ARIMA Modelling and
Forecasting
Introduction
• Describe the stationarity of the AR process
• Determine the mean and variance of the
AR process
• Assess the importance of Box-Jenkins
methodology
• Describe the various types of forecasts
• Evaluate the measures of forecast
importance
Stationarity of the AR process
• If an AR model is not stationary, this implies that
previous values of the error term will have a
non-declining effect on the current value of the
dependent variable.
• This implies that the coefficients on the MA
process would not converge to zero as the lag
length increases.
• For an AR model to be stationary, the
coefficients on the corresponding MA process
decline with lag length, converging on 0.
AR Process
• The test for stationarity in an AR model (with
p lags)is that the roots of the characteristic
equation lie outside the unit circle (i.e. > 1),
where the characteristic equation is:
0
...
1 2
2
1 



 p
p z
z
z 


Unit Root
• When testing for stationarity for any
variable, we describe it as testing for a
‘unit root’, this is based on this same idea.
• The most basic AR model is the AR(1)
model, on which most tests for stationarity
are based, such as the Dickey-Fuller test
(covered later)
Unit Root Test
equation)
stic
characteri
(
0
)
1
(
)
1
(
1







 
z
u
y
L
u
Ly
y
u
y
y
t
t
t
t
t
t
t
t
Unit Root Test
• With the AR(1) model, the characteristic
equation of (1-z)= 0, suggests that it has a root
of z = 1. This lies on the unit circle, rather than
outside it, so we conclude that it is non-
stationary.
• As we increase the lags in the AR model, so the
potential number of roots increases, so for 2
lags, we have a quadratic equation producing 2
roots, for the model to be stationary, they both
need to lie outside the unit circle.
AR Process
• The (unconditional mean) for an AR(1)
process, with a constant (μ) is given by:
1
1
1
1
)
(
)
1
(









 
t
t
t
t
y
E
AR
u
y
y
AR Process
• The (unconditional) variance for an AR
process of order 1 (excluding the constant)
is:
1
)
1
(
)
var(
1
2
1
2






t
y
Box-Jenkins Methodology
• This is a method for estimating ARIMA models,
based on the ACF and PACF as a means of
determining the stationarity of the variable in
question and the lag lengths of the ARIMA
model.
• Although the ACF and PACF methods for
determining the lag length in an ARIMA model
are commonly used, there are other methods
termed information criteria which can also be
used (covered later)
Box-Jenkins
• The Box-Jenkins approach typically
comprises four parts:
- Identification of the model
- Estimation, usually OLS
-Diagnostic checking (mostly for
autocorrelation)
- Forecasting
ACF and PACF
•
•
• Autocorrelation Partial Correlation AC PAC Q-Stat Prob
•
•
• . |*. | . |*. | 1 0.093 0.093 0.7580 0.384
• .*| . | .*| . | 2 -0.073 -0.082 1.2307 0.540
• . | . | . | . | 3 -0.023 -0.008 1.2772 0.735
• .*| . | .*| . | 4 -0.106 -0.111 2.3010 0.681
• . | . | . | . | 5 -0.003 0.016 2.3017 0.806
• . |*. | . |*. | 6 0.140 0.124 4.1334 0.659
• . |*. | . |*. | 7 0.162 0.141 6.6260 0.469
• .*| . | .*| . | 8 -0.103 -0.128 7.6356 0.470
• . | . | . | . | 9 -0.047 -0.003 7.8513 0.549
• .*| . | .*| . | 10 -0.124 -0.117 9.3624 0.498
• . | . | . |*. | 11 0.028 0.088 9.4434 0.581
• . |** | . |*. | 12 0.217 0.166 14.231 0.286
•
•
•
Identification
• Identification of the most appropriate model is
the most important part of the process, where it
becomes as much ‘art’ as ‘science’.
• The first step is to determine if the variable is
stationary, this can be done with the
correlogram. If it is not stationary it needs to be
first-differenced. (it may need to be differenced
again to induce stationarity)
• The next stage is to determine the p and q in the
ARIMA (p, I, q) model (the I refers to how many
times the data needs to be differenced to
produce a stationary series)
Identification
• To determine the appropriate lag structure in the
AR part of the model, the PACF or Partial
correlogram is used, where the number of non-
zero points of the PACF determine where the AR
lags need to be included.
• To determine the MA lag structure, the ACF or
correlogram is used, again the non-zero points
suggest where the lags should be included.
• Seasonal dummy variables may also need to be
included if the data exhibits seasonal effects.
Diagnostic Checks
• With this approach we only test for
autocorrelation usually, using the Q or Ljung-Box
statistic.
• If there is evidence of autocorrelation, we need
to go back to the identification stage and
respecify the model, by adding more lags.
• A criticism of this approach is that it fails to
identify if the model is too big or over-
parameterised, it only tells us if it is too small.
ARIMA Example
• Following the Box-Jenkins methodology, the
following ARIMA(2,1,1) model was produced:
21
.
3
)
2
(
,
12
.
0
R
(0.01)
(0.1)
(0.2)
(0.1)
1
.
0
3
.
0
6
.
0
7
.
0
ˆ
2
1
2
1








