Course administration
Course introduction
Start and finish Course style
LunchCoffee and breaks
M00 - Course introduction 2/17 | 2/434
Course objectives
At the end of this course, you will be able to:
 The underpinning philosophy, principles,
terminology of PRINCE2
 Understand PRINCE2 project lifecycle including
processes and themes
 Define PRINCE2 roles and responsibilities
 Describe PRINCE2 techniques and procedures
 The products/artefacts produced by PRINCE2
Main goal
 Attempt Foundation exam with confidence
 Communicate freely within PRINCE2 project,
understanding its principles and philosophy
Secondary goal
 Benefits and value of project management and
PRINCE2
Course introduction
M00 - Course introduction 3/17 | 3/434
 Please share with the class:
 Your name and surname
 Your organization
 Your profession
 Title, function, job responsibilities
 Your familiarity with the
project management
 Your experience with
PRINCE2/PMBOK/IPMA
 Your personal session expectations
Course introduction
Let’s Get to Know Each Other
M00 - Course introduction 4/17 | 4/434
Day1
Module Subject Start End
Total Time
(in hours)
01 Defining project management and PRINCE2 09:00 11:00 02:00
02 Organization theme 11:00 12:15 01:15
03 Starting up a Project (SP) 12:15 13:00 00:45
Lunch 13:00 13:30 00:30
04 Business Case theme 13:30 14:45 01:15
05 Initiating a Project (IP) 14:45 16:30 01:45
Recap Day 1 (including sample exam questions) 16:30 17:00 00:30
Total Training Time 08:00
Course agenda - Day 1
Course introduction
M00 - Course introduction 5/17 | 5/434
Day2
Module Subject Start End
Total Time
(in hours)
Review Day 1 09:00 09:15 00:15
06 Plans theme 09:15 10:30 01:15
07 Quality theme 10:30 11:45 01:15
08 Risk theme 11:45 13:00 01:15
Lunch 13:00 13:30 00:30
09 Managing a Stage Boundary (MSB) 13:30 15:15 01:45
10 Progress theme 15:15 16:30 01:15
Recap Day 2 (including sample exam questions) 16:30 17:00 00:30
Total Training Time 08:00
Course agenda - Day 2
Course introduction
M00 - Course introduction 6/17 | 6/434
Day3
Module Subject Start End
Total Time
(in hours)
Review Day 2 09:00 09:15 00:15
11 Controlling a Stage (CS) 09:15 10:45 01:30
12 Change theme 10:45 13:00 02:15
Lunch 13:00 13:30 00:30
13 Managing Product Delivery (MPD) 13:30 14:45 01:15
14 Closing a Project (CP) 14:45 15:15 00:30
15 Directing a Project (DP) 15:15 16:00 00:45
Foundation exam 16:00 17:00
Total Training Time 07:00
Course agenda - Day 3
Course introduction
M00 - Course introduction 7/17 | 7/434
PRINCE2 Foundation certification
 Foundation Exam
 Paper based and closed book exam
 Only pencil and eraser are allowed
 Simple multiple (ABCD) choice exam
 Only one answer is correct
 75 questions, pass mark is 35 (50%)
 max 70 points, 5 questions of control
 1 hour exam
 No negative points, no “Tricky Questions”
 No pre-requisite for Foundation exam
 Sample, two (official) mock exams are
provided to you
Course introduction
Candidates completing an examination in a language that
is not their mother tongue, will receive additional time
M00 - Course introduction 8/17 | 8/434
PRINCE2 Practitioner certification
 Practitioner Exam
 Paper based and open book exam
 Reference to PRINCE2 Handbook ONLY
 Handbook is provided for students
 2:30 hour exam
 4 questions worth 20 marks each (80
marks), pass mark is 35 (50%)
 Dictionary/translation lists allowed for non-
native speakers
 Non-scientific calculator for basic
calculations
 Foundation certification is required
Course introduction
Candidates completing an examination in a language that
is not their mother tongue, will receive additional time
M00 - Course introduction 9/17 | 9/434
PRINCE2 Professional certification
 Professional Exam (January 2012)
 Assessment is against 19 individual
performance criteria (there is no written
examination)
 Level 0, 1, 2, 3
 2.5 day exam (in PRINCE2 Professional
assessment centre)
 Group activities and exercises (usually in
groups of 4, as well as a one-to-one
interview, and your performance will be
rated)
 Based on a fictional project case study
 Practitioner certification is required
Course introduction
Candidates completing an examination in a language that
is not their mother tongue, will receive additional time
M00 - Course introduction 10/17 | 10/434
PRINCE2 official handbook and examination syllabus
Course introduction
PRINCE2 syllabus section code and title
OV Overview, Principles and Tailoring PRINCE2
BC Business Case theme
OR Organization theme
QU Quality theme
PL Plans theme
RK Risk theme
CH Change theme
PG Progress theme
SU Starting up a Project process
DP Directing a Project process
IP Initiating a Project process
SB Managing a Stage Boundary process
CS Controlling a Stage process
MP Managing Product Delivery process
CP Closing a Project process
Module slide number / total module slides
Slide number /
total slides
Module number
and name
Syllabus Handbook Page
PRINCE2
handbook page
PRINCE2 syllabus
section code
M00 - Course introduction 11/17 | 11/434
PRINCE2 interactive study guide mind map
Course introduction
See Appendix #2 for more mind maps from AXELOS Global Best Practice
M00 - Course introduction 12/17 | 12/434
PRINCE2 interactive glossary
Course introduction
quizlet.com/45249735/
M00 - Course introduction 13/17 | 13/434
PRINCE2 Project Processes vs Products vs Roles vs Responsibilities Matrix
Course introduction
M00 - Course introduction 14/17 | 14/434
PRINCE2 Process model
Course introduction
M00 - Course introduction 15/17 | 15/434
PRINCE2 – Free complete set of PRINCE2 document templates
Course introduction
M00 - Course introduction 16/17 | 16/434
About course author - Mirosław Dąbrowski
Course introduction
twitter.com/mirodabrowski
linkedin.com/in/miroslawdabrowski
google.com/+miroslawdabrowski
miroslaw_dabrowski
www.miroslawdabrowski.com
Mirosław Dąbrowski
Agile Coach, Trainer, Consultant
(former JEE/PHP developer, UX/UI designer, BA/SA)
Creator Writer / Translator Trainer / Coach
• Creator of 50+ mind maps from PPM and related
topics (2mln views): miroslawdabrowski.com
• Lead author of more than 50+ accredited materials
from PRINCE2, PRINCE2 Agile, MSP, MoP, P3O, ITIL,
M_o_R, MoV, PMP, Scrum, AgilePM, DSDM, CISSP,
CISA, CISM, CRISC, CGEIT, TOGAF, COBIT5 etc.
• Creator of 50+ interactive mind maps from PPM
topics: mindmeister.com/users/channel/2757050
• Product Owner of biggest Polish project
management portal: 4PM: 4pm.pl (15.000+ views
each month)
• Editorial Board Member of Official PMI Poland
Chapter magazine: “Strefa PMI”: strefapmi.pl
• Official PRINCE2 Agile, AgilePM, ASL2, BiSL methods
translator for Polish language
• English speaking, international, independent
trainer and coach from multiple domains.
• Master Lead Trainer & Coach
• 11+ years in training and coaching / 15.000+ hours
• 100+ certifications
• 5000+ people trained and coached
• 25+ trainers trained and coached
linkedin.com/in/miroslawdabrowski
Agile Coach / Scrum Master PM / IT architect Notable clients
• 8+ years of experience with Agile projects as a
Scrum Master, Product Owner and Agile Coach
• Coached 25+ teams from Agile and Scrum
• Agile Coach coaching C-level executives
• Scrum Master facilitating multiple teams
experienced with UX/UI + Dev teams
• Experience multiple Agile methods
• Author of AgilePM/DSDM Project Health Check
