3x3 Recommendations for Successful
Public Participation in Large-Scale Projects
Monika Ollig
Division G II 2
Public Participation in Environment, Building and Urban Development
Policy, Public Participation Processes
Federal Ministry for the Environment,
Nature Conservation and Nuclear Safety
Stresemannstraße 128 - 130, 10117 Berlin
26 March 2018
3rd OECD Forum on Governance of Infrastructure: “In the Public Interest –
Making Infrastructure Delivery Transparent, Inclusive and Fair”
Session 2: Consultation for inclusive infrastructure
3x3 Recommendations for Successful
Public Participation in Infrastructure Projects
Outline:
1. Introduction
2. Key data on the research project, objectives and terminology
3. Methodology and examples
4. Outcome: 3x3 recommendations for good public participation
5. Conclusion
2. Key data on the research project
Title: Participation processes in environmentally relevant projects
• Research ID 3714 16 104 0
• Commissioned by: Federal Environment Agency and Federal
Ministry for the Environment, Nature Conservation and Nuclear
Safety
• Carried out by: German Institute for Urban Affairs (DIFU)
• Duration: December 2014 to January 2017
• Closing event and recommendations:
• “3x3 Recommendations for Successful
Public Participation in Large-Scale Projects”
https://www.bmub.bund.de/pressemitteilung/das-3x3-einer-
guten-oeffentlichkeitsbeteiligung-bei-grossprojekten/
2. Objectives and terminology
of the research project
Objective: Developing recommendations for improving informal public participation in
large-scale environmentally relevant projects
Terminology:
Large-scale projects: planning and approval of infrastructure projects (e.g. airport
expansion, transformer stations, light rail systems, electricity grids, wind energy
installations, water reservoirs)
Environmental relevance: projects which have non-negligible impacts on the
environment, e.g. construction causes significant interventions in protected assets (land
use, emissions, nature conservation and conflicts of use, etc.)
Public: NGOs, grass roots initiatives and interest groups, associations and environmental
organisations and citizens who are not organised in group or NGOs
Informal Participation: dialogues which are not regulated by law, no participation in
decision-making
3. Methodology
Using a mix of methods:
• A
Step 1
20 participation processes
on environmentally
relevant projects
- fact sheets
Step 2
5 projects selected for
in-depth case studies
e.g. interviews with different
groups of participants
2 Expert meetings over the entire project term:
with representatives from approval authorities, federal states,
local authorities, interest groups and industry
concluding event
Recommen-
dations
3. Methodology
The study mainly focuses on three aspects:
• Completed infrastructure projects with public participation
(best practice)
• Participation research, documentation and experiences
• Perspectives of different groups of people involved in project planning and the
participation process
 Deriving recommendations for action
3. Methodology: key questions
Key questions:
• How were informal dialogues linked with the formal planning and approval
procedure?
• How were tasks divided between project developers (private and public), approval
authorities and other stakeholders (e.g. civil society)?
• Who participated? Did inclusion play a role, did different social groups become
involved?
4. Methodology: key questions
Lessons to be learned:
• When is the right time for public participation?
• How can formal and informal dialogues be linked in a useful way?
• How should public participation be managed?...
3. Methodology: example
Example: Shell Connect Pipeline
• Background: Shell Rheinland Refinery consists of two parts, the northern plant (Werk
Nord) in Cologne Godorf and the southern plant (Werk Süd) in Wesseling. The
“Connect” project refers to a pipeline that connects the two plants, crossing under the
Rhine twice. Potential conflicts were identified with environmental protection, landscape
and water protection, since the originally planned pipeline would have affected
ecologically sensitive areas.
• Participation took place as a continuous process, comprising several planning and
