International
OPEN ACCESS
Journal
Of Modern Engineering Research (IJMER)
| IJMER | ISSN: 2249–6645 | www.ijmer.com | Vol. 4 | Iss. 3 | Mar. 2014 | 36 |
Isolated Wind Hydro Hybrid Generation System with Battery
Storage
Nirmal S.1
, Rinku Scaria2
1
(Student, Department of Electrical and Electronics, FISAT, MG University, Kerala, India)
2
(Assistant Professor, Department of Electrical and Electronics, FISAT, MG University, Kerala, India)
I. INTRODUCTION
Renewable energy sources have attracted attention worldwide due to soaring prices of fossil fuels.
Renewable energy sources are considered to be important in improving the security of energy supplies by
decreasing the dependence on fossil fuels and in reducing the emissions of greenhouse gases. The viability of
isolated systems using renewable energy sources depends largely on regulations and stimulation measures.
Renewable energy sources are the natural energy resources that are inexhaustible, for example, wind, solar,
geothermal, biomass, and small hydro generation. Among the renewable energy sources, small hydro and wind
energy have the ability to complement each other.
Hybrid power systems are combinations of two or more energy conversion devices (e.g., electricity
generators or storage devices), or two or more fuels for the same device, that when integrated, overcome
limitations that may be inherent in either. System efficiencies are typically higher than that of the individual
technologies used separately, and higher reliability can be accomplished with redundant technologies and/or
energy storage. Some hybrid systems include both, which can simultaneously improve the quality and
availability of power.
In general, well-designed hybrid systems will substantially reduce diesel fuel consumption while
increasing system reliability. In addition to the diesel generator and the renewable energy generator, hybrid
systems consist of a battery bank for energy storage, a control system and particular system architecture that
allows optimal use of all components. Hybrid systems are potentially very cost-effective solutions to rural AC
electricity needs. For low load applications (< 10 kWh/day), wind/PV hybrid systems are very attractive. For
larger applications, wind/diesel hybrids are very attractive as long as a reasonable wind resource is available.
Bilateral and multilateral finance and market stimulation programs should be based on best service at least
cost.
There exists a wide collection of literatures on the modeling of WECS, specifically on the modeling of
individual components in the system which is mainly comprised of two subsystems, namely a wind turbine part
and an electric generator part. Detailed descriptions of these concepts can be found in references
[5],[6],[7].The conversion of mechanical power of the wind turbine into electrical power can be accomplished
by an electrical generator which can be a DC machine, a synchronous machine, or an induction machine. DC
machines were used widely until 1980s in smaller installations below 100 kW, because of its extremely easy
speed control. The presence of commutators in DC machines has low reliability and high maintenance.
The second kind of electric generators are synchronous generators suitable for constant speed systems.
Another choice for the electric generator in a WECS is a permanent magnet synchronous generator PMSG.
Abstract: In this paper, a new isolated wind- hydro hybrid generation system comprising one squirrel -
cage induction generator (SCIG) driven by a variable-speed wind turbine and another synchronous
generator driven by constant power hydro turbine feeding three phase four wire local loads is proposed.
The system utilizes two back to back connected voltage-source converters (VSCs) with a battery energy
storage system at their dc link. The main objective of the control algorithm for the VSC is to achieve
control of the magnitude and the frequency of the load voltage. The proposed wind-hydro hybrid system
has a capability of bidirectional active- and reactive-power flow, by which it controls the magnitude and
the frequency of the load voltage. The proposed electromechanical system is modelled and simulated in
MATLAB using Simulink.
Keywords: Battery energy storage system (BESS), squirrel cage induction generator (SCIG),
synchronous generator, wind energy conversion system (WECS), voltage source converter (VSC).
Keywords : Continuous Conduction Mode (CCM), Discontinuous Conduction Mode (DCM), Duty
cycle (D), Integrated double Buck–boost (IDBB), white power LED
Isolated Wind Hydro Hybrid Generation System with Battery Storage
| IJMER | ISSN: 2249–6645 | www.ijmer.com | Vol. 4 | Iss. 3 | Mar. 2014 | 37 |
But PMSGs have the weakness of uncontrollable magnetic field decaying over a period of time. Induction
generators on the the other hand have many advantages over conventional synchronous generators due to their
ruggedness, no need for DC field current, low maintenance requirements and low cost.
Many wind power systems for economy and reliability reasons used induction machines driven by a
wind turbine through a gear box as an electrical generator. Based on the rotor construction induction machine
can be one of two types based on the rotor construction, squirrel cage type or wound rotor type. Squirrel cage
rotor construction is popular because of its ruggedness, lower cost and simplicity of construction. Hence,
nowadays it is most commonly used.
In the case of stand-alone or autonomous systems, the issues of voltage and frequency control (VFC)
are very important. In references [17]–[18], the issues of VFC for stand-alone systems using SCIGs have been
addressed. However, maximum power tracking (MPT) could not be realized in this battery-based isolated
system employing SCIG operated at fixed speed. Reference [4] proposes an electronic load controller for VFC
at the stator terminals, and the controller transfers excess power from the hydropower generator to a dump
load, whenever the load is less than the generated power.
In this paper, a new three-phase four-wire autonomous (or isolated) wind–small hydro hybrid system
is proposed for isolated locations, which cannot be connected to the grid and where the wind potential and
hydro potential exist simultaneously. One such location in India is the Andaman and Nicobar group of islands
[24].The proposed system utilizes variable speed wind-turbine-driven SCIG and a constant-speed/constant-
power small hydro-turbine-driven synchronous generator.
A schematic diagram of a three-phase four-wire autonomous system is shown in Fig. 1.Two back-to-
back-connected pulse width modulation (PWM)-controlled insulated-gate-bipolar transistor (IGBTs)-based
Figure 1: Schematic of wind hydro hybrid system
voltage-source converters (VSCs) are connected between the stator windings of SCIG and the stator
windings of the PMSG to facilitate bidirectional power flow. The stator windings of the PMSG are connected to
the load terminals. The two VSCs can be called as the machine side converter and the load-side converter. The
system employs a battery energy storage system (BESS), which performs the function of load leveling in the
wake of uncertainty in the wind speed and variable loads. The BESS is connected at the dc bus of the PWM
converters. The advantage of using BESS on the dc bus of the PWM converters is that no additional converter
is required for transfer of power to or from the battery. Further, the battery keeps the dc-bus voltage constant
during load disturbances or load fluctuations. An inductor is connected in series with the BESS to remove
ripples from the battery current. A zigzag transformer is connected in parallel to the load for filtering zero-
sequence components of the load currents. Further, the zigzag windings trap triplen harmonic (third, ninth,
fifteenth, etc.) currents. As shown in Fig. 1, the zigzag transformer consists of three single-phase transformers
with a turn ratio of 1 : 1. The zigzag transformer is to be located as near to the load as possible. The neutral
terminal of the consumer loads is connected to the neutral terminal of the zigzag transformer.
In the conventional control of variable-speed SCIGs, the objective of the load-side converter (called as
grid-side converter in the grid-connected systems) is to maintain the dc-bus voltage constant at the dc link of
two back-to-back connected VSCs. Because in the proposed system the dc-bus voltage is kept constant by the
battery, the control objective of the load-side converter is different, i.e., to maintain an active power balance in
the system by transferring the excess power to the battery or for providing deficit power from the battery.
Further, the load-side converter provides the requisite reactive power for the load. .
Isolated Wind Hydro Hybrid Generation System with Battery Storage
| IJMER | ISSN: 2249–6645 | www.ijmer.com | Vol. 4 | Iss. 3 | Mar. 2014 | 38 |
A novel control strategy using indirect current control is proposed for the load-side converter. The
control signals for switching of the load-side converter are generated from the error of the reference and the
sensed stator currents of SCIG rather than by the errors of the load-side converter currents. With this control
strategy, the switching of the load-side converter is controlled to make the SCIG currents balanced and
sinusoidal at the nominal frequency. Any unbalance and harmonics in the load currents are compensated by
the zigzag transformer and the load-side converter. The proposed control algorithm for load-side converter
requires sensing of the load voltage and stator currents of SCIG.For the control purpose, sensing of load-side-
converter currents and load currents is not required, thus reducing the requirement of current sensors for the
control of load-side converter.
