Civilverse Admin 17 January 2021
Basics of Contract Management
civilverse.org/contract-management-basics
Table of Content for Basics of Contract Management-
1. Introduction
2. What is Contract and Contract Management?
3. Need for Contract Management
4. Contract Management Life Cycle
5. Stages of Contract Management
1. Formulation of Contract
2. Contract Administration
3. Risk Management
4. Ending Contract
5. Contract Review
6. Best Practices of Contract Management
1. Introduction-
The businesses require the collaboration of teams to successfully achieve their objectives.
These collaborations happen with the vendors, suppliers, clients, contractors and even
customers via signed contracts between them. The parties involved in contracts abide by
the terms mentioned in it.
A clear understanding of the basics of contract management enables the contract manager
to successfully execute the contract.
2/6
2. What is Contract and Contract Management?
The section 2(b) of Indian Contract Act, 1872 defines the contract as-
“any agreement enforceable by law”
The same section also defines the other terms related to the contract such as offer,
acceptance, promise, promisor and promise, consideration, agreement, reciprocal
promises, void agreement, etc. The same can be read in details here.
2.1 Contract Management-
Contract Management can be summarised as the process of performing activities that
enables both the contracting authority and the contractor to fulfil their contractual
obligations. It also ensures the contract meets the optimum combination of cost, time,
and quality during the contract period.
3. Need for Contract Management-
A contract can’t run itself; it needs to be proactively managed. Contract management
needs resources to manage it. The key resources are Project Manager, Contract Manager,
Contracting Authority, and Contractor’s representative.
The contract management fulfils the following objectives-
a. Protect the agreed contractual position.
b. Accept deliverables under the contract.
c. Maintain agreed allocation of risks.
d. Monitor contractor’s performance against output specifications.
e. Take appropriate action on the financial implication of any failure.
f. Ensure that payments are conditional upon the contractor’s quality of performance.
g. Maintain continuous improvements & service deliveries.
4. Contract Management Lifecycle-
The contract management lifecycle can be broadly classified into two parts- pre-award
and post-award. The pre-award activities include initiation, planning, and tender
preparation. The post-award activities are execution, performance measurement, closing
and review.
3/6
Contract Management Life Cycle
The steps of contract management lifecycle are-
4.1 Pre-award-
a. Prepare a procurement note stating the purpose, requirement and need of the
procurement.
b. Develop Procurement Process, specifications, contract strategy, tender evaluation
criteria.
c. Do market survey for current market practices, trends, price schedules etc.
d. Publish a Specific Procurement Note or an advertisement.
e. Invite Tenders and Receive them.
f. Clarify the ambiguities or doubts, if any from the contractors who have submitted
the tenders.
g. Evaluate the submitted contracts as per predefined tender evaluation criteria and
award the contract to the most suitable bidder.
h. Debrief the unsuccessful bidders or disqualified bidders.
4.2 Post-award-
i. Manage contract during the execution by performance measurement of the
contractor as per the defined contractual parameters, risk assessment and
mitigation, maintaining timeline and quality during the contract period.
ii. Keep the contractor in the loop regarding the variations on contract and apprise the
contractor of its performance.
iii. Post closure of the contract, maintain a feedback register to record findings,
learnings, observations, risks, etc. to use them as the benchmark for the future
procurement process.
5. Stages of Contract Management-
4/6
The basics of contract management must include the stages of contract management as it
increases the control of contract manager over the entire process and helps in easier
execution. The contract goes through five stages throughout its life. The stages are as
formulation, administration, risk management, closure and review.
5.1 Formulation of a Contract-
A contract has component documents dealing with the different topics and bound
together in a logical sequence. It has price schedules, schedules of works, requirement,
technical specifications, agreement, distribution list, general terms and conditions, special
conditions, other amendments to the contract, agreed work methodology, contractor’s
notification of contract award.
The contract should be prepared in line with the equality, mutual benefit of the
contracting authority and contractor and applicable law.
The main focus should be kept on following areas while preparing the contract-
a. Specifications
b. General Clauses- Applicable law, the language of communication, the order of
precedence, communication route etc.
