Don Czernick
21767- 94A Ave
Edmonton AB T5T 1N1
Cell (780) 333-6144
E-Mail dczer@telusplanet.net
OJECTIVE
I’m looking for permanent work with your company
EXPERIENCE
Fourquest Energy
Field Technician
Sept 2-2015 to Dec 1-2015
Hook up and maintain equipment, for Air blows, Lube Oil Flushes, and
Steam blows.
Walk system closing valves and checking P&ID’s.
Leader Mechanical
JULY 18-2015 TO Sept 1-2015
Warehouse/Delivery
Take care of warehouse, load and haul material to work sites.
CNRL Wabasca/WoodenHouse
Consultant
April 2012 – January 2015
Pad rebuilds, pad extensions, install skimmers in tanks, and operations
repairs as required in field. Install Eagle 300 compressors. KO and scavengers tanks.
Install cost and sign off of paperwork,
Laid off due to low oil prices.
Conoco Phillips
Consultant
January 2012 – March 2012
Install 6” pipeline and liner install, Rimbey Area.
Brush burning at Whitecourt. Ops maintenance, laid off due to end of work projects.
Mosaic Energy
Consultant
November 2011 – January 2012
Install well site facilities and pipelines. Attend safety meetings, ERP, HRA, safe work
permits. Complete ABOC and line list contacts. Daily Reports.
Enbridge
Consultant
January 2011 – November 2011
Supervise installing HVAC units & containment pads.
Expose 20” P/L line for repairs
Demolition ESB Stations and install new ESB Stations
Naverone Energy
Consultant
July 2010 – October 2010
Set up test well site, and start up. Attend safety meetings, ERP, HRA, safe work permits
Complete ABOC and line list contacts. Supervise staking out for vessel setting and flare
stack. Install required piles, no lines in area hydro vac not required.
Supervise welding of sour 2” sch 160 line from wellhead to separator.
NDT and Meg 100%. Return to site for casing tie-in and new tubing line after rods
installed in wellhead.
Bountiful Resources Inc.
Consultant
July 2009 – July 2010
Complete Alberta One Call, contacted forestry, and any other required contacts as per
line list attend safety meetings, ERP, HRA, safe work permits.
Install well site and 2434m Flex Pipe to NAL tie-in Point Co-ordinate installation
Complete line locating and hydro vacing lines within 5m of work area. Hydro vac at
satellite exposing 6 lines and ditched out for new line tie-in keeping all lines exposed at
all times.
Supervise directional drill across unnamed creek bed, high grade gravel road, two lease
roads and wet area. Gathering profiles for each drill and following crossing agreements to
min depth under creek and roads.
Meet with construction foreman, and with LRC Native Band Construction Company
conducted per job meetings... Supervise logging and ROW clearing, Co-ordinate with
construction crew installation of 5279m of Flex pipe, and supervise crimp connections.
Tie-in three well sites complete with pump jack and well head piping. Control cost file,
daily reports and pictures of 4 AFE jobs to completion of project.
Ranch West Resources Inc.
Consultant
June 2009 – July 2009
Attend safety meetings, ERP, HRA, safe work permits
Complete Alberta One Call contact companies in required line list before starting work.
Per test existing 6” line, mark out and build gravel pads for separator, compressor
packages, co-ordinate setting of equipment. Supervise piping and layout, test above
ground facility piping as per line list. Keep cost control file and send in daily reports with
pictures of project.
West Hill Resources
Consultant
May 2009 – June 2009
Upgrade facility site, remove old compressor, dehy, and replace with new all in one
building and retie-in. Pressure test new piping. Attend safety meetings, ERP, HRA, safe
work permits. Complete ABOC, contact line list, meet with oilfield companies. Line
locate facility site check against abacus maps & checking with operations for any
unknown lines installed. Hydro vac all lines within 5m of work area checking for
direction, size & depth. Complete daily reports and pictures, sign off QC package at end
of project.
