SlideShare a Scribd company logo
Presented by
Michael Davies
CFMS-ASRC Business Manager
CFMS-ASRC
Bristol, September 2011
advanced simulation research centre
TRANSFORMING SIMULATION
What is CFMS?
ā€œCFMS is an independent, not-for-profit organisation, committed to
accelerating the delivery of more intuitive and powerful design
processes.ā€
Rolls-Royce data-strictly private
CFMS Limited
• A not for profit company, limited by guarantee has been established to manage delivery of
the CFMS Vision via the CFMS Framework*
• The company is known as CFMS Ltd
• Member Companies are:
• Airbus
• BAE Systems
• Frazer-Nash Consultancy
• MBDA UK
• Rolls-Royce
• Williams F1
• Activities carried out by CFMS Ltd include:
• Technology road-mapping
• Project scoping and facilitation
• Project management support
• Facilities provision
• All services are available to organisations beyond the Member companies of CFMS Ltd
The CFMS Framework is a co-ordinated programme of research and technology deployment projects, the
scope of which has been defined to achieve the CFMS Vision
*
TRANSFORMING SIMULATION
Advanced Simulation Research Centre
 Created to challenge our perceptions of a
ā€œtraditional working environmentā€
• On-site HPC cluster
• IT Lab (flexible infrastructure)
• Visualisation suite
• Integration room
• Collaborative working areas
• Hot-desking and touchdown-desking
• Meeting rooms & conference facilities
• Break-out areas
ā€œAn inspiring and stimulating environment to encourage collaboration and
innovation, alongside the cutting-edge facilities required to support the
development and demonstration of the latest technologiesā€
TRANSFORMING SIMULATION
Associates Scheme
 Primary method of CFMS engagement
 Brings together end users, technology developers
and researchers
 Unique programme of activities to improve
awareness and identify longer-term developments
• Best practice exchange
• Road-mapping
• Demonstrations
• Networking
• Forums
• Technical notes/white papers
• Newsletters
ā€œIntroduce organisations to technologies and methodologies which will make their
design processes quicker, cheaper and more effectiveā€
October 2010
7
Facility elements
Capability Lab
a facility to support collaborative research & development
HPC – High Performance Computer
IT laboratory
a facility to support R&D in emerging IT architectures
 An open plan office space, with flexible partitioning
 Focus on supporting CFMS programmes and methods
developments
 Front office:
 Desktop clients with docking stations for ā€˜approved’ laptops
 Wireless internet access,
 Wired access to HPC and IT Lab
 Visualisation/Integration/Conferencing/Meeting Rooms
 Back office servers:
 18 Xeon-based severs (development, code, email,…etc)
 3.6TB storage
 Software stacks
Capability Lab
HPC
 2880 core clusters – latest Nehalem (six-core) chipset
- Fast file server : 60TB usable
- QDR IB interconnect, 40Gbps bandwidth
- IBM iDataPlex, with water-cooled rear doors
 1440 cores Rolls-Royce, 720 cores Airbus, 720 cores third-party
 Head/login nodes
 2 x PostProcessing-nodes
 2 X Visualisation nodes, with Nvidia Quadroplex 2200S4 GPUs
 OS: RHE v5.4
 Scheduler: SunGridEngine
Rolls-Royce data-strictly private
Facility floor plan
*
Ground Floor Layout
ITLab HPC
v
v
v
v Venus
Integration
Room Mars
Visualisation
Zone
Game Zone
Break-out
Zone
15
16
17 18 19 20
22
21
23 24
Venus
Integration
Room
Mars
Visualisation
Zone
Max capacity = 25 people (8 people
in baseline layout)
Max capacity = 25 people (12 people
in baseline layout)
Rolls-Royce data-strictly private
Facility floor plan
*
First Floor Layout
CFMS
ASRC
ASRC
ASRC
ASRC
Saturn Room
Jupiter Room
Mercury
Room
Neptune
Room
Transit Zone
5
6
4 3
1 2
Neptune
Room
Mercury
Room
Saturn RoomJupiter Room Transit Zone
7
8
9
Max capacity = 40 people in seminar room
layout (24 people in training room layout)
Max capacity = 25 people in seminar room
layout (16 people in training room layout)
Max capacity = 20 people in seminar room
layout (6people with baseline layout)
Max capacity = 14 people in seminar
room layout (4people +2 desks with
baseline layout)
Capacity = 6 people with
baseline layout
10
11
12
13 14
Rolls-Royce data-strictly private
Organisation
Member Organisations
RR, Airbus, Williams F1, Fraser Nash, MBDA, BAE
CFMS Board
B Barzegar, I Martindale, P Best, N Buckland, A Burns, G Gapper, B Davis
ASRC Board
Martin Aston
Frank McQuade
Carolyn Webb
Andy Williams
Implementation
Manager
Mike Davies
Business Manager
Zoe Thorne
Administrator
Neil Whyld Paul Edwards
Outreach Manager
Technical controller
Operations/Facilities
Nathan Harper
IBM Support
Thank you for your attention