II. Principle Of Operation Of Hybrid System
Figure 2: Coefficient of performance versus tip speed ratio
The proposed system uses two back to-back-connected VSCs. These VSCs are referred to as the machine side
converter and load-side converter.The objective of the load-side converter is VFC at the load terminals by
maintaining active- and reactive-power balance. To achieve MPT, the SCIG is required to be operated at
optimal tip speed ratio as shown in Fig. 2. The tip speed ratio determines the SCIGw rotor-speed set point for a
given wind speed, and the mechanical power generated at this speed lies on the maximum power line of the
turbine.
The load-side converter is controlled for the regulation of load-voltage magnitude and load frequency.
Further, for maintaining the load-frequency constant, it is also essential that any surplus active power in the
system is diverted to the battery. Alternatively, the battery system should be able to supply any deficit in the
generated power. Similarly, the magnitude of the load voltage is maintained constant in the system by
balancing the reactive-power requirement of the load through the load side converter.
For the proposed system, there are three modes of operation. In the first mode, the required active power
of the load is less than the power generated by the synchronous generator and the excess power generated by
the PMSG is transferred to the BESS through the load-side converter. Moreover, the power generated by the
SCIG is transferred to the BESS. In the second mode, the required active power of the load is more than the
power generated by the PMSG but less than the total power generated by SCIG and PMSG. Thus, portion of
the power generated by SCIG is supplied to the load through the load-side converter and remaining power is
stored in BESS. In the third mode, the required active power of the load is more than the total power generated
by SCIG and PMSG. Thus, the deficit power is supplied by the BESS, and the power generated by PMSG and
the deficit met by BESS are supplied to the load through the load-side converter.
2.1 Control of Load-Side Converter
The objectives of the load-side converter are to maintain rated voltage and frequency at the load terminals
irrespective of connected load. The power balance in the system is maintained by diverting the surplus power
generated to the battery or by supplying power from the battery in case of deficit between generated power and
load requirement. Similarly, the required reactive power for the load is supplied by the load-side converter to
maintain constant value of the load voltage.
1) Generation of Reference Three-Phase SCIGw Currents:
The reference voltages (V*an, V*bn, and V*cn) for the control of the load voltages at time t are given as
V*an =√2 Vt sin(2πft) (1)
V*bn =√2 Vt sin(2πft − 120) (2)
V*cn =√2 Vt sin(2πft + 120) (3)
Isolated Wind Hydro Hybrid Generation System with Battery Storage
| IJMER | ISSN: 2249–6645 | www.ijmer.com | Vol. 4 | Iss. 3 | Mar. 2014 | 39 |
where f is the nominal frequency, which is considered as 50 Hz, and Vt is the rms phase-to-neutral load
voltage, which is considered as 240 V. The load voltages (van, vbn, and vcn) are sensed and compared with the
reference voltages. The error voltages (vanerr,vbnerr and vcnerr) at the nth sampling instant are calculated as
Vanerr(n) = V∗an(n) -Van(n) (4)
Vbnerr(n) = V∗bn(n)-Vbn(n). (5)
Vcnerr(n) = V∗cn(n) - Vcn(n) (6)
The reference three-phase SCIGw currents (i∗swa, i∗swb, i∗swc) are generated by feeding the voltage
error signals to PI voltage voltage controller with proportionate gain Kpv and integral gain Kiv. The reference
three-phase SCIGw currents are then compared with the sensed SCIGw currents (iswa, iswb, and iswc) to compute
the SCIGw current errors as
iswaerr =i∗swa− iswa (7)
iswberr =i∗swb− iswb (8)
iswcerr =i∗swc − iswc (9)
These current errors are amplified with gain (K=5), and the amplified signals are compared with a
fixed-frequency (10 kHz) triangular carrier wave of unity amplitude to generate gating signals for IGBTs of the
load-side converter. The sampling time of the controller is taken as 50μs, as this time is sufficient for
completion of calculations in a typical DSP controller.
III. DESIGN
3.1 Turbine
The wind hydro hybrid system being considered has a wind turbine of 55kW and a hydro turbine of 60 kW
respectively. The rating of the SCIGw is equal to the rating of the wind turbine, ie 55 kW.
3.2 Selection of Voltage of Dc Link And Battery Design
The dc-bus voltage (Vdc) must be more than the peak of the line voltage for satisfactory PWM control as
Vdc >2√(2/3)Vac ma (10)
where ma is the modulation index normally with a maximum value of one and Vac is the rms value of the line
voltage on the ac side of the PWM converter .The maximum rms value of the line voltage at the load terminals
is 415 V. Substituting this value in (10), Vdc should be more than 677.7 V. The voltage of the dc link and the
battery bank is selected as 700 V. The maximum rms value of the line voltage at the load terminals is 415 V.
Substituting this value in Vdc should be more than 677 V.The voltage of the dc link and the battery bank is
selected as 700 V.
Considering the ability of the proposed system to supply electricity to a load of 60 kW for 10 h, the
design storage capacity of the battery bank is taken as 600 kWh. . The commercially available battery bank
consists of cells of 12 V. The nominal capacity of each cell is taken as 150 A.h. To achieve a dc-bus voltage of
700 V through series connected cells of 12 V, the battery bank should have (700/12) = 59 number of cells in
series. Since the storage capacity of this combination is 150 A · h, and the total ampere hour required is (600
kW · h/700 V) = 857 A · h, the number of such sets required to be connected in parallel would be (857 A.h
/150 A.h) = 5.71 or 6 (selected). Thus, the battery bank consists of six parallel-connected sets of 59 series
connected battery cells.
Thevenin’s model is used to describe the energy storage of the battery in which the parallel combination
of capacitance (Cb) and resistance (Rb) in series with internal resistance (Rin) and an ideal voltage source of
voltage 700 V are used for modelling the battery.
Cb= (Kw.h∗3600∗1000)/0.5 (V2ocmax−V2ocmin) ) (11)
Taking the values of Vocmax = 750 V, Vocmin = 680 V, and Kw.h = 600, the value of Cb obtained is 43156 F.
3.3 Selection of Rating of Ac Inductor And Rc Filter On Ac Side Of Load-Side Converter
An inductor is used on the ac side of the load-side converter for boost function. inductance (Lf ) of the
inductive filter can be calculated as
Lf ={(√3/2)maVdc /(6a fsIr (p−p)Isc} (12)
where fs is the switching frequency and is equal to 10 kHz and Ir(p−p)lsc is the peak-to-peak ripple current in
the load-side converter and inductive filter. During transients, the current in the inductive filter is likely to be
more than the steady-state values. For calculation of inductance, current rating of 120% (a = 1.2) of steady-
state current is taken; modulation index ma is taken as one. Thus, the value of inductance of the filter is
Isolated Wind Hydro Hybrid Generation System with Battery Storage
| IJMER | ISSN: 2249–6645 | www.ijmer.com | Vol. 4 | Iss. 3 | Mar. 2014 | 40 |
0.76mH . A high-pass first-order filter tuned at half the switching frequency is used to filter out the noise from
the voltage at the load terminals. The time constant of the filter should be very small compared with the
fundamental time period (T), or
RC <<T/10. . (13)
When T = 20 ms, considering, C = 5μF, R can be chosen as 5 Ω. This combination offers a low impedance of
8.1 Ω for the harmonic voltage at a frequency of 5 kHz (half of the switching frequency).