Questionnaire (PHCQ) audit tool
• Dozens of mobile and ecommerce projects
• IT architect experienced in IT projects with budget
above 10mln PLN and timeline of 3+ years
• Experienced with (“traditional”) projects under high
security, audit and compliance requirements based
on ISO/EIC 27001
• 25+ web portal design and development and
mobile application projects with iterative,
incremental and adaptive approach
ABB, AGH, Aiton Caldwell, Asseco, Capgemini, Deutsche Bank,
Descom, Ericsson, Ericpol, Euler Hermes, General Electric,
Glencore, HP Global Business Center, Ideo, Infovide-Matrix,
Interia, Kemira, Lufthansa Systems, Media-Satrun Group,
Ministry of Defense (Poland), Ministry of Justice (Poland),
Nokia Siemens Networks, Oracle, Orange, Polish Air Force,
Proama, Roche, Sabre Holdings, Samsung Electronics, Sescom,
Scania, Sopra Steria, Sun Microsystems, Tauron Polish Energy,
Tieto, University of Wroclaw, UBS Service Centre, Volvo IT…
miroslawdabrowski.com/about-me/clients-and-references/
M00 - Course introduction 17/17 | 17/434
Accreditations/certifications (selected): CISA, CISM, CRISC, CASP, Security+, Project+, Network+, Server+, Approved
Trainer: (MoP, MSP, PRINCE2, PRINCE2 Agile, M_o_R, MoV, P3O, ITIL Expert, RESILIA), ASL2, BiSL, Change Management,
Facilitation, Managing Benefits, COBIT5, TOGAF 8/9L2, OBASHI, CAPM, PSM I, SDC, SMC, ESMC, SPOC, AEC, DSDM Atern,
DSDM Agile Professional, DSDM Agile Trainer-Coach, AgilePM, OCUP Advanced, SCWCD, SCBCD, SCDJWS, SCMAD, ZCE 5.0,
ZCE 5.3, MCT, MCP, MCITP, MCSE-S, MCSA-S, MCS, MCSA, ISTQB, IQBBA, REQB, CIW Web Design / Web Development /
Web Security Professional, Playing Lean Facilitator, DISC D3 Consultant, SDI Facilitator, Certified Trainer Apollo 13 ITSM
Simulation …
AXELOS - PRINCE2® Foundation
11. Progress theme
12. Controlling a Stage (CS)
13. Change theme
14. Managing Product Delivery
(MPD)
15. Closing a Project (CP)
16. Directing a Project (DP)
1. Defining project management
and PRINCE2
2. PRINCE2 principles
3. Organization theme
4. Starting up a Project (SP)
5. Business Case theme
6. Initiating a Project (IP)
7. Plans theme
8. Quality theme
9. Risk theme
10. Managing a Stage Boundary
(MSB)
Agenda
Defining project management and PRINCE2
M01 - Defining project management and PRINCE2 2/29 | 19/434
What is PRNCE2?
 PRINCE2 is detailed project management method (HOW)
 PRINCE2 is a structured (sequential) project management
method based on principles and themes that originate
from lessons learned from projects
 The PRINCE2 project management approach is:
 process based
 product based
 PRINCE2 provides easy to understand project lifecycle
 PRINCE2 creates project organisation structure with clearly
defined roles and responsibilities
 PRINCE2 recognizes performance projects factors for time,
costs, quality, scope, benefits and risks
Defining project management and PRINCE2
M01 - Defining project management and PRINCE2 3/29 | 20/434
1970s
•PROMPT
1983
•PROMPT II
1996
•PRINCE2
2002
•PRINCE2
update
2005
•PRINCE2
update
2009
•PRINCE2
update
2013
•AXELOS
acquisition
(new logo)
•No changes
in content
2015
•PRICE2
Agile
PRINCE2 history
Defining project management and PRINCE2
M01 - Defining project management and PRINCE2 4/29 | 21/434
Project definition according to PRINCE2
Defining project management and PRINCE2
©AXELOSLtd.2013.MaterialisreproducedunderlicencefromAXELOS.
"A temporary organization that is
created for the purpose of
delivering one or more business
products according to an agreed
Business Case"
3OV0102M01 - Defining project management and PRINCE2 5/29 | 22/434
Project management cycle according to PRINCE2
Defining project management and PRINCE2
©AXELOSLtd.2013.MaterialisreproducedunderlicencefromAXELOS.
Plan
Delegate
Monitor
Control
5M01 - Defining project management and PRINCE2 6/29 | 23/434
5 Factors that differentiate Projects from Business As Usual (BAU)
Defining project management and PRINCE2
Factor
Change Temporary
Cross-
Functional
Unique Uncertainty
3OV0203
Changes in the
business as Usual
(BAU) in the form of a
new products
delivered by the
project and with
those new products
there will be changes
in the organization
(e.g. new processes,
training to the end
users, etc.).
The project has a
finite beginning and
end of what
distinguishes it from
what every day
dealing with the client
organization.
Similarly each project
phase has it's starting
and ending date (with
agreed tolerances).
Customers and
suppliers have various
perspectives,
motivations,
expectations and
attitudes to the
project
Bringing together of a
temporary team with
different skills
working together to
introduce a change
that will impact others
outside of the team.
The project is
implemented in a
unique environment /
context
Among other things,
the uniqueness is also
another period of
time in which the
project is conducted
(different place in
time, different laws
and regulations, etc.)
Project involves a
higher risk level than
regular business
operations
Each project is
uncertain venture can
be successful or a
failure to enhance the
chance of successful
completion of the
project we need to
manage uncertainty in
the project, i.e.. the
risk
M01 - Defining project management and PRINCE2 7/29 | 24/434
6 project performance variables (effectiveness aspects)
Defining project management and PRINCE2
Project
costs
timescales
quality
scope
risk
benefits
5OV0101M01 - Defining project management and PRINCE2 8/29 | 25/434
PRINCE2 structure
 PRINCE2 method involves 4 integrated elements:
 The principles - 7 rules (a project compliant with PRINCE2 must be
compliant with all the principles)
 The themes - 7 project management areas
 The processes - 7 groups of activities specifying step by step what
should/must be done within the project its lifecycle
 Tailoring PRINCE2 to the project - tailoring PRINCE2 method to suit
the project/organisation environment/context requirements
 PRINCE2 method also provides 2 general techniques:
 product-based planning
 quality review
Defining project management and PRINCE2
5OV0103M01 - Defining project management and PRINCE2 9/29 | 26/434
PRINCE2 Themes
PRINCE2 Principles
Progress
Business
Case
Organisation
Quality
Risk
Change
Plans
PROJECT ENVIRONMENT
©AXELOSLtd.2013.MaterialisreproducedunderlicencefromAXELOS.
PRINCE2 Processes
6OV0103M01 - Defining project management and PRINCE2 10/29 | 27/434
Pre-project
Initiation
stage
Final delivery
stage
After the
project
Subsequent
delivery stage(s)
Subsequent
delivery stage
General process model at PRINCE2
Defining project management and PRINCE2
©AXELOSLtd.2013.MaterialisreproducedunderlicencefromAXELOS.
113OV0206
Legend
• SP - Starting up a Project
• IP - Initiating a Project
• SB - Managing a Stage Boundary
• MPD - Managing Product Delivery
• CP - Closing a Project
• DP - Directing a Project
• CS - Controlling a Stage
Directing
Managing
Delivering
SP
IP CS CS CS
MSB MSB MSB CP
DP
MPD MPD MPD MPD MPDMPD
MPD MPD MPD
M01 - Defining project management and PRINCE2 11/29 | 28/434
Pre-project Initiation
stage
Final delivery
stage
Post-project
Two-stage project PRINCE2 model
Defining project management and PRINCE2
DP
MSB CP
IP
SP
Directing
Managing
Delivering
MPD
CS
MPD
MPD
©AXELOSLtd.2013.MaterialisreproducedunderlicencefromAXELOS.
Legend
• SP - Starting up a Project
• IP - Initiating a Project