Talisman Energy
Consultant
May 2008 – May 2009
Expose lines for corrosion inspection, repair and complete backfill. Install new 2 Oil
lines, & Upgrade 2” Injection line & piping. Attend safety meetings, ERP, HRA, safe
work permits. Follow line defect map stake locate defect sites as per line list. Contact
landowners, Oilfield related Companies as per contact list. Supervise Construction crew
Expose hot line, remove outside coating locate defects. Send pictures and daily report to
Talisman Energy. Repair corrosion section of pipe by Cut Out or Re-taping line and
backfill. Complete all ABO-Calls and crossing agreements as per Construction binder
from Talisman Energy. Hydro vac all lines within 5m of dig area, check lines found
against abacus map and old construction drawings and asking questions for unknown
lines from field operators and landowners. Hydro vac in Husky Oil plant site as per there
practice and check against their line lists before digging after approval from production
field foreman. Oil line Install, AB-One-Call, landowners, Kick Off meeting with
Construction Crew. Supervise all aspects of pipe line install, and facility piping with
daily reports to Talisman Energy.
North Point Energy
Consultant
December 2007 – April 2008
BC Pipeline Installation, 6” insulated piping - Well Site Sour Service Facility Install
Complete BCOC, contact line list, hydro vac lines with 5m of dig site.
Supervise all aspect of pipeline install, supervise pipeline test, supervise Construction
Crew for well site piping, and installation of new skid packages. Coordinate NDT for
weld x-rays as per conditions in contract and ERCB requirements for Daily reports, all
field cost related, to be collected and installed in daily report. Complete all paperwork
required for project and sign off construction company QC package for North Point
Energy Engineering Firm.
Primrose Drilling Adventures
Consultant
October 2006 – December 2007
P/L install. AB-One-Call, Landowners, Oilfield Company notification as per contact list.
Supervise Construction crew installation in pipeline and riser installs as per construction
binder, following all EUB, OHS, and Company QC binder. Collect all costs install in
daily report and send to Primrose Engineering firm daily.
Directional drill under gas line in wet area, gathering profile for drill after completion,
Sabretooth Energy
Consultant
2006 –P/L Gathering Systems, well site installs Small plant sites with compressor, tanks,
flare system, dehy, and separator package.
Supervise installation of gathering system; complete all contacts as per contact list.
Attend safety meeting ERP, HRA, and safe work permits. Installing steel and poly lines
by track hoe and spider plow. Directional drill high grade gravel roads, Creek crossing
following Alberta Sustainable Resources conditions in agreement. Supervise compressor
facility site, order fittings as needed, daily reports, cost collecting,
Supervise line testing and sign off.
West Energy
Consultant
2006 –Installation gathering system, pipe line, on many locations in Drayton Valley area
Attend safety meetings, ERP, HRA, safe work permits
Assist field Inspectors in pipe line installation, and complete piping at gathering sites.
Keeper Resources
Consultant
2006 – Installation poly line and well site, setting pump jacks, site up grades.
Attend safety meeting, ERP, HRA & safe work permits.
Complete ABOC, line locating landowner contacts & line list.
Supervise directional drill across high grade gravel roads, P/L crossings.
Installation and fusing of poly line, clean up.
Supervise installation of conde tank, turbine separator and wellhead tie-in.
Daily reports and pictures.
Tear down pump jack and haul to bone yard, site cleanup. Clean and remove 400bbl tank.
Winstar Resources
Consultant
2006 – Installation facility site up grade.
Attend safety meetings, ERP, HRA & safe work permits.
Complete ABOC, Line locating and site meeting with oilfield company on site.
Hydro vac test holes for piles on live lease.
Install piles for new separator, set equipment and weld new spools for tie-in.
Test piping, charted, and dead weight, daily cost file & pictures.
Maverick Resources
Consultant
2006 – Installation steel line by plow and well site and second party field tie-in.
Attend kick off meeting, daily safety meetings, ERP, HRA & safe work permits.
Supervise clearing of ROW for spider plow, meet with NAL go over tie-in point,
complete ABOC, contacting landowners and related oilfield companies. Supervise
directional drill across high grade road, gas coop line, NAL main line, hydro vacing lines
for depth, size & direction with company reps on site. Supervise well site lay out and pile
installation. Transporting to site and setting of equipment, instrumentation and electrical
install. Welding of steel pipeline, NPT of welds, shrink sleeve welds.
