SlideShare a Scribd company logo
Combining PMBOK waterfall and
Adaptive (Agile, Scrum) models for
start-up software projects
Страница  2
DANIL DINTSIS
PH. D. IN SYSTEM ANALYSIS,
PGMP, PMP, ITIL OSA, MOF CERTIFIED SPECIALIST
CONSULT@DINTSIS.ORG
WWW.DDINTSIS.COM
Страница  3 www.specialist.ru
Sources
 PMBOK® Guide 5 Edition
 PMBOK Extension for Software Projects
 ISO/IEC/IEEE/ГОСТ Р ИСО 12207, 15288
 IEEE Standards (SWEBOK® 3)
 ITIL ®, MOF®
Страница  4 www.specialist.ru
What is Software Product? It is:
Business Solution Common Decision
Serviceable and Changeable
Страница  5 www.specialist.ru
Software and Apps as a specific type of a Product
Wide audience
Virtual teams
External
dependencies
High educated
developers
Advanced
users
Страница  6 www.specialist.ru
Project planning and management models
Страница  7 www.specialist.ru
Waterfall – planning from start to finish
The most lovely one by corporate customers and top managers
Страница  8 www.specialist.ru
Rolling wave
Rolling wave is the best approach for long
projects, or for projects with phase-to-phase
dependencies
Страница  9 www.specialist.ru
Waterfall model advantages
 Strong and clear development roadmap
 Opportunity for complex architectural planning
 Clearly defined project scope: time, resources, finance
Страница  10 www.specialist.ru
Early bird key decisions.
Waterfall models are hard to quick changes.
Final product market opportunities are in a risk zone in case
of long-term development
Disadvantages of the waterfall model
Страница  11 www.specialist.ru
Adaptive models
Страница  12 www.specialist.ru
Agile model
User
story
Analyze
Projectize
Develop
(Code)
Document
Test and
Validate
Operate
Страница  13 www.specialist.ru
• Incremental planning with steps from 1-day to 1 month
• Integration of users and developers in a regular collaboration
• Small self-organized teams
• Large projects can include many adaptive teams
• Each team member works on a single project during one iteration
• Each team includes specialists with specific and general
competencies
Adaptive model. Main features
Страница  14 www.specialist.ru
• predict results
• strongly fixed project scope
• team considers result as realistic one
• clear monitoring and control
• assistance in other projects planning
• baseline for resource, financial and schedule planning
Why WBS is so important?
Project
Package Package Package
Phase
Страница  15 www.specialist.ru
Time
Functionality
Minimizing risks in requirements
Release 1
Release 2
Release 3
ADAPTIVE MODELS
Страница  16 www.specialist.ru
Disadvantages of the Adaptive model
Summarizing of bugs from consequent iterations
Volume, time and resource uncertainty
Strategic planning challenges
Strongly based on both customer’s and team’s involvement
and motivation
Страница  17 www.specialist.ru
Combined waterfall – agile model
as in the PMBOK extension for software projects
Страница  18 www.specialist.ru
Risk management cycle
combining waterfall and agile
as in the PMBOK extension for software projects
Страница  19 www.specialist.ru
MSF model
Project plan
approved
Out of
Developm
ent
Release Readiness
Review
Deployment
Milestone
Vision approved
Build
Страница  20 www.specialist.ru
A Single Iteration Lifecycle
Plan
Analyze
DesignDevelop
Test
© Scott Schultz “Rapid Iterative
Production Prototyping”, 1988
Страница  21 www.specialist.ru
WBS extension for mixed Waterfall – Agile models
Страница  22 www.specialist.ru
Boards for different planning levels (based on Trello)
Global Board
Package
board
(SCRUM)
Team member
individual
board
Страница  23 www.specialist.ru
Product. Version 1.0
Страница  24 www.specialist.ru
Развитие продукта. Регулярные улучшения
Страница  25 www.specialist.ru
Change levels vs Planning models
Change
category
What changes Difficulties Duration Model
First level Modification of
existing work
procedures
Low Fast change Adaptive/
Agile
Second
level
Changing of
business
procedures
Medium Medium Adaptive as a
part of a
project/Program
Third level Changing business
branches
Very difficult Long-term Portfolio
Страница  26 www.specialist.ru
Developers are not only a “resourse”!
People need more than tasks!
Team motivation.
Implementing best from Agile
Страница  27 www.specialist.ru
Team building approaches
 Combining local and virtual teams
 Experts and specialists of common practices
 Balance between project and functional team members
Страница  28 www.specialist.ru
Face-to-face information change recommended
Страница  29 www.specialist.ru
Team work models
 Pair programming
 Test-led programming
 Co-location
Страница  30 www.specialist.ru
PM role
Leadership
Control
Страница  31 www.specialist.ru
Slack as an example of a team collaboration tool
Страница  32 www.specialist.ru
Contacts
 www.i-mokymas.com
 info@i-mokymas.com
 www.itstartupadvise.me