• SB - Managing a Stage Boundary
• MPD - Managing Product Delivery
• CP - Closing a Project
• DP - Directing a Project
• CS - Controlling a Stage
A project has at least 2
management stages:
• Initiation stage (during which
the project is planned)
• At least one more to cover
the delivery of the project’s
specialist products
OV0206M01 - Defining project management and PRINCE2 12/29 | 29/434
Directing
Managing
Delivering
DP
Pre-project
Initiation Stage +
Final delivery
stage
Post-project
One-stage project PRINCE2 model (shortest possible version of PRINCE2)
Defining project management and PRINCE2
©AXELOSLtd.2013.MaterialisreproducedunderlicencefromAXELOS.
OV0206
SP
CP
IP
CS
MPDMPD
MPD
Legend
• SP - Starting up a Project
• IP - Initiating a Project
• SB - Managing a Stage Boundary
• MPD - Managing Product Delivery
• CP - Closing a Project
• DP - Directing a Project
• CS - Controlling a Stage
M01 - Defining project management and PRINCE2 13/29 | 30/434
What PRINCE2 does not provide?
 PRINCE2 method does not include:
 Specialist aspects (PRINCE2 is purely general in
nature, not industry/domain specific)
 Detailed project management techniques (see
PMBOK Guide)
 Leadership/coaching/mentoring skills
 Soft-skills
 Communication techniques
 Human resource management
 Contract negotiations
 Software for project management
 …
Defining project management and PRINCE2
6M01 - Defining project management and PRINCE2 14/29 | 31/434
 Applies to any type or project and business domain
 Project security with EWIs and risk management
 Accountability with clearly defined roles
 Project process analysis and optimisation
 Efficient use of senior management
time by “management by exception”
 License-free
 Full project control/assurance
 Common vocabulary and approach
 Tailored project documentation
 Proven integration with Agile (e.g. DSDM/Scrum)
Defining project management and PRINCE2
Key benefits of adopting PRINCE2
7OV0201M01 - Defining project management and PRINCE2 15/29 | 32/434
PRINCE2 and integration with Agile -> Proven integration between PRINCE2 and Agile…
Defining project management and PRINCE2
Keith Richards, KRC Consultants; Lead
Author of:
• DSDM Atern (method and official handbook)
• Agile Project Management: Running PRINCE2
Projects with DSDM Atern
Agile Project Management: Running
PRINCE2 Projects with DSDM Atern
• ISBN-13: 978-0113310586
• Publisher: TSO (The Stationery Office) (2007)
M01 - Defining project management and PRINCE2 16/29 | 33/434
PRINCE2 and integration with Agile -> PRINCE2 Agile
Defining project management and PRINCE2
Keith Richards, agileKRC; Lead Author of:
• PRINCE2 Agile (method and official handbook)
M01 - Defining project management and PRINCE2 17/29 | 34/434
Relationship with other AXELOS Global Best Practices
Defining project management and PRINCE2
Portfolio
management
Portfolio(s)
Office
Programme
management
Programme(s)
Office
Project(s)
Office
Project
management
Project
management
Project
management
ManagementofRisk(M_o_R)
ITIL
ManagementofValue(MoV)
6
RESILIA
M01 - Defining project management and PRINCE2 18/29 | 35/434
The Portfolio,
Programme,
and Project
Management
Maturity
Model
(P3M3)
ITIL
Maturity
Model
(IMM)
Relationship with other AXELOS Global Best Practices and Models
Defining project management and PRINCE2
ITILPortfolio,
Programme
and Project
Offices
(P3O)
Management
of Value
(MoV)
Management
of Risk
(M_o_R)
Best practice guides
AXELOS common glossary
PRINCE2
Maturity
Model
(P2MM)
Models
(MoP)
Management of Portfolios
(MSP)
Managing Successful Programmes
(PRINCE2)
PRojects IN Controlled Environments
Portfolio
Office
Programme
Office
Project
Office
RESILIA
M01 - Defining project management and PRINCE2 19/29 | 36/434
How PRINCE2 fits with other AXELOS Global Best Practice Guides
Defining project management and PRINCE2
P3O
MoP
M_o_R
MSPMoV
ITIL
RESILIA
 Can be used as a
method for delivering
IT projects having
requirements
regarding reporting,
compliance, control
and risk management
 Integrates with PMOs by dedicated roles strictly
responsible for project support and project
assurance
 Support project monitoring
and control at the portfolio
level with KPIs, KRIs and
EWIs
 PRINCE2 uses risk
management process
defined in M_o_R
allowing PRINCE2 to be
easily integrated within
enterprise risk
management (ERM)
 Offers predictable products delivery
within programme
 Provides framework for producing
products acting as options for value
improvement proposals framework
 Can be used as a method
for implementing Cyber
Resilience into IT services
M01 - Defining project management and PRINCE2 20/29 | 37/434
M01 - Defining project management and PRINCE2 21/29 | 38/434
PRINCE2 in numbers (version 2009)
Defining project management and PRINCE2
7
7
7
40
10
4
2
2
5
6
26
Principles
Themes
Processes
Sub-processes
Project roles
QA roles
Procedures
Techniques
Project factors
Performance
factors
Management
products
3Issue types3 Budget types
M01 - Defining project management and PRINCE2 22/29 | 39/434
M01 - Defining project management and PRINCE2 23/29 | 40/434
World’s best known Project Management standardization/certifications bodies
Defining project management and PRINCE2
M01 - Defining project management and PRINCE2 24/29 | 41/434
World’s best known Project Management publications
Defining project management and PRINCE2
4th version
(2015)
5th version
(2013)
4th version
(2009)
6th version
(2012)
11th version
M01 - Defining project management and PRINCE2 25/29 | 42/434
AXELOS PRINCE2, PMI PMBOK Guide, IPMA ICB, APM Body of Knowledge, TenStep
Defining project management and PRINCE2
PRINCE2 PMI PMBOK Guide IPMA ICB
APM Body of
Knowledge
TenStep
Type Methodology/Method Standard Competency Best Practice Methodology
Model Process based Process based Competency/skills based
Recommendations/
Guidelines
Process based
Roles &
responsibilities
PM competencies
Tools & Techniques 2
Document outlines
Soft skills mentioned
Certifications
Foundation, Practitioner,
Professional, Agile
CAPM, PMP, PGMP,
PFMP, PMI-SP, PMI-
RMP, PMI-ACP, PMI-PBA
Level D, C, B, A
APM IC, APMP, APM PPQ,
PQ, APM Project Risk
Management L1 and L2
Fn-TSPM, TSPM
Accreditationof
training
materials
Commercial
methodology
trainers PMP required
training
organizations
in some countries only,
not unified
Number of
certified people
Foundation: 776,000+
Practitioner: 400,000+
Professional: 100+
PRINCE2 Agile: -
CAPM: 30,000+
PMP: 686,500+
PMI-ACP: 10,000+
Level D: 170,000+
Level C: 61,000+
Level B: 13,000+
Level A: 800+
no data no data
M01 - Defining project management and PRINCE2 26/29 | 43/434
Module review and summary
 Project definition
 Project management cycle
 5 Factors that differentiate
Projects from BAU
 6 project performance
variables
 PRINCE2 structure
 7 Principles
 7 Themes
 7 Processes
 Tailoring PRINCE2 project
 PRINCE2 general process
model
 What PRINCE2 does not
provide
 Key benefits of adopting
PRINCE2
Defining project management and PRINCE2
M01 - Defining project management and PRINCE2 27/29 | 44/434
Q&A
Defining project management and PRINCE2
M01 - Defining project management and PRINCE2 28/29 | 45/434
I hope you enjoyed
this presentation. If so,
please like, share and
leave a comment
below.
Endorsements on
LinkedIn are also
highly appreciated! 
(your feedback = more free stuff)