Golden Eagle
Consultant
2006
Installation steel pipe lines and well site installation. Attend safety meetings, ERP, HRA
& safe work permits before starting work. Supervise clearing of ROW, salvage of trees,
Contact line list, and go over line crossings and tie-in point with Oil Field Company.
Supervise lay out and installation of piles and setting of well site equipment. Daily
reports, pictures, coordinating equipment for continuous flow of installation. Hydro vac
line crossing and tie-in point exposing all lines & witness by owner before ditching out
for tie-in and crossing.
Silverwing Resource
Consultant
2006- Installation Poly lines and well sites.
Northern BC
Contact line list, conduct kick-off meeting with crew, hydro vac to expose line crossings.
Supervise installation of poly lines. Coordinate fusing crew for tie-ins. Test P/L; install
well site equipment on piles and tie-in test piping. Keeping records of all tests, QC
packages for Engineering Company. Daily reports and pictures, attend all morning safety
meetings before starting work. Complete ERP, HRA and post.
Accrete Energy
Consultant
2004 & 2005
Projects Phase 1, 2, & 3. Compressor Install, South Project Phase 1. Sundre Alberta-
Installation, 6” Sales Line, 6” Group Line and 4” spur lines, Well Site Facilities.
Complete ERP, HRA reports and post, attend all morning safety meetings before starting
work, and safe work permits signed. Attend kick off meeting and safety meeting before
construction start. Completed line list contacts and delivered checks to landowners.
Directional drill Highway # 760, TWP 60, Community Creek, Trans Canada Line,
TELUS cable, gas lines, multiple gravel roads along 25 km line, unnamed creek
crossings, keeping track of fluid used in creek crossings and disposal. Coordinating P/L
installation with 54 crossings and 20 landowners. Logging trees as required and piling as
per agreement. Notify and test lines as per line list. Tie-in to facility hydro vacing all
lines for crossing. Supervise clean up, and fence repair, insulating required piping.
High Point Resources
Consultant
2004 & 2005 Winter Projects
Ft Nelson Desan Area- Installation, 6” Main Line and 4”Spur Lines, & Well Site
Facilities. Ferrier & Ricinus Area- Installation, 6” Main Line and Well Site Facilities.
Attend all morning safety meetings, ERP, HRA, safety work permits and post
Attend kick off meeting with engineering group and construction supervisor.
Complete line list OGC & Forestry notification. Hydro vac P/L crossings, directional
drill, multiple line crossings and creek crossings, wetlands. Logging and clearing of
ROWS, determine location of P/L weights when required. Installation of well site
equipment and skid packages. Coordinate equipment delivery for continuous installation.
Complete ABOC and notification for construction start and testing, for Southern Alberta.
Clearing of trees, and salvaging – removal. Complete daily reports for multiple AFES
during construction.
Elpaso Resources
Conultant
July 2003 – October 2004
Ft St. John & Dawson Creek Area- Installation, 8” & 10” Main Lines, Well Site
Facilities and Compressor Stations. Attend all safety meetings, ERP, HRA and safety
work permits before starting work. Contact line list, Forestry, OGC for start notification,
and testing. Clearing of trees, and salvaging-removal. Hydro vac P/L crossings with
owners Rep on site, directional drill highway # 52, two river crossings (Dawson Creek
drinking supply), and installed culverts at bore site enter to keep circulation. Keeping
track of fluids used contacted forestry for disposal requirements at end of bores.
Directional drilled across unnamed creek, and wetlands. Keeping cost files and inspector
meetings. Taking pictures of all bore sites, supervise P/L installation. Testing all creek
and road crossing by air for 24 hr. as requested in crossing agreements.
South Point Resources Ltd.
Consultant
April 2003 – July 2003
Southern Alberta Area- Installation, 3” & 4” Pipe Lines and tie in points to existing
pipelines, Well Site Facilities.
Duties; Attended safety meetings, ERP, HRA & safe work permits with construction
crews before starting work.
Complete kick off with Construction Company, contact line list, directional drill creek
crossings, keeping track of fluid used, & gravel roads. Keeping cost files, pictures, drill
profiles. Daily cost files and communication with engineering firm
Devon Canada
Consultant
December 2002 – April 2003
Hamburg & Chinchaga Area- Installation, Multiple 3” & 4” Pipe Lines & Well Site
Installations, plant site upgrades.