More Related Content

What's hot (18)

PPTX
Insights into the Project Management Body of Knowledge (PMBOK® Guide) - Sixth...
Tareq Al-Behairi,PMP,PMI-ACP
 
PDF
Scheduling Optimization with Line of Balance and Start-to-Finish Relations
Ricardo Viana Vargas
 
PDF
Complete Online PMP Study Training Material for PMP Exam Provided Free for PM...
GlobalSkillup
 
PPTX
Project Manager Interview Questions And Answers | PMP Certification Training ...
Simplilearn
 
PDF
PMBOK® Guide Processes Flow – 6th Edition
Ricardo Viana Vargas
 
PPT
Prince2 2005 Vs Prince2 2009
Firebrand Training
 
PPT
Introduction to PMP Brief Presentation
jamilireifij
 
PDF
Change in PMP Exam PMBOK 6th Edition, Presentation by Ahmad Al-Musallami
Ahmad Al-Musallami. MSc, PMP
 
PPTX
UPDATE: PMP Exam Changes From Jan 11, 2016. What You Need To Know?
Trainings24x7
 
PDF
2017 | E-Brochure | PMP® Fast Track (4 Days) | Project Management Training - ...
Dcolearning
 
PPTX
Project Management Class ( based on PMBOK) - Day 1
Highmark Health
 
PDF
Project managment 2
Абдулазіз Мухаммед
 
PPTX
Project integration management
deep sharma
 
PDF
KCS Academy PMP Exam Prep Course Chapter 1 - Introduction
King Consulting Services
 
PPT
Prince I Iand Babok Ver1 0
Maganathin Veeraragaloo
 
PPTX
Project Management - PMI Approach
Zaur Ahmadov, PMP
 
PDF
PMBOK® Guide Processes Flow – 6th Edition (Simplified version)
Ricardo Viana Vargas
 
Insights into the Project Management Body of Knowledge (PMBOK® Guide) - Sixth...
Tareq Al-Behairi,PMP,PMI-ACP
 
Scheduling Optimization with Line of Balance and Start-to-Finish Relations
Ricardo Viana Vargas
 
Complete Online PMP Study Training Material for PMP Exam Provided Free for PM...
GlobalSkillup
 
Project Manager Interview Questions And Answers | PMP Certification Training ...
Simplilearn
 
PMBOK® Guide Processes Flow – 6th Edition
Ricardo Viana Vargas
 
Prince2 2005 Vs Prince2 2009
Firebrand Training
 
Introduction to PMP Brief Presentation
jamilireifij
 
Change in PMP Exam PMBOK 6th Edition, Presentation by Ahmad Al-Musallami
Ahmad Al-Musallami. MSc, PMP
 
UPDATE: PMP Exam Changes From Jan 11, 2016. What You Need To Know?
Trainings24x7
 
2017 | E-Brochure | PMP® Fast Track (4 Days) | Project Management Training - ...
Dcolearning
 
Project Management Class ( based on PMBOK) - Day 1
Highmark Health
 
Project integration management
deep sharma
 
KCS Academy PMP Exam Prep Course Chapter 1 - Introduction
King Consulting Services
 
Prince I Iand Babok Ver1 0
Maganathin Veeraragaloo
 
Project Management - PMI Approach
Zaur Ahmadov, PMP
 
PMBOK® Guide Processes Flow – 6th Edition (Simplified version)
Ricardo Viana Vargas
 

Viewers also liked (20)

PPTX
IT Service management for non-IT managers (CEO and others)
IE Private Consulting in PM & ITSM
 
PPTX
Implementing e learning and combined training methods
IE Private Consulting in PM & ITSM
 
PDF
A New Technique for Adapting SIP Protocol to Ad Hoc Networks: VNSIP (Virtual ...
ijcncs
 
PDF
Secure Virtualization for Cloud Environment Using Guest OS and VMM-based Tech...
ijcncs
 