MIROSLAWDABROWSKI.COM/downloads

More Related Content

PPT
PRINCE2 - Presentation
Matt Trigg
 
PPTX
Prince2 explained in 30mins
ILX Group
 
PDF
PRINCE2 Foundation Training Manual by Frank Turley
Frank Turley
 
PDF
PRINCE2 Practitioner Classroom slides - Sample
Frank Turley
 
PDF
AXELOS - P3O® - Portfolio, Programme and Project Offices - Foundation
Mirosław Dąbrowski C-level IT manager, CEO, Agile, ICF Coach, Speaker
 
PDF
DSDM® AgilePF® - Agile Project Framework - Foundation
Mirosław Dąbrowski C-level IT manager, CEO, Agile, ICF Coach, Speaker
 
PRINCE2 - Presentation
Matt Trigg
 
Prince2 explained in 30mins
ILX Group
 
PRINCE2 Foundation Training Manual by Frank Turley
Frank Turley
 
PRINCE2 Practitioner Classroom slides - Sample
Frank Turley
 
AXELOS - P3O® - Portfolio, Programme and Project Offices - Foundation
Mirosław Dąbrowski C-level IT manager, CEO, Agile, ICF Coach, Speaker
 
DSDM® AgilePF® - Agile Project Framework - Foundation
Mirosław Dąbrowski C-level IT manager, CEO, Agile, ICF Coach, Speaker
 

What's hot (20)

PDF
7 Themes of Prince2
Barry Hodge
 
PDF
Learn the PRINCE2 Principles ebook
Knowledge Train
 
PDF
PMO View Interactive Dashboard
Matt Angerer
 
PDF
PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...
Anand Bobade
 
PPT
Setting up a pmo
crmackenzie
 
PDF
PMO 101
shailsood
 
PDF
Agile project management using scrum
PrudentialSolutions
 
PDF
The funkiest PRINCE2 Processes revision guide on the internet
Knowledge Train
 
PDF
AXELOS - MoP® - Management of Portfolios - Foundation
Mirosław Dąbrowski C-level IT manager, CEO, Agile, ICF Coach, Speaker
 
PDF
Agile Delivery Powerpoint Presentation Slides
SlideTeam
 
PDF
Project Management Tools & Techniques | PMP® Training Videos | Project Manage...
Edureka!
 
PDF
AgilePM® - Agile Project Management - Foundation
Mirosław Dąbrowski C-level IT manager, CEO, Agile, ICF Coach, Speaker
 
PPTX
The PMO journey
Tery Everett
 
PDF
Introduction To Scrum
Dave Neuman
 
PDF
PMO Frameworks
Michael Kaplan
 
PDF
PMP® Training Video | PMBOK® Guide Sixth Edition Training | PMP® Certificatio...
Edureka!
 
PDF
Project Management Tutorial | PMP Certification | Edureka
Edureka!
 
PDF
PRINCE2 Process Model Flow Diagram
Antony della Porta MBA GPM-m
 
PDF
PMBOK PROCESS FLOW.pdf
Balamurali J, PMP
 
PDF
Professional Scrum Product Owner I (PSPO-I)
Mirosław Dąbrowski C-level IT manager, CEO, Agile, ICF Coach, Speaker
 
7 Themes of Prince2
Barry Hodge
 
Learn the PRINCE2 Principles ebook
Knowledge Train
 
PMO View Interactive Dashboard
Matt Angerer
 
PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...
Anand Bobade
 
Setting up a pmo
crmackenzie
 
PMO 101
shailsood
 
Agile project management using scrum
PrudentialSolutions
 
The funkiest PRINCE2 Processes revision guide on the internet
Knowledge Train
 
AXELOS - MoP® - Management of Portfolios - Foundation
Mirosław Dąbrowski C-level IT manager, CEO, Agile, ICF Coach, Speaker
 
Agile Delivery Powerpoint Presentation Slides
SlideTeam
 
Project Management Tools & Techniques | PMP® Training Videos | Project Manage...
Edureka!
 
AgilePM® - Agile Project Management - Foundation
Mirosław Dąbrowski C-level IT manager, CEO, Agile, ICF Coach, Speaker
 
The PMO journey
Tery Everett
 
Introduction To Scrum
Dave Neuman
 
PMO Frameworks
Michael Kaplan
 
PMP® Training Video | PMBOK® Guide Sixth Edition Training | PMP® Certificatio...
Edureka!
 
Project Management Tutorial | PMP Certification | Edureka
Edureka!
 
PRINCE2 Process Model Flow Diagram
Antony della Porta MBA GPM-m
 
PMBOK PROCESS FLOW.pdf
Balamurali J, PMP
 
Ad

Viewers also liked (19)

PDF
PRINCE2 Foundation Workshops -- Organization
Frank Turley
 
PDF
REQB® - Foundation Level Requirements Manager
Mirosław Dąbrowski C-level IT manager, CEO, Agile, ICF Coach, Speaker
 
PDF
AgileBA® - Agile Business Analysis - Foundation
Mirosław Dąbrowski C-level IT manager, CEO, Agile, ICF Coach, Speaker
 
PDF
IQBBA® - Foundation Level Business Analyst
Mirosław Dąbrowski C-level IT manager, CEO, Agile, ICF Coach, Speaker
 
PDF
REQB® - Advanced Level Requirements Manager
Mirosław Dąbrowski C-level IT manager, CEO, Agile, ICF Coach, Speaker
 
PDF
APMP: The APM Project Management Qualification
Mirosław Dąbrowski C-level IT manager, CEO, Agile, ICF Coach, Speaker
 
PRINCE2 Foundation Workshops -- Organization
Frank Turley
 
REQB® - Foundation Level Requirements Manager
Mirosław Dąbrowski C-level IT manager, CEO, Agile, ICF Coach, Speaker
 
AgileBA® - Agile Business Analysis - Foundation
Mirosław Dąbrowski C-level IT manager, CEO, Agile, ICF Coach, Speaker
 
APMP: The APM Project Management Qualification
Mirosław Dąbrowski C-level IT manager, CEO, Agile, ICF Coach, Speaker
 
Ad

Similar to AXELOS - PRINCE2® Foundation (20)

PDF
P3O.pdf
MarjolijnvanBoven1
 
PDF
AXELOS - MSP® - Managing Successful Programmes - Foundation
Mirosław Dąbrowski C-level IT manager, CEO, Agile, ICF Coach, Speaker
 
PDF
AgilePM® V2 - Agile Project Management V2 - Foundation
Mirosław Dąbrowski C-level IT manager, CEO, Agile, ICF Coach, Speaker
 
PDF
AXELOS - MoV® - Management of Value - Foundation
Mirosław Dąbrowski C-level IT manager, CEO, Agile, ICF Coach, Speaker
 
PPTX
PMP, vs Princes vs AIPM & IPMA certifications
Joel Dupont, CSM®, PMP®, Prince2®
 
PPTX
PMP Exam Prep Course Preview
Invensis Learning
 
PDF
AXELOS - M_o_R® - Management of Risk - Foundation
Mirosław Dąbrowski C-level IT manager, CEO, Agile, ICF Coach, Speaker
 
PPT
PMP study TTT
Jean Pаoli
 
PDF
PMP Prep Course(English)
Dong-Hwan Han, Ph.D.
 
