Enhancing Facility Reliability:
The Case for Using Energy
Institute Guidelines
Dr. Rana I. Shakoor
CEO
NTI Sol
1
Speaker
Rana I. Shakoor, PhD, MechEng
Asset Integrity and Reliability Consultant
CAT III Certified Vibration Analyst
20 years of CBM and Reliability services
Instructor of MOBIUS Australia for ISO 18436-2 Cat I, II and III
https://pk.linkedin.com/in/dr-rana-iqtidar-shakoor
NTI Sol
2
Agenda
1. Introduction
2. Why EI Guidelines Matter
3. Key Components of EI Guidelines
4. NTI Sol
5. Vibration Screening Approach
6. Recommendations
7. Conclusion
NTI Sol
3
Introduction
Challenge: Vibration-induced fatigue failure
Solution: Proactive risk management.
EI Guidelines
NTI Sol
4
EI Guidelines Matter
EI AVIFF (2nd Ed., 2008):
Complements existing
frameworks like API 570 for
mechanical integrity.
Focus on safety-critical and
production-critical systems.
NTI Sol
5
Key Components of EI Guidelines
Excitation Mechanisms:
Flow-induced turbulence (FIT)
Mechanical excitation and pulsation
High-frequency acoustic excitation (AIV)
Screening Tools:
Qualitative assessments
Detailed design evaluations
Actionable Insights:
Recommendations for clamps, braces, flow limits, and
speed ranges.
NTI Sol
6
NTI Sol
7
How do you Know When to be Worried
NTI Sol
8
Know Where to Focus your Efforts
NTI Sol
9
Vibration Screening Tool Veridian
NTI Sol
10
Vibration Screening Approach
NTI Sol
11
Enter Piping Information
NTI Sol
12
Enter Stream Information
NTI Sol
13
Qualitative Screening
NTI Sol
14
Quantitative Screening
NTI Sol
15
Target Actions
NTI Sol
16
NOVATech
• Proactive Management: Identify risks before failures occur.
• Cost Savings: Avoid unplanned downtimes and repair costs.
• Enhanced Safety: Protect personnel and infrastructure.
• Efficiency: Aligns with current data in Risk-Based Inspection (RBI)
programs.
NTI Sol
17
Case Study Insights
• Assessment Scope:
• Mechanical excitation in static pipework.
• Flow-Induced Vibration (FIV) on process pipework.
• Acoustic-Induced Vibration (AIV) on flare systems.
• Outcomes:
• Identified priority actions, including immediate and long-term measures.
• Implementation of engineered solutions (e.g., anti-vibration braces).
NTI Sol
18
• Adopt EI Guidelines:
• As part of NTI SOL integrity management strategy.
• Leverage Screening Tools:
• Implement tools like Veridian for risk assessments.
• Train Personnel:
• Ensure teams understand and apply EI recommendations effectively.
Recommendations
NTI Sol
19
• Vibration risks are real and significant.
• EI guidelines provide the framework for proactive management.
• By adopting these practices, NTI SOL can ensure reliability, safety, and
cost efficiency.
Conclusion

More Related Content

PPTX
Sosialisasi sni iso iec 20000 - sistem manajemen layanan
PPTX
Sarwono sutikno forum tik utk standardisasi keamanan kartu cerdas - 4 nov 2...
PDF
Mynd company presentation
PPTX
ISO - International Organization for Standardization
PPTX
Sosialisasi sni iso iec 15408 common criteria - evaluasi keamanan ti
PPT
6824837121 - Valero Benicia's MI program
PPTX
Solar PV Technology : Health & Safety
PDF
Process20Hazard20Analysis20-20Bow-Tie20Methodology-1.pdf
Sosialisasi sni iso iec 20000 - sistem manajemen layanan
Sarwono sutikno forum tik utk standardisasi keamanan kartu cerdas - 4 nov 2...
Mynd company presentation
ISO - International Organization for Standardization
Sosialisasi sni iso iec 15408 common criteria - evaluasi keamanan ti
6824837121 - Valero Benicia's MI program
Solar PV Technology : Health & Safety
Process20Hazard20Analysis20-20Bow-Tie20Methodology-1.pdf

Similar to Enhancing Facility Reliability W/EI.pptx (20)