 


LB
u
y
y
y t
t
t
t
Parsimonious Model
• The aim of this type of modelling is to produce a
model that is parsimonious, or as small as
possible, whilst passing the diagnostic checks.
• A parsimonious model is desirable because
including irrelevant lags in the model increases
the coefficient standard errors and therefore
reduces the t-statistics.
• Models that incorporate large numbers of lags,
tend not to forecast well, as they fit data specific
features, explaining much of the noise or
random features in the data.
Forecasting
• One of the most important tests of how
well a model performs is how well it
forecasts.
• One of the most useful models for
forecasting is the ARIMA model.
• To produce dynamic forecasts the model
needs to include lags of either the
variables or error terms.
Types of Forecast
• Forecasts can be either in-sample or out-
of-sample forecasts.
• In general the out-of sample forecasts are
a better test of how well the model works,
as the forecast uses data not included in
the estimation of the model.
• To conduct out-of-sample forecasts, we
need to leave some observations at the
end of our sample for this purpose
Types of Forecasts
• A one-step-ahead is a forecast for the next
observation only.
• A multi-step-ahead forecast is for 1,2,3,…s steps
ahead.
• A recursive window for the forecast means that
the initial estimation date is fixed but the
additional observations are added one by one to
the estimation time span.
• A rolling window is where the estimation time
period is fixed but the start and end dates
successively increase by 1.
Conditional Forecasting
• A conditional expectation is one that is taken for
time t + 1, conditional upon or given all information
available up to and including time t (this is
important later). It is written as:
t
y
E
t
t
t
at time
n
informatio
all
)
|
( 1




Measuring Forecast Accuracy
• To determine how accurate a forecast is, the
simplest method is to plot the forecast against
the actual values as a direct comparison
• In addition it may be worthwhile to compare the
turning points, this is particularly important in
finance.
• There are a number of methods to determine
accuracy of the forecast, often more than one is
included in a set of results.
Tests of Forecast Accuracy
• Tests of forecast accuracy are based on the difference
between the forecast of the variables value at time t and
the actual value at time t. The closer the two are together
and the smaller the forecast error, the better the forecast.
• There are a variety of statistics measuring this accuracy,
mostly based on an average of the errors between the
actual and forecast values at time t.
• However these statistics provide little information in
isolation, as they are unbounded from above and their
value depends on the units of the variables being
forecast.
Mean Squared Error (MSE)
• The MSE statistic can be defined as:
t
y
t
f
T
T
f
y
T
T
MSE
s
t
s
t
T
T
t
s
t
s
t
at time
value
actual
the
at time
made
forecasts
ahead
-
step
-
s
n
observatio
forecast
sample
-
of
-
out
first
size
sample
total
)
(
)
1
(
1
,
1
2
,
1 1












MSE Example
Steps
Ahead
Forecast Actual Squared
Error
1 0.1 0.15 0.0025
2 0.25 0.20 0.0025
3 0.5 0.40 0.01
005
.
0
3
/
)
01
.
0
0025
.
0
0025
.
0
( 