3.4 Selection of Specifications Of Wind Turbine And Gear Ratio
The wind turbine is designed for 55 kW at 11.2 m/s, which is considered as rated wind speed. For wind speeds
below the rated wind speed, the mechanical power Pm captured by the turbine is a function of wind speed Vw,
radius of turbine rw, density of air ρ, and coefficient of performance Cp, and is given
Pm = 0.5Cpπr2
ρV 3
(14)
The relationship between the coefficient of performance and tip speed ratio for a typical wind turbine is shown
in Fig. 3.The maximum coefficient of performance (Cpmax) is achieved optimum tip ratio (λ∗w). The values of
Cpmax and λ∗w obtained from the Figure. 3.1 are 0.4411 and 5.66, respectively. Substituting, Pm = 55 kW, Cp
= 0.4411, wind speed Vw = 11.2 m/s, and density of air ρ = 1.1544 kg/m3 in 4.1, the radius of the wind turbine
rw is obtained as 7.5m.
At 11.2 m/s wind speed, the generator rotor speed is considered as 100 rad/s. Substituting the value of tip
speed ratio = 5.66, radius of the wind turbine = 7.5 m,wind speed = 11.2 m/s, and generator speed = 100 rad/s,
the gear ratio is obtained as
ηw = ωrwrw/λwVw (15)
=100∗7.5/5.66∗11.2
= 11.811 ∼=12 (selected).
Above equations are used to simulate wind turbine. In the real turbines above the rated wind speed, the blade-
pitch control comes in operation, and the turbine blades are pitched slightly out of the wind to limit power.
Conversely, the blades are turned back into the wind whenever the wind drops again. The ratings and the
specifications of the selected components of the hybrid system based on the aforementioned design procedure
are used for simulation purpose.
IV. Simulation Results
The performance of the wind hydro hybrid system is demonstrated in figure 2.1. A balanced linear load
and a secondary dynamic load at wind speed of 11m/s is connected to the above network. At this speed the
wind turbine generates 55 kW and the hydro generates 60 kW. So the total power generation is 115 kW. The
model is tested for the following loads.
1. Half load of 57.5 kW
2. Full load of 115 kW
3. Overload of 10%
In each case the output waveforms of load voltage, load current and load frequency are studied. The
model is working satisfactorily for the above mentioned loads. The waveforms are purely sinusoidal as
expected for the above three conditions. Also, under the above conditions both the magnitude and frequency of
the load voltage are maintained constant. The obtained waveforms are shown in figures.
Figure 4.1: Simulink Block diagram of proposed system
Isolated Wind Hydro Hybrid Generation System with Battery Storage
| IJMER | ISSN: 2249–6645 | www.ijmer.com | Vol. 4 | Iss. 3 | Mar. 2014 | 41 |
Figure 4.2 Output voltage and current waveforms for half load
Figure 4.3: Frequency waveform for half load
Figure 4.4 Output voltage and current waveforms for full load
Isolated Wind Hydro Hybrid Generation System with Battery Storage
| IJMER | ISSN: 2249–6645 | www.ijmer.com | Vol. 4 | Iss. 3 | Mar. 2014 | 42 |
Figure 4.5: Frequency waveform for full load
Figure 4.6: Output voltage and current waveforms for over load
Figure 4.7: Frequency waveform for over load
Isolated Wind Hydro Hybrid Generation System with Battery Storage
| IJMER | ISSN: 2249–6645 | www.ijmer.com | Vol. 4 | Iss. 3 | Mar. 2014 | 43 |
V. Conclusion
Among the renewable energy sources, small hydro and wind energy have the ability to complement each
other. Further, there are many isolated locations which cannot be connected to the grid and where the wind
potential and hydro potential exist simultaneously. For such locations, a new three-phase four wire autonomous
wind-hydro hybrid system, using one cage generator driven by wind turbine and another synchronous
generator driven by hydro turbine along with BESS, has been modeled and simulated in MATLAB using
Simulink and Sim Power System tool boxes. The design procedure for selection of various components has
been demonstrated for the proposed hybrid system. The performance of the proposed hybrid system has been
demonstrated under different electrical (consumer load variation) and mechanical (with wind-speed variation)
dynamic conditions. It has been demonstrated that the proposed hybrid system performs satisfactorily for linear
loads while maintaining constant voltage and frequency.
REFERENCES
[1] Puneet.K.Goel, Bhim Singh, S.S Murthy and Navin Kishore “Isolated Wind-Hydro Hybrid System Using Cage
Generators and Battery Storage”, In IEEE Trans, Industrial Electronics.vol 58, no.4, April 2011.
[2] L. L. Lai and T. F. Chan, Distributed Generation: Induction and Permanent Magnet Generators. West Sussex,
U.K.: Wiley, 2007, ch. 1.
[3] E. D. Castronuovo and J. A. Pecas, “Bounding active power generation of a wind-hydro power plant,” in Proc. 8th
Conf. Probabilistic Methods Appl. Power Syst., Ames, IA, 2004, pp. 705–710.
[4] B. Singh, S. S. Murthy, and S. Gupta, “ An improved electronic load controller for self-excited induction generator
in micro-Hydel applications,” in Proc. IEEE Annu. Conf. Ind. Electron. Soc., Nov. 2003, vol. 3,pp. 2741–2746.
[5] J. B. Ekanayake, “Induction generators for small hydro schemes,” IEEE Power Eng. J., vol. 16, no. 2, pp. 61–67,
2002.
[6] M. Molinas, J. A. Suul, and T. Undeland, “Low voltage ride through of wind farms with cage generators:
STATCOM versus SVC,” IEEE Trans.Power Electron., vol. 23, no. 3, pp. 1104–1117, May 2008.
[7] S. Ganesh Kumar, S. Abdul Rahman, and G. Uma, “Operation of selfexcited induction generator through matrix
converter,” in Proc. 23rd Annu. IEEE APEC, Feb. 24–28, 2008, pp. 999–1002.
[8] G. Quinonez-Varela and A. Cruden, “Modelling and validation of a squirrel cage induction generator wind turbine
during connection to the local grid,” IET Gener., Transmiss. Distrib., vol. 2, no. 2, pp. 301–309,Mar. 2008.
[9] E. Diaz-Dorado, C. Carrillo, and J. Cidras, “Control algorithm for coordinated
reactive power compensation in a wind park,” IEEE Trans. Energy Convers., vol. 23, no. 4, pp. 1064–1072, Dec.
2008.
[10] L. Tamas and Z. Szekely, “Modeling and simulation of an induction drive with application to a small wind turbine
generator,” in Proc. IEEE Int. Conf. Autom., Quality Test., Robot., May 22–25, 2008, pp. 429–433.
[11] A. Luna, P. Rodriguez, R. Teodorescu, and F. Blaabjerg, “Low voltage ride through strategies for SCIG wind
turbines in distributed power generation systems,” in Proc. IEEE Power Electron. Spec. Conf., Jun. 15–19,
2008,pp. 2333–2339.
[13] B. Fox, D. Flynn, L. Bryans, N. Jenkins, D. Milborrow, M. O’Malley,R. Watson, and O. Anaya-Lara, Wind Power
Integration Connection and System Operational Aspects. London, U.K.: IET, 2007, ch. 3.
[14] S. S. Murthy, B. Singh, P. K. Goel, and S. K. Tiwari, “A comparative study of fixed speed and variable speed wind
energy conversion systems feeding the grid,” in Proc. IEEE PEDS, Nov. 2007, pp. 736–743.
[15] G. Poddar, A. Joseph, and A. K. Unnikrishnan, “Sensorless variable speed controller for existing fixed-speed wind
power generator with unity-power-factor operation,” IEEE Trans. Ind. Electron., vol. 50, no. 5,pp. 1007–1015, Oct.
2003.
[16] M. G. Simoes, B. K. Bose, and R. T. Spiegel, “Fuzzy-logic-based intelligent control of a variable speed cage
machine wind generation system,”IEEE Trans. Power Electron., vol. 12, no. 1, pp. 87–95, Jan. 1997.