approval procedures and the construction phase. A wide range of participation
instruments (such as meetings with residents and bilateral talks) and supporting
communication measures (e.g. direct mailings and radio reports) were used.
• The outcomes were included in the plan approval documents: The pipeline was built
underneath the Rhine.
4. Outcome: 3x3 messages for
good public participation
4. 3x3 messages for
good public participation
1. Project developers should launch informal public participation as early as possible,
improve the quality further and make it more binding.
2. Continuous communication should be ensured from the early stages to the
implementation of the project.
3. Informal public participation must be prepared and managed professionally.
How project developers should shape participation processes:
4. 3x3 messages for
good public participation
1. Project developers and approval authorities should plan the dialogue together
because communication is the key to successful public participation.
2. Approval authorities should play their role as initiators, stakeholders and managers
of participation. The dialogue with interest groups and citizens requires a new
culture of dialogue and communication.
3. Learning from local authorities: They know how to organise good participation
processes. All stakeholders in public participation can learn from them.
Project developers and approval authorities should forge an
alliance for public participation
ein Bündnis für Öffentlichkeitsbeteiligung schmieden:
4. 3x3 messages for
good public participation
1. Project developers and facilitators must ensure that interest groups and private
citizens are being equally addressed.
2. Targeted mobilisation is required, especially for those individuals and groups who
are not familiar with participation processes. Processes must be shaped accordingly
and specific selection and participation formats are needed.
3. Environmental associations are advocates of the environment. Project
developers should actively engage environmental associations in public participation.
How the public should be involved:
5. Conclusion
- Informal participation formats are a useful complement to formal participation.
- Taking into account the nine messages from this study can help to make infrastructure
planning even more robust and improve results from an environmental point of view.
- We will keep up the dialogue!
Thank you for your attention
Monika Ollig
Division G II 2
Public Participation in Environment, Building and Urban Development Policy,
Public Participation Processes
www.bmub.bund.de/buergerbeteiligung/
3. Methodology: example
Example: bypass in Waren/Müritz
• Background: The town of Waren is an important hub for traffic between
Neubrandenburg in the east and the motorway A19 in the west. The connecting road is
federal highway B 192. B 192 runs right through the town of Waren. High noise levels
caused by heavy traffic on this road affect the health of residents. The idea of a bypass
has been discussed at local and state level for 30 years. One option was to have the
road run through a nature conservation area.
• Participation: An early, broad-based and open information and communication process
was initiated as a dialogue of equals. Information was disseminated through various
channels, such as a website, press articles and direct mailings.
• As the citizens voted against the project, the road was not built. Noise abatement
measures were taken instead.
1. Introduction: The BMU is a pioneer
of public participation at national level
 The BMU has a specific division which deals with fundamental aspects of public
participation and also carries out public participation processes itself.
 We organise dialogues on central environmental policy programmes and decision-
making processes: e.g. Climate Action Plan 2050, ProgRess II, Integrated
Environmental Programme, COP 23 and COP 21. We engage citizens from across
Germany who are not organised in NGOs, and we publish the outcomes of the
dialogues. This makes us pioneers in participation at national level.
 We also commission research projects to further develop public participation.

