Prevent Unplanned Outages with On-line PD
Measurement of MV/HV Power Cables
Cable Partial Discharge Measuring Systems
Ammar Khan
Technical Application Specialist – Cables CBM
1Dated: June 21, 2016
• Partial discharge theory
• Power cable structure
• PD detection and localization
• Why online PD measurement
• Sensors used for online PD measurement
• Qualitrol offerings
• Case Studies
Overview
2
PARTIAL DISCHARGE
THEORY
3
• According to IEC 60270
Partial discharge (PD) is a localized electrical
discharge that only partially bridges the insulation
between conductors and which may or may not occur
adjacent to a conductor.
• The term ‘partial discharge’ includes a wide group of discharge
phenomena
– (i) internal discharges occurring in voids or cavities within solid or
liquid dielectrics;
– (ii) surface discharges appearing at the boundary of different
insulation materials;
– (iii) corona discharges occurring in gaseous dielectrics in the
presence of inhomogeneous fields;
– (iv) continuous impact of discharges in solid dielectrics forming
discharge channels (treeing).
What is Partial Discharge?
4
PD Phenomenon
5
HV across conductor
PD Pulses
Breakdown in cavity
The detection and measurement of discharges is based on the exchange of
energy taking place during the discharge. These exchanges are manifested
as:
– (i) electrical pulse currents
– (ii) dielectric losses
– (iii) E.M. radiation (light)
– (iv) sound (noise)
– (v) increased gas pressure
– (vi) chemical reactions
Results of Partial Discharges
6
POWER CABLE STRUCTURE
7
• Designed life of power cables is approximately 40 years
• Cable Types that can be tested using Qualitrol Online PD Technology:
– XLPE (Cross Linked PolyEthylene)
– EPR (Ethylene Propylene Rubber)
– PE (PolyEthylene)
– PILC (Paper Insulated Lead Covered)
Power Cable, its Basic Structure
8
A Power Cable Circuit
9
Joints
Terminations Cross-bonding Links
Multi point grounding
10
Solid grounding
Distributed PD measurement
11
Zone 1 Zone 2 Zone 3
PD DETECTION AND
LOCALIZATION
12
PD Detection into Cables
13
Long Cable
Defect
Measurement EndRemote End
PD at Cable Terminations
• PD in cable induces HF signals
• The signals travel in both
directions
• Signals attenuate during
propagation and reflect back at
terminations
• Detection Principle
• Capture the HF signals emitted
by PD at termination point
• Analyse signals to identify PD
fault and differentiate with Noise
or External PD signals
Long Cable
Defect
Measurement EndRemote End
PD in Joints and inside the Cables
PD Fault Localization
14
• Time Domain Reflectometry (TDR)
Principle is used to locate PD.
 Measure time difference between
main and reflected HF signals (∆T)
• For Longer cables, reflected pulse
may not reach to the measurement
end
 Requires a signal injector at the
other end to inject same HF signal
• For accurate localisation requires
 Accurate length of cable
 Cable Return Time (Tr)
Long Cable
Defect
Measurement End
Remote End
ΔT
Long Cable
Measurement EndRemote End
Tr
WHY ONLINE PD
MEASUREMENT
15
• No need to de-energize the cable system
• Non destructive testing
• Accurate Detection of Incipient Faults under operating conditions
• Accurate Localization or Zoning of Incipient Faults
• Trending Fault Severity via regular CHECKUPs
• Helps in scheduling maintenance and planned outage
• Ensure that cable is defect free after repair / workmanship
Why Online PD Monitoring?
16
• Most of the incipient faults or defects in power cables
generate PD signals well before the actual failure except water
trees.
• PD monitoring helps in identifying the incipient faults before
the break down -> Saves cost of UNPLANNED OUTAGE
SENSORS USED FOR ONLINE
PD MEASUREMENT
17
• HFCT (High Frequency Current Transformers)
– To detect any PD signal coming from Cable insulation
– One for each Cable
– Installed at termination / joints
• TEV (Transient Earth Voltage)
– To detect any external PD signals coming from termination
or nearby Switchgear Panel
– One for each Termination
– Installed near the openings or vents of terminations
• RF Antenna (Radio Frequency)
– For Noise gating
– One for each Termination