[17] D. Joshi, K. S. Sindhu, and M. K. Soni, “Constant voltage constant frequency operation for a self-excited induction
generator,” IEEE Trans.Energy Convers., vol. 21, no. 1, pp. 228–234, Mar. 2006
[18] B. Singh, S. S. Murthy, and S. Gupta, “Analysis and design of STATCOM based
voltage regulator for self-excited induction generators,” IEEE Trans. Energy Convers., vol. 19, no. 4, pp. 783–790,
Dec. 2004.
[19] J. G. Slootweg, S. W. H. Haan, H. Polinder, and W. L. Kling, “General model for representing variable speed wind
turbines in power system dynamics simulations,” IEEE Trans. Power Syst., vol. 18, no. 1, pp. 144–151, Feb. 2003.

More Related Content

PDF
Renewable energy for bts (2)
PDF
ROLE OF POWER ELECTRONICS IN NON-RENEWABLE AND RENEWABLE ENERGY SYSTEMS
PDF
Review Grid Connected Wind Photovoltaic Cogeneration Using Back to Back Volta...
PPTX
Role of power electronics in renewable and non renewable sources
PDF
Power electronics in Wind Turbine Systems
PDF
Introduction 1
PDF
Modeling and Steady State Response Analysis of Interconnected Hybrid Renewabl...
PDF
Modeling and Simulation of an electrical micro-grid using MATLAB Simulink Sum...
Renewable energy for bts (2)
ROLE OF POWER ELECTRONICS IN NON-RENEWABLE AND RENEWABLE ENERGY SYSTEMS
Review Grid Connected Wind Photovoltaic Cogeneration Using Back to Back Volta...
Role of power electronics in renewable and non renewable sources
Power electronics in Wind Turbine Systems
Introduction 1
Modeling and Steady State Response Analysis of Interconnected Hybrid Renewabl...
Modeling and Simulation of an electrical micro-grid using MATLAB Simulink Sum...

What's hot (20)

PDF
DESIGN AND MODELLING OF STANDALONE HYBRID POWER SYSTEM WITH MATLAB/SIMULINK
PDF
Economic evaluation of hybrid wind-pv-diesel of grid power system
PDF
Px7301 power electronics for renewable energy systems
PDF
Simulation of MPPT Algorithm Based Hybrid Wind-Solar-Fuel Cell Energy System
PPTX
Advance Power Electronic Converters for Renewable Energy Systems
PDF
Operation and Control of Grid Connected Hybrid AC/DC Microgrid using Various RES
PPTX
Impacts of Distributed Generation on Power Quality
PPTX
Power electronics technology in wind turbine system
PPTX
Future on power electronics for wind turbine systems
PPTX
Control Scheme for a Stand-Alone Wind Energy Conversion System
PDF
Microogrid with diesel generator ,wind turbine and solar farm with optimistic...
PDF
K010516873
PDF
Power Electronic Interface
PDF
An Intelligent Power Management Investigation for Stand-alone Hybrid System U...
PPTX
ENERGY MANAGEMENT SYSTEM FOR CRITICAL LOADS USING POWER ELECTRONICS
PDF
Battery energy storage and power electronics based voltage and frequency cont...
PPTX
integration of pumped hydro storage into renewable energy sources for support...
PDF
Hybrid powersystems
PPTX
HYBRID Microgrid Integration Using Fuzzy Logic Controller
DESIGN AND MODELLING OF STANDALONE HYBRID POWER SYSTEM WITH MATLAB/SIMULINK
Economic evaluation of hybrid wind-pv-diesel of grid power system
Px7301 power electronics for renewable energy systems
Simulation of MPPT Algorithm Based Hybrid Wind-Solar-Fuel Cell Energy System
Advance Power Electronic Converters for Renewable Energy Systems
Operation and Control of Grid Connected Hybrid AC/DC Microgrid using Various RES
Impacts of Distributed Generation on Power Quality
Power electronics technology in wind turbine system
Future on power electronics for wind turbine systems
Control Scheme for a Stand-Alone Wind Energy Conversion System
Microogrid with diesel generator ,wind turbine and solar farm with optimistic...
K010516873
Power Electronic Interface
An Intelligent Power Management Investigation for Stand-alone Hybrid System U...
ENERGY MANAGEMENT SYSTEM FOR CRITICAL LOADS USING POWER ELECTRONICS
Battery energy storage and power electronics based voltage and frequency cont...
integration of pumped hydro storage into renewable energy sources for support...
Hybrid powersystems
HYBRID Microgrid Integration Using Fuzzy Logic Controller
Ad

Viewers also liked (20)

PPTX
Hybrid power system
PDF
The Eighteenth Annual Newfoundland Electrical and Computer Engineering Confer...
PPTX
HYBRID POWER GENERATION SYSTEM FOR DOMESTIC PIRPOSEES
PDF
Regression analysis of shot peening process for performance characteristics o...
PDF
Experimental Investigation of Electrode Wear in Die-Sinking EDM on Different ...
PDF
By32908914
PDF
A02414491453
PPTX
Как сделать документы красивыми
PDF
| IJMER | ISSN: 2249–6645 | www.ijmer.com | Vol. 4 | Iss. 4 | April 2014 ...
PDF
HMM-Based Speech Synthesis
PDF
Numerical Modelling of Wind Patterns around a Solar Parabolic Trough Collector
PDF
Ax32739746
PDF
A brave new web - A talk about Web Components
PDF
Integration of Struts & Spring & Hibernate for Enterprise Applications
PDF
Ds3211761179
PDF
Creating a ppc campaign to improve seo
PDF
Ijmer 46060106
PDF
Security of Data in Cloud Environment Using DPaaS
PDF
A Review on Brain Disorder Segmentation in MR Images
PDF
Improvement of Surface Roughness of Nickel Alloy Specimen by Removing Recast ...
Hybrid power system
The Eighteenth Annual Newfoundland Electrical and Computer Engineering Confer...
HYBRID POWER GENERATION SYSTEM FOR DOMESTIC PIRPOSEES
Regression analysis of shot peening process for performance characteristics o...
Experimental Investigation of Electrode Wear in Die-Sinking EDM on Different ...
By32908914
A02414491453
Как сделать документы красивыми
| IJMER | ISSN: 2249–6645 | www.ijmer.com | Vol. 4 | Iss. 4 | April 2014 ...
HMM-Based Speech Synthesis
Numerical Modelling of Wind Patterns around a Solar Parabolic Trough Collector
Ax32739746
A brave new web - A talk about Web Components
Integration of Struts & Spring & Hibernate for Enterprise Applications
Ds3211761179
Creating a ppc campaign to improve seo
Ijmer 46060106
Security of Data in Cloud Environment Using DPaaS
A Review on Brain Disorder Segmentation in MR Images
Improvement of Surface Roughness of Nickel Alloy Specimen by Removing Recast ...
Ad

Similar to Isolated Wind Hydro Hybrid Generation System with Battery Storage (20)

PDF
Power Quality Improvement of a Distributed Generation Power System
PDF
paper_1.pdf
PPTX
Isolated Wind–Hydro Hybrid System Using Cage Generators and.pptx
PDF
Design of Integrated Generator-Rectifier System to Determine the Maximum Powe...
PDF
Gm3611661171
PDF
a new pv/fuel cell based bi-directional pwm converter for micro grid applicat...
PDF
Energy management of PV wind based microgrid with hybrid energy storage systems
PDF
IRJET- Energy Management and Control for Grid Connected Hybrid Energy Storage...
PDF
REDUCTION OF CHARGING TIME OF PLUG-IN ELECTRIC VEHICLE USING SMART CHARGING A...