PPTX
CAPM Exam Prep Course Preview
Invensis Learning
 
PDF
PMP Course Outline
Raghunandan Venugopal
 
PDF
PMP Certification Brochure
Knowledgehut
 
PPT
How to Become a Certified PMP | ISEL GLOBAL
ISELGlobal
 
PPTX
Comparing PMP and PRINCE2 Certifications | Invensis Learning
Invensis Learning
 
PDF
PMP vs Prince2 vs PMI-ACP
Edureka!
 
PPTX
Path to PMP
Edureka!
 
PPT
0. Course Introduction
Intro C# Book
 
PDF
Pmp with-ms-project-2013
Knowledgehut
 
AXELOS - MSP® - Managing Successful Programmes - Foundation
Mirosław Dąbrowski C-level IT manager, CEO, Agile, ICF Coach, Speaker
 
AgilePM® V2 - Agile Project Management V2 - Foundation
Mirosław Dąbrowski C-level IT manager, CEO, Agile, ICF Coach, Speaker
 
AXELOS - MoV® - Management of Value - Foundation
Mirosław Dąbrowski C-level IT manager, CEO, Agile, ICF Coach, Speaker
 
PMP, vs Princes vs AIPM & IPMA certifications
Joel Dupont, CSM®, PMP®, Prince2®
 
PMP Exam Prep Course Preview
Invensis Learning
 
AXELOS - M_o_R® - Management of Risk - Foundation
Mirosław Dąbrowski C-level IT manager, CEO, Agile, ICF Coach, Speaker
 
PMP study TTT
Jean Pаoli
 
PMP Prep Course(English)
Dong-Hwan Han, Ph.D.
 
CAPM Exam Prep Course Preview
Invensis Learning
 
PMP Course Outline
Raghunandan Venugopal
 
PMP Certification Brochure
Knowledgehut
 
How to Become a Certified PMP | ISEL GLOBAL
ISELGlobal
 
Comparing PMP and PRINCE2 Certifications | Invensis Learning
Invensis Learning
 
PMP vs Prince2 vs PMI-ACP
Edureka!
 
Path to PMP
Edureka!
 
0. Course Introduction
Intro C# Book
 
Pmp with-ms-project-2013
Knowledgehut
 

Recently uploaded (20)

PPTX
Pakistan’s Leading Manpower Export Agencies for Qatar
Glassrooms Dubai
 
PPTX
PUBLIC RELATIONS N6 slides (4).pptx poin
chernae08
 
PDF
Using Innovative Solar Manufacturing to Drive India's Renewable Energy Revolu...
Insolation Energy
 
PDF
A Complete Guide to Data Migration Services for Modern Businesses
Aurnex
 
PPTX
Appreciations - July 25.pptxffsdjjjjjjjjjjjj
anushavnayak
 
PPTX
Memorandum and articles of association explained.pptx
Keerthana Chinnathambi
 
PDF
2025 07 29 The Future, Backwards Agile 2025.pdf
Daniel Walsh
 
PPTX
Brain Based Enterprises - Harmonising Man, Woman and Machine
Peter Cook
 
PPTX
Virbyze_Our company profile_Preview.pptx
myckwabs
 
PDF
High Capacity Core IC Pneumatic Spec-Sheet
Forklift Trucks in Minnesota
 
PPTX
E-Way Bill under GST – Transport & Logistics.pptx
Keerthana Chinnathambi
 
PPTX
Final PPT on DAJGUA, EV Charging, Meter Devoloution, CGRF, Annual Accounts & ...
directord
 
PDF
Followers to Fees - Social media for Speakers
Corey Perlman, Social Media Speaker and Consultant
 
PDF
GenAI for Risk Management: Refresher for the Boards and Executives
Alexei Sidorenko, CRMP
 
PDF
NewBase 24 July 2025 Energy News issue - 1805 by Khaled Al Awadi._compressed...
Khaled Al Awadi
 
PDF
askOdin - An Introduction to AI-Powered Investment Judgment
YekSoon LOK
 
PPTX
Integrative Negotiation: Expanding the Pie
badranomar1990
 
PDF
NewBase 26 July 2025 Energy News issue - 1806 by Khaled Al Awadi_compressed.pdf
Khaled Al Awadi
 
DOCX
unit 1 BC.docx - INTRODUCTION TO BUSINESS COMMUICATION
MANJU N
 
PDF
India Cold Chain Storage And Logistics Market: From Farm Gate to Consumer – T...
Kumar Satyam
 
Pakistan’s Leading Manpower Export Agencies for Qatar
Glassrooms Dubai
 
PUBLIC RELATIONS N6 slides (4).pptx poin
chernae08
 
Using Innovative Solar Manufacturing to Drive India's Renewable Energy Revolu...
Insolation Energy
 
A Complete Guide to Data Migration Services for Modern Businesses
Aurnex
 
Appreciations - July 25.pptxffsdjjjjjjjjjjjj
anushavnayak
 
Memorandum and articles of association explained.pptx
Keerthana Chinnathambi
 
2025 07 29 The Future, Backwards Agile 2025.pdf
Daniel Walsh
 
Brain Based Enterprises - Harmonising Man, Woman and Machine
Peter Cook
 
Virbyze_Our company profile_Preview.pptx
myckwabs
 
High Capacity Core IC Pneumatic Spec-Sheet
Forklift Trucks in Minnesota
 
E-Way Bill under GST – Transport & Logistics.pptx
Keerthana Chinnathambi
 
Final PPT on DAJGUA, EV Charging, Meter Devoloution, CGRF, Annual Accounts & ...
directord
 
Followers to Fees - Social media for Speakers
Corey Perlman, Social Media Speaker and Consultant
 
GenAI for Risk Management: Refresher for the Boards and Executives
Alexei Sidorenko, CRMP
 
NewBase 24 July 2025 Energy News issue - 1805 by Khaled Al Awadi._compressed...
Khaled Al Awadi
 
askOdin - An Introduction to AI-Powered Investment Judgment
YekSoon LOK
 
Integrative Negotiation: Expanding the Pie
badranomar1990
 
NewBase 26 July 2025 Energy News issue - 1806 by Khaled Al Awadi_compressed.pdf
Khaled Al Awadi
 
unit 1 BC.docx - INTRODUCTION TO BUSINESS COMMUICATION
MANJU N
 
India Cold Chain Storage And Logistics Market: From Farm Gate to Consumer – T...
Kumar Satyam
 