More Related Content

PDF
Consultation for inclusive infrastructure - Alberto ALEMANNO, HEC Paris/NYU S...
PDF
Consultation for inclusive infrastructure - Tarick GRACIDA, GIFT
PDF
can new technologies and digitalization improve infrastructure governance? - ...
PDF
The data needs to support the effectiveness of social entrepreneurship initia...
PDF
Presentation by the OECD on Encouraging Open Data in Governments made at the ...
PDF
Presentation by Futurs Publics on Educational use of digital technologies in ...
PPTX
Digital Pioneers and D-CENT
PDF
Istat web cosi-Donatella.Fazio
Consultation for inclusive infrastructure - Alberto ALEMANNO, HEC Paris/NYU S...
Consultation for inclusive infrastructure - Tarick GRACIDA, GIFT
can new technologies and digitalization improve infrastructure governance? - ...
The data needs to support the effectiveness of social entrepreneurship initia...
Presentation by the OECD on Encouraging Open Data in Governments made at the ...
Presentation by Futurs Publics on Educational use of digital technologies in ...
Digital Pioneers and D-CENT
Istat web cosi-Donatella.Fazio

What's hot (20)

PPT
Trends and new technologies for curbing corruption in public procurement: the...
PDF
Catalan ecosystem of citizen participation: Open infrastructures for communit...
PPTX
Drt findings presentation
PDF
Istat web cosi meeting-e.baldacci
PDF
Innovations for Open Development
PDF
OpenCoesione Monithon at CTG Albany
PDF
Web cosi caps concertation presentation
PDF
(Open) data driven public services
PDF
Development as Freedom in a Digital Age
PPTX
The Gov 3.0 project
PPTX
Open Data as OER for Transversal Skills - WOERC 2017
PPTX
Transferring knowledge into policy and the role of Wikiprogress
PDF
qolexity_fazio_26 septembr_2014
PDF
Implementing transparency and open government projects in Greece
PPT
Niklas wilhelmsson eparticipation-26.11.2013
PPTX
Transformacion digital del tercer sector. Ricard Espelt
PPT
20130617, dublin, crossover, mgonzalez v4
PDF
Approaches and use of ai in the public sector by the european member states a...
PPTX
Local Open Data: a perspective from local government in England 2014
PPT
Open cadastre map innsbruck
Trends and new technologies for curbing corruption in public procurement: the...
Catalan ecosystem of citizen participation: Open infrastructures for communit...
Drt findings presentation
Istat web cosi meeting-e.baldacci
Innovations for Open Development
OpenCoesione Monithon at CTG Albany
Web cosi caps concertation presentation
(Open) data driven public services
Development as Freedom in a Digital Age
The Gov 3.0 project
Open Data as OER for Transversal Skills - WOERC 2017
Transferring knowledge into policy and the role of Wikiprogress
qolexity_fazio_26 septembr_2014
Implementing transparency and open government projects in Greece
Niklas wilhelmsson eparticipation-26.11.2013
Transformacion digital del tercer sector. Ricard Espelt
20130617, dublin, crossover, mgonzalez v4
Approaches and use of ai in the public sector by the european member states a...
Local Open Data: a perspective from local government in England 2014
Open cadastre map innsbruck
Ad

Similar to Consultation for inclusive infrastructure - Monika OLLIG, Germany (20)

PDF
The Public Participation Handbook Making Better Decisions Through Citizen Inv...
PDF
Integrated Watershed Management Ch.4 The Consultation Process
PPTX
Involved project preliminary findings - what makes stakeholder participation ...
PPTX
Enabling citizen choices about land use and the natural environment
PPT
Participatory Policy Making
PPTX
Conflict & Working Together - Alison Crowther, MadeToLast – the Resilience Or...
PPTX
Construction Management in Developing Countries, Lecture 7
PDF
The Public Participation Handbook Making Better Decisions Through Citizen Inv...
PPTX
Lecture fsw 2013 short version stakeholders and participation
PDF
The Public Participation Handbook Making Better Decisions Through Citizen Inv...
PPTX
Making participation legal - UNH law school forum
PPT
Focus Groups, Citizens’ Juries and Open Space method: Innovative tools of pub...
PPT
Focus Groups, Citizens’ Juries and Open Space method: Innovative tools of pub...
PPT
Focus Groups, Citizens’ Juries and Open Space method: Innovative tools of pub...
PPT
Information Access and NGO Participation: North America and Europe
PPT
Information Access and NGO Participation: North America and Europe
PPT
Information Access and NGO Participation: North America and Europe
PPTX
Public Engagement Presentation - Jessica Carroll
PPT
Application of tools. stakeholder and public participation dana thalmeinerova
PDF
Rethinking green infrastructure
The Public Participation Handbook Making Better Decisions Through Citizen Inv...
Integrated Watershed Management Ch.4 The Consultation Process
Involved project preliminary findings - what makes stakeholder participation ...
Enabling citizen choices about land use and the natural environment
Participatory Policy Making
Conflict & Working Together - Alison Crowther, MadeToLast – the Resilience Or...
Construction Management in Developing Countries, Lecture 7
The Public Participation Handbook Making Better Decisions Through Citizen Inv...
Lecture fsw 2013 short version stakeholders and participation
The Public Participation Handbook Making Better Decisions Through Citizen Inv...
Making participation legal - UNH law school forum
Focus Groups, Citizens’ Juries and Open Space method: Innovative tools of pub...
Focus Groups, Citizens’ Juries and Open Space method: Innovative tools of pub...
Focus Groups, Citizens’ Juries and Open Space method: Innovative tools of pub...
Information Access and NGO Participation: North America and Europe
Information Access and NGO Participation: North America and Europe
Information Access and NGO Participation: North America and Europe
Public Engagement Presentation - Jessica Carroll
Application of tools. stakeholder and public participation dana thalmeinerova
Rethinking green infrastructure
Ad

More from OECD Governance (20)