PDF
Performance Enhancement of VNSIP approach, using MCAC algorithm
ijcncs
 
PDF
SLA Based Information Security Metric for Cloud Computing from COBIT 4.1 Fram...
ijcncs
 
PPTX
Walt Disney
mlmabry
 
PPTX
PMP and CCR updates in 2015
IE Private Consulting in PM & ITSM
 
PDF
Gini in A Bottle: A Case Study of Pareto’s Principle in the Wild
ijcncs
 
PDF
Cryptosystem An Implementation of RSA Using Verilog
ijcncs
 
PDF
Design of Robust Speed Controller by Optimization Techniques for DTC IM Drive
ijcncs
 
PPTX
Virtual learning in 15 minutes
IE Private Consulting in PM & ITSM
 
PDF
State of the ART in Boolean Functions Cryptographic Assessment
ijcncs
 
PPTX
Implementing e learning and combined training methods for lifelong learning
IE Private Consulting in PM & ITSM
 
PDF
Call Center World 2016: Petralex Speech communications software for call centers
IE Private Consulting in PM & ITSM
 
PDF
Enhancing the Performance of DSR Routing Protocol Using Link Breakage Predict...
ijcncs
 
PPTX
Dolly Parton
mlmabry
 
PDF
Performance Evaluation of Routing Protocol on AODV and DSR under Wormhole Attack
ijcncs
 
PDF
Neural Network Web-Based Human Resource Management System Model (NNWBHRMSM)
ijcncs
 
PPTX
Ray Charles
mlmabry
 
IT Service management for non-IT managers (CEO and others)
IE Private Consulting in PM & ITSM
 
Implementing e learning and combined training methods
IE Private Consulting in PM & ITSM
 
A New Technique for Adapting SIP Protocol to Ad Hoc Networks: VNSIP (Virtual ...
ijcncs
 
Secure Virtualization for Cloud Environment Using Guest OS and VMM-based Tech...
ijcncs
 
Performance Enhancement of VNSIP approach, using MCAC algorithm
ijcncs
 
SLA Based Information Security Metric for Cloud Computing from COBIT 4.1 Fram...
ijcncs
 
Walt Disney
mlmabry
 
PMP and CCR updates in 2015
IE Private Consulting in PM & ITSM
 
Gini in A Bottle: A Case Study of Pareto’s Principle in the Wild
ijcncs
 
Cryptosystem An Implementation of RSA Using Verilog
ijcncs
 
Design of Robust Speed Controller by Optimization Techniques for DTC IM Drive
ijcncs
 
Virtual learning in 15 minutes
IE Private Consulting in PM & ITSM
 
State of the ART in Boolean Functions Cryptographic Assessment
ijcncs
 
Implementing e learning and combined training methods for lifelong learning
IE Private Consulting in PM & ITSM
 
Call Center World 2016: Petralex Speech communications software for call centers
IE Private Consulting in PM & ITSM
 
Enhancing the Performance of DSR Routing Protocol Using Link Breakage Predict...
ijcncs
 
Dolly Parton
mlmabry
 
Performance Evaluation of Routing Protocol on AODV and DSR under Wormhole Attack
ijcncs
 
Neural Network Web-Based Human Resource Management System Model (NNWBHRMSM)
ijcncs
 
Ray Charles
mlmabry
 
Ad

Similar to Combining Waterfall and Adaptive practice in IT projects (20)

PPSX
SDLC Methodologies
Ravikanth-BA
 
PDF
ICEC 2014 Linking 6 Phase Project Life Cycle with TCM Framework-Slides
Russell Archibald
 
PPTX
2.SDLC . (1).pptxyuyhhgfbhsdfgsrsgwtrgtrgt
ssuser2d043c
 
PPTX
Scrum in IT Industry Part1
JayeshPatil149
 
PPTX
Coupling stage gate to agile pm models
Johnny Ryser
 
PPSX
Software Development Life Cycle - SDLC
Shwetha-BA
 
PPTX
SOFTWARE ENGINEERING.pptx for It students
larivincent7
 
PPTX
Session 03 - SDLC
PoojaLQA
 
PPTX
The six phase comprehensive project life cycle model-2013
Russell Archibald
 
PPT
Planning in management
DineshVeera5
 
PPTX
A collaborative approach to develop an integrated master program using p6 for...
Saeed Shalbafan
 
PPTX
Software Development Life Cycle – SDLC – Waterfall, Iterative, V, Spiral, and...
Murageppa-QA
 