More Related Content

PPT
HP CloudSystem Matrix
Arun prasath
Ā 
PPTX
Software-Defined Storage
NetApp
Ā 
PDF
Fortissimo Foundation A Clustered, Pervasive, Global Direct-remote I/O Access...
inside-BigData.com
Ā 
PDF
POWER8 the x86 Server Farm - IBM Business Partners use POWER8 to Lower Client...
Paula Koziol
Ā 
PDF
Object Storage 3: How to Use and Develop Applications Designed for Object Sto...
Hitachi Vantara
Ā 
PPTX
HDS Influencer Summit 2014: Innovating with Information to Address Business N...
Hitachi Vantara
Ā 
PPT
Linux world consolidation of storage infrastructures 2006
Sascha Oehl
Ā 
PPTX
When to select hyper converged 2016 Sydney VMUG
Keith Townsend
Ā 
HP CloudSystem Matrix
Arun prasath
Ā 
Software-Defined Storage
NetApp
Ā 
Fortissimo Foundation A Clustered, Pervasive, Global Direct-remote I/O Access...
inside-BigData.com
Ā 
POWER8 the x86 Server Farm - IBM Business Partners use POWER8 to Lower Client...
Paula Koziol
Ā 
Object Storage 3: How to Use and Develop Applications Designed for Object Sto...
Hitachi Vantara
Ā 
HDS Influencer Summit 2014: Innovating with Information to Address Business N...
Hitachi Vantara
Ā 
Linux world consolidation of storage infrastructures 2006
Sascha Oehl
Ā 
When to select hyper converged 2016 Sydney VMUG
Keith Townsend
Ā 

What's hot (20)

