Choosing the Right Supplier A Guide for Evaluating difficult choices
Introduction Since our founding in 1992 the BP Group and its Associates have been involved in dozens of evaluations of new systems and business approaches. We have helped major government departments, financial services companies, local government, Telco’s, utilities and ‘not for profits’.  This presentation outlines our best practice and the top level process to help you choose the right supplier. Naturally our assessment  goes much deeper than this and we subsequently are often involved in post selection support, project guidance and implementation.
Evaluation Viewpoint High level Designed to achieve optimum results Flexibility to satisfy the needs of ….. Budget and time constraints
OVERVIEW WHO  is appropriate to help in the search WHAT  steps are taken during the search WHERE  do you look WHEN  do you do certain activities HOW  you make the decision. . . . .
Assemble the Evaluation Team Representation from: Information systems  personnel End users Consultants Business process specialists
The Evaluation Team Criteria: Empowered Establish reporting  relationship Full time Team room Flexible Shared goals Shared loyalties
Feasibility Does your company need more than is currently available?
What is Driving the Need to Change? Functions Requirements to get the job done Features Convenience attributes that enhance functions of usage New processing requirements Results of mergers, acquisitions for changes in scope of operation
Preparing for the Evaluation Document your current system Interview users from each area Identify needs and wants Prioritize your new system  features/functions
Document Your Current System Identify and document: What does it do well? What needs improvement? What does it  not  do?
Interview Users From Each Area Document users’: Functions performed with current system Perceived weaknesses of current system Perceived strengths of current system Potential efficiency  enhancements
Identify  Needs  and Wants Current System Features and Functions
Prioritize New System Features/Functions Needs Wants Environmental issues  such as: Database support Platform preferences
Decision Yes No?  then Reengineer Do you really need a new system?
Decision Build Buy Yes we do. Now do we?
Develop a List of  Possible Vendors Sources include: Professional organizations contacts such as BPGroup, ABPMP, IPM and IOD Analysts such as  Gartner  and  Forrester Other companies in the area Other companies in the same industry Trade shows Evaluation consultant
Develop a  Request for Information (RFI) Include minimum qualification requirements such as: Hardware/software environment requirements Specific application requirements Major functional requirements Major feature requirements
Request from each vendor: Concurrence with minimum requirements Current pricing with 180 day hold Three references installed in the last three years Nearest local user group contract Develop a  Request for Information (RFI)
Request vendor background: Profile Financials Client base Other applications offered Third party software included/required Develop a  Request for Information (RFI)
Getting the Answers Request response within three weeks of receipt of RFI. Immediate Answers
Evaluate the Results of the RFI Disqualify: All non-respondents Vendors not meeting minimum requirements Unreasonable pricing
Evaluate the Results of the RFI Contact the references of the remaining vendors to: Interview their evaluation team. Validate the length of use of their system. Review their implementation: Time Scope Staffing requirements Consultants, if used
Evaluate the Results of the RFI Determine if the source code has been altered. If yes, why and to what extent? Ask for other references. If consultants were used, contact them.
The Request for Proposal  (RFP) Expansion of the RFI Written RFP Detailed requirements Instructions for bids Evaluation tool Verbal RFP
Meet With Each Vendor to  Review Needs Objectives for the meeting  should  include: Review the process thus far. Define the priorities of needs. Discuss the vendor’s “solution”. Seek clarification of RFI responses. Review the next event and the remaining evaluation process.
Vendor Presentations/Demo Scheduling considerations: Demos should be at your site. Schedule no more than two demos per week. Avoid scheduling for a Friday or before a holiday. Schedule an internal debriefing the day after each demo. Start in the morning.
Vendor Presentations/Demo Prior  to demo, discuss with vendor: Expectations and preliminary agenda Minimum demo criteria/checklist Emphasis on “LIVE” demo over presentation
The Demo – beware of the glitz! Do  Expect  the vendor to demo based on your needs. Focus  on functional requirements. All evaluation team  members should stay  for the entire meeting. Do  not  fragment meeting by evaluation groups.
Evaluations Will objectives be met? Are requirements filled? Is there a  cost/value balance? Does it fit in long term  strategic plans?
Choose Finalists Select a front runner, an option two and  never more than  three finalists. Criteria: Best fit with needs Strength of references Responsiveness of vendor representatives Implementation time and cost
User Site Visits... Select the site based on functional match rather than location or industry. If  the vendor attends, request time alone with the users. Review vendor reference questions. Ask about other product users, get names and phone numbers for further follow-up. View system. An opportunity to see the product  in the real world
Vendor Corporate Visit... Optional Opportunity to meet senior management, review corporate direction and upcoming technology. Stay focused on requirements and current product availability.
Now Select One Finalist...and One Alternate Explain where each vendor stands and that you  will buy from the finalist  unless terms cannot be reached.
Evaluate Your Implementation Options Internal staff Consulting alternatives... don’t choose without looking at more  than one option. Vendor  Others
Contract Negotiations Begin Decide if vendor’s standard license or yours will be the basis for negotiations. Set forth your expectations and timeframes. Include pricing only for all software and maintenance. Buy  ONLY  what you evaluated. Beware of extras.
Sign the Agreement
Summary Stay focused on functionality Beware of distractions Glitz and bling Insignificant functions and features
Summary Software license Internal staff Consulting cost 5 Year projected cost Maintenance cost Vendor Internal staffing
Implementation...The Real Work Begins Thank you More information? [email_address] www.bpgroup.org LinkedIn: www.linkedin.com/e/gis/1062077