Attend kick-off meeting with Devon & Construction Supervisor. Attend morning safety
meeting, ERP, HRA, safe work permits with construction crews. Contact ABOC,
Complete contacting line list, notify ERCB for construction start and testing of pipe lines
as required. Notify Forestry, went over agreement issues. Hydro vac all lines, supervise
directional drill across gravel roads, multiple lines, and wetland and unnamed creeks.
Keeping track of fluid used, and removal. Daily reports, co-coordinating equipment for
continuous flow for installation.
Samson Canada
Consultant
July 2002 – November 2002
Ft St John Area- Installation, 8” Main Line & Compressor Station. Attend all morning
safety meetings, ERP, HRA & safe work permits with construction crews before starting
work. Attended kick-off meeting with construction crew, complete BC-ONE-Call,
complete contact list as per line list. Supervise Directional Drill across highway 32, and
Buick Creek, as per crossing agreements. Inspected installation of pipeline, installed
breaker berms when required. Supervised P/L test and removal of fluid. Supervised
installation of all piles, and cut and set required vessels. Supervise facility piping install.
Star Oil & Gas
Consultant
July 2000 – July 2002
Inverness, Dawson Creek, Grand Prairie, & Slave Lake Areas. Attend morning safety
meetings, ERP, HRA & safe work permits with construction crews before starting work.
Line repairs, plant upgrade, dewaxing of lines, line testing, 3” & 4’ pipeline
installations.Complete ERCB requirements, and forestry agreements, find and expose
waxed lines cut and clean lines out. Supervise repairs and backfill making out back fill
and repair reports. Take pictures, and daily cost files communicating with Calgary
Office.Hydro vac multiple lines for line crossing when digging in facility yards, checking
with field foreman and old construction drawings, after line locating for any missed lines
before exposing starts.
Inermark
Consultant
June 2000 – July 2000
Attend all safety meeting, ERP, HRA & safe work permits with crew before starting
work. Inspection Oil & Gas Plant shut downs, and upgrades. Install 2” fiberglass line,
hydro vac, exposing crossing lines check against abacus maps & old construction
drawings
SCHINDLE AND BAZIN OILFIELD CONSTUCTION LTD.
Crew Coordinator
October 5, 1983 to June 1999
Began work at Shindle and Bazin as a laborer, welder’s helper, and then was promoted to
Crew Forman, then to Crew Supervisor.
Associated safety and certification requirements for the position and the Boiler’s Branch
Supervising service crews, welders, and carpenters.
Battery building – construction of new facilities for gathering systems for oil, water and
gas systems.
Construction and maintenance of pump jack units, flow lines (steel and fiberglass) and all
maintenance related to oilfield gathering systems.
Maintenance includes treaters, free water knock out, oil tank and pump jack inspections.
Supervising crews on location at Wascana Energy Inc. /Can Oxy in S.E. Saskatchewan.
PERSONAL INFORMATION
Safety Courses: M D Y
ď‚§ First Aid 10/25/2018
ď‚§ Confined Spaces 9/12/2017
ď‚§ Ground Disturbances 2 01/09/2018
ď‚§ WHMS 07/02/2016
ď‚§ CPR 10/25/2018
ď‚§ H2S 05/25/2018
ď‚§ TGD 7/02/2016
ď‚§ Leadership for Safety Excellence 02/10/2012
ď‚§ Asme B31.3 Seminar 05/01/2015
ď‚§ CSA Z662 Seminar 05/02/2015
ď‚§ CNRL SSST Course 04/12/2018
ď‚§ CSTS-09 02/28/2018
ď‚§ PCST 10/23/2020
ď‚§ CNRL GD /Thermal site 02/05/2018
ď‚§ CNRL GD Horizon Site 02/05/2018
ď‚§ CNRL Bear Awareness 02/05/2018
ď‚§ OSSA Confined Space Entry/Monitor 03/12/2018
ď‚§ OSSA Fire Watch 03/10/2018
ď‚§ Fork Lift 07/20/2018
HOBBIES
ď‚§ Woodworking
ď‚§ Cabinet Making
ď‚§ Gardening
REFERENCES
Gord Stark Edmonton AB (587) 985-4315
Mike Sharky Edmonton AB (780) 916-6799
Terry Heidinger Edmonton AB (780) 721-8453
Mike Sharky Edmonton AB (780) 916-6799
Bill Keating Edmonton AB (780) 603-1756
Don's #2

Don's #2

  • 1.
