SOFTWARE METRICS




PCMM/LEMTRICS/1           ©CyberQ Consulting
Recap…….Process Taxonomy
Project Line
Processes         RA    SD   Code Test       RA      SD    Code Test



                   Project Planning            Risk Management
Project Support
Processes
                        Estimation            Configuration Mgt.

                   Reviews                        Project Monitoring


Organization           Organization Process Deployment
Support
Processes                              Training

                                      Metrication

       Strong          Moderate Strengths                  Weak
Why Measure?

                  Need for measures



PCMM/LEMTRICS/3                       ©CyberQ Consulting
Exercise

      1.    Why do we need measures?
            _______________________
            _______________________
            _______________________
            _______________________



PCMM/LEMTRICS/4                   ©CyberQ Consulting
Why Measure?

      • If you don’t know where you are going,
        any road will do - CHINESE PROVERB

      • If you don’t know where you are, a map
        won’t help - WATTS S. HUMPHREY




PCMM/LEMTRICS/5                          ©CyberQ Consulting
Why Measure?...contd.
      • Management implies measures /
        quantitative control
      • Think of all management functions
      • Measurement has been the Basis of all
        Scientific & Engineering progress

      What you cannot measure, you cannot
       manage - DRUCKER




PCMM/LEMTRICS/6                           ©CyberQ Consulting
Why Measure?...contd.

          Do we have the answers to the
         following:
       1. How much did we produce?
       2. Are our products of high quality?
       3. Are we improving?
       4. How well do we compare with other
         companies?

       Can we really do without measures?


PCMM/LEMTRICS/7                           ©CyberQ Consulting
Why Measure?...contd.
      A management view:

      Dashboard
      • Tells at a glance
      • When Situation is out of Control
      • Key Elements to focus on
      • Understand what they are doing
      • Know quality and productivity levels




PCMM/LEMTRICS/8                           ©CyberQ Consulting
Why Measure?...contd.

      An engineering view:
      Measures help to:

         – better understand attributes of software
           that we have produced

         – assess the quality of our product


PCMM/LEMTRICS/9                            ©CyberQ Consulting
It is not really a question of
        “Why measure?” but “Why
        not measure?”




PCMM/LEMTRICS/10                  ©CyberQ Consulting
However, Management Dilemma

      1. Information Overload
         – Low level data
         – Too many measures

      2. Selecting key indicators:
         – Quality?
         – Size?
         – Progress?



PCMM/LEMTRICS/11                     ©CyberQ Consulting
But Who Needs Measures?

      _______________________
      _______________________
      _______________________
      _______________________




PCMM/LEMTRICS/12                ©CyberQ Consulting
Everybody needs Measures
      • Top Management
      • Project Managers
      • Testers
      • Quality Assurance
      • Auditors
      • Marketing
      • Software developers

      Who needs, most of all?

PCMM/LEMTRICS/13                 ©CyberQ Consulting
Ideal Metrics:

     •   Simple , Precise, Definable
     •   Objective
     •   Easily Obtainable
     •   Valid
     •   Robust




PCMM/LEMTRICS/14                       ©CyberQ Consulting
A few examples of metrics




PCMM/LEMTRICS/15                  ©CyberQ Consulting
Product Metrics

         – Measurement of Size
             • Function Points
             • Lines of code
             • Many others..
         – Measurement of Quality
             • Based generally on defects data



PCMM/LEMTRICS/16                          ©CyberQ Consulting
Defect Metrics

      • Life cycle metric
      • Extremely valuable for describing
        product “health” and process
        improvement opportunities
      • Derived from Quality Control
        activities
      • A large no. of such metrics

PCMM/LEMTRICS/17                     ©CyberQ Consulting
Defect Severity Metric

      IBM’s Severity Code:

      Severity 1 System inoperable
      Severity 2 Major functions
           disabled / incorrect
      Severity 3 Minor functions
                        disabled / incorrect
      Severity 4 Superficial functions


PCMM/LEMTRICS/18                           ©CyberQ Consulting
Defect Age

      Time from Introduction to Detection
      • Can be done in terms of time
      • Can also Normalize this Metric
        e.g.. Phase Numbers Method
      Average Age =   Σ   Phase (Detected - Introduced)
                            Number of Defects



PCMM/LEMTRICS/19                                ©CyberQ Consulting
Defect Density

      • Defects per KLOC (Kilo Lines of
        Code)
      • Defects per Function Point
      • Defects per module / program

      Points to Error Prone Module


PCMM/LEMTRICS/20                     ©CyberQ Consulting
Defect Removal Efficiency

      • Points to QC effectiveness before
        shipment
      • DRE = No. of Defects found prior to
        delivery/Total No. of Defects

      Good companies have DRE > 90%
      How do you find Total No.?