MSE
Forecast Accuracy
• There are a number of other measures
used and these include:
– Mean Absolute Error
– Mean Average Prediction Error
– Chows test for predictive failure
– Theil’s U-statistic (where the forecast is
compared to that of a benchmark model)
– Root Mean Square Error ( the square root of
the MSE)
Theil’s U-statistic
best
forecasts
model
benchmark
1
U
best
is
forecast
model
1
U
accuracy
equal
ith
forecast w
models
both
1
U
model
benchmark
a
from
forecast
)
(
)
(
,
,
2
,
1









 





s
t
T
T
t
s
t
s
t
s
t
s
t
s
t
s
t
fb
x
fb
y
x
f
y
u
Financial Loss Functions
• When using financial data, it is not always the accuracy
of the forecast that matters, very often it is the accuracy
of forecasts relating to the sign of future returns or
turning points that is important, as this decides if a profit
is made.
• It is possible to estimate statistics that give the % of
correct sign predictions and correct direction change
predictions
• These statistics work on the principle that if the value of
the forecast and actual value are the same, when
multiplied together they produce a positive sign. Similarly
with the change in forecast and actual values giving the
correct direction change.
Correct Sign Predictions
• The formula for the % of correct sign
predictions is as follows:
otherwise
0
0
)
*
(
1
)
1
(T
-
T
1
signs
correct
%
,
1 1











s
t
s
t
s
t
s
t
T
T
t
s
t
Z
f
y
if
Z
z
Conclusion
• When using AR models, whether the series is
stationary of not determine how stable it is.
• Box-Jenkins methodology is part art and part
science.
• Forecasting of time series is an important
measure of how well a model works
• There are many measures of how accurate a
forecast is, usually a number are calculated to
determine if the forecast is acceptable, although
all have faults.

More Related Content

PPTX
Time series analysis
PDF
arimamodel-170204090012.pdf
PPTX
Arima model
PDF
PPTX
PPTX
PDF
Forecasting%20Economic%20Series%20using%20ARMA
PDF
Lecture_18 hypothesis testing and probability
Time series analysis
arimamodel-170204090012.pdf
Arima model
Forecasting%20Economic%20Series%20using%20ARMA
Lecture_18 hypothesis testing and probability

Similar to ARIMA Model for analysis of time series data.ppt (20)

PPTX
Business Analytics Foundation with R tool - Part 5
PPTX
HR Cost Forecasting using ARIMA modelling
PDF
Enhance interval width of crime forecasting with ARIMA model-fuzzy alpha cut
PPTX
ARIMA.pptx
PDF
Module 5.pptx (Data science in engineering)
PDF
Different Models Used In Time Series - InsideAIML
PDF
ARIMA Models - [Lab 3]
PDF
Time series modelling arima-arch
PDF
Intro to Forecasting in R - Part 4
PDF
Time Series for FRAM-Second_Sem_2021-22 (1).pdf
PDF
Byungchul Yea (Project)
PDF
a brief introduction to Arima
PPTX
What is ARIMA Forecasting and How Can it Be Used for Enterprise Analysis?
PPT
Arma model ar model arima model time series
PPTX
Air Passenger Prediction Using ARIMA Model
PPTX
PDF
On Modeling Murder Crimes in Nigeria
PDF
Study of effectiveness of time series modeling (arima) in forecasting stock p...
PPTX
Project time series ppt
PDF
6-130914140240-phpapp01.pdf
Business Analytics Foundation with R tool - Part 5
HR Cost Forecasting using ARIMA modelling
Enhance interval width of crime forecasting with ARIMA model-fuzzy alpha cut
ARIMA.pptx
Module 5.pptx (Data science in engineering)
Different Models Used In Time Series - InsideAIML
ARIMA Models - [Lab 3]
Time series modelling arima-arch
Intro to Forecasting in R - Part 4
Time Series for FRAM-Second_Sem_2021-22 (1).pdf
Byungchul Yea (Project)
a brief introduction to Arima
What is ARIMA Forecasting and How Can it Be Used for Enterprise Analysis?
Arma model ar model arima model time series
Air Passenger Prediction Using ARIMA Model
On Modeling Murder Crimes in Nigeria
Study of effectiveness of time series modeling (arima) in forecasting stock p...
Project time series ppt
6-130914140240-phpapp01.pdf
Ad