    Don Czernick 21767- 94AAve Edmonton AB T5T 1N1 Cell (780) 333-6144 E-Mail [email protected] OJECTIVE I’m looking for permanent work with your company EXPERIENCE Fourquest Energy Field Technician Sept 2-2015 to Dec 1-2015 Hook up and maintain equipment, for Air blows, Lube Oil Flushes, and Steam blows. Walk system closing valves and checking P&ID’s. Leader Mechanical JULY 18-2015 TO Sept 1-2015 Warehouse/Delivery Take care of warehouse, load and haul material to work sites. CNRL Wabasca/WoodenHouse Consultant April 2012 – January 2015 Pad rebuilds, pad extensions, install skimmers in tanks, and operations repairs as required in field. Install Eagle 300 compressors. KO and scavengers tanks. Install cost and sign off of paperwork, Laid off due to low oil prices. Conoco Phillips Consultant January 2012 – March 2012 Install 6” pipeline and liner install, Rimbey Area. Brush burning at Whitecourt. Ops maintenance, laid off due to end of work projects.
  • 2.
    Mosaic Energy Consultant November 2011– January 2012 Install well site facilities and pipelines. Attend safety meetings, ERP, HRA, safe work permits. Complete ABOC and line list contacts. Daily Reports. Enbridge Consultant January 2011 – November 2011 Supervise installing HVAC units & containment pads. Expose 20” P/L line for repairs Demolition ESB Stations and install new ESB Stations Naverone Energy Consultant July 2010 – October 2010 Set up test well site, and start up. Attend safety meetings, ERP, HRA, safe work permits Complete ABOC and line list contacts. Supervise staking out for vessel setting and flare stack. Install required piles, no lines in area hydro vac not required. Supervise welding of sour 2” sch 160 line from wellhead to separator. NDT and Meg 100%. Return to site for casing tie-in and new tubing line after rods installed in wellhead. Bountiful Resources Inc. Consultant July 2009 – July 2010 Complete Alberta One Call, contacted forestry, and any other required contacts as per line list attend safety meetings, ERP, HRA, safe work permits. Install well site and 2434m Flex Pipe to NAL tie-in Point Co-ordinate installation Complete line locating and hydro vacing lines within 5m of work area. Hydro vac at satellite exposing 6 lines and ditched out for new line tie-in keeping all lines exposed at all times. Supervise directional drill across unnamed creek bed, high grade gravel road, two lease roads and wet area. Gathering profiles for each drill and following crossing agreements to min depth under creek and roads. Meet with construction foreman, and with LRC Native Band Construction Company conducted per job meetings... Supervise logging and ROW clearing, Co-ordinate with construction crew installation of 5279m of Flex pipe, and supervise crimp connections.
  • 3.
    Tie-in three wellsites complete with pump jack and well head piping. Control cost file, daily reports and pictures of 4 AFE jobs to completion of project. Ranch West Resources Inc. Consultant June 2009 – July 2009 Attend safety meetings, ERP, HRA, safe work permits Complete Alberta One Call contact companies in required line list before starting work. Per test existing 6” line, mark out and build gravel pads for separator, compressor packages, co-ordinate setting of equipment. Supervise piping and layout, test above ground facility piping as per line list. Keep cost control file and send in daily reports with pictures of project. West Hill Resources Consultant May 2009 – June 2009 Upgrade facility site, remove old compressor, dehy, and replace with new all in one building and retie-in. Pressure test new piping. Attend safety meetings, ERP, HRA, safe work permits. Complete ABOC, contact line list, meet with oilfield companies. Line locate facility site check against abacus maps & checking with operations for any unknown lines installed. Hydro vac all lines within 5m of work area checking for direction, size & depth. Complete daily reports and pictures, sign off QC package at end of project. Talisman Energy Consultant May 2008 – May 2009 Expose lines for corrosion inspection, repair and complete backfill. Install new 2 Oil lines, & Upgrade 2” Injection line & piping. Attend safety meetings, ERP, HRA, safe work permits. Follow line defect map stake locate defect sites as per line list. Contact landowners, Oilfield related Companies as per contact list. Supervise Construction crew Expose hot line, remove outside coating locate defects. Send pictures and daily report to Talisman Energy. Repair corrosion section of pipe by Cut Out or Re-taping line and backfill. Complete all ABO-Calls and crossing agreements as per Construction binder from Talisman Energy. Hydro vac all lines within 5m of dig area, check lines found against abacus map and old construction drawings and asking questions for unknown lines from field operators and landowners. Hydro vac in Husky Oil plant site as per there practice and check against their line lists before digging after approval from production field foreman. Oil line Install, AB-One-Call, landowners, Kick Off meeting with
  • 4.