– Installed near to termination (Either TEV or RF Antenna)
Sensors used for Online PD Measurement
18
• High Frequency Current Transformers
– Inductive type sensor
– Split core to install sensor easily
– Different variants to fit the purpose (current (up to 1000A), diameter
(up to 150mm internal diameter))
– Sensitivity: Up to 10mV / mA
– Frequency Response: 200kHz – 15MHz
• Installation requires
– Individual cable earth
– Cable insulation gland
– Installation is done while the
cable is energised
Sensors: HFCT, Options for Installation
19
• Transient Earth Voltage Sensor
– Capacitive type sensor
– Integrated magnets help to attach it to
metallic body
– Sensitivity: Up to 100mV / V
• Installation requires:
– Metal Switchgear should not be double
skinned / walled
• RF Antenna
– Can be used in place of TEV
– Used to perform noise gating
20
Earthed metal clad
TEV
HFCT
Vent
Sensors: TEV and RF Antenna Installation
Sensors Positioning
21
HFCT
Sensors Positioning
22
Online Cable PD Measurement Topology
23
Sensors
(HFCT, TEV)
Termination
Portable System /
Permanent Installation
Sensors cables
QUALITROL OFFERINGS ON
CABLE PD MEASUREMENT
24
Field Service
25
• Field Service
•Sit Survey and feasibility of Online PD measurement
•Risk Assessment
•Method statement document shared with the customer
•Testing of 6-9 cables per day
•Detailed report with further recommendations within 5 days as standard or
more days depending on the number of days of testing
Portable System
26
•Portable System (Periodic Measurement)
•Main Unit (4 simultaneous channels)
•Accessory Box
•Sensors
•Cables
Sensors
27
•High Frequency Current Transformers (HFCT)
•Transient Earth Voltage Sensor (TEV)
HFCT-150
1000A
3mV/mA
HFCT-100
500A, 1000A
3-5mV/mA
HFCT-60
50A, 500A,
5-10mV/mA
HFCT-30
50A
10mV/mA
Continuous Monitoring Solution
Continuous PD Monitoring Software
29
Continuous PD Monitoring Software
30
CASE STUDIES
HIGH NOISE ENVIRONMENTS
31
Case Study 1: Lab Verification of Technology
Maximum magnitude phase
resolved distribution of mixed
signals including noise, PD,
interference were applied
together to test the system and
separated out by the system
Case Study 2: GIS Substation
33
 Cable Termination
 GIS termination
 220kV, XLPE
 Around 500m
length
 Cable Termination
 Remote end
 Terminating to
Overhead lines
Case Study 2: High Noise Environment
34
Before performing any filtering on
Channel A single cycle data, high noise
level and too much interference can be
seen.
Not sure which is PD or which is noise.
Also not sure that there is any PD?
After filtering, white noise level is
decreased. Interference signals can still
be seen at the same locations.
However, some more pulses appeared
in the middle.
These pulses in the middle may or may
not be PD
Case Study 2: Extracted Noise Pulses
35
Channel A noise pulse shape, its
maximum magnitude phase resolved
distribution and pulse count phase
resolved distribution
Case Study 2: Extracted PD Pulses
36
Channel A PD pulse shape, its
maximum magnitude phase resolved
distribution and pulse count phase
resolved distribution By TDR, it states
that PD is located at remote end.
Case Study 3: Metalclad Switchgear
37
 Cable Termination
 Metal clad
 10kV, XLPE
 Around 1367m
length
 One HFCT on the
earth shield of
cable
 Other two beneath
the metal housing
as earth shield
was available
there
Case Study 3: Interference and PD
38
Before performing any filtering on
Channel A single cycle data, low noise
level but too much interference can be
seen.
Not sure which is PD or which is noise.
Also not sure that there is any PD?
Case Study 3: Extracted Noise Signals
39
Noise pulse shape, its maximum
magnitude phase resolved distribution
and pulse count phase resolved
distribution
Case Study 3: Extracted PD Signals
40
Channel A PD pulse shape, its
maximum magnitude phase resolved
distribution and pulse count phase
resolved distribution. By TDR, it states
that PD is located at remote end.
Case Study 3: Extracted PD Signals
41
Channel C PD pulse shape, its
maximum magnitude phase resolved
distribution and pulse count phase
resolved distribution
THANK YOU
End of Session
42

