SlideShare a Scribd company logo
2016 Byson Report
Page 1BE Confidential
Contents
A. Byson Achievements 1
B. Recently Important Figures 6
C. Technical Information 10
D. Forward Looking 15
E. Q&A 17
Page 2BE Confidential
At a glance
SOLID FINANCIALS
31M USD Annual
Revenues in 2015
3M USD shareholder
equity
INDUSTIES
Solar
Chemical
Automotive
Society Infrastructure
MISSION & VISION
Be inspired
Keep innovation on
material R&D
VALUES
Technology Innovation
Team Work
Social Responsibility
Page 3BE Confidential
Our History
• Set up the
headquarter in
Shanghai and built
the factory in
Kunshan
• Set up the core
business and
penetrate the PV
cable market
• Approved by UL,
Obtained ISO 14064,
ISO 14001, ISO
9001, OHSAS 18001
• Product passed the
test at UL and TUV,
Received certificate
from TUV & UL for
600V, UL 1000V &
2000V PV cables
• Added one more
extrusion line and 3
stranding machines
• Expanded business
overseas ,established
sales office in Japan,
EMEA and America
• Owned four extrusion
lines and transformed
one line to dual-layer
• Acquired dual-
approval from TUV &
UL for 1,500V PV
cables
• Invested significantly
in R&D to improve
manufacturing
process and to
become technical
leader in the market
segment
• Establish a high end
lab to meet the
different test
requirements
• Expand the cable line
horizontally and enter
into the new industry
section such as
Automotive (Electric
vehicle), infrastructure
(railway), robot,
copper and chemical
(low smoke halogen
free) .
• Update the logo, VI
and also the website
• Establish the new
material factory
• Start transformation to
PLC
We are
fast growing
Page 4BE Confidential
Our Footprint
Page 5BE Confidential
Advantages



Extensive experience in the cable and environmentally industry
Has developed material to fit the different standards and obtained
the competitive advantages to simplify the products scope
Strong material research center to support Byson explore the
products chain
 Strong ability of process control and stable flow line production
 Solid financial statements to expand the business scope
Page 6BE Confidential
Contents
A. Byson Achievements 1
B. Recently Important Figures 6
C. Technical Information 10
D. Forward Looking 15
E. Q&A 17
Page 7BE Confidential
Revenues 2011 - 2015
31.0
23.2
18.9
10.8
5.9
0
2
4
6
8
10
12
14
16
18
20
22
24
26
28
30
32
+425%
20152011 201420132012
25%
China
34%
Other Asia
10%
Japn 31%
EMEA
Revenues 2011 -2015 (USD )M 2015 Revenue Distribution (%)
Page 8BE Confidential
Shipment and Capacity in 2014 and 2015
69800
50000
0
20,000
30,000
40,000
50,000
60,000
70,000
20152014
+40%
KM
YR
12000
9000
7,000
1,000
11,000
9,000
5,000
3,000
0
2014 2015
+33%
KM
YR
Shipment 2014 – 2015 (KM) Capacity 2014 – 2015 (KM/M)
Page 9BE Confidential
Contents
A. Byson Achievements 1
B. Recently Important Figures 6
C. Technical Information 10
D. Forward Looking 15
E. Q&A 17
Page 10BE Confidential
25 – Year lifetime guarantee
Page 11BE Confidential
High-end Laboratories
 Stimulate the environment when
the cable outdoor use
 Flame retardant test
 Long term insulation resistance test
 Capacitance and relative permittivity
 Mechanical properties test
 Compound analysis test
 RoHS test
Page 12BE Confidential
Electron – beam cross linking
The competitive of Byson
Cable after irradiation
 Better physical and
chemical performance than
UL and TUV requirement
 Improved impact strength
and crack resistance
 Better weather and humidity
resistance
 Longer lifetime of the
material
Page 13BE Confidential
MussangTM Flame retardant polymer formulation
 Excellent weather ability;
working temperature -50°C
~125°C
 10 years life cycle; high
insulation resistance under the
damp condition
 High mechanical
performance; excellent
resilience
 Oil resistance against diesel
and IRM902
 Flame retardant
Page 14BE Confidential
Contents
A. Byson Achievements 1
B. Recently Important Figures 6
C. Technical Information 10
D. Forward Looking 15
E. Q&A 17
Page 15BE Confidential
Forward Looking
EV CABLE TRVV - RobotRailway Cable
Q&A?