PDF
Government at a Glance 2025 Launch Presentation.pdf
PDF
Session 15: Grzegorz Marecki - AI Innovation for the Permitting Process
PDF
Session 14: Sander Renes - Improving Procedures in practice, through research
PDF
Session 13: John Stewart - The Challenge of Coordinating Many - The Experienc...
PDF
Session 12: Elise Brax - The Grand Paris Express.pdf
PDF
Session 11: Peter Bryant - The Sizewell C Mega Project – Challenges and Oppor...
PDF
Session 10: Thomas Lautsch - Permitting for Nuclear Waster Repository Konrad ...
PDF
Session 7: Rene Queren - Permitting Challenges in the Energy Industry
PDF
Session 6: Claus Dynesen - OECD Network Advancing Infrastructure Governance
PDF
Session 5: Nuno Gil - Escaping the Governance Trap
PDF
Session 4: Zachary Liscow - Getting Infrastructure Built
PDF
Session 3: Ulla Steen - Environmental Permitting of Infrastructure projects
PDF
Session 2: Charles Banner - Independent Review of Legal Challenges to Nationa...
PDF
Session 1: Jonas Ebbesson - Environment protection in infrastructure projects
PDF
OECD Survey on the Drivers of Trust in Public Institutions: 2024 Results
PPTX
Public Integrity Indicators Slides
PDF
Summary of the OECD expert meeting: Construction Risk Management in Infrastru...
PDF
Using AI led assurance to deliver projects on time and on budget - D. Amratia...
PDF
ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm (SE)
PDF
Building Client Capability to Deliver Megaprojects - J. Denicol, professor at...
Government at a Glance 2025 Launch Presentation.pdf
Session 15: Grzegorz Marecki - AI Innovation for the Permitting Process
Session 14: Sander Renes - Improving Procedures in practice, through research
Session 13: John Stewart - The Challenge of Coordinating Many - The Experienc...
Session 12: Elise Brax - The Grand Paris Express.pdf
Session 11: Peter Bryant - The Sizewell C Mega Project – Challenges and Oppor...
Session 10: Thomas Lautsch - Permitting for Nuclear Waster Repository Konrad ...
Session 7: Rene Queren - Permitting Challenges in the Energy Industry
Session 6: Claus Dynesen - OECD Network Advancing Infrastructure Governance
Session 5: Nuno Gil - Escaping the Governance Trap
Session 4: Zachary Liscow - Getting Infrastructure Built
Session 3: Ulla Steen - Environmental Permitting of Infrastructure projects
Session 2: Charles Banner - Independent Review of Legal Challenges to Nationa...
Session 1: Jonas Ebbesson - Environment protection in infrastructure projects
OECD Survey on the Drivers of Trust in Public Institutions: 2024 Results
Public Integrity Indicators Slides
Summary of the OECD expert meeting: Construction Risk Management in Infrastru...
Using AI led assurance to deliver projects on time and on budget - D. Amratia...
ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm (SE)
Building Client Capability to Deliver Megaprojects - J. Denicol, professor at...

Recently uploaded (20)