More Related Content

PPTX
Partial Discharge Test - Switchgear
PPTX
Partial discharge testing
PDF
Cable fault location methods (Megger)
PPT
Unit 1 thyristors protection
PDF
Chapter 09 - Measurement of Partial Discharge
PPT
Fault level calculations
PPTX
Protection & switchgear
PPTX
Buck boost converter
Partial Discharge Test - Switchgear
Partial discharge testing
Cable fault location methods (Megger)
Unit 1 thyristors protection
Chapter 09 - Measurement of Partial Discharge
Fault level calculations
Protection & switchgear
Buck boost converter

What's hot (20)

PPTX
GENERATING OF HIGH ALTERNATING VOLTAGE
PPTX
Presentation on 132/33 KVSubstation Training
PPTX
measurement of high voltage and high currents
PPT
ABCB(air blast circuit breaker)
PPTX
INTRINSIC OR IONIC BREAKDOWN MECHANISM OF SOLID DIELECTRICS|BREAKDOWN IN SOLI...
PPTX
Generator Protection
PPTX
Capacitive voltage transformer (1)
PPTX
power quality improvement of power system network using UPFC
PPT
Transmission Line Basics
PPT
Seminar on Partial Discharge detection methods
PDF
Transformer design-and-design-parameters
PDF
Sf6 circuit breakers
PDF
Testing of Transformer (AREVA)
PPTX
AC Distribution System - Generation Distribution and Transmission
PPTX
Dc voltage
PPTX
Tests on insulators
PPTX
Harmonics and mitigation techniques
PPTX
Transformer relays trips alarms.pptx
POTX
Sinusoidal pwm
PPTX
High direct current measurement
GENERATING OF HIGH ALTERNATING VOLTAGE
Presentation on 132/33 KVSubstation Training
measurement of high voltage and high currents
ABCB(air blast circuit breaker)
INTRINSIC OR IONIC BREAKDOWN MECHANISM OF SOLID DIELECTRICS|BREAKDOWN IN SOLI...
Generator Protection
Capacitive voltage transformer (1)
power quality improvement of power system network using UPFC
Transmission Line Basics
Seminar on Partial Discharge detection methods
Transformer design-and-design-parameters
Sf6 circuit breakers
Testing of Transformer (AREVA)
AC Distribution System - Generation Distribution and Transmission
Dc voltage
Tests on insulators
Harmonics and mitigation techniques
Transformer relays trips alarms.pptx
Sinusoidal pwm
High direct current measurement
Ad

Viewers also liked (20)

PPTX
Action plan week 2 - term 2
PDF
Ertug_Sunum
PPTX
Jaringan Komputer Dan Koneksi Internet IX-2 RIZKYERLYRIDHO
PDF
Giay phep hanh nghe ha loc0001
PDF
Adding Emotion to Transactional Loyalty: the benefits of digital stamps in sh...
PPTX
My career path
PPTX
Odi leeds 1.09.14
PPTX
The Crime Thriller Genre
PPT
افضل شركة شحن فى مصر
PPTX
Ancillary task 1 - Similar products
PPTX
Questionaire results graphs
PPTX
Andrew goodwin's 6 features of music videos
PPTX
Action plan Week 2 - Term 2
PPTX
Jaringan Komputer
DOCX
Khu biệt thự nhà liền kề chung cư cao cấp interlàce
PDF
Ho so nang luc
DOC
Questionario individuale alunno - Competenze metafonologiche
DOC
Piano di lavoro Piavon
PDF
Wuthering bytes september 2015
PPTX
ODI Leeds sponsors update may 16
Action plan week 2 - term 2
Ertug_Sunum
Jaringan Komputer Dan Koneksi Internet IX-2 RIZKYERLYRIDHO
Giay phep hanh nghe ha loc0001
Adding Emotion to Transactional Loyalty: the benefits of digital stamps in sh...
My career path
Odi leeds 1.09.14
The Crime Thriller Genre
افضل شركة شحن فى مصر
Ancillary task 1 - Similar products
Questionaire results graphs
Andrew goodwin's 6 features of music videos
Action plan Week 2 - Term 2
Jaringan Komputer
Khu biệt thự nhà liền kề chung cư cao cấp interlàce
Ho so nang luc
Questionario individuale alunno - Competenze metafonologiche
Piano di lavoro Piavon
Wuthering bytes september 2015
ODI Leeds sponsors update may 16
Ad