c. Main responsibilities of the owner and contractor.
d. Commercial Clauses.
e. Contract Execution Timeline- Commencement, work program, procurement and
delivery, delays etc.
f. Compliance with specifications- QA policy, inspection, testing, the rectification of
defects.
g. Payment- Assessment and certification method, time of payment, method of
payment and delayed payment etc.
h. Variations and Claims.
i. Titles-Ownership of objects, materials, equipment at the site.
j. Risks- Provision for damage in transportation, theft etc.
k. Insurances.
l. Force Majeure.
m. Failure to Perform-Termination, security, delay damages, performance guarantee.
n. Other area-Breach of contract, social and environmental issue.
o. Resolution of Disputes.
5.2 Contract Administration-
The contract administration can be explained by following activities-
a. Maintaining contact details of key personnel.
b. Scheduling of meetings and notice periods.
c. Developing and maintain a mechanism for managing things.
d. Monitoring cost and payment procedure.
e. Establishment & maintaining contract documentation.
5/6
f. Management reporting.
5.3 Risk Management-
The study of risk is an integral part of contract management. When studying the basics of
contract management, it comes important to get an understanding of the process of risk
management.
The risk management process involves the identification and assessment of risks, their
evaluation, treatment and mitigation.
The major risks arise from variations in the contract. The variations arise due to the
change in work scope, design change, error/omission in design, different site conditions,
value engineering, change in technology, the extension of duration, legislative change,
poor contract management, safety consideration, genuine unforeseen circumstances.
Further, the variations in the contract can lead to the change in cost, change in funding
requirement, delays and EOTs, wasted or additional efforts, unproductive labour cost,
reprogramming of contract to absorb or reduce the effects of variations.
5.4 Ending Contract-
A contract is closed when the contractual obligations of both the parties have been
completed. Sometimes, the contract is ended even if any one of the parties don’t perform
their contractual obligations well.
Upon closure of contract; joint inspection, commissioning and handover are done
followed by settlement of final bill of the contractor and the issuance pf the taking-over
certificate by the employer to the contractor along with the release of securities and
retention amount.
The employer can end the contract after 14 days of giving written notice or immediately
when the contractor fails to perform its duties, abandon the project, non-compliance with
the quality, sub-contracting to another contractor without written notice, bankruptcy etc.
The contractor can also end the contract when the employer fails to perform its duties,
failure to issue IPC within 56 days of receipt of documents, non-receipt of payment after
42 days of issuance of IPC, bankruptcy etc.
5.5 Contract Review-
The purpose of the contract review is to develop good practices of procurement and to
establish the benchmarks.
After the closure of the contract, arrangement benefits are assessed, the lessons learnt are
recorded, best practices are capitalised and performance is recorded for future reference.
The contract review checklist must include the review requirement, assessment of how the
requirements have developed, analysis of contract performance, recording of milestones.
6/6
6. The Best Practices of Contract Management-
Some of the best practices of the contract management are as follows-
a. The contract should be such formulated and administered to avoid/minimise the
variations, claims and delays.
b. Thorough planning, market survey and site inspection to be done when formulating
the contract to minimise/avoid the variance.
c. Technical specifications, QA/QC program and performance measurement should be
clearly defined to avoid any ambiguity at the execution stage.
d. Project kick-off meeting to be organised after contract award to bring the employer
and the contractor on the same page before starting execution.
e. In the Kick-off meeting, both the employer and the contractor to be apprised of each
other’s contractual obligations.
f. Payments should be linked with time and quality performance of the contractor.
g. Delays on account of employer and contractor should be separately recorded.
h. The risk register should be maintained.
i. Formal communication between the parties, minutes of the meetings etc. should be
recorded for future references.
j. Both the employer and the contractor should try to maintain the same staff
throughout the contract life as it builds the relationship and helps in the successful
implementation of the contract.
Liked the article? Please comment below to let me know. Also, help me to spread the word
about this blog by sharing it.
Check out my other article on Project Scheduling here.
For article on Basics of Building Information Modeling, click here.