PDF
Lesson-1-Introduction-to-Maintenance.pdf
PDF
InTech-FOCUS-Process-Safety-Sept2020.pdf
PDF
SIL Awareness | Introduction to Safety Life-Cycle | IEC - 61508 & IEC- 61511 ...
PPTX
Lean Implementation on IT Infrastructure Monitoring System
PPTX
Functional_Safety_.pptx
PPTX
More practical insights on the 20 critical controls
PPTX
Process Safety Life Cycle Management: Best Practices and Processes
PPTX
Safety system life cycle
PPTX
Optimizing Maintenance Planning, Scheduling, and Control.pptx
PDF
IRJET- Trouble Shooting of Rotary Equipments using Vibration Anaysis
PDF
ME-MTT3871 - event
PDF
Team Dynamics and Technical Excellence.pdf
PPTX
Introduction-for_management_program(part_1)
PPTX
Safety life cycle seminar IEC61511
PDF
V&V Considerations In Implementing IEC61508-3
PPTX
safety instrumented system xSISpart.pptx
PDF
091814 Failure Mode Effect and Analysis (FMEA)
PDF
Bhadale group of companies quality standards catalogue
PDF
EESS 2018 Day 1 - Tim Gray
PPT
The information security audit
Lesson-1-Introduction-to-Maintenance.pdf
InTech-FOCUS-Process-Safety-Sept2020.pdf
SIL Awareness | Introduction to Safety Life-Cycle | IEC - 61508 & IEC- 61511 ...
Lean Implementation on IT Infrastructure Monitoring System
Functional_Safety_.pptx
More practical insights on the 20 critical controls
Process Safety Life Cycle Management: Best Practices and Processes
Safety system life cycle
Optimizing Maintenance Planning, Scheduling, and Control.pptx
IRJET- Trouble Shooting of Rotary Equipments using Vibration Anaysis
ME-MTT3871 - event
Team Dynamics and Technical Excellence.pdf
Introduction-for_management_program(part_1)
Safety life cycle seminar IEC61511
V&V Considerations In Implementing IEC61508-3
safety instrumented system xSISpart.pptx
091814 Failure Mode Effect and Analysis (FMEA)
Bhadale group of companies quality standards catalogue
EESS 2018 Day 1 - Tim Gray
The information security audit
Ad

Recently uploaded (20)

PPT
Comprehensive Java Training Deck - Advanced topics
DOCX
ENVIRONMENTAL PROTECTION AND MANAGEMENT (18CVL756)
PDF
THE PEDAGOGICAL NEXUS IN TEACHING ELECTRICITY CONCEPTS IN THE GRADE 9 NATURAL...
PPTX
SE unit 1.pptx by d.y.p.akurdi aaaaaaaaaaaa
PDF
Module 1 part 1.pdf engineering notes s7
PDF
ASPEN PLUS USER GUIDE - PROCESS SIMULATIONS
PDF
BBC NW_Tech Facilities_30 Odd Yrs Ago [J].pdf
PPTX
INTERNET OF THINGS - EMBEDDED SYSTEMS AND INTERNET OF THINGS
PPTX
1. Effective HSEW Induction Training - EMCO 2024, O&M.pptx
PPTX
quantum theory on the next future in.pptx
PDF
Engineering Solutions for Ethical Dilemmas in Healthcare (www.kiu.ac.ug)
PPT
UNIT-I Machine Learning Essentials for 2nd years
PPTX
Unit IILATHEACCESSORSANDATTACHMENTS.pptx
PPT
Unit - I.lathemachnespct=ificationsand ppt
PPTX
IOP Unit 1.pptx for btech 1st year students
DOCX
An investigation of the use of recycled crumb rubber as a partial replacement...
PDF
Introduction to Machine Learning -Basic concepts,Models and Description
PPTX
Software-Development-Life-Cycle-SDLC.pptx
PDF
Performance, energy consumption and costs: a comparative analysis of automati...
PDF
Software defined netwoks is useful to learn NFV and virtual Lans
Comprehensive Java Training Deck - Advanced topics
ENVIRONMENTAL PROTECTION AND MANAGEMENT (18CVL756)
THE PEDAGOGICAL NEXUS IN TEACHING ELECTRICITY CONCEPTS IN THE GRADE 9 NATURAL...
SE unit 1.pptx by d.y.p.akurdi aaaaaaaaaaaa
Module 1 part 1.pdf engineering notes s7
ASPEN PLUS USER GUIDE - PROCESS SIMULATIONS
BBC NW_Tech Facilities_30 Odd Yrs Ago [J].pdf
INTERNET OF THINGS - EMBEDDED SYSTEMS AND INTERNET OF THINGS
1. Effective HSEW Induction Training - EMCO 2024, O&M.pptx
quantum theory on the next future in.pptx
Engineering Solutions for Ethical Dilemmas in Healthcare (www.kiu.ac.ug)
UNIT-I Machine Learning Essentials for 2nd years
Unit IILATHEACCESSORSANDATTACHMENTS.pptx
Unit - I.lathemachnespct=ificationsand ppt
IOP Unit 1.pptx for btech 1st year students
An investigation of the use of recycled crumb rubber as a partial replacement...
Introduction to Machine Learning -Basic concepts,Models and Description
Software-Development-Life-Cycle-SDLC.pptx
Performance, energy consumption and costs: a comparative analysis of automati...
Software defined netwoks is useful to learn NFV and virtual Lans
Ad