Similar to Descarga Parcial de Cables - Conferencia Virtual (20)

PPTX
Detection of fault location in underground cable using arduino
PDF
Insulation testing of power cable
PDF
Online condition moniroing of power system, branched cables
PPTX
Overhead & Underground Electric Safety Webinar Presented by Amprobe
PPTX
A Frequency-based RF Partial Discharge Detector for Low-power Wireless Sens...
PPTX
Presentation-Power-Cable-Condition-Assessment
PPTX
UNIT_5 PPT-MBM.pptx
PPTX
LECTURE No. 2.pptxEngineeringEngineering
PDF
Heat Exchangers inspection .pdf
PPT
FAMECA Transmission Earthing Devices
PPTX
Presentation on Transmission Media
PDF
Heat Exchanger Inspection.pdf
PDF
Electrical condition monitoring part 2
PPT
UCF Wireless SAW Sensor Systems
PDF
Chapter 2 [compatibility mode]
PPTX
IEEE-Alberta_Partial-Discharge new high voltages .pptx
PDF
RF and Microwave Engineering
PDF
UNDERWATER ACOUSTIC MODEM FOR SHORT –RANGE SENSOR NETWORKS
PPTX
presentationfinal-141205064600-conversion-gate01(1).pptx
PPTX
CN Lecture 7 CN slide for ppt presentation.pptx
Detection of fault location in underground cable using arduino
Insulation testing of power cable
Online condition moniroing of power system, branched cables
Overhead & Underground Electric Safety Webinar Presented by Amprobe
A Frequency-based RF Partial Discharge Detector for Low-power Wireless Sens...
Presentation-Power-Cable-Condition-Assessment
UNIT_5 PPT-MBM.pptx
LECTURE No. 2.pptxEngineeringEngineering
Heat Exchangers inspection .pdf
FAMECA Transmission Earthing Devices
Presentation on Transmission Media
Heat Exchanger Inspection.pdf
Electrical condition monitoring part 2
UCF Wireless SAW Sensor Systems
Chapter 2 [compatibility mode]
IEEE-Alberta_Partial-Discharge new high voltages .pptx
RF and Microwave Engineering
UNDERWATER ACOUSTIC MODEM FOR SHORT –RANGE SENSOR NETWORKS
presentationfinal-141205064600-conversion-gate01(1).pptx
CN Lecture 7 CN slide for ppt presentation.pptx

More from TRANSEQUIPOS S.A. (20)

