4M CHANGE
Presented By : Hardil Shah
What is 4M change?
1. MAN
2. MACHINE
3. MATERIAL
4. METHOD
Purpose of 4M Change
• To closely monitor process and effect of
change on product.
Man
• If new Person join.
• Person is on leave for more than 1 month.
• Shift time extended
• If person is sick.
Machine
• Machine Change.
• Engineering change in Machine.
• Preventive Maintenance planned.
• Break down maintenance done on machine.
• Fixture change in machine.
• Removing or adding external process on machine
Material
• New Supplier or change current supplier
• New Material for approval source of trial.
• Same Supplier but mixing combination change.
Method
• Any Deviation form Process control (Process Parameter Change)
• Process Sequence Change.
• Additional process implemented.
• New technology implemented
Type of 4M change
1. Planned (Permanent)
2. Un Planned (Temporary)
Planned (Permanent) Type Change
• The Change that is done due to some
unavoidable reason.
Unplanned (Temporary) Type Change
• The change that discussed before change and
pre planned.
Criteria of 4M change
• Set up
• Containment
• Retro active
Setup
• First Part Approval report
Containment
• To Closely monitor running production
Retroactive
• To trace back from where problem arise in
production.
Criteria : 4 M Change
MAN MATERIAL METHOD MACHINE
Extended shift working (
over 2 shifts ) -
unplanned
Source of supply
change for controlled
item- planned
Any deviation from Process control
standard - planned
Machine Change - planned
Manpower change
( regular)
Different spec /
Grade of incoming
controlled material
from approved
source for trials -
planned
Process sequence change -Unplanned Breakdown Maint. Which
affects process / quality of
product - unplanned
Person left shift job due
to sickness
Material
Composition change-
Planned
New technology introduction - planned Fixture change - such as enamel
applicator - planned
New joinee - planned Material
Combination Change-
Planned
Additional process adopted - planned Preventive maintanence. -
planned
On Leave For More than
one Month
Inspection equipment change - planned
Traceability
• Traceability or unique Identification is very
important for further assessment of product.
• To check product deforms after time interval.

More Related Content

PPTX
Training module 4 m change
PPTX
4M-Change-Management.pptx
PPTX
Training_Module_4M_Change.pptx
PDF
7 QC Tools training presentation
PDF
5S TAMIL
DOCX
question paper 4M change management.docx
PPTX
Lean ppt
PPT
Training & development
Training module 4 m change
4M-Change-Management.pptx
Training_Module_4M_Change.pptx
7 QC Tools training presentation
5S TAMIL
question paper 4M change management.docx
Lean ppt
Training & development

What's hot (20)

PPTX
4M Change ppt.pptx
PPTX
5 s and workplace productivity cet
PPT
5 s training shop floor 4
PDF
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
PPT
5S Training Presentation
PPT
Ppap training ppt
PPTX
Mistake proofing for web1
PPTX
5S Implementation Presentation
PPTX
TPM Activity
PPTX
Visual Management
PDF
Kaizen training
PPTX
Autonomous maintenance Jishu Hozen
PPT
PPTX
Daily Production Management - 5 Tips to Maintain Stability & Exclusion of Abn...
PPT
16 major losses tng
PPT
PPTX
Total productive maintenance(TPM)
PPTX
Autonomous Maintenance (AM)
PDF
TPM for lean manufacturing chp4 step of “jlshu hozen “activities
PDF
5S Auditing Sheet
4M Change ppt.pptx
5 s and workplace productivity cet
5 s training shop floor 4
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
5S Training Presentation
Ppap training ppt
Mistake proofing for web1
5S Implementation Presentation
TPM Activity
Visual Management
Kaizen training
Autonomous maintenance Jishu Hozen
Daily Production Management - 5 Tips to Maintain Stability & Exclusion of Abn...
16 major losses tng
Total productive maintenance(TPM)
Autonomous Maintenance (AM)
TPM for lean manufacturing chp4 step of “jlshu hozen “activities
5S Auditing Sheet
Ad

Similar to Change Management - 4 m change (20)

PPTX
Change Control in Pharmaceutical Industry
PPT
IEM UNIT 4 PLANT LOCATION.ppt
PDF
Unit iii operations management
PPTX
4M Change management - key requirement in automobile
PPTX
CCF PPT By Amit Gupta.pptx
PPTX
Production and operation management.pptx
PPTX
introduction TO PRODUCTION PLANNING AND CONTROL
PPTX
OPERATIONS MANAGEMENT- Full Slides.pptx
PPTX
Pharmaceutical Production Planning and control
PPTX
4M CHANGE & ABNORMAL CONDITION TRAINING final.pptx
PPT
APQP-PPAP[1].ppt for engineering products
PPTX
GMP Training: Handling of deviation
PPTX
Pilot plant scaleup.pptx
DOCX
Prepare Raw material notes (AutoRecovered).docx
PPTX
CASE STUDY ON CHANGE CONTROL
PPT
Process Change Notification Procedure (4M Change notify)
PPT
PCN Route adsadsadsadrereafeafeafawraweraefearaer
PPT
Process Change Notification Procedure (4M Change)
PPT
Ppap la
PPSX
QUALITY MANAGEMNT SYSTEMS: Change Control (CC)
Change Control in Pharmaceutical Industry
IEM UNIT 4 PLANT LOCATION.ppt
Unit iii operations management
4M Change management - key requirement in automobile
CCF PPT By Amit Gupta.pptx
Production and operation management.pptx
introduction TO PRODUCTION PLANNING AND CONTROL
OPERATIONS MANAGEMENT- Full Slides.pptx
Pharmaceutical Production Planning and control
4M CHANGE & ABNORMAL CONDITION TRAINING final.pptx
APQP-PPAP[1].ppt for engineering products
GMP Training: Handling of deviation
Pilot plant scaleup.pptx
Prepare Raw material notes (AutoRecovered).docx
CASE STUDY ON CHANGE CONTROL
Process Change Notification Procedure (4M Change notify)
PCN Route adsadsadsadrereafeafeafawraweraefearaer
Process Change Notification Procedure (4M Change)
Ppap la
QUALITY MANAGEMNT SYSTEMS: Change Control (CC)
Ad