AXELOS - PRINCE2® Foundation

  • 2. Course administration Course introduction Start and finish Course style LunchCoffee and breaks M00 - Course introduction 2/17 | 2/434
  • 3. Course objectives At the end of this course, you will be able to:  The underpinning philosophy, principles, terminology of PRINCE2  Understand PRINCE2 project lifecycle including processes and themes  Define PRINCE2 roles and responsibilities  Describe PRINCE2 techniques and procedures  The products/artefacts produced by PRINCE2 Main goal  Attempt Foundation exam with confidence  Communicate freely within PRINCE2 project, understanding its principles and philosophy Secondary goal  Benefits and value of project management and PRINCE2 Course introduction M00 - Course introduction 3/17 | 3/434
  • 4.  Please share with the class:  Your name and surname  Your organization  Your profession  Title, function, job responsibilities  Your familiarity with the project management  Your experience with PRINCE2/PMBOK/IPMA  Your personal session expectations Course introduction Let’s Get to Know Each Other M00 - Course introduction 4/17 | 4/434
  • 5. Day1 Module Subject Start End Total Time (in hours) 01 Defining project management and PRINCE2 09:00 11:00 02:00 02 Organization theme 11:00 12:15 01:15 03 Starting up a Project (SP) 12:15 13:00 00:45 Lunch 13:00 13:30 00:30 04 Business Case theme 13:30 14:45 01:15 05 Initiating a Project (IP) 14:45 16:30 01:45 Recap Day 1 (including sample exam questions) 16:30 17:00 00:30 Total Training Time 08:00 Course agenda - Day 1 Course introduction M00 - Course introduction 5/17 | 5/434
  • 6. Day2 Module Subject Start End Total Time (in hours) Review Day 1 09:00 09:15 00:15 06 Plans theme 09:15 10:30 01:15 07 Quality theme 10:30 11:45 01:15 08 Risk theme 11:45 13:00 01:15 Lunch 13:00 13:30 00:30 09 Managing a Stage Boundary (MSB) 13:30 15:15 01:45 10 Progress theme 15:15 16:30 01:15 Recap Day 2 (including sample exam questions) 16:30 17:00 00:30 Total Training Time 08:00 Course agenda - Day 2 Course introduction M00 - Course introduction 6/17 | 6/434
  • 7. Day3 Module Subject Start End Total Time (in hours) Review Day 2 09:00 09:15 00:15 11 Controlling a Stage (CS) 09:15 10:45 01:30 12 Change theme 10:45 13:00 02:15 Lunch 13:00 13:30 00:30 13 Managing Product Delivery (MPD) 13:30 14:45 01:15 14 Closing a Project (CP) 14:45 15:15 00:30 15 Directing a Project (DP) 15:15 16:00 00:45 Foundation exam 16:00 17:00 Total Training Time 07:00 Course agenda - Day 3 Course introduction M00 - Course introduction 7/17 | 7/434
  • 8. PRINCE2 Foundation certification  Foundation Exam  Paper based and closed book exam  Only pencil and eraser are allowed  Simple multiple (ABCD) choice exam  Only one answer is correct  75 questions, pass mark is 35 (50%)  max 70 points, 5 questions of control  1 hour exam  No negative points, no “Tricky Questions”  No pre-requisite for Foundation exam  Sample, two (official) mock exams are provided to you Course introduction Candidates completing an examination in a language that is not their mother tongue, will receive additional time M00 - Course introduction 8/17 | 8/434
  • 9. PRINCE2 Practitioner certification  Practitioner Exam  Paper based and open book exam  Reference to PRINCE2 Handbook ONLY  Handbook is provided for students  2:30 hour exam  4 questions worth 20 marks each (80 marks), pass mark is 35 (50%)  Dictionary/translation lists allowed for non- native speakers  Non-scientific calculator for basic calculations  Foundation certification is required Course introduction Candidates completing an examination in a language that is not their mother tongue, will receive additional time M00 - Course introduction 9/17 | 9/434
  • 10. PRINCE2 Professional certification  Professional Exam (January 2012)  Assessment is against 19 individual performance criteria (there is no written examination)  Level 0, 1, 2, 3  2.5 day exam (in PRINCE2 Professional assessment centre)  Group activities and exercises (usually in groups of 4, as well as a one-to-one interview, and your performance will be rated)  Based on a fictional project case study  Practitioner certification is required Course introduction Candidates completing an examination in a language that is not their mother tongue, will receive additional time M00 - Course introduction 10/17 | 10/434
  • 11. PRINCE2 official handbook and examination syllabus Course introduction PRINCE2 syllabus section code and title OV Overview, Principles and Tailoring PRINCE2 BC Business Case theme OR Organization theme QU Quality theme PL Plans theme RK Risk theme CH Change theme PG Progress theme SU Starting up a Project process DP Directing a Project process IP Initiating a Project process SB Managing a Stage Boundary process CS Controlling a Stage process MP Managing Product Delivery process CP Closing a Project process Module slide number / total module slides Slide number / total slides Module number and name Syllabus Handbook Page PRINCE2 handbook page PRINCE2 syllabus section code M00 - Course introduction 11/17 | 11/434
  • 12. PRINCE2 interactive study guide mind map Course introduction See Appendix #2 for more mind maps from AXELOS Global Best Practice M00 - Course introduction 12/17 | 12/434
  • 13. PRINCE2 interactive glossary Course introduction quizlet.com/45249735/ M00 - Course introduction 13/17 | 13/434
  • 14. PRINCE2 Project Processes vs Products vs Roles vs Responsibilities Matrix Course introduction M00 - Course introduction 14/17 | 14/434
  • 15. PRINCE2 Process model Course introduction M00 - Course introduction 15/17 | 15/434
  • 16. PRINCE2 – Free complete set of PRINCE2 document templates Course introduction M00 - Course introduction 16/17 | 16/434
  • 17. About course author - Mirosław Dąbrowski Course introduction twitter.com/mirodabrowski linkedin.com/in/miroslawdabrowski google.com/+miroslawdabrowski miroslaw_dabrowski www.miroslawdabrowski.com Mirosław Dąbrowski Agile Coach, Trainer, Consultant (former JEE/PHP developer, UX/UI designer, BA/SA) Creator Writer / Translator Trainer / Coach • Creator of 50+ mind maps from PPM and related topics (2mln views): miroslawdabrowski.com • Lead author of more than 50+ accredited materials from PRINCE2, PRINCE2 Agile, MSP, MoP, P3O, ITIL, M_o_R, MoV, PMP, Scrum, AgilePM, DSDM, CISSP, CISA, CISM, CRISC, CGEIT, TOGAF, COBIT5 etc. • Creator of 50+ interactive mind maps from PPM topics: mindmeister.com/users/channel/2757050 • Product Owner of biggest Polish project management portal: 4PM: 4pm.pl (15.000+ views each month) • Editorial Board Member of Official PMI Poland Chapter magazine: “Strefa PMI”: strefapmi.pl • Official PRINCE2 Agile, AgilePM, ASL2, BiSL methods translator for Polish language • English speaking, international, independent trainer and coach from multiple domains. • Master Lead Trainer & Coach • 11+ years in training and coaching / 15.000+ hours • 100+ certifications • 5000+ people trained and coached • 25+ trainers trained and coached linkedin.com/in/miroslawdabrowski Agile Coach / Scrum Master PM / IT architect Notable clients • 8+ years of experience with Agile projects as a Scrum Master, Product Owner and Agile Coach • Coached 25+ teams from Agile and Scrum • Agile Coach coaching C-level executives • Scrum Master facilitating multiple teams experienced with UX/UI + Dev teams • Experience multiple Agile methods • Author of AgilePM/DSDM Project