More Related Content

DOCX
Supplier evaluation
PDF
Supplier evaluation criteria
PPT
Vendor evalu.nikhil 12mt07ind017
PPT
shahank soni vendor evaluation presentation
PPT
SUPPLIER SELECTION AND EVALUATION
PDF
Strategic sourcing & vendor selection
PPTX
SUPPLIER SELECTION AND DEVELOPMENT
PDF
bp case study
Supplier evaluation
Supplier evaluation criteria
Vendor evalu.nikhil 12mt07ind017
shahank soni vendor evaluation presentation
SUPPLIER SELECTION AND EVALUATION
Strategic sourcing & vendor selection
SUPPLIER SELECTION AND DEVELOPMENT
bp case study

What's hot (20)

PDF
Methods for selecting suppliers in international procurement
PPTX
Vendor rating system
DOC
Supplier selection (abr)
DOCX
A holistic framework of supplier selection and performance evaluation for an ...
PPTX
Denis Ford, International Leader EMEA at Cummins - Supplier Evaluation & Incl...
PPTX
Consumer Behaviour: Supplier Evaluation Selection
PPT
Supplier evaluation and selection
PPTX
Supplier Approval And Assessment
PPT
Vendor Selection
PPT
Supplier evaluation & selection
PPTX
Smarter Supplier Management - Improving Supplier Performance Through Better ...
PPT
ASQ QMD GSC Supplier Scorecard Benchmark 021209
PDF
Effective Supplier Selection - Boeing 787
PPTX
Vendor development
PPTX
Vendor Management System - Introduction2
PPTX
PDF
Managing-Supplier-Performance-Key-Competitive-Advantage
PDF
Make or buy, insourcingoutsourcing
PPT
Supplier Evaluation & Selection
Methods for selecting suppliers in international procurement
Vendor rating system
Supplier selection (abr)
A holistic framework of supplier selection and performance evaluation for an ...
Denis Ford, International Leader EMEA at Cummins - Supplier Evaluation & Incl...
Consumer Behaviour: Supplier Evaluation Selection
Supplier evaluation and selection
Supplier Approval And Assessment
Vendor Selection
Supplier evaluation & selection
Smarter Supplier Management - Improving Supplier Performance Through Better ...
ASQ QMD GSC Supplier Scorecard Benchmark 021209
Effective Supplier Selection - Boeing 787
Vendor development
Vendor Management System - Introduction2
Managing-Supplier-Performance-Key-Competitive-Advantage
Make or buy, insourcingoutsourcing
Supplier Evaluation & Selection
Ad

Viewers also liked (16)

PPT
Supplier selection
PPT
Lecture 2a: Vendors/Suppliers
PPTX
Supplier Risk Management for ISM 4-16
PPT
Know your suppliers? How can you manage supplier risk?
PPTX
ICB PAYROLL & MONTHLY SARS RETURNS Learning module 5
PPTX
Supplier selection using ahp
PDF
Contracts Of Employment 20.10.09.F
PPTX
Key Components of an Employment Contract
PPT
Business Registration and Licensing
PPT
Employment Contracts 101
PPT
Legal forms of business 2015
PPT
Operations - Working with Suppliers
PDF
Doing Business In Malaysia
PPTX
TOPSIS - A multi-criteria decision making approach
PDF
Record keeping for a small business
PDF
Event Evaluation
Supplier selection
Lecture 2a: Vendors/Suppliers
Supplier Risk Management for ISM 4-16
Know your suppliers? How can you manage supplier risk?
ICB PAYROLL & MONTHLY SARS RETURNS Learning module 5
Supplier selection using ahp
Contracts Of Employment 20.10.09.F
Key Components of an Employment Contract
Business Registration and Licensing
Employment Contracts 101
Legal forms of business 2015
Operations - Working with Suppliers
Doing Business In Malaysia
TOPSIS - A multi-criteria decision making approach
Record keeping for a small business
Event Evaluation
Ad

