Offshore Construction in South Korea
LOCATION OF CONSTRUCTION TO
  LOCATION OF OPERATIONS
The Goal for 2011 onward; 6th generation
 Drill ships ready for operations in Brazil
The Goal only a few hundred years ago a
 6th Generation Sail Ship to reach Brazil
Differences then and now:
• Same Goals

• Different technology

• Different dreams

• Different needs
Then it started out with
    Manual Labor
And more manual labor to build ships
Early 20th century the Mass Production
Only since the last 30 years: Little Manual Labor
      / Fully Automated cutting Machines.
Erection Block / Section
Pre Outfitting for Block Sections
Blasting & Painting & Coating
• Blasting will take in block stage in controlled
  environments (blast shops) with grid.
• Painting & Coating will take place in block stage
  will take place mainly in controlled environment.

•   The Hull and Superstructure
•   The underwater part of the Hull
•   The Individual Tanks
•   The Equipment and it’s systems
The good old days
Block Construction / Use Sections
YARD Overall Project Plan Construction
              Facilities
• YARD will use 5 mayor location for construction of Block
  Sections & Modules
•   Main yard: Majority of blocks and the Hull
•   Shin Han Yard: Living Quarters & Heli deck
•   Sung Jin: Certain curved blocks (bow & stern)
•   Posh: Mud module Roof sections
•   Hochang: Derrick and Flap & small sections
YARD planning
Block erection diagram
YARD reality – to Planning
YARD reality to Planning
YARD overall construction facilities for
   pre outfitting and piping spools
• YARD will use over 70 different vendors and subcontractors to
  assist with the production and fabrication of spools and
  outfitting materials:

• The biggest contributors (and mostly mentioned in the office)

• HARVARD, DEOK SU, TAECHANG, GANA, SAM NOK.

• KANG RIM, SUNG IL, SAM KUN, SHIN WOO, SUNG WANG
Process Piping well fabricated and
     inspected and installed
Welding Accepted, installation
          rejected
Failed After re-inspection
INSPECTIONS as there are thousands of
  inspections these are being catagorized
• YARD Witness Inspections; Owner and Class are
  invited for the inspection.

• YARD Monitor Inspection; YARD will perform the
  inspection Owner and Class could witness

• OWNER Patrol Inspection: Owner will inform
  YARD that a visit will take to a fabrication shop
  and a random inspection will take place
DOCUMENTATION for INSPECTIONS

• YARD Witness Inspection Sheet: To receive at each witness inspection for
  owner, YARD and Class

• OFR sheet: Owner performs a patrol inspection and finds a discrepancy.
  Owner will issue to YARD

• YARD NCR: A failure occurred, YARD will issue a NCR

• OWNER NCR: In case an OFR will not be resolved within a certain time
  Owner will change to a NCR

• Class discrepancy: Class will issue to YARD

• In any case of failure or rejection these items will become “punch items”
WEB SITES for inspections planning &
  tracking of results and punchitems
• YARD has 2 websites available to track the
  inspections and the punch items
• PCS: This website is for all inspections on and off
  site, excluding paint inspections; Also for the Punch
  items.

• E-QISS: This website is for all inspections on and
  offsite, including paint inspections AND the NDE
  reports.
See website: http://www.dsme.co.kr/eng/company/ceo/ceo01.jsp
Daily Activities and Inspection reviews in
 the site office, with Korean Inspectors
Present status in site office
• Every morning: we review the websites to review
  the inspection planning and locations
• Every Morning: we have a pre inspection meeting
  with all inspectors to review the daily schedule
• Every end of the day: we have a short summary
  on inspections; failures and owner findings
• Every Friday afternoon: we have an evaluation
  QA/QC meeting with YARD, Owner and Class on
  the results and the next week look ahead
Present Status for Site Inspection Team
•   For construction Owner has hired and will further hire local inspectors specialized
    in construction for drill ships in various disciplines.

•   Additionally part of the Engineering team will slowly grow into the construction
    and mechanical completion of the construction phase.

•   Following Mayor Disciplines:

•   HSE (safety first!)
•   Hull, Structure & Welding
•   Piping & Mechanical & Installation
•   Painting & Coating
•   Later: Outfitting, Electrical, Marine, Drilling, Subsea.