PDF
08529419.pdf
PDF
Analysis of Fuel Cell Based Multilevel DC-DC Boost Converter for Induction Motor
PDF
2013 IEEE Eee m.tech 2013 titles with abstracts
PDF
Performance Analysis of DC Micro Grid with PV-Fuel Cell Hybrid Generation
PDF
Design and Control of Micro Grid Fed by Renewable Energy Generating Sources
PDF
Energy management system for pv and battery system
PDF
PV and battery base energy management system
PDF
Space Vector Modulation Based Direct Matrix Converter for Stand-Alone system
PDF
Modelling and simulation for energy management of a hybrid microgrid with dro...
PDF
IRJET- Power Quality Improvement in SEIG
DOC
2018 2019 ieee power electronics and drives title and abstract
Power Quality Improvement of a Distributed Generation Power System
paper_1.pdf
Isolated Wind–Hydro Hybrid System Using Cage Generators and.pptx
Design of Integrated Generator-Rectifier System to Determine the Maximum Powe...
Gm3611661171
a new pv/fuel cell based bi-directional pwm converter for micro grid applicat...
Energy management of PV wind based microgrid with hybrid energy storage systems
IRJET- Energy Management and Control for Grid Connected Hybrid Energy Storage...
REDUCTION OF CHARGING TIME OF PLUG-IN ELECTRIC VEHICLE USING SMART CHARGING A...
08529419.pdf
Analysis of Fuel Cell Based Multilevel DC-DC Boost Converter for Induction Motor
2013 IEEE Eee m.tech 2013 titles with abstracts
Performance Analysis of DC Micro Grid with PV-Fuel Cell Hybrid Generation
Design and Control of Micro Grid Fed by Renewable Energy Generating Sources
Energy management system for pv and battery system
PV and battery base energy management system
Space Vector Modulation Based Direct Matrix Converter for Stand-Alone system
Modelling and simulation for energy management of a hybrid microgrid with dro...
IRJET- Power Quality Improvement in SEIG
2018 2019 ieee power electronics and drives title and abstract

More from IJMER (20)

PDF
A Study on Translucent Concrete Product and Its Properties by Using Optical F...
PDF
Developing Cost Effective Automation for Cotton Seed Delinting
PDF
Study & Testing Of Bio-Composite Material Based On Munja Fibre
PDF
Hybrid Engine (Stirling Engine + IC Engine + Electric Motor)
PDF
Fabrication & Characterization of Bio Composite Materials Based On Sunnhemp F...
PDF
Geochemistry and Genesis of Kammatturu Iron Ores of Devagiri Formation, Sandu...
PDF
Experimental Investigation on Characteristic Study of the Carbon Steel C45 in...
PDF
Non linear analysis of Robot Gun Support Structure using Equivalent Dynamic A...
PDF
Static Analysis of Go-Kart Chassis by Analytical and Solid Works Simulation
PDF
High Speed Effortless Bicycle
PDF
Microcontroller Based Automatic Sprinkler Irrigation System
PDF
On some locally closed sets and spaces in Ideal Topological Spaces
PDF
Intrusion Detection and Forensics based on decision tree and Association rule...
PDF
Natural Language Ambiguity and its Effect on Machine Learning
PDF
Evolvea Frameworkfor SelectingPrime Software DevelopmentProcess
PDF
Material Parameter and Effect of Thermal Load on Functionally Graded Cylinders
PDF
Studies On Energy Conservation And Audit
PDF
An Implementation of I2C Slave Interface using Verilog HDL
PDF
Discrete Model of Two Predators competing for One Prey
PDF
Application of Parabolic Trough Collectorfor Reduction of Pressure Drop in Oi...
A Study on Translucent Concrete Product and Its Properties by Using Optical F...
Developing Cost Effective Automation for Cotton Seed Delinting
Study & Testing Of Bio-Composite Material Based On Munja Fibre
Hybrid Engine (Stirling Engine + IC Engine + Electric Motor)
Fabrication & Characterization of Bio Composite Materials Based On Sunnhemp F...
Geochemistry and Genesis of Kammatturu Iron Ores of Devagiri Formation, Sandu...
Experimental Investigation on Characteristic Study of the Carbon Steel C45 in...
Non linear analysis of Robot Gun Support Structure using Equivalent Dynamic A...
Static Analysis of Go-Kart Chassis by Analytical and Solid Works Simulation
High Speed Effortless Bicycle
Microcontroller Based Automatic Sprinkler Irrigation System
On some locally closed sets and spaces in Ideal Topological Spaces
Intrusion Detection and Forensics based on decision tree and Association rule...
Natural Language Ambiguity and its Effect on Machine Learning
Evolvea Frameworkfor SelectingPrime Software DevelopmentProcess
Material Parameter and Effect of Thermal Load on Functionally Graded Cylinders
Studies On Energy Conservation And Audit
An Implementation of I2C Slave Interface using Verilog HDL
Discrete Model of Two Predators competing for One Prey
Application of Parabolic Trough Collectorfor Reduction of Pressure Drop in Oi...

Recently uploaded (20)

PDF
Cryptography and Network Security-Module-I.pdf
PPTX
DATA STRCUTURE LABORATORY -BCSL305(PRG1)
PPTX
WN UNIT-II CH4_MKaruna_BapatlaEngineeringCollege.pptx
PDF
[jvmmeetup] next-gen integration with apache camel and quarkus.pdf
PPTX
SE unit 1.pptx by d.y.p.akurdi aaaaaaaaaaaa
PDF
electrical machines course file-anna university
PPTX
Unit IImachinemachinetoolopeartions.pptx
PDF
Lesson 3 .pdf
PDF
Beginners-Guide-to-Artificial-Intelligence.pdf
PPTX
AI-Reporting for Emerging Technologies(BS Computer Engineering)
PDF
LS-6-Digital-Literacy (1) K12 CURRICULUM .pdf
PPTX
Design ,Art Across Digital Realities and eXtended Reality
PDF
Project_Mgmt_Institute_-Marc Marc Marc .pdf
PDF
VTU IOT LAB MANUAL (BCS701) Computer science and Engineering
PDF
ASPEN PLUS USER GUIDE - PROCESS SIMULATIONS
DOCX
ENVIRONMENTAL PROTECTION AND MANAGEMENT (18CVL756)
PPTX
ARCHITECTURE AND PROGRAMMING OF EMBEDDED SYSTEMS
PDF
MACCAFERRY GUIA GAVIONES TERRAPLENES EN ESPAÑOL
PPTX
SE unit 1.pptx aaahshdhajdviwhsiehebeiwheiebeiev
PDF
Mechanics of materials week 2 rajeshwari
Cryptography and Network Security-Module-I.pdf
DATA STRCUTURE LABORATORY -BCSL305(PRG1)
WN UNIT-II CH4_MKaruna_BapatlaEngineeringCollege.pptx
[jvmmeetup] next-gen integration with apache camel and quarkus.pdf
SE unit 1.pptx by d.y.p.akurdi aaaaaaaaaaaa
electrical machines course file-anna university
Unit IImachinemachinetoolopeartions.pptx
Lesson 3 .pdf
Beginners-Guide-to-Artificial-Intelligence.pdf
AI-Reporting for Emerging Technologies(BS Computer Engineering)
LS-6-Digital-Literacy (1) K12 CURRICULUM .pdf
Design ,Art Across Digital Realities and eXtended Reality
Project_Mgmt_Institute_-Marc Marc Marc .pdf
VTU IOT LAB MANUAL (BCS701) Computer science and Engineering
ASPEN PLUS USER GUIDE - PROCESS SIMULATIONS
ENVIRONMENTAL PROTECTION AND MANAGEMENT (18CVL756)
ARCHITECTURE AND PROGRAMMING OF EMBEDDED SYSTEMS
MACCAFERRY GUIA GAVIONES TERRAPLENES EN ESPAÑOL
SE unit 1.pptx aaahshdhajdviwhsiehebeiwheiebeiev
Mechanics of materials week 2 rajeshwari

Isolated Wind Hydro Hybrid Generation System with Battery Storage