Recently uploaded (20)

PPTX
A powerpoint on colorectal cancer with brief background
PPT
LEC Synthetic Biology and its application.ppt
PPT
Enhancing Laboratory Quality Through ISO 15189 Compliance
PPT
Heredity-grade-9 Heredity-grade-9. Heredity-grade-9.
PDF
BET Eukaryotic signal Transduction BET Eukaryotic signal Transduction.pdf
PPT
Mutation in dna of bacteria and repairss
PDF
Warm, water-depleted rocky exoplanets with surfaceionic liquids: A proposed c...
PPT
THE CELL THEORY AND ITS FUNDAMENTALS AND USE
PPTX
Microbes in human welfare class 12 .pptx
PPT
Animal tissues, epithelial, muscle, connective, nervous tissue
PPTX
limit test definition and all limit tests
PPTX
Presentation1 INTRODUCTION TO ENZYMES.pptx
PPTX
GREEN FIELDS SCHOOL PPT ON HOLIDAY HOMEWORK
PPTX
Understanding the Circulatory System……..
PDF
Worlds Next Door: A Candidate Giant Planet Imaged in the Habitable Zone of ↵ ...
PDF
Unit 5 Preparations, Reactions, Properties and Isomersim of Organic Compounds...
PPT
veterinary parasitology ````````````.ppt
PPTX
Hypertension_Training_materials_English_2024[1] (1).pptx
PPTX
TORCH INFECTIONS in pregnancy with toxoplasma
PPTX
Seminar Hypertension and Kidney diseases.pptx
A powerpoint on colorectal cancer with brief background
LEC Synthetic Biology and its application.ppt
Enhancing Laboratory Quality Through ISO 15189 Compliance
Heredity-grade-9 Heredity-grade-9. Heredity-grade-9.
BET Eukaryotic signal Transduction BET Eukaryotic signal Transduction.pdf
Mutation in dna of bacteria and repairss
Warm, water-depleted rocky exoplanets with surfaceionic liquids: A proposed c...
THE CELL THEORY AND ITS FUNDAMENTALS AND USE
Microbes in human welfare class 12 .pptx
Animal tissues, epithelial, muscle, connective, nervous tissue
limit test definition and all limit tests
Presentation1 INTRODUCTION TO ENZYMES.pptx
GREEN FIELDS SCHOOL PPT ON HOLIDAY HOMEWORK
Understanding the Circulatory System……..
Worlds Next Door: A Candidate Giant Planet Imaged in the Habitable Zone of ↵ ...
Unit 5 Preparations, Reactions, Properties and Isomersim of Organic Compounds...
veterinary parasitology ````````````.ppt
Hypertension_Training_materials_English_2024[1] (1).pptx
TORCH INFECTIONS in pregnancy with toxoplasma
Seminar Hypertension and Kidney diseases.pptx
Ad