More Related Content

PPTX
Contract management
pritesh gharat
 
PDF
Project procuremenet contract in ethiopia
Guta Mengesha
 
PPTX
Employee Satisfaction.pptx
RupaliTasnimSamad
 
PPT
Women's welfare & legal provisions
VIBHUTI PATEL
 
PPTX
prepositions
bezawada tarun reddy
 
PPTX
Working capital finance
VIKESH KUMAR
 
PPTX
Heat treatment : the best one
Abhijeet Dash
 
PDF
Airport Engineering
Arbaz Kazi
 
Contract management
pritesh gharat
 
Project procuremenet contract in ethiopia
Guta Mengesha
 
Employee Satisfaction.pptx
RupaliTasnimSamad
 
Women's welfare & legal provisions
VIBHUTI PATEL
 
prepositions
bezawada tarun reddy
 
Working capital finance
VIKESH KUMAR
 
Heat treatment : the best one
Abhijeet Dash
 
Airport Engineering
Arbaz Kazi
 

What's hot (20)

PPTX
CONTRACT ADMINISTRATION- Presentation dated 22.11.16
Arvind Solanki
 
PPTX
Construction contract
Rakshith Reddy
 
PDF
Contract Administration Presentation
Yanet Ormeno
 
PPTX
CONTRACTS AND ITS TYPES
Pundlik Rathod
 
PPTX
project management information system
Aswin prakash i , Xantus Technologies
 
PPT
Cp 2 selection of contractor - pq and post q
umes manandhar
 
PPTX
Contract Management
Gazi Sanaul Hasan
 
PPTX
Quality Management In Construction
Isidro Sid Calayag
 
PPTX
Tendering
kusha Ahmed
 
PPTX
Tender & Tender Notice
Sakshi Kirar
 
PPTX
Lecture 4 - selection of contract forms
kohwenqi
 
PPTX
Project cost control
Sourabh Modgil
 
PDF
Fidic contract
Yash Patel
 
PDF
contract management, stages of contract management
VISHAKA BOTHRA
 
PPTX
Tenders contract -arti
jagadish108
 
PDF
Lecture 2 project procurement and contract management .pdf
Ahmed Mohamed Hassan (Baasaay)
 
PDF
Fidic comparison red yellow - silver book
Hani Saad
 
PPTX
Total quality management models
Muzo Bacan
 
PPTX
project management concepts
Aswin prakash i , Xantus Technologies
 
CONTRACT ADMINISTRATION- Presentation dated 22.11.16
Arvind Solanki
 
Construction contract
Rakshith Reddy
 
Contract Administration Presentation
Yanet Ormeno
 
CONTRACTS AND ITS TYPES
Pundlik Rathod
 
project management information system
Aswin prakash i , Xantus Technologies
 
Cp 2 selection of contractor - pq and post q
umes manandhar
 
Contract Management
Gazi Sanaul Hasan
 
Quality Management In Construction
Isidro Sid Calayag
 
Tendering
kusha Ahmed
 
Tender & Tender Notice
Sakshi Kirar
 
Lecture 4 - selection of contract forms
kohwenqi
 
Project cost control
Sourabh Modgil
 
Fidic contract
Yash Patel
 
contract management, stages of contract management
VISHAKA BOTHRA
 
Tenders contract -arti
jagadish108
 
Lecture 2 project procurement and contract management .pdf
Ahmed Mohamed Hassan (Baasaay)
 
Fidic comparison red yellow - silver book
Hani Saad
 
Total quality management models
Muzo Bacan
 
project management concepts
Aswin prakash i , Xantus Technologies
 
Ad

Similar to Basics of Contract Management (20)

DOCX
Contracting process paper cpmgt302september 21, 2015
SONU61709
 
PPTX
Chapter 5.1 Contracts Management - Contract Administration-owners perspective...
ChandanLawrence
 
PDF
Top 20 Standard Contract Clauses Every Manager Should Know
SHAZEBALIKHAN1
 
PDF
10 Essentials For An Effective Construction Contract
Sarah Fox
 
PPTX
Chapter 9 - Admin Contract managment .pptx
BMKDTMQTBiThBchLin
 
PPTX
Contract management
Nishant Rai
 
PDF
Engineering Contract for project managers..pdf
bahatimosha17
 
PPT
Audit of contracts version 2
EMAC Consulting Group
 
PDF
Conduct procurements
Shereef Sabri
 
PDF
Contract Management
Setiono Winardi
 
PDF
The Professional Certificate in International & Construction Contract Managem...
Moabdallah
 
PDF
برنامج ادارة...
Moabdallah
 
DOCX
Contracting Process Paper CPMGT_302.docx
RebeccaEdwards88
 
PDF
Post Award Contract Management for IT Suppliers v1.0 20200701
Peter Soetevent
 
PPTX
Contracts & Claims Management Workshop (Session-1)
Tahir B Mirza
 
PDF
Green field making of production plant.ppt2
LT COLONEL VIKRAM BAKSHI ( RETD)
 