Enhancing Facility Reliability W/EI.pptx

  • 1. Enhancing Facility Reliability: The Case for Using Energy Institute Guidelines Dr. Rana I. Shakoor CEO NTI Sol 1
  • 2. Speaker Rana I. Shakoor, PhD, MechEng Asset Integrity and Reliability Consultant CAT III Certified Vibration Analyst 20 years of CBM and Reliability services Instructor of MOBIUS Australia for ISO 18436-2 Cat I, II and III https://pk.linkedin.com/in/dr-rana-iqtidar-shakoor NTI Sol 2
  • 3. Agenda 1. Introduction 2. Why EI Guidelines Matter 3. Key Components of EI Guidelines 4. NTI Sol 5. Vibration Screening Approach 6. Recommendations 7. Conclusion NTI Sol 3
  • 4. Introduction Challenge: Vibration-induced fatigue failure Solution: Proactive risk management. EI Guidelines NTI Sol 4
  • 5. EI Guidelines Matter EI AVIFF (2nd Ed., 2008): Complements existing frameworks like API 570 for mechanical integrity. Focus on safety-critical and production-critical systems. NTI Sol 5
  • 6. Key Components of EI Guidelines Excitation Mechanisms: Flow-induced turbulence (FIT) Mechanical excitation and pulsation High-frequency acoustic excitation (AIV) Screening Tools: Qualitative assessments Detailed design evaluations Actionable Insights: Recommendations for clamps, braces, flow limits, and speed ranges. NTI Sol 6
  • 7. NTI Sol 7 How do you Know When to be Worried
  • 8. NTI Sol 8 Know Where to Focus your Efforts
  • 11. NTI Sol 11 Enter Piping Information
  • 12. NTI Sol 12 Enter Stream Information
  • 16. NTI Sol 16 NOVATech • Proactive Management: Identify risks before failures occur. • Cost Savings: Avoid unplanned downtimes and repair costs. • Enhanced Safety: Protect personnel and infrastructure. • Efficiency: Aligns with current data in Risk-Based Inspection (RBI) programs.
  • 17. NTI Sol 17 Case Study Insights • Assessment Scope: • Mechanical excitation in static pipework. • Flow-Induced Vibration (FIV) on process pipework. • Acoustic-Induced Vibration (AIV) on flare systems. • Outcomes: • Identified priority actions, including immediate and long-term measures. • Implementation of engineered solutions (e.g., anti-vibration braces).
  • 18. NTI Sol 18 • Adopt EI Guidelines: • As part of NTI SOL integrity management strategy. • Leverage Screening Tools: • Implement tools like Veridian for risk assessments. • Train Personnel: • Ensure teams understand and apply EI recommendations effectively. Recommendations
  • 19. NTI Sol 19 • Vibration risks are real and significant. • EI guidelines provide the framework for proactive management. • By adopting these practices, NTI SOL can ensure reliability, safety, and cost efficiency. Conclusion