1 | P a g e
Chris Potts
113 Cypress
Yukon,OK
Cell: (405) 802-0314
cpotts234@hotmail.com
Summary
More than 19 years’ experience in oil and gas delivery service and installation.(10 years inspecting). I
have a proven track record of customer satisfaction and immediate problem resolution. Strengths
include a relationship building and excellent time management. I am a personable, reliable and
respected achiever with an acute awareness of customer needs and a reputation for delivering on
commitments gained by establishing exceptional and lasting customer relationships.
Core
Strengths
 Building and Maintaining Relationships
 Poly Fusion Certified
 OQ qualified
 ProjectManagement
 H2S Certified
 TD Williams Certified
 OSHA 10
Experience:
Inspector
Parnell Consultants for Oklahoma Natural Gas
Oklahoma City and Tulsa, Ok.
Dec. 2011 to Present
 Manage and inspect the construction of distribution and transmission pipelines on new
and rehab installations. Documentation, Asbuild drawings, quality control.
Pipeline Inspector
Parnell Consultants for SandRidge Energy
Enid, Ok region
June 2011 to Dec 2011
 Overseeing the Installation of SWD disposal lines Hook-ups at wells, setting valves.
Hydro testing on gathering systems pipelines
Utility Inspector
Southwinds Inspection for BearPaw Energy
North Dakota region
July 2009 to june2011
 Responsible for the inspection of new pipeline and related oil and gas projects. This
includes mainline pipelines, gathering systems, facilities, compressor stations and more.
Inspection includes weld inspection, coating inspection and all other quality assurance
inspection related to pipeline construction and maintenance.
2 | P a g e
Pipeline Foreman
Northern Pipeline
1120 NW Us Highway 24, Topeka,KS (785)232-0034
October 2007 to July 2009
 Responsible for all aspects of required DOT maintenance on pipeline: leak survey,
cathodic protection, and AC voltage mitigation. Maintain pipeline efficiency, and
installing Reg. stations and distribution systems.
Construction Foreman
Evans & Associates
315 NW 59th Oklahoma City, OK (405)842-7013
January1999 to 2007
 Responsible for planning, executing, and managing all phases of a Pre and Post job.
Briefing and reporting as required. Installing and rebuilding of customer gas lines,
cathodic protection, leak repair and mainline rebuild.
Reference:
Johnny Wells
Applied Consultants
479-806-0527
Don Reece
Parnell Inspections
479-264-0231
Darryl Heim
Bobs Oilfield
701-290-8198
Bryan Haynes
Chief operating officer (Oklahoma Natural Gas)
405-206-9669
Dave Berry
Regional Manager (Northern Pipeline) 785-640-0181
3 | P a g e

Chris potts resume; new

  • 1.
    1 | Pa g e Chris Potts 113 Cypress Yukon,OK Cell: (405) 802-0314 [email protected] Summary More than 19 years’ experience in oil and gas delivery service and installation.(10 years inspecting). I have a proven track record of customer satisfaction and immediate problem resolution. Strengths include a relationship building and excellent time management. I am a personable, reliable and respected achiever with an acute awareness of customer needs and a reputation for delivering on commitments gained by establishing exceptional and lasting customer relationships. Core Strengths  Building and Maintaining Relationships  Poly Fusion Certified  OQ qualified  ProjectManagement  H2S Certified  TD Williams Certified  OSHA 10 Experience: Inspector Parnell Consultants for Oklahoma Natural Gas Oklahoma City and Tulsa, Ok. Dec. 2011 to Present  Manage and inspect the construction of distribution and transmission pipelines on new and rehab installations. Documentation, Asbuild drawings, quality control. Pipeline Inspector Parnell Consultants for SandRidge Energy Enid, Ok region June 2011 to Dec 2011  Overseeing the Installation of SWD disposal lines Hook-ups at wells, setting valves. Hydro testing on gathering systems pipelines Utility Inspector Southwinds Inspection for BearPaw Energy North Dakota region July 2009 to june2011  Responsible for the inspection of new pipeline and related oil and gas projects. This includes mainline pipelines, gathering systems, facilities, compressor stations and more. Inspection includes weld inspection, coating inspection and all other quality assurance inspection related to pipeline construction and maintenance.
  • 2.
    2 | Pa g e Pipeline Foreman Northern Pipeline 1120 NW Us Highway 24, Topeka,KS (785)232-0034 October 2007 to July 2009  Responsible for all aspects of required DOT maintenance on pipeline: leak survey, cathodic protection, and AC voltage mitigation. Maintain pipeline efficiency, and installing Reg. stations and distribution systems. Construction Foreman Evans & Associates 315 NW 59th Oklahoma City, OK (405)842-7013 January1999 to 2007  Responsible for planning, executing, and managing all phases of a Pre and Post job. Briefing and reporting as required. Installing and rebuilding of customer gas lines, cathodic protection, leak repair and mainline rebuild. Reference: Johnny Wells Applied Consultants 479-806-0527 Don Reece Parnell Inspections 479-264-0231 Darryl Heim Bobs Oilfield 701-290-8198 Bryan Haynes Chief operating officer (Oklahoma Natural Gas) 405-206-9669 Dave Berry Regional Manager (Northern Pipeline) 785-640-0181
  • 3.
    3 | Pa g e