PPSX
SDLC
Fayis-QA
 
PPTX
SDLC
JayeshPatil149
 
PDF
Scope creep - cylfe campain
M Maged Hegazy, LLM, MBA, CCP, P3O
 
PDF
PMBOK PROCESS FLOW.pdf
Balamurali J, PMP
 
PPTX
Group_5,6_software Project Mangement.pptx
sabakhanzadi54
 
PDF
First time right - Prokon
Tmtm Tmtm
 
PDF
Product-oriented construction management
M Maged Hegazy, LLM, MBA, CCP, P3O
 
SDLC Methodologies
Ravikanth-BA
 
ICEC 2014 Linking 6 Phase Project Life Cycle with TCM Framework-Slides
Russell Archibald
 
2.SDLC . (1).pptxyuyhhgfbhsdfgsrsgwtrgtrgt
ssuser2d043c
 
Scrum in IT Industry Part1
JayeshPatil149
 
Coupling stage gate to agile pm models
Johnny Ryser
 
Software Development Life Cycle - SDLC
Shwetha-BA
 
SOFTWARE ENGINEERING.pptx for It students
larivincent7
 
Session 03 - SDLC
PoojaLQA
 
The six phase comprehensive project life cycle model-2013
Russell Archibald
 
Planning in management
DineshVeera5
 
A collaborative approach to develop an integrated master program using p6 for...
Saeed Shalbafan
 
Software Development Life Cycle – SDLC – Waterfall, Iterative, V, Spiral, and...
Murageppa-QA
 
SDLC
Fayis-QA
 
Scope creep - cylfe campain
M Maged Hegazy, LLM, MBA, CCP, P3O
 
PMBOK PROCESS FLOW.pdf
Balamurali J, PMP
 
Group_5,6_software Project Mangement.pptx
sabakhanzadi54
 
First time right - Prokon
Tmtm Tmtm
 
Product-oriented construction management
M Maged Hegazy, LLM, MBA, CCP, P3O
 
Ad

More from IE Private Consulting in PM & ITSM (15)

PDF
Portfolio/project management information system demands
IE Private Consulting in PM & ITSM
 
PDF
PMBOK processes schema by Ricardo Vargas
IE Private Consulting in PM & ITSM
 
PPTX
Project KPI presentation sample by YouExec
IE Private Consulting in PM & ITSM
 
PDF
AEC project management jobs grow report
IE Private Consulting in PM & ITSM
 
PDF
Microsoft Abbreviations Dictionary
IE Private Consulting in PM & ITSM
 
DOCX
Lead for Call centers and Call center solutions developers and integrators
IE Private Consulting in PM & ITSM
 
PPTX
ИТ служба как сервисная организация в Вашей компании
IE Private Consulting in PM & ITSM
 
PPTX
ITSM for non IT managers
IE Private Consulting in PM & ITSM
 
PPTX
Developing software and/or App requirements specification
IE Private Consulting in PM & ITSM
 
PPTX
PMBOK and Agile in IT projects
IE Private Consulting in PM & ITSM
 
PPTX
Stakeholder management
IE Private Consulting in PM & ITSM
 
PPTX
Business plan template for IT start-ups
IE Private Consulting in PM & ITSM
 
Portfolio/project management information system demands
IE Private Consulting in PM & ITSM
 
PMBOK processes schema by Ricardo Vargas
IE Private Consulting in PM & ITSM
 
Project KPI presentation sample by YouExec
IE Private Consulting in PM & ITSM
 
AEC project management jobs grow report
IE Private Consulting in PM & ITSM
 
Microsoft Abbreviations Dictionary
IE Private Consulting in PM & ITSM
 
Lead for Call centers and Call center solutions developers and integrators
IE Private Consulting in PM & ITSM
 
ИТ служба как сервисная организация в Вашей компании
IE Private Consulting in PM & ITSM
 
ITSM for non IT managers
IE Private Consulting in PM & ITSM
 
Developing software and/or App requirements specification
IE Private Consulting in PM & ITSM
 
PMBOK and Agile in IT projects
IE Private Consulting in PM & ITSM
 
Stakeholder management
IE Private Consulting in PM & ITSM
 
Business plan template for IT start-ups
IE Private Consulting in PM & ITSM
 

Recently uploaded (20)

PDF
Open Chain Q2 Steering Committee Meeting - 2025-06-25
Shane Coughlan
 
PDF
IDM Crack with Internet Download Manager 6.42 Build 43 with Patch Latest 2025
bashirkhan333g
 