PPTX
Virtual datacenter hif 2014
Sascha Oehl
Ā 
PDF
Comprehensive and Simplified Management for VMware vSphere environments
Hitachi Vantara
Ā 
PDF
Solution Brief: Commvault & Red Hat Storage
Marcel Hergaarden
Ā 
PPTX
Comprehensive and Simplified Management for VMware vSphere Environments - now...
Hitachi Vantara
Ā 
PDF
Software-Defined Storage (SDS)
Ali Mirfallah
Ā 
DOCX
Exploring HCI
David Han
Ā 
PDF
Data center 2.0: Data center built for private cloud by Mr. Cheng Che Hoo of ...
HKISPA
Ā 
PPSX
Hitachi Virtual Storage Platform and Storage Virtualization Operating System ...
Hitachi Vantara
Ā 
PDF
Panasonic information systems
Yash Mittal
Ā 
PDF
Why You Should Consider Linux on IBM POWER8 - How IBM Partners are Driving Bu...
Paula Koziol
Ā 
PDF
Community Session: Strategic Private Cloud in SKY UK
VMUG IT
Ā 
PDF
PANASASĀ® ACTIVESTORĀ® AND STAR-CCM+
Panasas
Ā 
PPTX
Virtual Infrastructure Integrator Overview Presentation
Hitachi Vantara
Ā 
PDF
Open-Source Lamp Stacks Fly with IBM POWER8
IBM Power Systems
Ā 
PDF
NetApp All Flash storage
MarketingArrowECS_CZ
Ā 
PDF
Presentazione Tintri - Clouditalia @ VMUGIT UserCon 2015
VMUG IT
Ā 
PDF
Hyper-converged infrastructure
Igor Malts
Ā 
PPTX
'Software-Defined Everything' Includes Storage and Data
PrimaryData
Ā 
PPTX
FlexPod as a Competitive Edge
NetApp
Ā 
PDF
IMEXresearch software defined storage
IMEX Research
Ā 
Virtual datacenter hif 2014
Sascha Oehl
Ā 
Comprehensive and Simplified Management for VMware vSphere environments
Hitachi Vantara
Ā 
Solution Brief: Commvault & Red Hat Storage
Marcel Hergaarden
Ā 
Comprehensive and Simplified Management for VMware vSphere Environments - now...
Hitachi Vantara
Ā 
Software-Defined Storage (SDS)
Ali Mirfallah
Ā 
Exploring HCI
David Han
Ā 
Data center 2.0: Data center built for private cloud by Mr. Cheng Che Hoo of ...
HKISPA
Ā 
Hitachi Virtual Storage Platform and Storage Virtualization Operating System ...
Hitachi Vantara
Ā 
Panasonic information systems
Yash Mittal
Ā 
Why You Should Consider Linux on IBM POWER8 - How IBM Partners are Driving Bu...
Paula Koziol
Ā 
Community Session: Strategic Private Cloud in SKY UK
VMUG IT
Ā 
PANASASĀ® ACTIVESTORĀ® AND STAR-CCM+
Panasas
Ā 
Virtual Infrastructure Integrator Overview Presentation
Hitachi Vantara
Ā 
Open-Source Lamp Stacks Fly with IBM POWER8
IBM Power Systems
Ā 
NetApp All Flash storage
MarketingArrowECS_CZ
Ā 
Presentazione Tintri - Clouditalia @ VMUGIT UserCon 2015
VMUG IT
Ā 
Hyper-converged infrastructure
Igor Malts
Ā 
'Software-Defined Everything' Includes Storage and Data
PrimaryData
Ā 
FlexPod as a Competitive Edge
NetApp
Ā 
IMEXresearch software defined storage
IMEX Research
Ā 
Ad

Viewers also liked (20)