    Construction Crew. Superviseall aspects of pipe line install, and facility piping with daily reports to Talisman Energy. North Point Energy Consultant December 2007 – April 2008 BC Pipeline Installation, 6” insulated piping - Well Site Sour Service Facility Install Complete BCOC, contact line list, hydro vac lines with 5m of dig site. Supervise all aspect of pipeline install, supervise pipeline test, supervise Construction Crew for well site piping, and installation of new skid packages. Coordinate NDT for weld x-rays as per conditions in contract and ERCB requirements for Daily reports, all field cost related, to be collected and installed in daily report. Complete all paperwork required for project and sign off construction company QC package for North Point Energy Engineering Firm. Primrose Drilling Adventures Consultant October 2006 – December 2007 P/L install. AB-One-Call, Landowners, Oilfield Company notification as per contact list. Supervise Construction crew installation in pipeline and riser installs as per construction binder, following all EUB, OHS, and Company QC binder. Collect all costs install in daily report and send to Primrose Engineering firm daily. Directional drill under gas line in wet area, gathering profile for drill after completion, Sabretooth Energy Consultant 2006 –P/L Gathering Systems, well site installs Small plant sites with compressor, tanks, flare system, dehy, and separator package. Supervise installation of gathering system; complete all contacts as per contact list. Attend safety meeting ERP, HRA, and safe work permits. Installing steel and poly lines by track hoe and spider plow. Directional drill high grade gravel roads, Creek crossing following Alberta Sustainable Resources conditions in agreement. Supervise compressor facility site, order fittings as needed, daily reports, cost collecting, Supervise line testing and sign off. West Energy Consultant 2006 –Installation gathering system, pipe line, on many locations in Drayton Valley area Attend safety meetings, ERP, HRA, safe work permits Assist field Inspectors in pipe line installation, and complete piping at gathering sites.
  • 5.
    Keeper Resources Consultant 2006 –Installation poly line and well site, setting pump jacks, site up grades. Attend safety meeting, ERP, HRA & safe work permits. Complete ABOC, line locating landowner contacts & line list. Supervise directional drill across high grade gravel roads, P/L crossings. Installation and fusing of poly line, clean up. Supervise installation of conde tank, turbine separator and wellhead tie-in. Daily reports and pictures. Tear down pump jack and haul to bone yard, site cleanup. Clean and remove 400bbl tank. Winstar Resources Consultant 2006 – Installation facility site up grade. Attend safety meetings, ERP, HRA & safe work permits. Complete ABOC, Line locating and site meeting with oilfield company on site. Hydro vac test holes for piles on live lease. Install piles for new separator, set equipment and weld new spools for tie-in. Test piping, charted, and dead weight, daily cost file & pictures. Maverick Resources Consultant 2006 – Installation steel line by plow and well site and second party field tie-in. Attend kick off meeting, daily safety meetings, ERP, HRA & safe work permits. Supervise clearing of ROW for spider plow, meet with NAL go over tie-in point, complete ABOC, contacting landowners and related oilfield companies. Supervise directional drill across high grade road, gas coop line, NAL main line, hydro vacing lines for depth, size & direction with company reps on site. Supervise well site lay out and pile installation. Transporting to site and setting of equipment, instrumentation and electrical install. Welding of steel pipeline, NPT of welds, shrink sleeve welds. Golden Eagle Consultant 2006 Installation steel pipe lines and well site installation. Attend safety meetings, ERP, HRA & safe work permits before starting work. Supervise clearing of ROW, salvage of trees,
  • 6.