PDF
Green field project making of production plant
Vikram Bakshi
 
PDF
12 procurement
Waseem Siddique
 
PPT
Contract admn ajit philip
Farhan Moosa
 
PDF
Yam yih hwan pp1 assignment aug 14
마 이환
 
Contracting process paper cpmgt302september 21, 2015
SONU61709
 
Chapter 5.1 Contracts Management - Contract Administration-owners perspective...
ChandanLawrence
 
Top 20 Standard Contract Clauses Every Manager Should Know
SHAZEBALIKHAN1
 
10 Essentials For An Effective Construction Contract
Sarah Fox
 
Chapter 9 - Admin Contract managment .pptx
BMKDTMQTBiThBchLin
 
Contract management
Nishant Rai
 
Engineering Contract for project managers..pdf
bahatimosha17
 
Audit of contracts version 2
EMAC Consulting Group
 
Conduct procurements
Shereef Sabri
 
Contract Management
Setiono Winardi
 
The Professional Certificate in International & Construction Contract Managem...
Moabdallah
 
برنامج ادارة...
Moabdallah
 
Contracting Process Paper CPMGT_302.docx
RebeccaEdwards88
 
Post Award Contract Management for IT Suppliers v1.0 20200701
Peter Soetevent
 
Contracts & Claims Management Workshop (Session-1)
Tahir B Mirza
 
Green field making of production plant.ppt2
LT COLONEL VIKRAM BAKSHI ( RETD)
 
Green field project making of production plant
Vikram Bakshi
 
12 procurement
Waseem Siddique
 
Contract admn ajit philip
Farhan Moosa
 
Yam yih hwan pp1 assignment aug 14
마 이환
 
Ad

More from SHAZEBALIKHAN1 (20)

PDF
Critical Path Explained With 7 Q&As and a Free Excel Template
SHAZEBALIKHAN1
 
PDF
5 Project Risk Identification Tools I Use & How You Can Use Them Too
SHAZEBALIKHAN1
 
PDF
Residential Building Preliminary Cost Estimate- Excel Template
SHAZEBALIKHAN1
 