•   All the inspectors will be lead by the construction and QA/QC department and for
    each discipline the leader will get involved in the
    failures, corrections, improvements and changes.
Construction Phase, Block Stage
• Total amount of small, block is 238

• Total amount of erection block is 14

• Separate are the Accommodation Block, the
  mud module, The Funnel Casing, The
  Derrick, The BOP, and the Deck Cranes
Block Stage on yard




Funnel Casing; Weight approx 500mT Accommodation: Weight approx 1800mT
Hull Block stage Program
Block Stage; Big Blocks on the Slipway
Load Out (Horizontal Launching) of Complete Hull
Lifting on large blocks




Lifting of Mud module: Weight 1400mT And Lifting of the Drill tower
(Derrick) Weight 1200mT.
THE NEXT PHASES
• The Construction Phase is normally completed
  with the launching of the vessel.
• Then the Mechanical Completion Phase will start
• Followed by the pre commissioning phase
• The commissioning and the integration
  commissioning phase
• And finally the Sea Trials
• Closing with the delivery.
A completed drill ship
Let’s try to avoid Shipwrecking
And let’s make sure we will avoid a
            Blow Out.
Make sure we will be ready for our Company
   and Client in Brazil in 2011 ONWARD




                 THE END

More Related Content

PDF
Design & Analyse Ship Floating Dry Dock
PDF
Company portfolio
PPTX
Forth Road Bridge - Truss End Link failure -22 dec
PPTX
MSP Technical Brieifing Truss End Link Failure
PDF
PaxOcean Zhoushan Presentation 150727s
PDF
Dorian lpg june 2016
PPT
다문화
PPTX
Cochin Shipyard Limited- Organisational Study
Design & Analyse Ship Floating Dry Dock
Company portfolio
Forth Road Bridge - Truss End Link failure -22 dec
MSP Technical Brieifing Truss End Link Failure
PaxOcean Zhoushan Presentation 150727s
Dorian lpg june 2016
다문화
Cochin Shipyard Limited- Organisational Study

Viewers also liked (9)

PDF
Shipyard Management - Design, Planning & Operations
PPT
114 site layout
PPT
113 site layout design
PDF
Chapter 9 site selection and layout planning ppt
PPTX
CJM Construction Consulting PowerPoint Presentation
PPSX
Residential Powerpoint Presentation
PDF
Modern Methods Of Construction Mmc Presentation
PPT
Building construction
PPSX
Project management
Shipyard Management - Design, Planning & Operations
114 site layout
113 site layout design
Chapter 9 site selection and layout planning ppt
CJM Construction Consulting PowerPoint Presentation
Residential Powerpoint Presentation
Modern Methods Of Construction Mmc Presentation
Building construction
Project management
Ad

Similar to Construction Presentation Slideshow (20)

PDF
Ship construction project
PPTX
Sea Transport Lecture On Shipboard Operations.pptx
PDF
Naval archtechture and ship constraction introduction
PDF
Ship dry docking
PPTX
Internship report ggshsususjsjssussjdhdjdj
RTF
Dry docking operations
PPT
Marine Production Technology
PDF
fish-capture- ALL TOPIC TLE 115 (TCCAFA)
PPTX
Offshore structure design, Sigve Hamilton Aspelund
PPTX
Ship_Design_and_Manufacturing_Presentation 04.pptx
PPTX
Ship conversion Overhaul and Repair.pptx
DOCX
PPT
Pnsc marine engineer apprentice training program
PPTX
Fpso floating structures
DOCX
Internship Report
PPT
Artificial islands
PDF
kupdf.net_advance-marine-engineering.pdf
PDF
News letteroct 2012
PDF
News letteroct 2012
PDF
Ravi Chakervarti - Paper on Modular Construction
Ship construction project
Sea Transport Lecture On Shipboard Operations.pptx
Naval archtechture and ship constraction introduction
Ship dry docking
Internship report ggshsususjsjssussjdhdjdj
Dry docking operations
Marine Production Technology
fish-capture- ALL TOPIC TLE 115 (TCCAFA)
Offshore structure design, Sigve Hamilton Aspelund
Ship_Design_and_Manufacturing_Presentation 04.pptx
Ship conversion Overhaul and Repair.pptx
Pnsc marine engineer apprentice training program
Fpso floating structures
Internship Report
Artificial islands
kupdf.net_advance-marine-engineering.pdf
News letteroct 2012
News letteroct 2012
Ravi Chakervarti - Paper on Modular Construction
Ad