    Contact line list,and go over line crossings and tie-in point with Oil Field Company. Supervise lay out and installation of piles and setting of well site equipment. Daily reports, pictures, coordinating equipment for continuous flow of installation. Hydro vac line crossing and tie-in point exposing all lines & witness by owner before ditching out for tie-in and crossing. Silverwing Resource Consultant 2006- Installation Poly lines and well sites. Northern BC Contact line list, conduct kick-off meeting with crew, hydro vac to expose line crossings. Supervise installation of poly lines. Coordinate fusing crew for tie-ins. Test P/L; install well site equipment on piles and tie-in test piping. Keeping records of all tests, QC packages for Engineering Company. Daily reports and pictures, attend all morning safety meetings before starting work. Complete ERP, HRA and post. Accrete Energy Consultant 2004 & 2005 Projects Phase 1, 2, & 3. Compressor Install, South Project Phase 1. Sundre Alberta- Installation, 6” Sales Line, 6” Group Line and 4” spur lines, Well Site Facilities. Complete ERP, HRA reports and post, attend all morning safety meetings before starting work, and safe work permits signed. Attend kick off meeting and safety meeting before construction start. Completed line list contacts and delivered checks to landowners. Directional drill Highway # 760, TWP 60, Community Creek, Trans Canada Line, TELUS cable, gas lines, multiple gravel roads along 25 km line, unnamed creek crossings, keeping track of fluid used in creek crossings and disposal. Coordinating P/L installation with 54 crossings and 20 landowners. Logging trees as required and piling as per agreement. Notify and test lines as per line list. Tie-in to facility hydro vacing all lines for crossing. Supervise clean up, and fence repair, insulating required piping. High Point Resources Consultant 2004 & 2005 Winter Projects Ft Nelson Desan Area- Installation, 6” Main Line and 4”Spur Lines, & Well Site Facilities. Ferrier & Ricinus Area- Installation, 6” Main Line and Well Site Facilities. Attend all morning safety meetings, ERP, HRA, safety work permits and post Attend kick off meeting with engineering group and construction supervisor. Complete line list OGC & Forestry notification. Hydro vac P/L crossings, directional drill, multiple line crossings and creek crossings, wetlands. Logging and clearing of ROWS, determine location of P/L weights when required. Installation of well site equipment and skid packages. Coordinate equipment delivery for continuous installation.
  • 7.
    Complete ABOC andnotification for construction start and testing, for Southern Alberta. Clearing of trees, and salvaging – removal. Complete daily reports for multiple AFES during construction. Elpaso Resources Conultant July 2003 – October 2004 Ft St. John & Dawson Creek Area- Installation, 8” & 10” Main Lines, Well Site Facilities and Compressor Stations. Attend all safety meetings, ERP, HRA and safety work permits before starting work. Contact line list, Forestry, OGC for start notification, and testing. Clearing of trees, and salvaging-removal. Hydro vac P/L crossings with owners Rep on site, directional drill highway # 52, two river crossings (Dawson Creek drinking supply), and installed culverts at bore site enter to keep circulation. Keeping track of fluids used contacted forestry for disposal requirements at end of bores. Directional drilled across unnamed creek, and wetlands. Keeping cost files and inspector meetings. Taking pictures of all bore sites, supervise P/L installation. Testing all creek and road crossing by air for 24 hr. as requested in crossing agreements. South Point Resources Ltd. Consultant April 2003 – July 2003 Southern Alberta Area- Installation, 3” & 4” Pipe Lines and tie in points to existing pipelines, Well Site Facilities. Duties; Attended safety meetings, ERP, HRA & safe work permits with construction crews before starting work. Complete kick off with Construction Company, contact line list, directional drill creek crossings, keeping track of fluid used, & gravel roads. Keeping cost files, pictures, drill profiles. Daily cost files and communication with engineering firm Devon Canada Consultant December 2002 – April 2003 Hamburg & Chinchaga Area- Installation, Multiple 3” & 4” Pipe Lines & Well Site Installations, plant site upgrades. Attend kick-off meeting with Devon & Construction Supervisor. Attend morning safety meeting, ERP, HRA, safe work permits with construction crews. Contact ABOC, Complete contacting line list, notify ERCB for construction start and testing of pipe lines as required. Notify Forestry, went over agreement issues. Hydro vac all lines, supervise directional drill across gravel roads, multiple lines, and wetland and unnamed creeks. Keeping track of fluid used, and removal. Daily reports, co-coordinating equipment for continuous flow for installation. Samson Canada
  • 8.