PDF
3 Most Important In-situ Soil Tests for Construction Works
SHAZEBALIKHAN1
 
PDF
5 Must Know Types of Concrete Testing for Civil Engineers
SHAZEBALIKHAN1
 
PDF
Construction Project Schedule Template- Residential Building
SHAZEBALIKHAN1
 
PDF
All About Construction Labour Planning- Excel Template
SHAZEBALIKHAN1
 
PDF
10 Powerful Construction Cost Estimation Steps
SHAZEBALIKHAN1
 
PDF
Construction Material Estimate with MS Excel file
SHAZEBALIKHAN1
 
PDF
Managing the Construction Claims Effectively
SHAZEBALIKHAN1
 
PDF
How Does MS Project Works 6- Task Controlling Factors
SHAZEBALIKHAN1
 
PDF
Most Popular 20 Evergreen Project Management Terms
SHAZEBALIKHAN1
 
PDF
Top 5 Concrete Quality Control Methods at Site
SHAZEBALIKHAN1
 
PDF
My 5 Learnings of Waterfall Project Management
SHAZEBALIKHAN1
 
PDF
Construction Project Schedule Example- Residential Building
SHAZEBALIKHAN1
 
PDF
5 Popular Types of Construction Contracts
SHAZEBALIKHAN1
 
PDF
Project Time Estimation 6 Powerful Tips & Tricks
SHAZEBALIKHAN1
 
PDF
Types of Building Foundations- Shallow and Deep
SHAZEBALIKHAN1
 
PDF
DCMA 14-Point Schedule Quality Check
SHAZEBALIKHAN1
 
PDF
Bamboo Reinforced Concrete - Criteria & Performance
SHAZEBALIKHAN1
 
Critical Path Explained With 7 Q&As and a Free Excel Template
SHAZEBALIKHAN1
 
5 Project Risk Identification Tools I Use & How You Can Use Them Too
SHAZEBALIKHAN1
 
Residential Building Preliminary Cost Estimate- Excel Template
SHAZEBALIKHAN1
 
3 Most Important In-situ Soil Tests for Construction Works
SHAZEBALIKHAN1
 
5 Must Know Types of Concrete Testing for Civil Engineers
SHAZEBALIKHAN1
 
Construction Project Schedule Template- Residential Building
SHAZEBALIKHAN1
 
All About Construction Labour Planning- Excel Template
SHAZEBALIKHAN1
 
10 Powerful Construction Cost Estimation Steps
SHAZEBALIKHAN1
 
Construction Material Estimate with MS Excel file
SHAZEBALIKHAN1
 
Managing the Construction Claims Effectively
SHAZEBALIKHAN1
 
How Does MS Project Works 6- Task Controlling Factors
SHAZEBALIKHAN1
 
Most Popular 20 Evergreen Project Management Terms
SHAZEBALIKHAN1
 
Top 5 Concrete Quality Control Methods at Site
SHAZEBALIKHAN1
 
My 5 Learnings of Waterfall Project Management
SHAZEBALIKHAN1
 
Construction Project Schedule Example- Residential Building
SHAZEBALIKHAN1
 
5 Popular Types of Construction Contracts
SHAZEBALIKHAN1
 
Project Time Estimation 6 Powerful Tips & Tricks
SHAZEBALIKHAN1
 
Types of Building Foundations- Shallow and Deep
SHAZEBALIKHAN1
 
DCMA 14-Point Schedule Quality Check
SHAZEBALIKHAN1
 
Bamboo Reinforced Concrete - Criteria & Performance
SHAZEBALIKHAN1
 

Recently uploaded (20)

PPTX
Information Retrieval and Extraction - Module 7
premSankar19
 
PPTX
22PCOAM21 Data Quality Session 3 Data Quality.pptx
Guru Nanak Technical Institutions
 
PDF
67243-Cooling and Heating & Calculation.pdf
DHAKA POLYTECHNIC
 
PDF
2010_Book_EnvironmentalBioengineering (1).pdf
EmilianoRodriguezTll
 
PPTX
easa module 3 funtamental electronics.pptx
tryanothert7
 
PDF
Advanced LangChain & RAG: Building a Financial AI Assistant with Real-Time Data
Soufiane Sejjari
 
PPTX
AgentX UiPath Community Webinar series - Delhi
RohitRadhakrishnan8
 
PDF
top-5-use-cases-for-splunk-security-analytics.pdf
yaghutialireza
 
PDF
flutter Launcher Icons, Splash Screens & Fonts
Ahmed Mohamed
 
PDF
EVS+PRESENTATIONS EVS+PRESENTATIONS like
saiyedaqib429
 
PDF
Biodegradable Plastics: Innovations and Market Potential (www.kiu.ac.ug)
publication11
 
PDF
67243-Cooling and Heating & Calculation.pdf
DHAKA POLYTECHNIC
 
PPTX
database slide on modern techniques for optimizing database queries.pptx
aky52024
 
PDF
Introduction to Data Science: data science process
ShivarkarSandip
 
PPTX
Module2 Data Base Design- ER and NF.pptx
gomathisankariv2
 
PPTX
22PCOAM21 Session 1 Data Management.pptx
Guru Nanak Technical Institutions
 
PDF
Zero carbon Building Design Guidelines V4
BassemOsman1
 
DOCX
SAR - EEEfdfdsdasdsdasdasdasdasdasdasdasda.docx
Kanimozhi676285
 
PPTX
business incubation centre aaaaaaaaaaaaaa
hodeeesite4
 
PPTX
Inventory management chapter in automation and robotics.
atisht0104
 
Information Retrieval and Extraction - Module 7
premSankar19
 
22PCOAM21 Data Quality Session 3 Data Quality.pptx
Guru Nanak Technical Institutions
 
67243-Cooling and Heating & Calculation.pdf
DHAKA POLYTECHNIC
 
2010_Book_EnvironmentalBioengineering (1).pdf
EmilianoRodriguezTll
 
easa module 3 funtamental electronics.pptx
tryanothert7
 
Advanced LangChain & RAG: Building a Financial AI Assistant with Real-Time Data
Soufiane Sejjari
 
AgentX UiPath Community Webinar series - Delhi
RohitRadhakrishnan8
 
top-5-use-cases-for-splunk-security-analytics.pdf
yaghutialireza
 
flutter Launcher Icons, Splash Screens & Fonts
Ahmed Mohamed
 
EVS+PRESENTATIONS EVS+PRESENTATIONS like
saiyedaqib429
 
Biodegradable Plastics: Innovations and Market Potential (www.kiu.ac.ug)
publication11
 