  • 1. International OPEN ACCESS Journal Of Modern Engineering Research (IJMER) | IJMER | ISSN: 2249–6645 | www.ijmer.com | Vol. 4 | Iss. 3 | Mar. 2014 | 36 | Isolated Wind Hydro Hybrid Generation System with Battery Storage Nirmal S.1 , Rinku Scaria2 1 (Student, Department of Electrical and Electronics, FISAT, MG University, Kerala, India) 2 (Assistant Professor, Department of Electrical and Electronics, FISAT, MG University, Kerala, India) I. INTRODUCTION Renewable energy sources have attracted attention worldwide due to soaring prices of fossil fuels. Renewable energy sources are considered to be important in improving the security of energy supplies by decreasing the dependence on fossil fuels and in reducing the emissions of greenhouse gases. The viability of isolated systems using renewable energy sources depends largely on regulations and stimulation measures. Renewable energy sources are the natural energy resources that are inexhaustible, for example, wind, solar, geothermal, biomass, and small hydro generation. Among the renewable energy sources, small hydro and wind energy have the ability to complement each other. Hybrid power systems are combinations of two or more energy conversion devices (e.g., electricity generators or storage devices), or two or more fuels for the same device, that when integrated, overcome limitations that may be inherent in either. System efficiencies are typically higher than that of the individual technologies used separately, and higher reliability can be accomplished with redundant technologies and/or energy storage. Some hybrid systems include both, which can simultaneously improve the quality and availability of power. In general, well-designed hybrid systems will substantially reduce diesel fuel consumption while increasing system reliability. In addition to the diesel generator and the renewable energy generator, hybrid systems consist of a battery bank for energy storage, a control system and particular system architecture that allows optimal use of all components. Hybrid systems are potentially very cost-effective solutions to rural AC electricity needs. For low load applications (< 10 kWh/day), wind/PV hybrid systems are very attractive. For larger applications, wind/diesel hybrids are very attractive as long as a reasonable wind resource is available. Bilateral and multilateral finance and market stimulation programs should be based on best service at least cost. There exists a wide collection of literatures on the modeling of WECS, specifically on the modeling of individual components in the system which is mainly comprised of two subsystems, namely a wind turbine part and an electric generator part. Detailed descriptions of these concepts can be found in references [5],[6],[7].The conversion of mechanical power of the wind turbine into electrical power can be accomplished by an electrical generator which can be a DC machine, a synchronous machine, or an induction machine. DC machines were used widely until 1980s in smaller installations below 100 kW, because of its extremely easy speed control. The presence of commutators in DC machines has low reliability and high maintenance. The second kind of electric generators are synchronous generators suitable for constant speed systems. Another choice for the electric generator in a WECS is a permanent magnet synchronous generator PMSG. Abstract: In this paper, a new isolated wind- hydro hybrid generation system comprising one squirrel - cage induction generator (SCIG) driven by a variable-speed wind turbine and another synchronous generator driven by constant power hydro turbine feeding three phase four wire local loads is proposed. The system utilizes two back to back connected voltage-source converters (VSCs) with a battery energy storage system at their dc link. The main objective of the control algorithm for the VSC is to achieve control of the magnitude and the frequency of the load voltage. The proposed wind-hydro hybrid system has a capability of bidirectional active- and reactive-power flow, by which it controls the magnitude and the frequency of the load voltage. The proposed electromechanical system is modelled and simulated in MATLAB using Simulink. Keywords: Battery energy storage system (BESS), squirrel cage induction generator (SCIG), synchronous generator, wind energy conversion system (WECS), voltage source converter (VSC). Keywords : Continuous Conduction Mode (CCM), Discontinuous Conduction Mode (DCM), Duty cycle (D), Integrated double Buck–boost (IDBB), white power LED
  • 2. Isolated Wind Hydro Hybrid Generation System with Battery Storage | IJMER | ISSN: 2249–6645 | www.ijmer.com | Vol. 4 | Iss. 3 | Mar. 2014 | 37 | But PMSGs have the weakness of uncontrollable magnetic field decaying over a period of time. Induction generators on the the other hand have many advantages over conventional synchronous generators due to their ruggedness, no need for DC field current, low maintenance requirements and low cost. Many wind power systems for economy and reliability reasons used induction machines driven by a wind turbine through a gear box as an electrical generator. Based on the rotor construction induction machine can be one of two types based on the rotor construction, squirrel cage type or wound rotor type. Squirrel cage rotor construction is popular because of its ruggedness, lower cost and simplicity of construction. Hence, nowadays it is most commonly used. In the case of stand-alone or autonomous systems, the issues of voltage and frequency control (VFC) are very important. In references [17]–[18], the issues of VFC for stand-alone systems using SCIGs have been addressed. However, maximum power tracking (MPT) could not be realized in this battery-based isolated system employing SCIG operated at fixed speed. Reference [4] proposes an electronic load controller for VFC at the stator terminals, and the controller transfers excess power from the hydropower generator to a dump load, whenever the load is less than the generated power. In this paper, a new three-phase four-wire autonomous (or isolated) wind–small hydro hybrid system is proposed for isolated locations, which cannot be connected to the grid and where the wind potential and hydro potential exist simultaneously. One such location in India is the Andaman and Nicobar group of islands [24].The proposed system utilizes variable speed wind-turbine-driven SCIG and a constant-speed/constant- power small hydro-turbine-driven synchronous generator. A schematic diagram of a three-phase four-wire autonomous system is shown in Fig. 1.Two back-to- back-connected pulse width modulation (PWM)-controlled insulated-gate-bipolar transistor (IGBTs)-based Figure 1: Schematic of wind hydro hybrid system voltage-source converters (VSCs) are connected between the stator windings of SCIG and the stator windings of the PMSG to facilitate bidirectional power flow. The stator windings of the PMSG are connected to the load terminals. The two VSCs can be called as the machine side converter and the load-side converter. The system employs a battery energy storage system (BESS), which performs the function of load leveling in the wake of uncertainty in the wind speed and variable loads. The BESS is connected at the dc bus of the PWM converters. The advantage of using BESS on the dc bus of the PWM converters is that no additional converter is required for transfer of power to or from the battery. Further, the battery keeps the dc-bus voltage constant during load disturbances or load fluctuations. An inductor is connected in series with the BESS to remove ripples from the battery current. A zigzag transformer is connected in parallel to the load for filtering zero- sequence components of the load currents. Further, the zigzag windings trap triplen harmonic (third, ninth, fifteenth, etc.) currents. As shown in Fig. 1, the zigzag transformer consists of three single-phase transformers with a turn ratio of 1 : 1. The zigzag transformer is to be located as near to the load as possible. The neutral terminal of the consumer loads is connected to the neutral terminal of the zigzag transformer. In the conventional control of variable-speed SCIGs, the objective of the load-side converter (called as grid-side converter in the grid-connected systems) is to maintain the dc-bus voltage constant at the dc link of two back-to-back connected VSCs. Because in the proposed system the dc-bus voltage is kept constant by the battery, the control objective of the load-side converter is different, i.e., to maintain an active power balance in the system by transferring the excess power to the battery or for providing deficit power from the battery. Further, the load-side converter provides the requisite reactive power for the load. .
