Maintenance practices introduction
PDF
Aircraft Inspection and Maintenance Records
PPTX
Airworthiness Management Camo
PPTX
Types of maintenance
PPT
Aircraft inspection and_repair
PDF
Car m
PPTX
AIRCRAFT MAINTENANCE ENGINEER’S LICENCING 3
PPTX
Ame logbook
PPTX
Airworthiness Management
PPTX
Aircraft maintenance and manuals week 2
PDF
The Consequences of Implementing the Indigenisation and Economic Empowerment ...
PPTX
Armouring india indigenisation of india’s defence needs
PDF
Iventory mgmt control
PDF
Ame work record
PPTX
Anatomy of conversation
PPTX
Aviation Management, LLC. Into 2016
PDF
Realistic material damage simulation using real-time Finite Element Analysis
PDF
Aircraft Interiors and Cabin Modifications. Eric Duvivier, Chief Project Mana...
PPTX
Project management using six sigma
Aircraft Maintenance Documentation
Aircraft Maintenance practices introduction
Aircraft Inspection and Maintenance Records
Airworthiness Management Camo
Types of maintenance
Aircraft inspection and_repair
Car m
AIRCRAFT MAINTENANCE ENGINEER’S LICENCING 3
Ame logbook
Airworthiness Management
Aircraft maintenance and manuals week 2
The Consequences of Implementing the Indigenisation and Economic Empowerment ...
Armouring india indigenisation of india’s defence needs
Iventory mgmt control
Ame work record
Anatomy of conversation
Aviation Management, LLC. Into 2016
Realistic material damage simulation using real-time Finite Element Analysis
Aircraft Interiors and Cabin Modifications. Eric Duvivier, Chief Project Mana...
Project management using six sigma
Ad

Similar to Aircraft maintenance program (20)

PPTX
118760084-Planned-Maintainece-System-for-Ships.pptx
PPTX
PPTX
Maintenance
PPTX
ManufacturingAndServicesOperations LB7.pptx
PPT
maintenance-management-UNIT-I-and-II-1.ppt
PPT
Maintenance Management.ppt
PPT
Chp-5-FRSI-2043-Type-of-Maivcsdntenance.ppt
PPTX
Unit 1 mpa
PPT
Maintenance Definition ppt for better understanding
PPT
maintenance-management.ppt
PPTX
Maintenance and material handling methods (1)
PPTX
Industrial Maintenance (Full Notes)
PPTX
Asset Managment
PPTX
Lead Time.pptx
PDF
document (1).pdf
PPTX
LECTURE 01.pptx
PPTX
MAINTENANCE POLICIES – PREVENTIVE MAINTENANCE
PDF
RCM, Maintenance Course PM, CM, TBM, RCFA, RCA, FRACAS.pdf
PPTX
Maintenance of electrical machines
PPT
Standard Maintenance Practices , Types.ppt
118760084-Planned-Maintainece-System-for-Ships.pptx
Maintenance
ManufacturingAndServicesOperations LB7.pptx
maintenance-management-UNIT-I-and-II-1.ppt
Maintenance Management.ppt
Chp-5-FRSI-2043-Type-of-Maivcsdntenance.ppt
Unit 1 mpa
Maintenance Definition ppt for better understanding
maintenance-management.ppt
Maintenance and material handling methods (1)
Industrial Maintenance (Full Notes)
Asset Managment
Lead Time.pptx
document (1).pdf
LECTURE 01.pptx
MAINTENANCE POLICIES – PREVENTIVE MAINTENANCE
RCM, Maintenance Course PM, CM, TBM, RCFA, RCA, FRACAS.pdf
Maintenance of electrical machines
Standard Maintenance Practices , Types.ppt

Recently uploaded (20)

PDF
From Legacy to Velocity: how we rebuilt everything in 8 months.
PDF
The Impact of Policy Changes on Legal Communication Strategies (www.kiu.ac.ug)
PDF
The Evolution of Legal Communication through History (www.kiu.ac.ug)
PDF
Implementing Steam Education: Challenges and Solutions (www.kiu.ac.ug)
PDF
France's Top 5 Promising EdTech Companies to Watch in 2025.pdf
PPTX
Business Research Methods- Secondary Data
PDF
El futuro en e sector empresarial 2024 e
PPTX
Biomass_Energy_PPT_FIN AL________________.pptx
PDF
BeMetals_Presentation_September_2025.pdf
PPTX
003 seven PARTS OF SPEECH english subject.pptx
PDF
The Relationship between Leadership Behaviourand Firm Performance in the Read...
DOCX
“Strategic management process of a selected organization”.Nestle-docx.docx
PDF
The Role of School Boards in Educational Management (www.kiu.ac.ug)
PPTX
OS ALL UNITS MATxtdtc5ctc5cycgctERIAL.pptx
PDF
Не GPT єдиним: можливості AI в бізнес-аналізі | Вебінар з Тетяною Перловською
 