67243-Cooling and Heating & Calculation.pdf
DHAKA POLYTECHNIC
 
database slide on modern techniques for optimizing database queries.pptx
aky52024
 
Introduction to Data Science: data science process
ShivarkarSandip
 
Module2 Data Base Design- ER and NF.pptx
gomathisankariv2
 
22PCOAM21 Session 1 Data Management.pptx
Guru Nanak Technical Institutions
 
Zero carbon Building Design Guidelines V4
BassemOsman1
 
SAR - EEEfdfdsdasdsdasdasdasdasdasdasdasda.docx
Kanimozhi676285
 
business incubation centre aaaaaaaaaaaaaa
hodeeesite4
 
Inventory management chapter in automation and robotics.
atisht0104
 

Basics of Contract Management

  • 1. 1/6 Civilverse Admin 17 January 2021 Basics of Contract Management civilverse.org/contract-management-basics Table of Content for Basics of Contract Management- 1. Introduction 2. What is Contract and Contract Management? 3. Need for Contract Management 4. Contract Management Life Cycle 5. Stages of Contract Management 1. Formulation of Contract 2. Contract Administration 3. Risk Management 4. Ending Contract 5. Contract Review 6. Best Practices of Contract Management 1. Introduction- The businesses require the collaboration of teams to successfully achieve their objectives. These collaborations happen with the vendors, suppliers, clients, contractors and even customers via signed contracts between them. The parties involved in contracts abide by the terms mentioned in it. A clear understanding of the basics of contract management enables the contract manager to successfully execute the contract.
  • 2. 2/6 2. What is Contract and Contract Management? The section 2(b) of Indian Contract Act, 1872 defines the contract as- “any agreement enforceable by law” The same section also defines the other terms related to the contract such as offer, acceptance, promise, promisor and promise, consideration, agreement, reciprocal promises, void agreement, etc. The same can be read in details here. 2.1 Contract Management- Contract Management can be summarised as the process of performing activities that enables both the contracting authority and the contractor to fulfil their contractual obligations. It also ensures the contract meets the optimum combination of cost, time, and quality during the contract period. 3. Need for Contract Management- A contract can’t run itself; it needs to be proactively managed. Contract management needs resources to manage it. The key resources are Project Manager, Contract Manager, Contracting Authority, and Contractor’s representative. The contract management fulfils the following objectives- a. Protect the agreed contractual position. b. Accept deliverables under the contract. c. Maintain agreed allocation of risks. d. Monitor contractor’s performance against output specifications. e. Take appropriate action on the financial implication of any failure. f. Ensure that payments are conditional upon the contractor’s quality of performance. g. Maintain continuous improvements & service deliveries. 4. Contract Management Lifecycle- The contract management lifecycle can be broadly classified into two parts- pre-award and post-award. The pre-award activities include initiation, planning, and tender preparation. The post-award activities are execution, performance measurement, closing and review.
  • 3. 3/6 Contract Management Life Cycle The steps of contract management lifecycle are- 4.1 Pre-award- a. Prepare a procurement note stating the purpose, requirement and need of the procurement. b. Develop Procurement Process, specifications, contract strategy, tender evaluation criteria. c. Do market survey for current market practices, trends, price schedules etc. d. Publish a Specific Procurement Note or an advertisement. e. Invite Tenders and Receive them. f. Clarify the ambiguities or doubts, if any from the contractors who have submitted the tenders. g. Evaluate the submitted contracts as per predefined tender evaluation criteria and award the contract to the most suitable bidder. h. Debrief the unsuccessful bidders or disqualified bidders. 4.2 Post-award- i. Manage contract during the execution by performance measurement of the contractor as per the defined contractual parameters, risk assessment and mitigation, maintaining timeline and quality during the contract period. ii. Keep the contractor in the loop regarding the variations on contract and apprise the contractor of its performance. iii. Post closure of the contract, maintain a feedback register to record findings, learnings, observations, risks, etc. to use them as the benchmark for the future procurement process. 5. Stages of Contract Management-