Similar to Business Process Management - Choosing The Right Supplier (20)

PPTX
Selecting CRM Software
PPTX
Vendor Selection Process
PPT
Software Selection
DOCX
Apples , oranges & crm software selection
PDF
How to Choose The Right Fundraising Software for your Not for Profit
PPTX
Best Practices in Software Vendor Selection
PPTX
Process of software selection
PPTX
52 Software Selection Tips to Pick the Best-Fit Software and Impress Your Col...
PDF
Synergist System Selection & Implementation Guide
PDF
Selecting a Software Solution: 13 Best Practices for Media and Entertainment ...
PPTX
52 Software Selection Tips to Pick the Best-Fit Software and Impress Your Col...
PPTX
Build vs buy
PDF
Dit yvol5iss25
DOC
New microsoft office word 97 2003 document
PPT
DOCX
Best Practices for Preparing a Request for Proposalby Be.docx
PPTX
How to Evaluate Solutions and Build your Evaluation Committee
PDF
SelectingCADRMSVendor
DOCX
40 JANUARYFEBRUARY 2010 INFORMATIONMANAGEMENTSelecting .docx
Selecting CRM Software
Vendor Selection Process
Software Selection
Apples , oranges & crm software selection
How to Choose The Right Fundraising Software for your Not for Profit
Best Practices in Software Vendor Selection
Process of software selection
52 Software Selection Tips to Pick the Best-Fit Software and Impress Your Col...
Synergist System Selection & Implementation Guide
Selecting a Software Solution: 13 Best Practices for Media and Entertainment ...
52 Software Selection Tips to Pick the Best-Fit Software and Impress Your Col...
Build vs buy
Dit yvol5iss25
New microsoft office word 97 2003 document
Best Practices for Preparing a Request for Proposalby Be.docx
How to Evaluate Solutions and Build your Evaluation Committee
SelectingCADRMSVendor
40 JANUARYFEBRUARY 2010 INFORMATIONMANAGEMENTSelecting .docx

More from Steve Towers, CEO and CPP Champion (20)

PDF
Executive Overview - Building the case for Customer Centricity
PDF
Design Thinking PEX Australia_July_2016_final
PDF
Scrum Gathering Prague November 2015 Biase de Gregorio - final v3
PDF
Business Acupuncture (yes really) - how one thing changes everything
PPTX
CEM the true version - one view of the customer
PDF
CEMMethod walkthough version 10
PDF
Steve Towers PEX_Sydney_Why_BPM_fails
PDF
Gutenberg impact - What happened then has happened again
PDF
Gutenberg impact - What happened then has happened again
PDF
PEX Sydney Steve_Towers * BPM is Dead, Long Live CEM *
PDF
PEX Asia 2014 Keynote Steve Towers
PDF
CEM meets BPM_London_April_2014
PPTX
Successful Customer Outcomes 2013
PDF
CX ABACUS 2013 (Customer Journey Mapping)
PPTX
The Science of Customer Experience
PDF
NPS - Dead in the Water (Terrific Paper 2013)
PDF
Raising the Bar to deliver customer success consistently
PDF
CEMMethod advanced principles 2013
Executive Overview - Building the case for Customer Centricity
Design Thinking PEX Australia_July_2016_final
Scrum Gathering Prague November 2015 Biase de Gregorio - final v3
Business Acupuncture (yes really) - how one thing changes everything
CEM the true version - one view of the customer
CEMMethod walkthough version 10
Steve Towers PEX_Sydney_Why_BPM_fails
Gutenberg impact - What happened then has happened again
Gutenberg impact - What happened then has happened again
PEX Sydney Steve_Towers * BPM is Dead, Long Live CEM *
PEX Asia 2014 Keynote Steve Towers
CEM meets BPM_London_April_2014
Successful Customer Outcomes 2013
CX ABACUS 2013 (Customer Journey Mapping)
The Science of Customer Experience
NPS - Dead in the Water (Terrific Paper 2013)
Raising the Bar to deliver customer success consistently
CEMMethod advanced principles 2013