PPTX
Homogeneity of Variance Test Options IBM SPSS Statistics Version 31.pptx
Version 1 Analytics
 
PPTX
Change Common Properties in IBM SPSS Statistics Version 31.pptx
Version 1 Analytics
 
PPTX
Agentic Automation: Build & Deploy Your First UiPath Agent
klpathrudu
 
PDF
Wondershare PDFelement Pro Crack for MacOS New Version Latest 2025
bashirkhan333g
 
PDF
Build It, Buy It, or Already Got It? Make Smarter Martech Decisions
bbedford2
 
PDF
[Solution] Why Choose the VeryPDF DRM Protector Custom-Built Solution for You...
Lingwen1998
 
PDF
NEW-Viral>Wondershare Filmora 14.5.18.12900 Crack Free
sherryg1122g
 
PDF
Digger Solo: Semantic search and maps for your local files
seanpedersen96
 
PPTX
Comprehensive Risk Assessment Module for Smarter Risk Management
EHA Soft Solutions
 
PDF
Generic or Specific? Making sensible software design decisions
Bert Jan Schrijver
 
PDF
Download Canva Pro 2025 PC Crack Full Latest Version
bashirkhan333g
 
PDF
Automate Cybersecurity Tasks with Python
VICTOR MAESTRE RAMIREZ
 
PDF
MiniTool Partition Wizard 12.8 Crack License Key LATEST
hashhshs786
 
PPTX
Coefficient of Variance in IBM SPSS Statistics Version 31.pptx
Version 1 Analytics
 
PPTX
AEM User Group: India Chapter Kickoff Meeting
jennaf3
 
PPTX
ChiSquare Procedure in IBM SPSS Statistics Version 31.pptx
Version 1 Analytics
 
PPTX
Empowering Asian Contributions: The Rise of Regional User Groups in Open Sour...
Shane Coughlan
 
PDF
MiniTool Partition Wizard Free Crack + Full Free Download 2025
bashirkhan333g
 
Open Chain Q2 Steering Committee Meeting - 2025-06-25
Shane Coughlan
 
IDM Crack with Internet Download Manager 6.42 Build 43 with Patch Latest 2025
bashirkhan333g
 
Homogeneity of Variance Test Options IBM SPSS Statistics Version 31.pptx
Version 1 Analytics
 
Change Common Properties in IBM SPSS Statistics Version 31.pptx
Version 1 Analytics
 
Agentic Automation: Build & Deploy Your First UiPath Agent
klpathrudu
 
Wondershare PDFelement Pro Crack for MacOS New Version Latest 2025
bashirkhan333g
 
Build It, Buy It, or Already Got It? Make Smarter Martech Decisions
bbedford2
 
[Solution] Why Choose the VeryPDF DRM Protector Custom-Built Solution for You...
Lingwen1998
 
NEW-Viral>Wondershare Filmora 14.5.18.12900 Crack Free
sherryg1122g
 
Digger Solo: Semantic search and maps for your local files
seanpedersen96
 
Comprehensive Risk Assessment Module for Smarter Risk Management
EHA Soft Solutions
 
Generic or Specific? Making sensible software design decisions
Bert Jan Schrijver
 
Download Canva Pro 2025 PC Crack Full Latest Version
bashirkhan333g
 
Automate Cybersecurity Tasks with Python
VICTOR MAESTRE RAMIREZ
 
MiniTool Partition Wizard 12.8 Crack License Key LATEST
hashhshs786
 
Coefficient of Variance in IBM SPSS Statistics Version 31.pptx
Version 1 Analytics
 
AEM User Group: India Chapter Kickoff Meeting
jennaf3
 
ChiSquare Procedure in IBM SPSS Statistics Version 31.pptx
Version 1 Analytics
 
Empowering Asian Contributions: The Rise of Regional User Groups in Open Sour...
Shane Coughlan
 