Construction Presentation Slideshow

  • 2. LOCATION OF CONSTRUCTION TO LOCATION OF OPERATIONS
  • 3. The Goal for 2011 onward; 6th generation Drill ships ready for operations in Brazil
  • 4. The Goal only a few hundred years ago a 6th Generation Sail Ship to reach Brazil
  • 5. Differences then and now: • Same Goals • Different technology • Different dreams • Different needs
  • 6. Then it started out with Manual Labor
  • 7. And more manual labor to build ships
  • 8. Early 20th century the Mass Production
  • 9. Only since the last 30 years: Little Manual Labor / Fully Automated cutting Machines.
  • 10. Erection Block / Section
  • 11. Pre Outfitting for Block Sections
  • 12. Blasting & Painting & Coating • Blasting will take in block stage in controlled environments (blast shops) with grid. • Painting & Coating will take place in block stage will take place mainly in controlled environment. • The Hull and Superstructure • The underwater part of the Hull • The Individual Tanks • The Equipment and it’s systems
  • 13. The good old days
  • 14. Block Construction / Use Sections
  • 15. YARD Overall Project Plan Construction Facilities • YARD will use 5 mayor location for construction of Block Sections & Modules • Main yard: Majority of blocks and the Hull • Shin Han Yard: Living Quarters & Heli deck • Sung Jin: Certain curved blocks (bow & stern) • Posh: Mud module Roof sections • Hochang: Derrick and Flap & small sections
  • 17. YARD reality – to Planning
  • 18. YARD reality to Planning
  • 19. YARD overall construction facilities for pre outfitting and piping spools • YARD will use over 70 different vendors and subcontractors to assist with the production and fabrication of spools and outfitting materials: • The biggest contributors (and mostly mentioned in the office) • HARVARD, DEOK SU, TAECHANG, GANA, SAM NOK. • KANG RIM, SUNG IL, SAM KUN, SHIN WOO, SUNG WANG
  • 20. Process Piping well fabricated and inspected and installed
  • 23. INSPECTIONS as there are thousands of inspections these are being catagorized • YARD Witness Inspections; Owner and Class are invited for the inspection. • YARD Monitor Inspection; YARD will perform the inspection Owner and Class could witness • OWNER Patrol Inspection: Owner will inform YARD that a visit will take to a fabrication shop and a random inspection will take place
  • 24. DOCUMENTATION for INSPECTIONS • YARD Witness Inspection Sheet: To receive at each witness inspection for owner, YARD and Class • OFR sheet: Owner performs a patrol inspection and finds a discrepancy. Owner will issue to YARD • YARD NCR: A failure occurred, YARD will issue a NCR • OWNER NCR: In case an OFR will not be resolved within a certain time Owner will change to a NCR • Class discrepancy: Class will issue to YARD • In any case of failure or rejection these items will become “punch items”
  • 25. WEB SITES for inspections planning & tracking of results and punchitems • YARD has 2 websites available to track the inspections and the punch items • PCS: This website is for all inspections on and off site, excluding paint inspections; Also for the Punch items. • E-QISS: This website is for all inspections on and offsite, including paint inspections AND the NDE reports. See website: http://www.dsme.co.kr/eng/company/ceo/ceo01.jsp
  • 26. Daily Activities and Inspection reviews in the site office, with Korean Inspectors
  • 27. Present status in site office • Every morning: we review the websites to review the inspection planning and locations • Every Morning: we have a pre inspection meeting with all inspectors to review the daily schedule • Every end of the day: we have a short summary on inspections; failures and owner findings • Every Friday afternoon: we have an evaluation QA/QC meeting with YARD, Owner and Class on the results and the next week look ahead
  • 28. Present Status for Site Inspection Team • For construction Owner has hired and will further hire local inspectors specialized in construction for drill ships in various disciplines. • Additionally part of the Engineering team will slowly grow into the construction and mechanical completion of the construction phase. • Following Mayor Disciplines: • HSE (safety first!) • Hull, Structure & Welding • Piping & Mechanical & Installation • Painting & Coating • Later: Outfitting, Electrical, Marine, Drilling, Subsea. • All the inspectors will be lead by the construction and QA/QC department and for each discipline the leader will get involved in the failures, corrections, improvements and changes.
  • 29. Construction Phase, Block Stage • Total amount of small, block is 238 • Total amount of erection block is 14 • Separate are the Accommodation Block, the mud module, The Funnel Casing, The Derrick, The BOP, and the Deck Cranes
  • 30. Block Stage on yard Funnel Casing; Weight approx 500mT Accommodation: Weight approx 1800mT
  • 31. Hull Block stage Program
  • 32. Block Stage; Big Blocks on the Slipway
  • 33. Load Out (Horizontal Launching) of Complete Hull
  • 34. Lifting on large blocks Lifting of Mud module: Weight 1400mT And Lifting of the Drill tower (Derrick) Weight 1200mT.
  • 35. THE NEXT PHASES • The Construction Phase is normally completed with the launching of the vessel. • Then the Mechanical Completion Phase will start • Followed by the pre commissioning phase • The commissioning and the integration commissioning phase • And finally the Sea Trials • Closing with the delivery.
  • 37. Let’s try to avoid Shipwrecking
  • 38. And let’s make sure we will avoid a Blow Out.
  • 39. Make sure we will be ready for our Company and Client in Brazil in 2011 ONWARD THE END