Recently uploaded (20)

PPTX
Chapter 2 strategic Presentation (6).pptx
PDF
Investment in CUBA. Basic information for United States businessmen (1957)
PDF
Pink Cute Simple Group Project Presentation.pdf
PPTX
Oracle Cloud Infrastructure Overview July 2020 v2_EN20200717.pptx
PDF
757557697-CERTIKIT-ISO22301-Implementation-Guide-v6.pdf
DOCX
“Strategic management process of a selected organization”.Nestle-docx.docx
PDF
The Dynamic CLOs Shaping the Future of the Legal Industry in 2025.pdf
PDF
109422672-Doc-8973-05-Security-Manual-Seventh-Edition.pdf
PPTX
Side hustles: 14 powerful tips to embrace the future of work
DOCX
Center Enamel Enabling Precision and Sustainability in the Netherlands' Advan...
PDF
Handouts for Housekeeping.pdfhsjsnvvbdjsnwb
PDF
COVID-19 Primer for business case prep.pdf
PDF
Chembond Chemicals Limited Presentation 2025
PDF
The Impact of Historical Events on Legal Communication Styles (www.kiu.ac.ug)
PDF
El futuro empresarial 2024 una vista gen
PDF
IFRS Green Book_Part B for professional pdf
DOCX
Handbook of entrepreneurship- Chapter 10 - Feasibility analysis by Subin K Mohan
PDF
The Influence of Historical Figures on Legal Communication (www.kiu.ac.ug)
PPTX
Business Research Methods- Secondary Data
PPTX
Biomass_Energy_PPT_FIN AL________________.pptx
Chapter 2 strategic Presentation (6).pptx
Investment in CUBA. Basic information for United States businessmen (1957)
Pink Cute Simple Group Project Presentation.pdf
Oracle Cloud Infrastructure Overview July 2020 v2_EN20200717.pptx
757557697-CERTIKIT-ISO22301-Implementation-Guide-v6.pdf
“Strategic management process of a selected organization”.Nestle-docx.docx
The Dynamic CLOs Shaping the Future of the Legal Industry in 2025.pdf
109422672-Doc-8973-05-Security-Manual-Seventh-Edition.pdf
Side hustles: 14 powerful tips to embrace the future of work
Center Enamel Enabling Precision and Sustainability in the Netherlands' Advan...
Handouts for Housekeeping.pdfhsjsnvvbdjsnwb
COVID-19 Primer for business case prep.pdf
Chembond Chemicals Limited Presentation 2025
The Impact of Historical Events on Legal Communication Styles (www.kiu.ac.ug)
El futuro empresarial 2024 una vista gen
IFRS Green Book_Part B for professional pdf
Handbook of entrepreneurship- Chapter 10 - Feasibility analysis by Subin K Mohan
The Influence of Historical Figures on Legal Communication (www.kiu.ac.ug)
Business Research Methods- Secondary Data
Biomass_Energy_PPT_FIN AL________________.pptx