PPTX
How to be a Hacker (Sut i fod yn Haciwr)
Martin Hamilton
Ā 
PPTX
UK National E-Infrastructure Survey 2014 - Update for HPC-SIG May 2014
Martin Hamilton
Ā 
PDF
A368 afa1 b0f8-4b79-812f-980f7dc622bf
Shatabdi Mahanta
Ā 
PDF
EGLACOMM / MEVIA APP TEASER
Dr. Edwin Hernandez
Ā 
PDF
A copula-based Simulation Method for Clustered Multi-State Survival Data
federicorotolo
Ā 
PPT
Simulation As a Method To Support Complex Organizational Transformations in H...
Jos van Hillegersberg
Ā 
PDF
Applying the Scientific Method to Simulation Experiments
Frank Bergmann
Ā 
PPTX
Urban simulation by ANN-CA
Davoud Karimzadeh
Ā 
PPTX
Eswaran Subrahmanian - Serious Games in Complex Design of Urban Systems and P...
SeriousGamesAssoc
Ā 
PDF
Brudaru, o. 2011: cellular genetic algorithm with communicating grids for a d...
ArchiLab 7
Ā 
PDF
Simulation of Urban Mobility (Sumo) For Evaluating Qos Parameters For Vehicul...
iosrjce
Ā 
PPTX
Serious games
Universiti Kebangsaan Malaysia
Ā 
PPT
Games and Serious Games in Urban Planning: Study Cases
Beniamino Murgante
Ā 
PDF
A High-speed Verilog HDL Simulation Method using a Lightweight Translator
Ryohei Kobayashi
Ā 
PPTX
charge simulation method
dharmendrawaghjipur007
Ā 
PDF
Architecture and urban planning (3 d) representation
Maria Bostenaru
Ā 
PPTX
Midsquare method- simulation system
Arman Hossain
Ā 
PPS
Parallel Simulation of Urban Dynamics on the GPU Ivan Blečić, Arnaldo Cecchi...
Beniamino Murgante
Ā 
PPT
Simulations and Educational Games
Cynthia Calongne
Ā 
PPTX
Spatial Microsimulation for City Modelling, Social Forecasting and Urban Poli...
NeISSProject
Ā 
How to be a Hacker (Sut i fod yn Haciwr)
Martin Hamilton
Ā 
UK National E-Infrastructure Survey 2014 - Update for HPC-SIG May 2014
Martin Hamilton
Ā 
A368 afa1 b0f8-4b79-812f-980f7dc622bf
Shatabdi Mahanta
Ā 
EGLACOMM / MEVIA APP TEASER
Dr. Edwin Hernandez
Ā 
A copula-based Simulation Method for Clustered Multi-State Survival Data
federicorotolo
Ā 
Simulation As a Method To Support Complex Organizational Transformations in H...
Jos van Hillegersberg
Ā 
Applying the Scientific Method to Simulation Experiments
Frank Bergmann
Ā 
Urban simulation by ANN-CA
Davoud Karimzadeh
Ā 
Eswaran Subrahmanian - Serious Games in Complex Design of Urban Systems and P...
SeriousGamesAssoc
Ā 
Brudaru, o. 2011: cellular genetic algorithm with communicating grids for a d...
ArchiLab 7
Ā 
Simulation of Urban Mobility (Sumo) For Evaluating Qos Parameters For Vehicul...
iosrjce
Ā 
Games and Serious Games in Urban Planning: Study Cases
Beniamino Murgante
Ā 
A High-speed Verilog HDL Simulation Method using a Lightweight Translator
Ryohei Kobayashi
Ā 
charge simulation method
dharmendrawaghjipur007
Ā 
Architecture and urban planning (3 d) representation
Maria Bostenaru
Ā 
Midsquare method- simulation system
Arman Hossain
Ā 
Parallel Simulation of Urban Dynamics on the GPU Ivan Blečić, Arnaldo Cecchi...
Beniamino Murgante
Ā 
Simulations and Educational Games
Cynthia Calongne
Ā 
Spatial Microsimulation for City Modelling, Social Forecasting and Urban Poli...
NeISSProject
Ā 
Ad

Similar to Cfms project (asrc) (20)