ARIMA Model for analysis of time series data.ppt

  • 2. Introduction • Describe the stationarity of the AR process • Determine the mean and variance of the AR process • Assess the importance of Box-Jenkins methodology • Describe the various types of forecasts • Evaluate the measures of forecast importance
  • 3. Stationarity of the AR process • If an AR model is not stationary, this implies that previous values of the error term will have a non-declining effect on the current value of the dependent variable. • This implies that the coefficients on the MA process would not converge to zero as the lag length increases. • For an AR model to be stationary, the coefficients on the corresponding MA process decline with lag length, converging on 0.
  • 4. AR Process • The test for stationarity in an AR model (with p lags)is that the roots of the characteristic equation lie outside the unit circle (i.e. > 1), where the characteristic equation is: 0 ... 1 2 2 1      p p z z z   
  • 5. Unit Root • When testing for stationarity for any variable, we describe it as testing for a ‘unit root’, this is based on this same idea. • The most basic AR model is the AR(1) model, on which most tests for stationarity are based, such as the Dickey-Fuller test (covered later)
  • 7. Unit Root Test • With the AR(1) model, the characteristic equation of (1-z)= 0, suggests that it has a root of z = 1. This lies on the unit circle, rather than outside it, so we conclude that it is non- stationary. • As we increase the lags in the AR model, so the potential number of roots increases, so for 2 lags, we have a quadratic equation producing 2 roots, for the model to be stationary, they both need to lie outside the unit circle.
  • 8. AR Process • The (unconditional mean) for an AR(1) process, with a constant (μ) is given by: 1 1 1 1 ) ( ) 1 (            t t t t y E AR u y y
  • 9. AR Process • The (unconditional) variance for an AR process of order 1 (excluding the constant) is: 1 ) 1 ( ) var( 1 2 1 2       t y
  • 10. Box-Jenkins Methodology • This is a method for estimating ARIMA models, based on the ACF and PACF as a means of determining the stationarity of the variable in question and the lag lengths of the ARIMA model. • Although the ACF and PACF methods for determining the lag length in an ARIMA model are commonly used, there are other methods termed information criteria which can also be used (covered later)
  • 11. Box-Jenkins • The Box-Jenkins approach typically comprises four parts: - Identification of the model - Estimation, usually OLS -Diagnostic checking (mostly for autocorrelation) - Forecasting
  • 12. ACF and PACF • • • Autocorrelation Partial Correlation AC PAC Q-Stat Prob • • • . |*. | . |*. | 1 0.093 0.093 0.7580 0.384 • .*| . | .*| . | 2 -0.073 -0.082 1.2307 0.540 • . | . | . | . | 3 -0.023 -0.008 1.2772 0.735 • .*| . | .*| . | 4 -0.106 -0.111 2.3010 0.681 • . | . | . | . | 5 -0.003 0.016 2.3017 0.806 • . |*. | . |*. | 6 0.140 0.124 4.1334 0.659 • . |*. | . |*. | 7 0.162 0.141 6.6260 0.469 • .*| . | .*| . | 8 -0.103 -0.128 7.6356 0.470 • . | . | . | . | 9 -0.047 -0.003 7.8513 0.549 • .*| . | .*| . | 10 -0.124 -0.117 9.3624 0.498 • . | . | . |*. | 11 0.028 0.088 9.4434 0.581 • . |** | . |*. | 12 0.217 0.166 14.231 0.286 • • •
  • 13. Identification • Identification of the most appropriate model is the most important part of the process, where it becomes as much ‘art’ as ‘science’. • The first step is to determine if the variable is stationary, this can be done with the correlogram. If it is not stationary it needs to be first-differenced. (it may need to be differenced again to induce stationarity) • The next stage is to determine the p and q in the ARIMA (p, I, q) model (the I refers to how many times the data needs to be differenced to produce a stationary series)
  • 14. Identification • To determine the appropriate lag structure in the AR part of the model, the PACF or Partial correlogram is used, where the number of non- zero points of the PACF determine where the AR lags need to be included. • To determine the MA lag structure, the ACF or correlogram is used, again the non-zero points suggest where the lags should be included. • Seasonal dummy variables may also need to be included if the data exhibits seasonal effects.
  • 15. Diagnostic Checks • With this approach we only test for autocorrelation usually, using the Q or Ljung-Box statistic. • If there is evidence of autocorrelation, we need to go back to the identification stage and respecify the model, by adding more lags. • A criticism of this approach is that it fails to identify if the model is too big or over- parameterised, it only tells us if it is too small.
  • 16. ARIMA Example • Following the Box-Jenkins methodology, the following ARIMA(2,1,1) model was produced: 21 . 3 ) 2 ( , 12 . 0 R (0.01) (0.1) (0.2) (0.1) 1 . 0 3 . 0 6 . 0 7 . 0 ˆ 2 1 2 1             LB u y y y t t t t