  • 3. Isolated Wind Hydro Hybrid Generation System with Battery Storage | IJMER | ISSN: 2249–6645 | www.ijmer.com | Vol. 4 | Iss. 3 | Mar. 2014 | 38 | A novel control strategy using indirect current control is proposed for the load-side converter. The control signals for switching of the load-side converter are generated from the error of the reference and the sensed stator currents of SCIG rather than by the errors of the load-side converter currents. With this control strategy, the switching of the load-side converter is controlled to make the SCIG currents balanced and sinusoidal at the nominal frequency. Any unbalance and harmonics in the load currents are compensated by the zigzag transformer and the load-side converter. The proposed control algorithm for load-side converter requires sensing of the load voltage and stator currents of SCIG.For the control purpose, sensing of load-side- converter currents and load currents is not required, thus reducing the requirement of current sensors for the control of load-side converter. II. Principle Of Operation Of Hybrid System Figure 2: Coefficient of performance versus tip speed ratio The proposed system uses two back to-back-connected VSCs. These VSCs are referred to as the machine side converter and load-side converter.The objective of the load-side converter is VFC at the load terminals by maintaining active- and reactive-power balance. To achieve MPT, the SCIG is required to be operated at optimal tip speed ratio as shown in Fig. 2. The tip speed ratio determines the SCIGw rotor-speed set point for a given wind speed, and the mechanical power generated at this speed lies on the maximum power line of the turbine. The load-side converter is controlled for the regulation of load-voltage magnitude and load frequency. Further, for maintaining the load-frequency constant, it is also essential that any surplus active power in the system is diverted to the battery. Alternatively, the battery system should be able to supply any deficit in the generated power. Similarly, the magnitude of the load voltage is maintained constant in the system by balancing the reactive-power requirement of the load through the load side converter. For the proposed system, there are three modes of operation. In the first mode, the required active power of the load is less than the power generated by the synchronous generator and the excess power generated by the PMSG is transferred to the BESS through the load-side converter. Moreover, the power generated by the SCIG is transferred to the BESS. In the second mode, the required active power of the load is more than the power generated by the PMSG but less than the total power generated by SCIG and PMSG. Thus, portion of the power generated by SCIG is supplied to the load through the load-side converter and remaining power is stored in BESS. In the third mode, the required active power of the load is more than the total power generated by SCIG and PMSG. Thus, the deficit power is supplied by the BESS, and the power generated by PMSG and the deficit met by BESS are supplied to the load through the load-side converter. 2.1 Control of Load-Side Converter The objectives of the load-side converter are to maintain rated voltage and frequency at the load terminals irrespective of connected load. The power balance in the system is maintained by diverting the surplus power generated to the battery or by supplying power from the battery in case of deficit between generated power and load requirement. Similarly, the required reactive power for the load is supplied by the load-side converter to maintain constant value of the load voltage. 1) Generation of Reference Three-Phase SCIGw Currents: The reference voltages (V*an, V*bn, and V*cn) for the control of the load voltages at time t are given as V*an =√2 Vt sin(2πft) (1) V*bn =√2 Vt sin(2πft − 120) (2) V*cn =√2 Vt sin(2πft + 120) (3)
  • 4. Isolated Wind Hydro Hybrid Generation System with Battery Storage | IJMER | ISSN: 2249–6645 | www.ijmer.com | Vol. 4 | Iss. 3 | Mar. 2014 | 39 | where f is the nominal frequency, which is considered as 50 Hz, and Vt is the rms phase-to-neutral load voltage, which is considered as 240 V. The load voltages (van, vbn, and vcn) are sensed and compared with the reference voltages. The error voltages (vanerr,vbnerr and vcnerr) at the nth sampling instant are calculated as Vanerr(n) = V∗an(n) -Van(n) (4) Vbnerr(n) = V∗bn(n)-Vbn(n). (5) Vcnerr(n) = V∗cn(n) - Vcn(n) (6) The reference three-phase SCIGw currents (i∗swa, i∗swb, i∗swc) are generated by feeding the voltage error signals to PI voltage voltage controller with proportionate gain Kpv and integral gain Kiv. The reference three-phase SCIGw currents are then compared with the sensed SCIGw currents (iswa, iswb, and iswc) to compute the SCIGw current errors as iswaerr =i∗swa− iswa (7) iswberr =i∗swb− iswb (8) iswcerr =i∗swc − iswc (9) These current errors are amplified with gain (K=5), and the amplified signals are compared with a fixed-frequency (10 kHz) triangular carrier wave of unity amplitude to generate gating signals for IGBTs of the load-side converter. The sampling time of the controller is taken as 50μs, as this time is sufficient for completion of calculations in a typical DSP controller. III. DESIGN 3.1 Turbine The wind hydro hybrid system being considered has a wind turbine of 55kW and a hydro turbine of 60 kW respectively. The rating of the SCIGw is equal to the rating of the wind turbine, ie 55 kW. 3.2 Selection of Voltage of Dc Link And Battery Design The dc-bus voltage (Vdc) must be more than the peak of the line voltage for satisfactory PWM control as Vdc >2√(2/3)Vac ma (10) where ma is the modulation index normally with a maximum value of one and Vac is the rms value of the line voltage on the ac side of the PWM converter .The maximum rms value of the line voltage at the load terminals is 415 V. Substituting this value in (10), Vdc should be more than 677.7 V. The voltage of the dc link and the battery bank is selected as 700 V. The maximum rms value of the line voltage at the load terminals is 415 V. Substituting this value in Vdc should be more than 677 V.The voltage of the dc link and the battery bank is selected as 700 V. Considering the ability of the proposed system to supply electricity to a load of 60 kW for 10 h, the design storage capacity of the battery bank is taken as 600 kWh. . The commercially available battery bank consists of cells of 12 V. The nominal capacity of each cell is taken as 150 A.h. To achieve a dc-bus voltage of 700 V through series connected cells of 12 V, the battery bank should have (700/12) = 59 number of cells in series. Since the storage capacity of this combination is 150 A · h, and the total ampere hour required is (600 kW · h/700 V) = 857 A · h, the number of such sets required to be connected in parallel would be (857 A.h /150 A.h) = 5.71 or 6 (selected). Thus, the battery bank consists of six parallel-connected sets of 59 series connected battery cells. Thevenin’s model is used to describe the energy storage of the battery in which the parallel combination of capacitance (Cb) and resistance (Rb) in series with internal resistance (Rin) and an ideal voltage source of voltage 700 V are used for modelling the battery. Cb= (Kw.h∗3600∗1000)/0.5 (V2ocmax−V2ocmin) ) (11) Taking the values of Vocmax = 750 V, Vocmin = 680 V, and Kw.h = 600, the value of Cb obtained is 43156 F. 3.3 Selection of Rating of Ac Inductor And Rc Filter On Ac Side Of Load-Side Converter An inductor is used on the ac side of the load-side converter for boost function. inductance (Lf ) of the inductive filter can be calculated as Lf ={(√3/2)maVdc /(6a fsIr (p−p)Isc} (12) where fs is the switching frequency and is equal to 10 kHz and Ir(p−p)lsc is the peak-to-peak ripple current in the load-side converter and inductive filter. During transients, the current in the inductive filter is likely to be more than the steady-state values. For calculation of inductance, current rating of 120% (a = 1.2) of steady- state current is taken; modulation index ma is taken as one. Thus, the value of inductance of the filter is