Recently uploaded (20)

PPTX
Environmental studies, Moudle 3-Environmental Pollution.pptx
PPTX
Agentic Artificial Intelligence (Agentic AI).pptx
PDF
Project_Mgmt_Institute_-Marc Marc Marc .pdf
PDF
VSL-Strand-Post-tensioning-Systems-Technical-Catalogue_2019-01.pdf
PDF
Beginners-Guide-to-Artificial-Intelligence.pdf
PDF
ASPEN PLUS USER GUIDE - PROCESS SIMULATIONS
PPTX
Unit IImachinemachinetoolopeartions.pptx
PPTX
MAD Unit - 3 User Interface and Data Management (Diploma IT)
PDF
UEFA_Embodied_Carbon_Emissions_Football_Infrastructure.pdf
PPTX
INTERNET OF THINGS - EMBEDDED SYSTEMS AND INTERNET OF THINGS
PDF
IAE-V2500 Engine Airbus Family A319/320
PDF
VTU IOT LAB MANUAL (BCS701) Computer science and Engineering
PPTX
AI-Reporting for Emerging Technologies(BS Computer Engineering)
PDF
[jvmmeetup] next-gen integration with apache camel and quarkus.pdf
PDF
electrical machines course file-anna university
PDF
UEFA_Carbon_Footprint_Calculator_Methology_2.0.pdf
PPTX
Software-Development-Life-Cycle-SDLC.pptx
PPTX
Principal presentation for NAAC (1).pptx
PDF
Principles of operation, construction, theory, advantages and disadvantages, ...
PPTX
Wireless sensor networks (WSN) SRM unit 2
Environmental studies, Moudle 3-Environmental Pollution.pptx
Agentic Artificial Intelligence (Agentic AI).pptx
Project_Mgmt_Institute_-Marc Marc Marc .pdf
VSL-Strand-Post-tensioning-Systems-Technical-Catalogue_2019-01.pdf
Beginners-Guide-to-Artificial-Intelligence.pdf
ASPEN PLUS USER GUIDE - PROCESS SIMULATIONS
Unit IImachinemachinetoolopeartions.pptx
MAD Unit - 3 User Interface and Data Management (Diploma IT)
UEFA_Embodied_Carbon_Emissions_Football_Infrastructure.pdf
INTERNET OF THINGS - EMBEDDED SYSTEMS AND INTERNET OF THINGS
IAE-V2500 Engine Airbus Family A319/320
VTU IOT LAB MANUAL (BCS701) Computer science and Engineering
AI-Reporting for Emerging Technologies(BS Computer Engineering)
[jvmmeetup] next-gen integration with apache camel and quarkus.pdf
electrical machines course file-anna university
UEFA_Carbon_Footprint_Calculator_Methology_2.0.pdf
Software-Development-Life-Cycle-SDLC.pptx
Principal presentation for NAAC (1).pptx
Principles of operation, construction, theory, advantages and disadvantages, ...
Wireless sensor networks (WSN) SRM unit 2

Change Management - 4 m change

  • 1. 4M CHANGE Presented By : Hardil Shah
  • 2. What is 4M change? 1. MAN 2. MACHINE 3. MATERIAL 4. METHOD
  • 3. Purpose of 4M Change • To closely monitor process and effect of change on product.
  • 4. Man • If new Person join. • Person is on leave for more than 1 month. • Shift time extended • If person is sick. Machine • Machine Change. • Engineering change in Machine. • Preventive Maintenance planned. • Break down maintenance done on machine. • Fixture change in machine. • Removing or adding external process on machine
  • 5. Material • New Supplier or change current supplier • New Material for approval source of trial. • Same Supplier but mixing combination change. Method • Any Deviation form Process control (Process Parameter Change) • Process Sequence Change. • Additional process implemented. • New technology implemented
  • 6. Type of 4M change 1. Planned (Permanent) 2. Un Planned (Temporary)
  • 7. Planned (Permanent) Type Change • The Change that is done due to some unavoidable reason. Unplanned (Temporary) Type Change • The change that discussed before change and pre planned.
  • 8. Criteria of 4M change • Set up • Containment • Retro active
  • 9. Setup • First Part Approval report Containment • To Closely monitor running production Retroactive • To trace back from where problem arise in production.
  • 10. Criteria : 4 M Change MAN MATERIAL METHOD MACHINE Extended shift working ( over 2 shifts ) - unplanned Source of supply change for controlled item- planned Any deviation from Process control standard - planned Machine Change - planned Manpower change ( regular) Different spec / Grade of incoming controlled material from approved source for trials - planned Process sequence change -Unplanned Breakdown Maint. Which affects process / quality of product - unplanned Person left shift job due to sickness Material Composition change- Planned New technology introduction - planned Fixture change - such as enamel applicator - planned New joinee - planned Material Combination Change- Planned Additional process adopted - planned Preventive maintanence. - planned On Leave For More than one Month Inspection equipment change - planned
  • 11. Traceability • Traceability or unique Identification is very important for further assessment of product. • To check product deforms after time interval.