Business Process Management - Choosing The Right Supplier

  • 1. Choosing the Right Supplier A Guide for Evaluating difficult choices
  • 2. Introduction Since our founding in 1992 the BP Group and its Associates have been involved in dozens of evaluations of new systems and business approaches. We have helped major government departments, financial services companies, local government, Telco’s, utilities and ‘not for profits’. This presentation outlines our best practice and the top level process to help you choose the right supplier. Naturally our assessment goes much deeper than this and we subsequently are often involved in post selection support, project guidance and implementation.
  • 3. Evaluation Viewpoint High level Designed to achieve optimum results Flexibility to satisfy the needs of ….. Budget and time constraints
  • 4. OVERVIEW WHO is appropriate to help in the search WHAT steps are taken during the search WHERE do you look WHEN do you do certain activities HOW you make the decision. . . . .
  • 5. Assemble the Evaluation Team Representation from: Information systems personnel End users Consultants Business process specialists
  • 6. The Evaluation Team Criteria: Empowered Establish reporting relationship Full time Team room Flexible Shared goals Shared loyalties
  • 7. Feasibility Does your company need more than is currently available?
  • 8. What is Driving the Need to Change? Functions Requirements to get the job done Features Convenience attributes that enhance functions of usage New processing requirements Results of mergers, acquisitions for changes in scope of operation
  • 9. Preparing for the Evaluation Document your current system Interview users from each area Identify needs and wants Prioritize your new system features/functions
  • 10. Document Your Current System Identify and document: What does it do well? What needs improvement? What does it not do?
  • 11. Interview Users From Each Area Document users’: Functions performed with current system Perceived weaknesses of current system Perceived strengths of current system Potential efficiency enhancements
  • 12. Identify Needs and Wants Current System Features and Functions
  • 13. Prioritize New System Features/Functions Needs Wants Environmental issues such as: Database support Platform preferences
  • 14. Decision Yes No? then Reengineer Do you really need a new system?
  • 15. Decision Build Buy Yes we do. Now do we?
  • 16. Develop a List of Possible Vendors Sources include: Professional organizations contacts such as BPGroup, ABPMP, IPM and IOD Analysts such as Gartner and Forrester Other companies in the area Other companies in the same industry Trade shows Evaluation consultant
  • 17. Develop a Request for Information (RFI) Include minimum qualification requirements such as: Hardware/software environment requirements Specific application requirements Major functional requirements Major feature requirements
  • 18. Request from each vendor: Concurrence with minimum requirements Current pricing with 180 day hold Three references installed in the last three years Nearest local user group contract Develop a Request for Information (RFI)
  • 19. Request vendor background: Profile Financials Client base Other applications offered Third party software included/required Develop a Request for Information (RFI)
  • 20. Getting the Answers Request response within three weeks of receipt of RFI. Immediate Answers
  • 21. Evaluate the Results of the RFI Disqualify: All non-respondents Vendors not meeting minimum requirements Unreasonable pricing
  • 22. Evaluate the Results of the RFI Contact the references of the remaining vendors to: Interview their evaluation team. Validate the length of use of their system. Review their implementation: Time Scope Staffing requirements Consultants, if used
  • 23. Evaluate the Results of the RFI Determine if the source code has been altered. If yes, why and to what extent? Ask for other references. If consultants were used, contact them.
  • 24. The Request for Proposal (RFP) Expansion of the RFI Written RFP Detailed requirements Instructions for bids Evaluation tool Verbal RFP
  • 25. Meet With Each Vendor to Review Needs Objectives for the meeting should include: Review the process thus far. Define the priorities of needs. Discuss the vendor’s “solution”. Seek clarification of RFI responses. Review the next event and the remaining evaluation process.
  • 26. Vendor Presentations/Demo Scheduling considerations: Demos should be at your site. Schedule no more than two demos per week. Avoid scheduling for a Friday or before a holiday. Schedule an internal debriefing the day after each demo. Start in the morning.
  • 27. Vendor Presentations/Demo Prior to demo, discuss with vendor: Expectations and preliminary agenda Minimum demo criteria/checklist Emphasis on “LIVE” demo over presentation
  • 28. The Demo – beware of the glitz! Do Expect the vendor to demo based on your needs. Focus on functional requirements. All evaluation team members should stay for the entire meeting. Do not fragment meeting by evaluation groups.
  • 29. Evaluations Will objectives be met? Are requirements filled? Is there a cost/value balance? Does it fit in long term strategic plans?
  • 30. Choose Finalists Select a front runner, an option two and never more than three finalists. Criteria: Best fit with needs Strength of references Responsiveness of vendor representatives Implementation time and cost
  • 31. User Site Visits... Select the site based on functional match rather than location or industry. If the vendor attends, request time alone with the users. Review vendor reference questions. Ask about other product users, get names and phone numbers for further follow-up. View system. An opportunity to see the product in the real world
  • 32. Vendor Corporate Visit... Optional Opportunity to meet senior management, review corporate direction and upcoming technology. Stay focused on requirements and current product availability.
  • 33. Now Select One Finalist...and One Alternate Explain where each vendor stands and that you will buy from the finalist unless terms cannot be reached.
  • 34. Evaluate Your Implementation Options Internal staff Consulting alternatives... don’t choose without looking at more than one option. Vendor Others
  • 35. Contract Negotiations Begin Decide if vendor’s standard license or yours will be the basis for negotiations. Set forth your expectations and timeframes. Include pricing only for all software and maintenance. Buy ONLY what you evaluated. Beware of extras.
  • 37. Summary Stay focused on functionality Beware of distractions Glitz and bling Insignificant functions and features
  • 38. Summary Software license Internal staff Consulting cost 5 Year projected cost Maintenance cost Vendor Internal staffing
  • 39. Implementation...The Real Work Begins Thank you More information? [email_address] www.bpgroup.org LinkedIn: www.linkedin.com/e/gis/1062077

Editor's Notes