  • 5. Isolated Wind Hydro Hybrid Generation System with Battery Storage | IJMER | ISSN: 2249–6645 | www.ijmer.com | Vol. 4 | Iss. 3 | Mar. 2014 | 40 | 0.76mH . A high-pass first-order filter tuned at half the switching frequency is used to filter out the noise from the voltage at the load terminals. The time constant of the filter should be very small compared with the fundamental time period (T), or RC <<T/10. . (13) When T = 20 ms, considering, C = 5μF, R can be chosen as 5 Ω. This combination offers a low impedance of 8.1 Ω for the harmonic voltage at a frequency of 5 kHz (half of the switching frequency). 3.4 Selection of Specifications Of Wind Turbine And Gear Ratio The wind turbine is designed for 55 kW at 11.2 m/s, which is considered as rated wind speed. For wind speeds below the rated wind speed, the mechanical power Pm captured by the turbine is a function of wind speed Vw, radius of turbine rw, density of air ρ, and coefficient of performance Cp, and is given Pm = 0.5Cpπr2 ρV 3 (14) The relationship between the coefficient of performance and tip speed ratio for a typical wind turbine is shown in Fig. 3.The maximum coefficient of performance (Cpmax) is achieved optimum tip ratio (λ∗w). The values of Cpmax and λ∗w obtained from the Figure. 3.1 are 0.4411 and 5.66, respectively. Substituting, Pm = 55 kW, Cp = 0.4411, wind speed Vw = 11.2 m/s, and density of air ρ = 1.1544 kg/m3 in 4.1, the radius of the wind turbine rw is obtained as 7.5m. At 11.2 m/s wind speed, the generator rotor speed is considered as 100 rad/s. Substituting the value of tip speed ratio = 5.66, radius of the wind turbine = 7.5 m,wind speed = 11.2 m/s, and generator speed = 100 rad/s, the gear ratio is obtained as ηw = ωrwrw/λwVw (15) =100∗7.5/5.66∗11.2 = 11.811 ∼=12 (selected). Above equations are used to simulate wind turbine. In the real turbines above the rated wind speed, the blade- pitch control comes in operation, and the turbine blades are pitched slightly out of the wind to limit power. Conversely, the blades are turned back into the wind whenever the wind drops again. The ratings and the specifications of the selected components of the hybrid system based on the aforementioned design procedure are used for simulation purpose. IV. Simulation Results The performance of the wind hydro hybrid system is demonstrated in figure 2.1. A balanced linear load and a secondary dynamic load at wind speed of 11m/s is connected to the above network. At this speed the wind turbine generates 55 kW and the hydro generates 60 kW. So the total power generation is 115 kW. The model is tested for the following loads. 1. Half load of 57.5 kW 2. Full load of 115 kW 3. Overload of 10% In each case the output waveforms of load voltage, load current and load frequency are studied. The model is working satisfactorily for the above mentioned loads. The waveforms are purely sinusoidal as expected for the above three conditions. Also, under the above conditions both the magnitude and frequency of the load voltage are maintained constant. The obtained waveforms are shown in figures. Figure 4.1: Simulink Block diagram of proposed system
  • 6. Isolated Wind Hydro Hybrid Generation System with Battery Storage | IJMER | ISSN: 2249–6645 | www.ijmer.com | Vol. 4 | Iss. 3 | Mar. 2014 | 41 | Figure 4.2 Output voltage and current waveforms for half load Figure 4.3: Frequency waveform for half load Figure 4.4 Output voltage and current waveforms for full load
  • 7. Isolated Wind Hydro Hybrid Generation System with Battery Storage | IJMER | ISSN: 2249–6645 | www.ijmer.com | Vol. 4 | Iss. 3 | Mar. 2014 | 42 | Figure 4.5: Frequency waveform for full load Figure 4.6: Output voltage and current waveforms for over load Figure 4.7: Frequency waveform for over load
  • 8. Isolated Wind Hydro Hybrid Generation System with Battery Storage | IJMER | ISSN: 2249–6645 | www.ijmer.com | Vol. 4 | Iss. 3 | Mar. 2014 | 43 | V. Conclusion Among the renewable energy sources, small hydro and wind energy have the ability to complement each other. Further, there are many isolated locations which cannot be connected to the grid and where the wind potential and hydro potential exist simultaneously. For such locations, a new three-phase four wire autonomous wind-hydro hybrid system, using one cage generator driven by wind turbine and another synchronous generator driven by hydro turbine along with BESS, has been modeled and simulated in MATLAB using Simulink and Sim Power System tool boxes. The design procedure for selection of various components has been demonstrated for the proposed hybrid system. The performance of the proposed hybrid system has been demonstrated under different electrical (consumer load variation) and mechanical (with wind-speed variation) dynamic conditions. It has been demonstrated that the proposed hybrid system performs satisfactorily for linear loads while maintaining constant voltage and frequency. REFERENCES [1] Puneet.K.Goel, Bhim Singh, S.S Murthy and Navin Kishore “Isolated Wind-Hydro Hybrid System Using Cage Generators and Battery Storage”, In IEEE Trans, Industrial Electronics.vol 58, no.4, April 2011. [2] L. L. Lai and T. F. Chan, Distributed Generation: Induction and Permanent Magnet Generators. West Sussex, U.K.: Wiley, 2007, ch. 1. [3] E. D. Castronuovo and J. A. Pecas, “Bounding active power generation of a wind-hydro power plant,” in Proc. 8th Conf. Probabilistic Methods Appl. Power Syst., Ames, IA, 2004, pp. 705–710. [4] B. Singh, S. S. Murthy, and S. Gupta, “ An improved electronic load controller for self-excited induction generator in micro-Hydel applications,” in Proc. IEEE Annu. Conf. Ind. Electron. Soc., Nov. 2003, vol. 3,pp. 2741–2746. [5] J. B. Ekanayake, “Induction generators for small hydro schemes,” IEEE Power Eng. J., vol. 16, no. 2, pp. 61–67, 2002. [6] M. Molinas, J. A. Suul, and T. Undeland, “Low voltage ride through of wind farms with cage generators: STATCOM versus SVC,” IEEE Trans.Power Electron., vol. 23, no. 3, pp. 1104–1117, May 2008. [7] S. Ganesh Kumar, S. Abdul Rahman, and G. Uma, “Operation of selfexcited induction generator through matrix converter,” in Proc. 23rd Annu. IEEE APEC, Feb. 24–28, 2008, pp. 999–1002. [8] G. Quinonez-Varela and A. Cruden, “Modelling and validation of a squirrel cage induction generator wind turbine during connection to the local grid,” IET Gener., Transmiss. Distrib., vol. 2, no. 2, pp. 301–309,Mar. 2008. [9] E. Diaz-Dorado, C. Carrillo, and J. Cidras, “Control algorithm for coordinated reactive power compensation in a wind park,” IEEE Trans. Energy Convers., vol. 23, no. 4, pp. 1064–1072, Dec. 2008. [10] L. Tamas and Z. Szekely, “Modeling and simulation of an induction drive with application to a small wind turbine generator,” in Proc. IEEE Int. Conf. Autom., Quality Test., Robot., May 22–25, 2008, pp. 429–433. [11] A. Luna, P. Rodriguez, R. Teodorescu, and F. Blaabjerg, “Low voltage ride through strategies for SCIG wind turbines in distributed power generation systems,” in Proc. IEEE Power Electron. Spec. Conf., Jun. 15–19, 2008,pp. 2333–2339. [13] B. Fox, D. Flynn, L. Bryans, N. Jenkins, D. Milborrow, M. O’Malley,R. Watson, and O. Anaya-Lara, Wind Power Integration Connection and System Operational Aspects. London, U.K.: IET, 2007, ch. 3. [14] S. S. Murthy, B. Singh, P. K. Goel, and S. K. Tiwari, “A comparative study of fixed speed and variable speed wind energy conversion systems feeding the grid,” in Proc. IEEE PEDS, Nov. 2007, pp. 736–743. [15] G. Poddar, A. Joseph, and A. K. Unnikrishnan, “Sensorless variable speed controller for existing fixed-speed wind power generator with unity-power-factor operation,” IEEE Trans. Ind. Electron., vol. 50, no. 5,pp. 1007–1015, Oct. 2003. [16] M. G. Simoes, B. K. Bose, and R. T. Spiegel, “Fuzzy-logic-based intelligent control of a variable speed cage machine wind generation system,”IEEE Trans. Power Electron., vol. 12, no. 1, pp. 87–95, Jan. 1997. [17] D. Joshi, K. S. Sindhu, and M. K. Soni, “Constant voltage constant frequency operation for a self-excited induction generator,” IEEE Trans.Energy Convers., vol. 21, no. 1, pp. 228–234, Mar. 2006 [18] B. Singh, S. S. Murthy, and S. Gupta, “Analysis and design of STATCOM based voltage regulator for self-excited induction generators,” IEEE Trans. Energy Convers., vol. 19, no. 4, pp. 783–790, Dec. 2004. [19] J. G. Slootweg, S. W. H. Haan, H. Polinder, and W. L. Kling, “General model for representing variable speed wind turbines in power system dynamics simulations,” IEEE Trans. Power Syst., vol. 18, no. 1, pp. 144–151, Feb. 2003.