PPTX
Side hustles: 14 powerful tips to embrace the future of work
PPTX
Week2: Market and Marketing Aspect of Feasibility Study.pptx
PDF
The Influence of Historical Figures on Legal Communication (www.kiu.ac.ug)
PPTX
PwC consulting Powerpoint Graphics 2014 templates
PPTX
Oracle Cloud Infrastructure Overview July 2020 v2_EN20200717.pptx
From Legacy to Velocity: how we rebuilt everything in 8 months.
The Impact of Policy Changes on Legal Communication Strategies (www.kiu.ac.ug)
The Evolution of Legal Communication through History (www.kiu.ac.ug)
Implementing Steam Education: Challenges and Solutions (www.kiu.ac.ug)
France's Top 5 Promising EdTech Companies to Watch in 2025.pdf
Business Research Methods- Secondary Data
El futuro en e sector empresarial 2024 e
Biomass_Energy_PPT_FIN AL________________.pptx
BeMetals_Presentation_September_2025.pdf
003 seven PARTS OF SPEECH english subject.pptx
The Relationship between Leadership Behaviourand Firm Performance in the Read...
“Strategic management process of a selected organization”.Nestle-docx.docx
The Role of School Boards in Educational Management (www.kiu.ac.ug)
OS ALL UNITS MATxtdtc5ctc5cycgctERIAL.pptx
Не GPT єдиним: можливості AI в бізнес-аналізі | Вебінар з Тетяною Перловською
 
Side hustles: 14 powerful tips to embrace the future of work
Week2: Market and Marketing Aspect of Feasibility Study.pptx
The Influence of Historical Figures on Legal Communication (www.kiu.ac.ug)
PwC consulting Powerpoint Graphics 2014 templates
Oracle Cloud Infrastructure Overview July 2020 v2_EN20200717.pptx

Aircraft maintenance program

  • 2. Maintenance Steering Group Conditioning Monitoring • Applies to items that have neither Hard Time limits nor On Condition maintenance as their primary maintenance policies On –Condition • A repetitive inspections or tests to determine the condition of units or systems, comprising servicing, inspecting, testing, calibrating and replacement. Hard Time limit • A maximum interval for performing maintenance tasks on a part or unit. Such intervals apply to overhaul, but also to the total life of the part or unit.
  • 3. Maintenance Steering Group MSG 2 •Process Oriented MSG 3 •Task Oriented
  • 4. MSG 2 Analysis Task that can be done Tasks that have to be done Tasks that should be done
  • 5. MSG 3 0 Task oriented process, analyses through system failure from the top down. 0 Results in maintenance tasks that are performed for safety, operational or economic reasons. 0 It involves preventive maintenance, performed before failure occurs (and is intended to prevent failure) as well as failure finding tasks. RCM • The Reliability Centered Maintenance (RCM) concept refined the logic process leading to MSG- 3. MSG 3 Rev 1 • This was a refining of the original MSG-3 in order to make it user- friendlier. It led to the elimination of the Operating Crew Monitoring strategy in the original MSG-3 MSG 3 Rev 2 • This is a revision of the MSG-3 policy. It provides additional clarification and guidelines on development of Corrosion Prevention Control Programs (CPCP).
  • 6. MSG 3 Objective 0 To ensure realization of inherent safety and reliability levels of the equipment 0 To restore safety and reliability to their inherent levels when deterioration has occurred 0 To obtain the information necessary for the design improvement of those items whose inherent reliability proves inadequate 0 To accomplish these goals at minimum total cost, including maintenance costs and the cost of residual failure
  • 7. MSG 3 Divided Into 2 Sub Task Scheduled Task • Lubrication/servicing (LU/SV) • Operational Visual check (OP/VC) • Inspection-General Visual/ Functional check (GV/FC) • Detailed Inspection (IN) • Restoration (RS) • Discard (DS) Unscheduled Task • Scheduled tasks accomplished at specific intervals • Reports of malfunction (usually originating from operating crew) • Data analysis
  • 8. MSG 3 Flow Analysis
  • 9. Maintenance Package Manufacturer • To provide the operator with packaging options for fleet maintenance program • Increase the production efficiency of an organization Operator • Increase aircraft availability • Reduce production costs
  • 10. Maintenance Package Considerations Operational considerations • Route structure • Flight length • Frequency of flight Commercial considerations • Traffic patterns • Seasonal constraints Technical considerations • Maintenance program • Manpower skills • Tooling
  • 11. Block Packaging Background 0 This is focused on the principle of grouping all maintenance tasks that require frequent repetition under a letter check (i.e. “A”, “B”, “C”, “D” Checks). 0 This method produces a small number of relatively large work packages having the disadvantage of a relatively long maintenance ground time.
  • 12. Block Packaging Conditions Large airplane fleet High utilization Spare airplane available Long range operation Flexible manpower Non-scheduled maintenance Single centrally located maintenance base Utilization varies with calendar season Contract maintenance
  • 13. Block Packaging Advantage Disadvantage Advantage • Reduces spare requirements at out stations • Increased ground time • Logistical considerations for spares are also simplified. • Accomplishment of modifications • Rectification of non-routines • More efficient sequencing of long jobs Disadvantage • Manpower requirements • the risk of the airplane becoming a parts department • High component removal
  • 14. Equalized/Phase/Progressive Package • Tasks are arranged into many small packages all having approximately the same ground time, less than 8 hours Ground Time • Satisfies the availability requirements specified by airline operations and scheduling • The larger letter checks are segmented into smaller but more frequent work packages Commercial • Helps to get the maximum life out of life-limited componentsComponent
  • 15. Equalized Considerations Small aircraft fleet Low & Constant utilisation No spare airplane Short range operations Manpower equalization Scheduled operations Multiple maintenance locations Maintenance performed in house
  • 16. Equalized Benefit & Loss Advantage • Simplifies manpower planning • High aircraft availability • Reduced ground time • Frequent visit supports full component life • Balanced workload on small fleets Disadvantage • High spare requirement at out stations • Increase in production planning and scheduling workload • Careful planning is required due to the limited ground time • There is limited time for the accomplishment of modifications • Short jobs are inherently inefficient • Limited time to identify and rectify non-routines