  • 4. 4/6 The basics of contract management must include the stages of contract management as it increases the control of contract manager over the entire process and helps in easier execution. The contract goes through five stages throughout its life. The stages are as formulation, administration, risk management, closure and review. 5.1 Formulation of a Contract- A contract has component documents dealing with the different topics and bound together in a logical sequence. It has price schedules, schedules of works, requirement, technical specifications, agreement, distribution list, general terms and conditions, special conditions, other amendments to the contract, agreed work methodology, contractor’s notification of contract award. The contract should be prepared in line with the equality, mutual benefit of the contracting authority and contractor and applicable law. The main focus should be kept on following areas while preparing the contract- a. Specifications b. General Clauses- Applicable law, the language of communication, the order of precedence, communication route etc. c. Main responsibilities of the owner and contractor. d. Commercial Clauses. e. Contract Execution Timeline- Commencement, work program, procurement and delivery, delays etc. f. Compliance with specifications- QA policy, inspection, testing, the rectification of defects. g. Payment- Assessment and certification method, time of payment, method of payment and delayed payment etc. h. Variations and Claims. i. Titles-Ownership of objects, materials, equipment at the site. j. Risks- Provision for damage in transportation, theft etc. k. Insurances. l. Force Majeure. m. Failure to Perform-Termination, security, delay damages, performance guarantee. n. Other area-Breach of contract, social and environmental issue. o. Resolution of Disputes. 5.2 Contract Administration- The contract administration can be explained by following activities- a. Maintaining contact details of key personnel. b. Scheduling of meetings and notice periods. c. Developing and maintain a mechanism for managing things. d. Monitoring cost and payment procedure. e. Establishment & maintaining contract documentation.
  • 5. 5/6 f. Management reporting. 5.3 Risk Management- The study of risk is an integral part of contract management. When studying the basics of contract management, it comes important to get an understanding of the process of risk management. The risk management process involves the identification and assessment of risks, their evaluation, treatment and mitigation. The major risks arise from variations in the contract. The variations arise due to the change in work scope, design change, error/omission in design, different site conditions, value engineering, change in technology, the extension of duration, legislative change, poor contract management, safety consideration, genuine unforeseen circumstances. Further, the variations in the contract can lead to the change in cost, change in funding requirement, delays and EOTs, wasted or additional efforts, unproductive labour cost, reprogramming of contract to absorb or reduce the effects of variations. 5.4 Ending Contract- A contract is closed when the contractual obligations of both the parties have been completed. Sometimes, the contract is ended even if any one of the parties don’t perform their contractual obligations well. Upon closure of contract; joint inspection, commissioning and handover are done followed by settlement of final bill of the contractor and the issuance pf the taking-over certificate by the employer to the contractor along with the release of securities and retention amount. The employer can end the contract after 14 days of giving written notice or immediately when the contractor fails to perform its duties, abandon the project, non-compliance with the quality, sub-contracting to another contractor without written notice, bankruptcy etc. The contractor can also end the contract when the employer fails to perform its duties, failure to issue IPC within 56 days of receipt of documents, non-receipt of payment after 42 days of issuance of IPC, bankruptcy etc. 5.5 Contract Review- The purpose of the contract review is to develop good practices of procurement and to establish the benchmarks. After the closure of the contract, arrangement benefits are assessed, the lessons learnt are recorded, best practices are capitalised and performance is recorded for future reference. The contract review checklist must include the review requirement, assessment of how the requirements have developed, analysis of contract performance, recording of milestones.
  • 6. 6/6 6. The Best Practices of Contract Management- Some of the best practices of the contract management are as follows- a. The contract should be such formulated and administered to avoid/minimise the variations, claims and delays. b. Thorough planning, market survey and site inspection to be done when formulating the contract to minimise/avoid the variance. c. Technical specifications, QA/QC program and performance measurement should be clearly defined to avoid any ambiguity at the execution stage. d. Project kick-off meeting to be organised after contract award to bring the employer and the contractor on the same page before starting execution. e. In the Kick-off meeting, both the employer and the contractor to be apprised of each other’s contractual obligations. f. Payments should be linked with time and quality performance of the contractor. g. Delays on account of employer and contractor should be separately recorded. h. The risk register should be maintained. i. Formal communication between the parties, minutes of the meetings etc. should be recorded for future references. j. Both the employer and the contractor should try to maintain the same staff throughout the contract life as it builds the relationship and helps in the successful implementation of the contract. Liked the article? Please comment below to let me know. Also, help me to spread the word about this blog by sharing it. Check out my other article on Project Scheduling here. For article on Basics of Building Information Modeling, click here.