PPT
Flexible Manufacturing Systems.ppt
AjayVasanth
Ā 
PPT
Flexible manufacturing systems
ravi sherasiya
Ā 
PPT
Should I Stay Or Go
brianholmes
Ā 
PPT
Should I Stay Or Go
nickhull
Ā 
PPTX
Icp 3273-the iiot understanding designing and developing the bigger picture v2
Graham Bleakley
Ā 
PPT
01 Colsa Capabilities Briefing January 2008 (Nx Power Lite)
guest59196e
Ā 
PDF
IBM HPC Transformation with AI
Ganesan Narayanasamy
Ā 
PPTX
Make from your it department a competitive differentiator for your business
Marcos Quezada
Ā 
PDF
T13.Fujitsu World Tour India 2016-World is your Workplace
Fujitsu India
Ā 
PPTX
Leading a successful move to cloud
Janet Brokerage
Ā 
PDF
The Value of IBM Rational Solutions in a PLM System
Cyrus Sorab
Ā 
PPTX
Infrastructure Matters
IBM Innovation Center Silicon Valley
Ā 
PPTX
Next Generation Manufacturing
Elliot Duff
Ā 
PDF
Visualization Studio
Shawna Sadler
Ā 
PPT
Ever Green Dc
Pravin Agarwal
Ā 
PPTX
The future is messy
Thoughtworks
Ā 
PDF
Map r whitepaper_zeta_architecture
Narender Kumar
Ā 
PDF
GAB 2016 Hybrid Storage
Carlos Mayol
Ā 
PDF
Hu Yoshida - Storage Trends and Directions (Storage Expo 2010)
VNU Exhibitions Europe
Ā 
PPTX
Microsofts Configurable Cloud
Chris Genazzio
Ā 
Flexible Manufacturing Systems.ppt
AjayVasanth
Ā 
Flexible manufacturing systems
ravi sherasiya
Ā 
Should I Stay Or Go
brianholmes
Ā 
Should I Stay Or Go
nickhull
Ā 
Icp 3273-the iiot understanding designing and developing the bigger picture v2
Graham Bleakley
Ā 
01 Colsa Capabilities Briefing January 2008 (Nx Power Lite)
guest59196e
Ā 
IBM HPC Transformation with AI
Ganesan Narayanasamy
Ā 
Make from your it department a competitive differentiator for your business
Marcos Quezada
Ā 
T13.Fujitsu World Tour India 2016-World is your Workplace
Fujitsu India
Ā 
Leading a successful move to cloud
Janet Brokerage
Ā 
The Value of IBM Rational Solutions in a PLM System
Cyrus Sorab
Ā 
Infrastructure Matters
IBM Innovation Center Silicon Valley
Ā 
Next Generation Manufacturing
Elliot Duff
Ā 
Visualization Studio
Shawna Sadler
Ā 
Ever Green Dc
Pravin Agarwal
Ā 
The future is messy
Thoughtworks
Ā 
Map r whitepaper_zeta_architecture
Narender Kumar
Ā 
GAB 2016 Hybrid Storage
Carlos Mayol
Ā 
Hu Yoshida - Storage Trends and Directions (Storage Expo 2010)
VNU Exhibitions Europe
Ā 
Microsofts Configurable Cloud
Chris Genazzio
Ā 

More from Michael Davies (6)

PDF
Programme project (ej)
Michael Davies
Ā 
PDF
Market overview project (pcso)
Michael Davies
Ā 
PDF
Lease strategy project (lem)
Michael Davies
Ā 
PDF
Ceqa saudi project (pm)
Michael Davies
Ā 
PDF
Airlines review project (rrna)
Michael Davies
Ā 
PDF
Services project (rrb)
Michael Davies
Ā 
Programme project (ej)
Michael Davies
Ā 
Market overview project (pcso)
Michael Davies
Ā 
Lease strategy project (lem)
Michael Davies
Ā 
Ceqa saudi project (pm)
Michael Davies
Ā 
Airlines review project (rrna)
Michael Davies
Ā 
Services project (rrb)
Michael Davies
Ā 

Recently uploaded (20)