Health Check Questionnaire (PHCQ) audit tool • Dozens of mobile and ecommerce projects • IT architect experienced in IT projects with budget above 10mln PLN and timeline of 3+ years • Experienced with (“traditional”) projects under high security, audit and compliance requirements based on ISO/EIC 27001 • 25+ web portal design and development and mobile application projects with iterative, incremental and adaptive approach ABB, AGH, Aiton Caldwell, Asseco, Capgemini, Deutsche Bank, Descom, Ericsson, Ericpol, Euler Hermes, General Electric, Glencore, HP Global Business Center, Ideo, Infovide-Matrix, Interia, Kemira, Lufthansa Systems, Media-Satrun Group, Ministry of Defense (Poland), Ministry of Justice (Poland), Nokia Siemens Networks, Oracle, Orange, Polish Air Force, Proama, Roche, Sabre Holdings, Samsung Electronics, Sescom, Scania, Sopra Steria, Sun Microsystems, Tauron Polish Energy, Tieto, University of Wroclaw, UBS Service Centre, Volvo IT… miroslawdabrowski.com/about-me/clients-and-references/ M00 - Course introduction 17/17 | 17/434 Accreditations/certifications (selected): CISA, CISM, CRISC, CASP, Security+, Project+, Network+, Server+, Approved Trainer: (MoP, MSP, PRINCE2, PRINCE2 Agile, M_o_R, MoV, P3O, ITIL Expert, RESILIA), ASL2, BiSL, Change Management, Facilitation, Managing Benefits, COBIT5, TOGAF 8/9L2, OBASHI, CAPM, PSM I, SDC, SMC, ESMC, SPOC, AEC, DSDM Atern, DSDM Agile Professional, DSDM Agile Trainer-Coach, AgilePM, OCUP Advanced, SCWCD, SCBCD, SCDJWS, SCMAD, ZCE 5.0, ZCE 5.3, MCT, MCP, MCITP, MCSE-S, MCSA-S, MCS, MCSA, ISTQB, IQBBA, REQB, CIW Web Design / Web Development / Web Security Professional, Playing Lean Facilitator, DISC D3 Consultant, SDI Facilitator, Certified Trainer Apollo 13 ITSM Simulation …
  • 19. 11. Progress theme 12. Controlling a Stage (CS) 13. Change theme 14. Managing Product Delivery (MPD) 15. Closing a Project (CP) 16. Directing a Project (DP) 1. Defining project management and PRINCE2 2. PRINCE2 principles 3. Organization theme 4. Starting up a Project (SP) 5. Business Case theme 6. Initiating a Project (IP) 7. Plans theme 8. Quality theme 9. Risk theme 10. Managing a Stage Boundary (MSB) Agenda Defining project management and PRINCE2 M01 - Defining project management and PRINCE2 2/29 | 19/434
  • 20. What is PRNCE2?  PRINCE2 is detailed project management method (HOW)  PRINCE2 is a structured (sequential) project management method based on principles and themes that originate from lessons learned from projects  The PRINCE2 project management approach is:  process based  product based  PRINCE2 provides easy to understand project lifecycle  PRINCE2 creates project organisation structure with clearly defined roles and responsibilities  PRINCE2 recognizes performance projects factors for time, costs, quality, scope, benefits and risks Defining project management and PRINCE2 M01 - Defining project management and PRINCE2 3/29 | 20/434
  • 21. 1970s •PROMPT 1983 •PROMPT II 1996 •PRINCE2 2002 •PRINCE2 update 2005 •PRINCE2 update 2009 •PRINCE2 update 2013 •AXELOS acquisition (new logo) •No changes in content 2015 •PRICE2 Agile PRINCE2 history Defining project management and PRINCE2 M01 - Defining project management and PRINCE2 4/29 | 21/434
  • 22. Project definition according to PRINCE2 Defining project management and PRINCE2 ©AXELOSLtd.2013.MaterialisreproducedunderlicencefromAXELOS. "A temporary organization that is created for the purpose of delivering one or more business products according to an agreed Business Case" 3OV0102M01 - Defining project management and PRINCE2 5/29 | 22/434
  • 23. Project management cycle according to PRINCE2 Defining project management and PRINCE2 ©AXELOSLtd.2013.MaterialisreproducedunderlicencefromAXELOS. Plan Delegate Monitor Control 5M01 - Defining project management and PRINCE2 6/29 | 23/434
  • 24. 5 Factors that differentiate Projects from Business As Usual (BAU) Defining project management and PRINCE2 Factor Change Temporary Cross- Functional Unique Uncertainty 3OV0203 Changes in the business as Usual (BAU) in the form of a new products delivered by the project and with those new products there will be changes in the organization (e.g. new processes, training to the end users, etc.). The project has a finite beginning and end of what distinguishes it from what every day dealing with the client organization. Similarly each project phase has it's starting and ending date (with agreed tolerances). Customers and suppliers have various perspectives, motivations, expectations and attitudes to the project Bringing together of a temporary team with different skills working together to introduce a change that will impact others outside of the team. The project is implemented in a unique environment / context Among other things, the uniqueness is also another period of time in which the project is conducted (different place in time, different laws and regulations, etc.) Project involves a higher risk level than regular business operations Each project is uncertain venture can be successful or a failure to enhance the chance of successful completion of the project we need to manage uncertainty in the project, i.e.. the risk M01 - Defining project management and PRINCE2 7/29 | 24/434
  • 25. 6 project performance variables (effectiveness aspects) Defining project management and PRINCE2 Project costs timescales quality scope risk benefits 5OV0101M01 - Defining project management and PRINCE2 8/29 | 25/434
  • 26. PRINCE2 structure  PRINCE2 method involves 4 integrated elements:  The principles - 7 rules (a project compliant with PRINCE2 must be compliant with all the principles)  The themes - 7 project management areas  The processes - 7 groups of activities specifying step by step what should/must be done within the project its lifecycle  Tailoring PRINCE2 to the project - tailoring PRINCE2 method to suit the project/organisation environment/context requirements  PRINCE2 method also provides 2 general techniques:  product-based planning  quality review Defining project management and PRINCE2 5OV0103M01 - Defining project management and PRINCE2 9/29 | 26/434
  • 27. PRINCE2 Themes PRINCE2 Principles Progress Business Case Organisation Quality Risk Change Plans PROJECT ENVIRONMENT ©AXELOSLtd.2013.MaterialisreproducedunderlicencefromAXELOS. PRINCE2 Processes 6OV0103M01 - Defining project management and PRINCE2 10/29 | 27/434
  • 28. Pre-project Initiation stage Final delivery stage After the project Subsequent delivery stage(s) Subsequent delivery stage General process model at PRINCE2 Defining project management and PRINCE2 ©AXELOSLtd.2013.MaterialisreproducedunderlicencefromAXELOS. 113OV0206 Legend • SP - Starting up a Project • IP - Initiating a Project • SB - Managing a Stage Boundary • MPD - Managing Product Delivery • CP - Closing a Project • DP - Directing a Project • CS - Controlling a Stage Directing Managing Delivering SP IP CS CS CS MSB MSB MSB CP DP MPD MPD MPD MPD MPDMPD MPD MPD MPD M01 - Defining project management and PRINCE2 11/29 | 28/434
  • 29. Pre-project Initiation stage Final delivery stage Post-project Two-stage project PRINCE2 model Defining project management and PRINCE2 DP MSB CP IP SP Directing Managing Delivering MPD CS MPD MPD ©AXELOSLtd.2013.MaterialisreproducedunderlicencefromAXELOS. Legend • SP - Starting up a Project • IP - Initiating a Project • SB - Managing a Stage Boundary • MPD - Managing Product Delivery • CP - Closing a Project • DP - Directing a Project • CS - Controlling a Stage A project has at least 2 management stages: • Initiation stage (during which the project is planned) • At least one more to cover the delivery of the project’s specialist products OV0206M01 - Defining project management and PRINCE2 12/29 | 29/434