PDF
The Landscape Observatory of Catalonia. Some projects and challenges
PPTX
一比一原版(MHL毕业证)德国吕贝克音乐学院毕业证文凭学历认证
PDF
Good-Citizenship-2.pdjshegmjaefhaljfhalfjqfwjhefjlw3r
PDF
The City of Stuart CDBG, Florida - Small Cities CDBG FloridaCommerce -Report ...
PPTX
Chapter 12 Public Enterprises and Regulatory Bodies in the Philippine Adminis...
PPTX
smart_health_monitoring_northeast_india_20250830155837.pptx
PDF
Covid-19 Immigration Effects - Key Slides - June 2025
PPTX
POLLWATCH TRAINING PPCRV - 2025 NLE.pptx
PDF
A Comparative Analysis of Digital Transformation in Public Administration.pdf
PPTX
Unit 3 - Genetic engineering.ppvvxtm.pptx
PDF
Item # 8 - Staff Report on Pool Pocket Park
PPTX
IMPLEMENTING RULES AND REGULATIONS OF REPUBLIC ACT NO. 11058 ENTITLED “AN ACT...
PDF
Item # 1b - August 12, 2025 Special Meeting Minutes
PDF
PPT Item # 8 - Pool Pocket Staff Report
PPTX
c. b. 3 Basics of BDP geared towards public service.pptx
PPT
4. Goverment Servant (Conduct) Rules, 1964.ppt
PDF
POCSO ACT in India and its implications.
PPTX
ISO 9001 awarness for government offices 2015
PPTX
ROADMAP AND PATHWAYS TO EXIT AND SUSTAINABILITY.pptx
PDF
Roshn vs Emaar – Corporate Social Responsibility (CSR) Analysis
The Landscape Observatory of Catalonia. Some projects and challenges
一比一原版(MHL毕业证)德国吕贝克音乐学院毕业证文凭学历认证
Good-Citizenship-2.pdjshegmjaefhaljfhalfjqfwjhefjlw3r
The City of Stuart CDBG, Florida - Small Cities CDBG FloridaCommerce -Report ...
Chapter 12 Public Enterprises and Regulatory Bodies in the Philippine Adminis...
smart_health_monitoring_northeast_india_20250830155837.pptx
Covid-19 Immigration Effects - Key Slides - June 2025
POLLWATCH TRAINING PPCRV - 2025 NLE.pptx
A Comparative Analysis of Digital Transformation in Public Administration.pdf
Unit 3 - Genetic engineering.ppvvxtm.pptx
Item # 8 - Staff Report on Pool Pocket Park
IMPLEMENTING RULES AND REGULATIONS OF REPUBLIC ACT NO. 11058 ENTITLED “AN ACT...
Item # 1b - August 12, 2025 Special Meeting Minutes
PPT Item # 8 - Pool Pocket Staff Report
c. b. 3 Basics of BDP geared towards public service.pptx
4. Goverment Servant (Conduct) Rules, 1964.ppt
POCSO ACT in India and its implications.
ISO 9001 awarness for government offices 2015
ROADMAP AND PATHWAYS TO EXIT AND SUSTAINABILITY.pptx
Roshn vs Emaar – Corporate Social Responsibility (CSR) Analysis