    Consultant July 2002 –November 2002 Ft St John Area- Installation, 8” Main Line & Compressor Station. Attend all morning safety meetings, ERP, HRA & safe work permits with construction crews before starting work. Attended kick-off meeting with construction crew, complete BC-ONE-Call, complete contact list as per line list. Supervise Directional Drill across highway 32, and Buick Creek, as per crossing agreements. Inspected installation of pipeline, installed breaker berms when required. Supervised P/L test and removal of fluid. Supervised installation of all piles, and cut and set required vessels. Supervise facility piping install. Star Oil & Gas Consultant July 2000 – July 2002 Inverness, Dawson Creek, Grand Prairie, & Slave Lake Areas. Attend morning safety meetings, ERP, HRA & safe work permits with construction crews before starting work. Line repairs, plant upgrade, dewaxing of lines, line testing, 3” & 4’ pipeline installations.Complete ERCB requirements, and forestry agreements, find and expose waxed lines cut and clean lines out. Supervise repairs and backfill making out back fill and repair reports. Take pictures, and daily cost files communicating with Calgary Office.Hydro vac multiple lines for line crossing when digging in facility yards, checking with field foreman and old construction drawings, after line locating for any missed lines before exposing starts. Inermark Consultant June 2000 – July 2000 Attend all safety meeting, ERP, HRA & safe work permits with crew before starting work. Inspection Oil & Gas Plant shut downs, and upgrades. Install 2” fiberglass line, hydro vac, exposing crossing lines check against abacus maps & old construction drawings SCHINDLE AND BAZIN OILFIELD CONSTUCTION LTD. Crew Coordinator October 5, 1983 to June 1999
  • 9.
    Began work atShindle and Bazin as a laborer, welder’s helper, and then was promoted to Crew Forman, then to Crew Supervisor. Associated safety and certification requirements for the position and the Boiler’s Branch Supervising service crews, welders, and carpenters. Battery building – construction of new facilities for gathering systems for oil, water and gas systems. Construction and maintenance of pump jack units, flow lines (steel and fiberglass) and all maintenance related to oilfield gathering systems. Maintenance includes treaters, free water knock out, oil tank and pump jack inspections. Supervising crews on location at Wascana Energy Inc. /Can Oxy in S.E. Saskatchewan. PERSONAL INFORMATION Safety Courses: M D Y  First Aid 10/25/2018  Confined Spaces 9/12/2017  Ground Disturbances 2 01/09/2018  WHMS 07/02/2016  CPR 10/25/2018  H2S 05/25/2018  TGD 7/02/2016  Leadership for Safety Excellence 02/10/2012  Asme B31.3 Seminar 05/01/2015  CSA Z662 Seminar 05/02/2015  CNRL SSST Course 04/12/2018  CSTS-09 02/28/2018  PCST 10/23/2020  CNRL GD /Thermal site 02/05/2018  CNRL GD Horizon Site 02/05/2018  CNRL Bear Awareness 02/05/2018  OSSA Confined Space Entry/Monitor 03/12/2018  OSSA Fire Watch 03/10/2018  Fork Lift 07/20/2018 HOBBIES
  • 10.
    ď‚§ Woodworking ď‚§ CabinetMaking ď‚§ Gardening REFERENCES Gord Stark Edmonton AB (587) 985-4315 Mike Sharky Edmonton AB (780) 916-6799 Terry Heidinger Edmonton AB (780) 721-8453 Mike Sharky Edmonton AB (780) 916-6799 Bill Keating Edmonton AB (780) 603-1756