  • 17. Parsimonious Model • The aim of this type of modelling is to produce a model that is parsimonious, or as small as possible, whilst passing the diagnostic checks. • A parsimonious model is desirable because including irrelevant lags in the model increases the coefficient standard errors and therefore reduces the t-statistics. • Models that incorporate large numbers of lags, tend not to forecast well, as they fit data specific features, explaining much of the noise or random features in the data.
  • 18. Forecasting • One of the most important tests of how well a model performs is how well it forecasts. • One of the most useful models for forecasting is the ARIMA model. • To produce dynamic forecasts the model needs to include lags of either the variables or error terms.
  • 19. Types of Forecast • Forecasts can be either in-sample or out- of-sample forecasts. • In general the out-of sample forecasts are a better test of how well the model works, as the forecast uses data not included in the estimation of the model. • To conduct out-of-sample forecasts, we need to leave some observations at the end of our sample for this purpose
  • 20. Types of Forecasts • A one-step-ahead is a forecast for the next observation only. • A multi-step-ahead forecast is for 1,2,3,…s steps ahead. • A recursive window for the forecast means that the initial estimation date is fixed but the additional observations are added one by one to the estimation time span. • A rolling window is where the estimation time period is fixed but the start and end dates successively increase by 1.
  • 21. Conditional Forecasting • A conditional expectation is one that is taken for time t + 1, conditional upon or given all information available up to and including time t (this is important later). It is written as: t y E t t t at time n informatio all ) | ( 1    
  • 22. Measuring Forecast Accuracy • To determine how accurate a forecast is, the simplest method is to plot the forecast against the actual values as a direct comparison • In addition it may be worthwhile to compare the turning points, this is particularly important in finance. • There are a number of methods to determine accuracy of the forecast, often more than one is included in a set of results.
  • 23. Tests of Forecast Accuracy • Tests of forecast accuracy are based on the difference between the forecast of the variables value at time t and the actual value at time t. The closer the two are together and the smaller the forecast error, the better the forecast. • There are a variety of statistics measuring this accuracy, mostly based on an average of the errors between the actual and forecast values at time t. • However these statistics provide little information in isolation, as they are unbounded from above and their value depends on the units of the variables being forecast.
  • 24. Mean Squared Error (MSE) • The MSE statistic can be defined as: t y t f T T f y T T MSE s t s t T T t s t s t at time value actual the at time made forecasts ahead - step - s n observatio forecast sample - of - out first size sample total ) ( ) 1 ( 1 , 1 2 , 1 1            
  • 25. MSE Example Steps Ahead Forecast Actual Squared Error 1 0.1 0.15 0.0025 2 0.25 0.20 0.0025 3 0.5 0.40 0.01 005 . 0 3 / ) 01 . 0 0025 . 0 0025 . 0 (     MSE
  • 26. Forecast Accuracy • There are a number of other measures used and these include: – Mean Absolute Error – Mean Average Prediction Error – Chows test for predictive failure – Theil’s U-statistic (where the forecast is compared to that of a benchmark model) – Root Mean Square Error ( the square root of the MSE)
  • 28. Financial Loss Functions • When using financial data, it is not always the accuracy of the forecast that matters, very often it is the accuracy of forecasts relating to the sign of future returns or turning points that is important, as this decides if a profit is made. • It is possible to estimate statistics that give the % of correct sign predictions and correct direction change predictions • These statistics work on the principle that if the value of the forecast and actual value are the same, when multiplied together they produce a positive sign. Similarly with the change in forecast and actual values giving the correct direction change.
  • 29. Correct Sign Predictions • The formula for the % of correct sign predictions is as follows: otherwise 0 0 ) * ( 1 ) 1 (T - T 1 signs correct % , 1 1            s t s t s t s t T T t s t Z f y if Z z
  • 30. Conclusion • When using AR models, whether the series is stationary of not determine how stable it is. • Box-Jenkins methodology is part art and part science. • Forecasting of time series is an important measure of how well a model works • There are many measures of how accurate a forecast is, usually a number are calculated to determine if the forecast is acceptable, although all have faults.