PDF
Research-Fundamentals-and-Topic-Development.pdf
ayesha butalia
Ā 
PDF
Structs to JSON: How Go Powers REST APIs
Emily Achieng
Ā 
PDF
Data_Analytics_vs_Data_Science_vs_BI_by_CA_Suvidha_Chaplot.pdf
CA Suvidha Chaplot
Ā 
PDF
Event Presentation Google Cloud Next Extended 2025
minhtrietgect
Ā 
PPTX
ChatGPT's Deck on The Enduring Legacy of Fax Machines
Greg Swan
Ā 
PDF
AI Unleashed - Shaping the Future -Starting Today - AIOUG Yatra 2025 - For Co...
Sandesh Rao
Ā 
PDF
SparkLabs Primer on Artificial Intelligence 2025
SparkLabs Group
Ā 
PDF
Accelerating Oracle Database 23ai Troubleshooting with Oracle AHF Fleet Insig...
Sandesh Rao
Ā 
PDF
Architecture of the Future (09152021)
EdwardMeyman
Ā 
PPTX
Applied-Statistics-Mastering-Data-Driven-Decisions.pptx
parmaryashparmaryash
Ā 
PDF
Using Anchore and DefectDojo to Stand Up Your DevSecOps Function
Anchore
Ā 
PDF
How Open Source Changed My Career by abdelrahman ismail
a0m0rajab1
Ā 
PDF
Oracle AI Vector Search- Getting Started and what's new in 2025- AIOUG Yatra ...
Sandesh Rao
Ā 
PPTX
New ThousandEyes Product Innovations: Cisco Live June 2025
ThousandEyes
Ā 
PDF
Presentation about Hardware and Software in Computer
snehamodhawadiya
Ā 
PPTX
IoT Sensor Integration 2025 Powering Smart Tech and Industrial Automation.pptx
Rejig Digital
Ā 
PDF
Beyond Automation: The Role of IoT Sensor Integration in Next-Gen Industries
Rejig Digital
Ā 
PPTX
Coupa-Overview _Assumptions presentation
annapureddyn
Ā 
PDF
A Strategic Analysis of the MVNO Wave in Emerging Markets.pdf
IPLOOK Networks
Ā 
PDF
NewMind AI Weekly Chronicles - July'25 - Week IV
NewMind AI
Ā 
Research-Fundamentals-and-Topic-Development.pdf
ayesha butalia
Ā 
Structs to JSON: How Go Powers REST APIs
Emily Achieng
Ā 
Data_Analytics_vs_Data_Science_vs_BI_by_CA_Suvidha_Chaplot.pdf
CA Suvidha Chaplot
Ā 
Event Presentation Google Cloud Next Extended 2025
minhtrietgect
Ā 
ChatGPT's Deck on The Enduring Legacy of Fax Machines
Greg Swan
Ā 
AI Unleashed - Shaping the Future -Starting Today - AIOUG Yatra 2025 - For Co...
Sandesh Rao
Ā 
SparkLabs Primer on Artificial Intelligence 2025
SparkLabs Group
Ā 
Accelerating Oracle Database 23ai Troubleshooting with Oracle AHF Fleet Insig...
Sandesh Rao
Ā 
Architecture of the Future (09152021)
EdwardMeyman
Ā 
Applied-Statistics-Mastering-Data-Driven-Decisions.pptx
parmaryashparmaryash
Ā 
Using Anchore and DefectDojo to Stand Up Your DevSecOps Function
Anchore
Ā 
How Open Source Changed My Career by abdelrahman ismail
a0m0rajab1
Ā 
Oracle AI Vector Search- Getting Started and what's new in 2025- AIOUG Yatra ...
Sandesh Rao
Ā 
New ThousandEyes Product Innovations: Cisco Live June 2025
ThousandEyes
Ā 
Presentation about Hardware and Software in Computer
snehamodhawadiya
Ā 
IoT Sensor Integration 2025 Powering Smart Tech and Industrial Automation.pptx
Rejig Digital
Ā 
Beyond Automation: The Role of IoT Sensor Integration in Next-Gen Industries
Rejig Digital
Ā 
Coupa-Overview _Assumptions presentation
annapureddyn
Ā 
A Strategic Analysis of the MVNO Wave in Emerging Markets.pdf
IPLOOK Networks
Ā 
NewMind AI Weekly Chronicles - July'25 - Week IV
NewMind AI
Ā 

Cfms project (asrc)