PDF
Gestión de activos en equipo primario de subestaciones eléctricas.pdf
PDF
Soluciones para el monitoreo en línea de transformadores de potencia.pdf
PDF
Monitoreo Integral Transformadores y Reactores
PDF
Análisis de Gases Disueltos - Cromatografía de Gases.pdf
PDF
Monitoreo Integral de Transformadores.pdf
PDF
Pruebas Eléctricas en Interruptores de Potencia.pdf
PDF
Diagnóstico de Motores Eléctricos.pdf
PDF
Gestión de Humedad en Transformadores de Potencia - Parte 1.pdf
PDF
Generalidades de PCB´s - Bifenilos Policlorados
PDF
Diagnóstico de transformadores por confiablidad
PDF
Regeneración de aislamientos de transformadores eléctricos inmersos en aceite...
PDF
Beneficios de las mediciones del sistema de puesta a tierra
PDF
Mapa Diagnostico - Transequipos
PDF
Cromatografía de Gases - Nueva Guía IEEE C57.104-2019
PDF
Importancia y Beneficios de las Pruebas DRM (Medición de Resistencia Dinámica)
PDF
Compensación de Energía Reactiva - CREG 015_2018
PDF
Como determinar el tiempo de vida util remanente de transformadores, a traves...
PDF
Entendiendo la Guía IEEE C57.104 2019
PDF
Equipos de seguridad para mantenimiento eléctrico
PDF
Sistema de secado en linea para transformadores
Gestión de activos en equipo primario de subestaciones eléctricas.pdf
Soluciones para el monitoreo en línea de transformadores de potencia.pdf
Monitoreo Integral Transformadores y Reactores
Análisis de Gases Disueltos - Cromatografía de Gases.pdf
Monitoreo Integral de Transformadores.pdf
Pruebas Eléctricas en Interruptores de Potencia.pdf
Diagnóstico de Motores Eléctricos.pdf
Gestión de Humedad en Transformadores de Potencia - Parte 1.pdf
Generalidades de PCB´s - Bifenilos Policlorados
Diagnóstico de transformadores por confiablidad
Regeneración de aislamientos de transformadores eléctricos inmersos en aceite...
Beneficios de las mediciones del sistema de puesta a tierra
Mapa Diagnostico - Transequipos
Cromatografía de Gases - Nueva Guía IEEE C57.104-2019
Importancia y Beneficios de las Pruebas DRM (Medición de Resistencia Dinámica)
Compensación de Energía Reactiva - CREG 015_2018
Como determinar el tiempo de vida util remanente de transformadores, a traves...
Entendiendo la Guía IEEE C57.104 2019
Equipos de seguridad para mantenimiento eléctrico
Sistema de secado en linea para transformadores

Recently uploaded (20)

PPTX
Soft Skills Unit 2 Listening Speaking Reading Writing.pptx
PDF
electrical machines course file-anna university
PDF
ECT443_instrumentation_Engg_mod-1.pdf indroduction to instrumentation
PPTX
ARCHITECTURE AND PROGRAMMING OF EMBEDDED SYSTEMS
PPTX
SE unit 1.pptx by d.y.p.akurdi aaaaaaaaaaaa
PDF
BBC NW_Tech Facilities_30 Odd Yrs Ago [J].pdf
PDF
ASPEN PLUS USER GUIDE - PROCESS SIMULATIONS
PDF
B461227.pdf American Journal of Multidisciplinary Research and Review
PPTX
MODULE 02 - CLOUD COMPUTING-Virtual Machines and Virtualization of Clusters a...
PPTX
chapter 1.pptx dotnet technology introduction
PDF
ST MNCWANGO P2 WIL (MEPR302) FINAL REPORT.pdf
PDF
IAE-V2500 Engine Airbus Family A319/320
PDF
Software defined netwoks is useful to learn NFV and virtual Lans
PDF
Research on ultrasonic sensor for TTU.pdf
PDF
Principles of operation, construction, theory, advantages and disadvantages, ...
PPTX
Unit IImachinemachinetoolopeartions.pptx
PPT
Programmable Logic Controller PLC and Industrial Automation
DOCX
An investigation of the use of recycled crumb rubber as a partial replacement...
PDF
IAE-V2500 Engine for Airbus Family 319/320
PPTX
DATA STRCUTURE LABORATORY -BCSL305(PRG1)
Soft Skills Unit 2 Listening Speaking Reading Writing.pptx
electrical machines course file-anna university
ECT443_instrumentation_Engg_mod-1.pdf indroduction to instrumentation
ARCHITECTURE AND PROGRAMMING OF EMBEDDED SYSTEMS
SE unit 1.pptx by d.y.p.akurdi aaaaaaaaaaaa
BBC NW_Tech Facilities_30 Odd Yrs Ago [J].pdf
ASPEN PLUS USER GUIDE - PROCESS SIMULATIONS
B461227.pdf American Journal of Multidisciplinary Research and Review
MODULE 02 - CLOUD COMPUTING-Virtual Machines and Virtualization of Clusters a...
chapter 1.pptx dotnet technology introduction
ST MNCWANGO P2 WIL (MEPR302) FINAL REPORT.pdf
IAE-V2500 Engine Airbus Family A319/320
Software defined netwoks is useful to learn NFV and virtual Lans
Research on ultrasonic sensor for TTU.pdf
Principles of operation, construction, theory, advantages and disadvantages, ...
Unit IImachinemachinetoolopeartions.pptx
Programmable Logic Controller PLC and Industrial Automation
An investigation of the use of recycled crumb rubber as a partial replacement...
IAE-V2500 Engine for Airbus Family 319/320
DATA STRCUTURE LABORATORY -BCSL305(PRG1)