  • 30. Directing Managing Delivering DP Pre-project Initiation Stage + Final delivery stage Post-project One-stage project PRINCE2 model (shortest possible version of PRINCE2) Defining project management and PRINCE2 ©AXELOSLtd.2013.MaterialisreproducedunderlicencefromAXELOS. OV0206 SP CP IP CS MPDMPD MPD Legend • SP - Starting up a Project • IP - Initiating a Project • SB - Managing a Stage Boundary • MPD - Managing Product Delivery • CP - Closing a Project • DP - Directing a Project • CS - Controlling a Stage M01 - Defining project management and PRINCE2 13/29 | 30/434
  • 31. What PRINCE2 does not provide?  PRINCE2 method does not include:  Specialist aspects (PRINCE2 is purely general in nature, not industry/domain specific)  Detailed project management techniques (see PMBOK Guide)  Leadership/coaching/mentoring skills  Soft-skills  Communication techniques  Human resource management  Contract negotiations  Software for project management  … Defining project management and PRINCE2 6M01 - Defining project management and PRINCE2 14/29 | 31/434
  • 32.  Applies to any type or project and business domain  Project security with EWIs and risk management  Accountability with clearly defined roles  Project process analysis and optimisation  Efficient use of senior management time by “management by exception”  License-free  Full project control/assurance  Common vocabulary and approach  Tailored project documentation  Proven integration with Agile (e.g. DSDM/Scrum) Defining project management and PRINCE2 Key benefits of adopting PRINCE2 7OV0201M01 - Defining project management and PRINCE2 15/29 | 32/434
  • 33. PRINCE2 and integration with Agile -> Proven integration between PRINCE2 and Agile… Defining project management and PRINCE2 Keith Richards, KRC Consultants; Lead Author of: • DSDM Atern (method and official handbook) • Agile Project Management: Running PRINCE2 Projects with DSDM Atern Agile Project Management: Running PRINCE2 Projects with DSDM Atern • ISBN-13: 978-0113310586 • Publisher: TSO (The Stationery Office) (2007) M01 - Defining project management and PRINCE2 16/29 | 33/434
  • 34. PRINCE2 and integration with Agile -> PRINCE2 Agile Defining project management and PRINCE2 Keith Richards, agileKRC; Lead Author of: • PRINCE2 Agile (method and official handbook) M01 - Defining project management and PRINCE2 17/29 | 34/434
  • 35. Relationship with other AXELOS Global Best Practices Defining project management and PRINCE2 Portfolio management Portfolio(s) Office Programme management Programme(s) Office Project(s) Office Project management Project management Project management ManagementofRisk(M_o_R) ITIL ManagementofValue(MoV) 6 RESILIA M01 - Defining project management and PRINCE2 18/29 | 35/434
  • 36. The Portfolio, Programme, and Project Management Maturity Model (P3M3) ITIL Maturity Model (IMM) Relationship with other AXELOS Global Best Practices and Models Defining project management and PRINCE2 ITILPortfolio, Programme and Project Offices (P3O) Management of Value (MoV) Management of Risk (M_o_R) Best practice guides AXELOS common glossary PRINCE2 Maturity Model (P2MM) Models (MoP) Management of Portfolios (MSP) Managing Successful Programmes (PRINCE2) PRojects IN Controlled Environments Portfolio Office Programme Office Project Office RESILIA M01 - Defining project management and PRINCE2 19/29 | 36/434
  • 37. How PRINCE2 fits with other AXELOS Global Best Practice Guides Defining project management and PRINCE2 P3O MoP M_o_R MSPMoV ITIL RESILIA  Can be used as a method for delivering IT projects having requirements regarding reporting, compliance, control and risk management  Integrates with PMOs by dedicated roles strictly responsible for project support and project assurance  Support project monitoring and control at the portfolio level with KPIs, KRIs and EWIs  PRINCE2 uses risk management process defined in M_o_R allowing PRINCE2 to be easily integrated within enterprise risk management (ERM)  Offers predictable products delivery within programme  Provides framework for producing products acting as options for value improvement proposals framework  Can be used as a method for implementing Cyber Resilience into IT services M01 - Defining project management and PRINCE2 20/29 | 37/434
  • 38. M01 - Defining project management and PRINCE2 21/29 | 38/434
  • 39. PRINCE2 in numbers (version 2009) Defining project management and PRINCE2 7 7 7 40 10 4 2 2 5 6 26 Principles Themes Processes Sub-processes Project roles QA roles Procedures Techniques Project factors Performance factors Management products 3Issue types3 Budget types M01 - Defining project management and PRINCE2 22/29 | 39/434
  • 40. M01 - Defining project management and PRINCE2 23/29 | 40/434
  • 41. World’s best known Project Management standardization/certifications bodies Defining project management and PRINCE2 M01 - Defining project management and PRINCE2 24/29 | 41/434
  • 42. World’s best known Project Management publications Defining project management and PRINCE2 4th version (2015) 5th version (2013) 4th version (2009) 6th version (2012) 11th version M01 - Defining project management and PRINCE2 25/29 | 42/434
  • 43. AXELOS PRINCE2, PMI PMBOK Guide, IPMA ICB, APM Body of Knowledge, TenStep Defining project management and PRINCE2 PRINCE2 PMI PMBOK Guide IPMA ICB APM Body of Knowledge TenStep Type Methodology/Method Standard Competency Best Practice Methodology Model Process based Process based Competency/skills based Recommendations/ Guidelines Process based Roles & responsibilities PM competencies Tools & Techniques 2 Document outlines Soft skills mentioned Certifications Foundation, Practitioner, Professional, Agile CAPM, PMP, PGMP, PFMP, PMI-SP, PMI- RMP, PMI-ACP, PMI-PBA Level D, C, B, A APM IC, APMP, APM PPQ, PQ, APM Project Risk Management L1 and L2 Fn-TSPM, TSPM Accreditationof training materials Commercial methodology trainers PMP required training organizations in some countries only, not unified Number of certified people Foundation: 776,000+ Practitioner: 400,000+ Professional: 100+ PRINCE2 Agile: - CAPM: 30,000+ PMP: 686,500+ PMI-ACP: 10,000+ Level D: 170,000+ Level C: 61,000+ Level B: 13,000+ Level A: 800+ no data no data M01 - Defining project management and PRINCE2 26/29 | 43/434
  • 44. Module review and summary  Project definition  Project management cycle  5 Factors that differentiate Projects from BAU  6 project performance variables  PRINCE2 structure  7 Principles  7 Themes  7 Processes  Tailoring PRINCE2 project  PRINCE2 general process model  What PRINCE2 does not provide  Key benefits of adopting PRINCE2 Defining project management and PRINCE2 M01 - Defining project management and PRINCE2 27/29 | 44/434
  • 45. Q&A Defining project management and PRINCE2 M01 - Defining project management and PRINCE2 28/29 | 45/434
  • 46. I hope you enjoyed this presentation. If so, please like, share and leave a comment below. Endorsements on LinkedIn are also highly appreciated!  (your feedback = more free stuff)  MIROSLAWDABROWSKI.COM/downloads