Consultation for inclusive infrastructure - Monika OLLIG, Germany

  • 1. 3x3 Recommendations for Successful Public Participation in Large-Scale Projects Monika Ollig Division G II 2 Public Participation in Environment, Building and Urban Development Policy, Public Participation Processes Federal Ministry for the Environment, Nature Conservation and Nuclear Safety Stresemannstraße 128 - 130, 10117 Berlin 26 March 2018 3rd OECD Forum on Governance of Infrastructure: “In the Public Interest – Making Infrastructure Delivery Transparent, Inclusive and Fair” Session 2: Consultation for inclusive infrastructure
  • 2. 3x3 Recommendations for Successful Public Participation in Infrastructure Projects Outline: 1. Introduction 2. Key data on the research project, objectives and terminology 3. Methodology and examples 4. Outcome: 3x3 recommendations for good public participation 5. Conclusion
  • 3. 2. Key data on the research project Title: Participation processes in environmentally relevant projects • Research ID 3714 16 104 0 • Commissioned by: Federal Environment Agency and Federal Ministry for the Environment, Nature Conservation and Nuclear Safety • Carried out by: German Institute for Urban Affairs (DIFU) • Duration: December 2014 to January 2017 • Closing event and recommendations: • “3x3 Recommendations for Successful Public Participation in Large-Scale Projects” https://www.bmub.bund.de/pressemitteilung/das-3x3-einer- guten-oeffentlichkeitsbeteiligung-bei-grossprojekten/
  • 4. 2. Objectives and terminology of the research project Objective: Developing recommendations for improving informal public participation in large-scale environmentally relevant projects Terminology: Large-scale projects: planning and approval of infrastructure projects (e.g. airport expansion, transformer stations, light rail systems, electricity grids, wind energy installations, water reservoirs) Environmental relevance: projects which have non-negligible impacts on the environment, e.g. construction causes significant interventions in protected assets (land use, emissions, nature conservation and conflicts of use, etc.) Public: NGOs, grass roots initiatives and interest groups, associations and environmental organisations and citizens who are not organised in group or NGOs Informal Participation: dialogues which are not regulated by law, no participation in decision-making
  • 5. 3. Methodology Using a mix of methods: • A Step 1 20 participation processes on environmentally relevant projects - fact sheets Step 2 5 projects selected for in-depth case studies e.g. interviews with different groups of participants 2 Expert meetings over the entire project term: with representatives from approval authorities, federal states, local authorities, interest groups and industry concluding event Recommen- dations
  • 6. 3. Methodology The study mainly focuses on three aspects: • Completed infrastructure projects with public participation (best practice) • Participation research, documentation and experiences • Perspectives of different groups of people involved in project planning and the participation process  Deriving recommendations for action
  • 7. 3. Methodology: key questions Key questions: • How were informal dialogues linked with the formal planning and approval procedure? • How were tasks divided between project developers (private and public), approval authorities and other stakeholders (e.g. civil society)? • Who participated? Did inclusion play a role, did different social groups become involved?
  • 8. 4. Methodology: key questions Lessons to be learned: • When is the right time for public participation? • How can formal and informal dialogues be linked in a useful way? • How should public participation be managed?...
  • 9. 3. Methodology: example Example: Shell Connect Pipeline • Background: Shell Rheinland Refinery consists of two parts, the northern plant (Werk Nord) in Cologne Godorf and the southern plant (Werk Süd) in Wesseling. The “Connect” project refers to a pipeline that connects the two plants, crossing under the Rhine twice. Potential conflicts were identified with environmental protection, landscape and water protection, since the originally planned pipeline would have affected ecologically sensitive areas. • Participation took place as a continuous process, comprising several planning and approval procedures and the construction phase. A wide range of participation instruments (such as meetings with residents and bilateral talks) and supporting communication measures (e.g. direct mailings and radio reports) were used. • The outcomes were included in the plan approval documents: The pipeline was built underneath the Rhine.
  • 10. 4. Outcome: 3x3 messages for good public participation
  • 11. 4. 3x3 messages for good public participation 1. Project developers should launch informal public participation as early as possible, improve the quality further and make it more binding. 2. Continuous communication should be ensured from the early stages to the implementation of the project. 3. Informal public participation must be prepared and managed professionally. How project developers should shape participation processes:
  • 12. 4. 3x3 messages for good public participation 1. Project developers and approval authorities should plan the dialogue together because communication is the key to successful public participation. 2. Approval authorities should play their role as initiators, stakeholders and managers of participation. The dialogue with interest groups and citizens requires a new culture of dialogue and communication. 3. Learning from local authorities: They know how to organise good participation processes. All stakeholders in public participation can learn from them. Project developers and approval authorities should forge an alliance for public participation ein Bündnis für Öffentlichkeitsbeteiligung schmieden:
  • 13. 4. 3x3 messages for good public participation 1. Project developers and facilitators must ensure that interest groups and private citizens are being equally addressed. 2. Targeted mobilisation is required, especially for those individuals and groups who are not familiar with participation processes. Processes must be shaped accordingly and specific selection and participation formats are needed. 3. Environmental associations are advocates of the environment. Project developers should actively engage environmental associations in public participation. How the public should be involved:
  • 14. 5. Conclusion - Informal participation formats are a useful complement to formal participation. - Taking into account the nine messages from this study can help to make infrastructure planning even more robust and improve results from an environmental point of view. - We will keep up the dialogue!
  • 15. Thank you for your attention Monika Ollig Division G II 2 Public Participation in Environment, Building and Urban Development Policy, Public Participation Processes www.bmub.bund.de/buergerbeteiligung/
  • 16. 3. Methodology: example Example: bypass in Waren/Müritz • Background: The town of Waren is an important hub for traffic between Neubrandenburg in the east and the motorway A19 in the west. The connecting road is federal highway B 192. B 192 runs right through the town of Waren. High noise levels caused by heavy traffic on this road affect the health of residents. The idea of a bypass has been discussed at local and state level for 30 years. One option was to have the road run through a nature conservation area. • Participation: An early, broad-based and open information and communication process was initiated as a dialogue of equals. Information was disseminated through various channels, such as a website, press articles and direct mailings. • As the citizens voted against the project, the road was not built. Noise abatement measures were taken instead.
  • 17. 1. Introduction: The BMU is a pioneer of public participation at national level  The BMU has a specific division which deals with fundamental aspects of public participation and also carries out public participation processes itself.  We organise dialogues on central environmental policy programmes and decision- making processes: e.g. Climate Action Plan 2050, ProgRess II, Integrated Environmental Programme, COP 23 and COP 21. We engage citizens from across Germany who are not organised in NGOs, and we publish the outcomes of the dialogues. This makes us pioneers in participation at national level.  We also commission research projects to further develop public participation.