More Related Content

PDF
WEC Group at a glance - May 2016
Jean-Yves Dziki
 
PDF
Gonvarri Industries Corporate Presentation
Gonvarri Industries
 
PDF
3 Year Financial Plan Presentational Tool
Rav Garcha Solutions & Results
 
PDF
Bengaluru Real Estate Presentation
Knight Frank India
 
PDF
GCDP MoC Award
Anastasiia Isakii
 
PPT
Erstaunliche Autos
Ducito10
 
PPTX
Ринат Ахметов: "Восстановление модели трехмерного объекта по видеопотоку"
Provectus
 
PDF
Proof of Time Travel and Teleportation?
smellybottlenec93
 
WEC Group at a glance - May 2016
Jean-Yves Dziki
 
Gonvarri Industries Corporate Presentation
Gonvarri Industries
 
3 Year Financial Plan Presentational Tool
Rav Garcha Solutions & Results
 
Bengaluru Real Estate Presentation
Knight Frank India
 
GCDP MoC Award
Anastasiia Isakii
 
Erstaunliche Autos
Ducito10
 
Ринат Ахметов: "Восстановление модели трехмерного объекта по видеопотоку"
Provectus
 
Proof of Time Travel and Teleportation?
smellybottlenec93
 

Viewers also liked (12)