  • 1. Presented by Michael Davies CFMS-ASRC Business Manager CFMS-ASRC Bristol, September 2011
  • 3. TRANSFORMING SIMULATION What is CFMS? ā€œCFMS is an independent, not-for-profit organisation, committed to accelerating the delivery of more intuitive and powerful design processes.ā€
  • 4. Rolls-Royce data-strictly private CFMS Limited • A not for profit company, limited by guarantee has been established to manage delivery of the CFMS Vision via the CFMS Framework* • The company is known as CFMS Ltd • Member Companies are: • Airbus • BAE Systems • Frazer-Nash Consultancy • MBDA UK • Rolls-Royce • Williams F1 • Activities carried out by CFMS Ltd include: • Technology road-mapping • Project scoping and facilitation • Project management support • Facilities provision • All services are available to organisations beyond the Member companies of CFMS Ltd The CFMS Framework is a co-ordinated programme of research and technology deployment projects, the scope of which has been defined to achieve the CFMS Vision *
  • 5. TRANSFORMING SIMULATION Advanced Simulation Research Centre  Created to challenge our perceptions of a ā€œtraditional working environmentā€ • On-site HPC cluster • IT Lab (flexible infrastructure) • Visualisation suite • Integration room • Collaborative working areas • Hot-desking and touchdown-desking • Meeting rooms & conference facilities • Break-out areas ā€œAn inspiring and stimulating environment to encourage collaboration and innovation, alongside the cutting-edge facilities required to support the development and demonstration of the latest technologiesā€
  • 6. TRANSFORMING SIMULATION Associates Scheme  Primary method of CFMS engagement  Brings together end users, technology developers and researchers  Unique programme of activities to improve awareness and identify longer-term developments • Best practice exchange • Road-mapping • Demonstrations • Networking • Forums • Technical notes/white papers • Newsletters ā€œIntroduce organisations to technologies and methodologies which will make their design processes quicker, cheaper and more effectiveā€
  • 8. Facility elements Capability Lab a facility to support collaborative research & development HPC – High Performance Computer IT laboratory a facility to support R&D in emerging IT architectures
  • 9.  An open plan office space, with flexible partitioning  Focus on supporting CFMS programmes and methods developments  Front office:  Desktop clients with docking stations for ā€˜approved’ laptops  Wireless internet access,  Wired access to HPC and IT Lab  Visualisation/Integration/Conferencing/Meeting Rooms  Back office servers:  18 Xeon-based severs (development, code, email,…etc)  3.6TB storage  Software stacks Capability Lab
  • 10. HPC  2880 core clusters – latest Nehalem (six-core) chipset - Fast file server : 60TB usable - QDR IB interconnect, 40Gbps bandwidth - IBM iDataPlex, with water-cooled rear doors  1440 cores Rolls-Royce, 720 cores Airbus, 720 cores third-party  Head/login nodes  2 x PostProcessing-nodes  2 X Visualisation nodes, with Nvidia Quadroplex 2200S4 GPUs  OS: RHE v5.4  Scheduler: SunGridEngine
  • 11. Rolls-Royce data-strictly private Facility floor plan * Ground Floor Layout ITLab HPC v v v v Venus Integration Room Mars Visualisation Zone Game Zone Break-out Zone 15 16 17 18 19 20 22 21 23 24 Venus Integration Room Mars Visualisation Zone Max capacity = 25 people (8 people in baseline layout) Max capacity = 25 people (12 people in baseline layout)
  • 12. Rolls-Royce data-strictly private Facility floor plan * First Floor Layout CFMS ASRC ASRC ASRC ASRC Saturn Room Jupiter Room Mercury Room Neptune Room Transit Zone 5 6 4 3 1 2 Neptune Room Mercury Room Saturn RoomJupiter Room Transit Zone 7 8 9 Max capacity = 40 people in seminar room layout (24 people in training room layout) Max capacity = 25 people in seminar room layout (16 people in training room layout) Max capacity = 20 people in seminar room layout (6people with baseline layout) Max capacity = 14 people in seminar room layout (4people +2 desks with baseline layout) Capacity = 6 people with baseline layout 10 11 12 13 14
  • 13. Rolls-Royce data-strictly private Organisation Member Organisations RR, Airbus, Williams F1, Fraser Nash, MBDA, BAE CFMS Board B Barzegar, I Martindale, P Best, N Buckland, A Burns, G Gapper, B Davis ASRC Board Martin Aston Frank McQuade Carolyn Webb Andy Williams Implementation Manager Mike Davies Business Manager Zoe Thorne Administrator Neil Whyld Paul Edwards Outreach Manager Technical controller Operations/Facilities Nathan Harper IBM Support
  • 14. Thank you for your attention