MiniTool Partition Wizard Free Crack + Full Free Download 2025
bashirkhan333g
 

Combining Waterfall and Adaptive practice in IT projects

  • 1. Combining PMBOK waterfall and Adaptive (Agile, Scrum) models for start-up software projects
  • 2. Страница  2 DANIL DINTSIS PH. D. IN SYSTEM ANALYSIS, PGMP, PMP, ITIL OSA, MOF CERTIFIED SPECIALIST [email protected] WWW.DDINTSIS.COM
  • 3. Страница  3 www.specialist.ru Sources  PMBOK® Guide 5 Edition  PMBOK Extension for Software Projects  ISO/IEC/IEEE/ГОСТ Р ИСО 12207, 15288  IEEE Standards (SWEBOK® 3)  ITIL ®, MOF®
  • 4. Страница  4 www.specialist.ru What is Software Product? It is: Business Solution Common Decision Serviceable and Changeable
  • 5. Страница  5 www.specialist.ru Software and Apps as a specific type of a Product Wide audience Virtual teams External dependencies High educated developers Advanced users
  • 6. Страница  6 www.specialist.ru Project planning and management models
  • 7. Страница  7 www.specialist.ru Waterfall – planning from start to finish The most lovely one by corporate customers and top managers
  • 8. Страница  8 www.specialist.ru Rolling wave Rolling wave is the best approach for long projects, or for projects with phase-to-phase dependencies
  • 9. Страница  9 www.specialist.ru Waterfall model advantages  Strong and clear development roadmap  Opportunity for complex architectural planning  Clearly defined project scope: time, resources, finance
  • 10. Страница  10 www.specialist.ru Early bird key decisions. Waterfall models are hard to quick changes. Final product market opportunities are in a risk zone in case of long-term development Disadvantages of the waterfall model
  • 11. Страница  11 www.specialist.ru Adaptive models
  • 12. Страница  12 www.specialist.ru Agile model User story Analyze Projectize Develop (Code) Document Test and Validate Operate
  • 13. Страница  13 www.specialist.ru • Incremental planning with steps from 1-day to 1 month • Integration of users and developers in a regular collaboration • Small self-organized teams • Large projects can include many adaptive teams • Each team member works on a single project during one iteration • Each team includes specialists with specific and general competencies Adaptive model. Main features
  • 14. Страница  14 www.specialist.ru • predict results • strongly fixed project scope • team considers result as realistic one • clear monitoring and control • assistance in other projects planning • baseline for resource, financial and schedule planning Why WBS is so important? Project Package Package Package Phase
  • 15. Страница  15 www.specialist.ru Time Functionality Minimizing risks in requirements Release 1 Release 2 Release 3 ADAPTIVE MODELS
  • 16. Страница  16 www.specialist.ru Disadvantages of the Adaptive model Summarizing of bugs from consequent iterations Volume, time and resource uncertainty Strategic planning challenges Strongly based on both customer’s and team’s involvement and motivation
  • 17. Страница  17 www.specialist.ru Combined waterfall – agile model as in the PMBOK extension for software projects
  • 18. Страница  18 www.specialist.ru Risk management cycle combining waterfall and agile as in the PMBOK extension for software projects
  • 19. Страница  19 www.specialist.ru MSF model Project plan approved Out of Developm ent Release Readiness Review Deployment Milestone Vision approved Build
  • 20. Страница  20 www.specialist.ru A Single Iteration Lifecycle Plan Analyze DesignDevelop Test © Scott Schultz “Rapid Iterative Production Prototyping”, 1988
  • 21. Страница  21 www.specialist.ru WBS extension for mixed Waterfall – Agile models
  • 22. Страница  22 www.specialist.ru Boards for different planning levels (based on Trello) Global Board Package board (SCRUM) Team member individual board
  • 23. Страница  23 www.specialist.ru Product. Version 1.0
  • 24. Страница  24 www.specialist.ru Развитие продукта. Регулярные улучшения
  • 25. Страница  25 www.specialist.ru Change levels vs Planning models Change category What changes Difficulties Duration Model First level Modification of existing work procedures Low Fast change Adaptive/ Agile Second level Changing of business procedures Medium Medium Adaptive as a part of a project/Program Third level Changing business branches Very difficult Long-term Portfolio
  • 26. Страница  26 www.specialist.ru Developers are not only a “resourse”! People need more than tasks! Team motivation. Implementing best from Agile
  • 27. Страница  27 www.specialist.ru Team building approaches  Combining local and virtual teams  Experts and specialists of common practices  Balance between project and functional team members
  • 28. Страница  28 www.specialist.ru Face-to-face information change recommended
  • 29. Страница  29 www.specialist.ru Team work models  Pair programming  Test-led programming  Co-location
  • 30. Страница  30 www.specialist.ru PM role Leadership Control
  • 31. Страница  31 www.specialist.ru Slack as an example of a team collaboration tool
  • 32. Страница  32 www.specialist.ru Contacts  www.i-mokymas.com  [email protected]  www.itstartupadvise.me