PDF
Museum and gallery events
smellybottlenec93
 
PDF
Social@Scale Summit Hosted by Nestle Purina Agenda
Jennifer Clemente
 
PDF
Sample Menu and Pricing Cards
Jennifer Clemente
 
PDF
883 THISTLE DOWN CIRCLE - Sept 10 (EXISTING)
Jonathan Mohabir
 
DOC
Noor CV
Noor Hossain
 
PPTX
QA MeetUp - Эмиль Хуснетдинов: "Управление качеством проекта"
Provectus
 
DOCX
Fundamentals of Investments Summary
Josue654
 
PPTX
Geolocation API実地試験
mikan_slide
 
PPTX
Роман Степанов: "Анализ данных о местоположении клиентов"
Provectus
 
PPTX
Backbone js for expert fridays.pptx
Provectus
 
PDF
Альмеева Ляйсан - Android studio 2.0
Provectus
 
RTF
Erika Gonzalez
Erika Gonzalez
 
Museum and gallery events
smellybottlenec93
 
Social@Scale Summit Hosted by Nestle Purina Agenda
Jennifer Clemente
 
Sample Menu and Pricing Cards
Jennifer Clemente
 
883 THISTLE DOWN CIRCLE - Sept 10 (EXISTING)
Jonathan Mohabir
 
Noor CV
Noor Hossain
 
QA MeetUp - Эмиль Хуснетдинов: "Управление качеством проекта"
Provectus
 
Fundamentals of Investments Summary
Josue654
 
Geolocation API実地試験
mikan_slide
 
Роман Степанов: "Анализ данных о местоположении клиентов"
Provectus
 
Backbone js for expert fridays.pptx
Provectus
 
Альмеева Ляйсан - Android studio 2.0
Provectus
 
Erika Gonzalez
Erika Gonzalez
 
Ad

Byson 2016_Web

  • 2. Page 1BE Confidential Contents A. Byson Achievements 1 B. Recently Important Figures 6 C. Technical Information 10 D. Forward Looking 15 E. Q&A 17
  • 3. Page 2BE Confidential At a glance SOLID FINANCIALS 31M USD Annual Revenues in 2015 3M USD shareholder equity INDUSTIES Solar Chemical Automotive Society Infrastructure MISSION & VISION Be inspired Keep innovation on material R&D VALUES Technology Innovation Team Work Social Responsibility
  • 4. Page 3BE Confidential Our History • Set up the headquarter in Shanghai and built the factory in Kunshan • Set up the core business and penetrate the PV cable market • Approved by UL, Obtained ISO 14064, ISO 14001, ISO 9001, OHSAS 18001 • Product passed the test at UL and TUV, Received certificate from TUV & UL for 600V, UL 1000V & 2000V PV cables • Added one more extrusion line and 3 stranding machines • Expanded business overseas ,established sales office in Japan, EMEA and America • Owned four extrusion lines and transformed one line to dual-layer • Acquired dual- approval from TUV & UL for 1,500V PV cables • Invested significantly in R&D to improve manufacturing process and to become technical leader in the market segment • Establish a high end lab to meet the different test requirements • Expand the cable line horizontally and enter into the new industry section such as Automotive (Electric vehicle), infrastructure (railway), robot, copper and chemical (low smoke halogen free) . • Update the logo, VI and also the website • Establish the new material factory • Start transformation to PLC We are fast growing
  • 6. Page 5BE Confidential Advantages    Extensive experience in the cable and environmentally industry Has developed material to fit the different standards and obtained the competitive advantages to simplify the products scope Strong material research center to support Byson explore the products chain  Strong ability of process control and stable flow line production  Solid financial statements to expand the business scope
  • 7. Page 6BE Confidential Contents A. Byson Achievements 1 B. Recently Important Figures 6 C. Technical Information 10 D. Forward Looking 15 E. Q&A 17
  • 8. Page 7BE Confidential Revenues 2011 - 2015 31.0 23.2 18.9 10.8 5.9 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 +425% 20152011 201420132012 25% China 34% Other Asia 10% Japn 31% EMEA Revenues 2011 -2015 (USD )M 2015 Revenue Distribution (%)
  • 9. Page 8BE Confidential Shipment and Capacity in 2014 and 2015 69800 50000 0 20,000 30,000 40,000 50,000 60,000 70,000 20152014 +40% KM YR 12000 9000 7,000 1,000 11,000 9,000 5,000 3,000 0 2014 2015 +33% KM YR Shipment 2014 – 2015 (KM) Capacity 2014 – 2015 (KM/M)
  • 10. Page 9BE Confidential Contents A. Byson Achievements 1 B. Recently Important Figures 6 C. Technical Information 10 D. Forward Looking 15 E. Q&A 17
  • 11. Page 10BE Confidential 25 – Year lifetime guarantee
  • 12. Page 11BE Confidential High-end Laboratories  Stimulate the environment when the cable outdoor use  Flame retardant test  Long term insulation resistance test  Capacitance and relative permittivity  Mechanical properties test  Compound analysis test  RoHS test
  • 13. Page 12BE Confidential Electron – beam cross linking The competitive of Byson Cable after irradiation  Better physical and chemical performance than UL and TUV requirement  Improved impact strength and crack resistance  Better weather and humidity resistance  Longer lifetime of the material
  • 14. Page 13BE Confidential MussangTM Flame retardant polymer formulation  Excellent weather ability; working temperature -50°C ~125°C  10 years life cycle; high insulation resistance under the damp condition  High mechanical performance; excellent resilience  Oil resistance against diesel and IRM902  Flame retardant
  • 15. Page 14BE Confidential Contents A. Byson Achievements 1 B. Recently Important Figures 6 C. Technical Information 10 D. Forward Looking 15 E. Q&A 17
  • 16. Page 15BE Confidential Forward Looking EV CABLE TRVV - RobotRailway Cable
  • 17. Q&A?