Descarga Parcial de Cables - Conferencia Virtual

  • 1. Prevent Unplanned Outages with On-line PD Measurement of MV/HV Power Cables Cable Partial Discharge Measuring Systems Ammar Khan Technical Application Specialist – Cables CBM 1Dated: June 21, 2016
  • 2. • Partial discharge theory • Power cable structure • PD detection and localization • Why online PD measurement • Sensors used for online PD measurement • Qualitrol offerings • Case Studies Overview 2
  • 4. • According to IEC 60270 Partial discharge (PD) is a localized electrical discharge that only partially bridges the insulation between conductors and which may or may not occur adjacent to a conductor. • The term ‘partial discharge’ includes a wide group of discharge phenomena – (i) internal discharges occurring in voids or cavities within solid or liquid dielectrics; – (ii) surface discharges appearing at the boundary of different insulation materials; – (iii) corona discharges occurring in gaseous dielectrics in the presence of inhomogeneous fields; – (iv) continuous impact of discharges in solid dielectrics forming discharge channels (treeing). What is Partial Discharge? 4
  • 5. PD Phenomenon 5 HV across conductor PD Pulses Breakdown in cavity
  • 6. The detection and measurement of discharges is based on the exchange of energy taking place during the discharge. These exchanges are manifested as: – (i) electrical pulse currents – (ii) dielectric losses – (iii) E.M. radiation (light) – (iv) sound (noise) – (v) increased gas pressure – (vi) chemical reactions Results of Partial Discharges 6
  • 8. • Designed life of power cables is approximately 40 years • Cable Types that can be tested using Qualitrol Online PD Technology: – XLPE (Cross Linked PolyEthylene) – EPR (Ethylene Propylene Rubber) – PE (PolyEthylene) – PILC (Paper Insulated Lead Covered) Power Cable, its Basic Structure 8
  • 9. A Power Cable Circuit 9 Joints Terminations Cross-bonding Links
  • 13. PD Detection into Cables 13 Long Cable Defect Measurement EndRemote End PD at Cable Terminations • PD in cable induces HF signals • The signals travel in both directions • Signals attenuate during propagation and reflect back at terminations • Detection Principle • Capture the HF signals emitted by PD at termination point • Analyse signals to identify PD fault and differentiate with Noise or External PD signals Long Cable Defect Measurement EndRemote End PD in Joints and inside the Cables
  • 14. PD Fault Localization 14 • Time Domain Reflectometry (TDR) Principle is used to locate PD.  Measure time difference between main and reflected HF signals (∆T) • For Longer cables, reflected pulse may not reach to the measurement end  Requires a signal injector at the other end to inject same HF signal • For accurate localisation requires  Accurate length of cable  Cable Return Time (Tr) Long Cable Defect Measurement End Remote End ΔT Long Cable Measurement EndRemote End Tr
  • 16. • No need to de-energize the cable system • Non destructive testing • Accurate Detection of Incipient Faults under operating conditions • Accurate Localization or Zoning of Incipient Faults • Trending Fault Severity via regular CHECKUPs • Helps in scheduling maintenance and planned outage • Ensure that cable is defect free after repair / workmanship Why Online PD Monitoring? 16 • Most of the incipient faults or defects in power cables generate PD signals well before the actual failure except water trees. • PD monitoring helps in identifying the incipient faults before the break down -> Saves cost of UNPLANNED OUTAGE
  • 17. SENSORS USED FOR ONLINE PD MEASUREMENT 17
  • 18. • HFCT (High Frequency Current Transformers) – To detect any PD signal coming from Cable insulation – One for each Cable – Installed at termination / joints • TEV (Transient Earth Voltage) – To detect any external PD signals coming from termination or nearby Switchgear Panel – One for each Termination – Installed near the openings or vents of terminations • RF Antenna (Radio Frequency) – For Noise gating – One for each Termination – Installed near to termination (Either TEV or RF Antenna) Sensors used for Online PD Measurement 18
  • 19. • High Frequency Current Transformers – Inductive type sensor – Split core to install sensor easily – Different variants to fit the purpose (current (up to 1000A), diameter (up to 150mm internal diameter)) – Sensitivity: Up to 10mV / mA – Frequency Response: 200kHz – 15MHz • Installation requires – Individual cable earth – Cable insulation gland – Installation is done while the cable is energised Sensors: HFCT, Options for Installation 19
  • 20. • Transient Earth Voltage Sensor – Capacitive type sensor – Integrated magnets help to attach it to metallic body – Sensitivity: Up to 100mV / V • Installation requires: – Metal Switchgear should not be double skinned / walled • RF Antenna – Can be used in place of TEV – Used to perform noise gating 20 Earthed metal clad TEV HFCT Vent Sensors: TEV and RF Antenna Installation
  • 23. Online Cable PD Measurement Topology 23 Sensors (HFCT, TEV) Termination Portable System / Permanent Installation Sensors cables
  • 24. QUALITROL OFFERINGS ON CABLE PD MEASUREMENT 24
  • 25. Field Service 25 • Field Service •Sit Survey and feasibility of Online PD measurement •Risk Assessment •Method statement document shared with the customer •Testing of 6-9 cables per day •Detailed report with further recommendations within 5 days as standard or more days depending on the number of days of testing
  • 26. Portable System 26 •Portable System (Periodic Measurement) •Main Unit (4 simultaneous channels) •Accessory Box •Sensors •Cables
  • 27. Sensors 27 •High Frequency Current Transformers (HFCT) •Transient Earth Voltage Sensor (TEV) HFCT-150 1000A 3mV/mA HFCT-100 500A, 1000A 3-5mV/mA HFCT-60 50A, 500A, 5-10mV/mA HFCT-30 50A 10mV/mA
  • 31. CASE STUDIES HIGH NOISE ENVIRONMENTS 31
  • 32. Case Study 1: Lab Verification of Technology Maximum magnitude phase resolved distribution of mixed signals including noise, PD, interference were applied together to test the system and separated out by the system
  • 33. Case Study 2: GIS Substation 33  Cable Termination  GIS termination  220kV, XLPE  Around 500m length  Cable Termination  Remote end  Terminating to Overhead lines
  • 34. Case Study 2: High Noise Environment 34 Before performing any filtering on Channel A single cycle data, high noise level and too much interference can be seen. Not sure which is PD or which is noise. Also not sure that there is any PD? After filtering, white noise level is decreased. Interference signals can still be seen at the same locations. However, some more pulses appeared in the middle. These pulses in the middle may or may not be PD
  • 35. Case Study 2: Extracted Noise Pulses 35 Channel A noise pulse shape, its maximum magnitude phase resolved distribution and pulse count phase resolved distribution
  • 36. Case Study 2: Extracted PD Pulses 36 Channel A PD pulse shape, its maximum magnitude phase resolved distribution and pulse count phase resolved distribution By TDR, it states that PD is located at remote end.
  • 37. Case Study 3: Metalclad Switchgear 37  Cable Termination  Metal clad  10kV, XLPE  Around 1367m length  One HFCT on the earth shield of cable  Other two beneath the metal housing as earth shield was available there
  • 38. Case Study 3: Interference and PD 38 Before performing any filtering on Channel A single cycle data, low noise level but too much interference can be seen. Not sure which is PD or which is noise. Also not sure that there is any PD?
  • 39. Case Study 3: Extracted Noise Signals 39 Noise pulse shape, its maximum magnitude phase resolved distribution and pulse count phase resolved distribution
  • 40. Case Study 3: Extracted PD Signals 40 Channel A PD pulse shape, its maximum magnitude phase resolved distribution and pulse count phase resolved distribution. By TDR, it states that PD is located at remote end.
  • 41. Case Study 3: Extracted PD Signals 41 Channel C PD pulse shape, its maximum magnitude phase resolved distribution and pulse count phase resolved distribution
  • 42. THANK YOU End of Session 42