PCMM/LEMTRICS/21                     ©CyberQ Consulting
Process Metrics

      Key processes that we will focus on:
      • Project Management
      • Estimation
      • Quality Control
      • Quality Assurance
      • Configuration Management


PCMM/LEMTRICS/22                     ©CyberQ Consulting
Project Management Metrics
      • Schedule slippage
                 Completion (Actual - Planned)
                  No. of planned elapse days
      • Effort overrun
                   Effort (Actual - Planned)
                   Planned effort in mandays
      • Productivity = Size / Effort


PCMM/LEMTRICS/23                          ©CyberQ Consulting
Project Management Metrics

      Similarly,
      • Cost overruns
      • Human resource utilisation
      • Project Management Effort overrun
      • Frequency of major replanning
      • Frequency of major adverse impacts
        to project

PCMM/LEMTRICS/24                   ©CyberQ Consulting
Estimation Process Metrics
      • Changes to size estimates
         – either FPs or LOCs or others
         – initial estimate / reestimate
         – Re estimate with same scope of
           work
         – Re estimate with altered scope
      • Changes to effort schedule
        estimates
PCMM/LEMTRICS/25                    ©CyberQ Consulting
Customer Satisfaction

      • Once in a while activity
      • Requires active soliciting
      • May be done by other than project
        personnel
      • Impact may go beyond product




PCMM/LEMTRICS/26                    ©CyberQ Consulting
An Interesting Metric
      • Combine Customer Satisfaction and
        Defect Data

               Deep Trouble         How do you do it, guys!!
    Defects

               Something else         Excellent!
               is wrong


                     Customer satisfaction
PCMM/LEMTRICS/27                                   ©CyberQ Consulting
REMEMBER!


      • WHAT YOU CANNOT MEASURE,
        YOU CANNOT MANAGE

      • STORY OF THE THREE BLIND
        MEN AND THE ELEPHANT


PCMM/LEMTRICS/28               ©CyberQ Consulting
When To Do ?

      • Throughout the project

      PAs – Measurement and Analysis
      Also, OPF / OPD and Engineering
        PAs
      + PAs at Level 4 and Level 5


PCMM/LEMTRICS/29                  ©CyberQ Consulting
Recap…….Process Taxonomy
Project Line
Processes         RA    SD   Code Test       RA      SD    Code Test



                   Project Planning            Risk Management
Project Support
Processes
                        Estimation            Configuration Mgt.

                   Reviews                        Project Monitoring


Organization           Organization Process Deployment
Support
Processes                              Training

                                      Metrication

       Strong          Moderate Strengths                  Weak

More Related Content

PDF
Measurement News Webinar
Glen Alleman
 
PDF
Precision Maintenance Presentation
Ricky Smith CMRP, CMRT
 
PPTX
Applicability of CMMI for Small to Medium Enterprises
rhefner
 
PPT
Why BI needs CMMI-5
Alain Charpentier
 
PPT
The True Costs and Benefits of CMMI Level 5
rhefner
 
PDF
Preventive Maintenance Best Practices workshop Brochure
Ricky Smith CMRP, CMRT
 
PDF
Developing Effective Work Procedures Training - 3 days
Ricky Smith CMRP, CMRT
 
PPT
Fundamentals of Business Process Management: A Quick Introduction to Value-Dr...
Marlon Dumas
 
Measurement News Webinar
Glen Alleman
 
Precision Maintenance Presentation
Ricky Smith CMRP, CMRT
 
Applicability of CMMI for Small to Medium Enterprises
rhefner
 
Why BI needs CMMI-5
Alain Charpentier
 
The True Costs and Benefits of CMMI Level 5
rhefner
 
Preventive Maintenance Best Practices workshop Brochure
Ricky Smith CMRP, CMRT
 
Developing Effective Work Procedures Training - 3 days
Ricky Smith CMRP, CMRT
 
Fundamentals of Business Process Management: A Quick Introduction to Value-Dr...
Marlon Dumas
 

What's hot (20)

PDF
White Belt DMAIC Project Line G MTTR
Irfan Rasheed Rana
 
PDF
Failure Reporting, Analysis, Corrective Action System
Ricky Smith CMRP, CMRT
 
PDF
7 Steps to a Working Failure Reporting System - FRACAS
Ricky Smith CMRP, CMRT
 
PDF
Pmbok 4th edition chapter 8 - Project Quality Management
Ahmad Maharma, PMP,RMP
 
PDF
BP Logix Whitepaper: Adding the Dimension of Time to BPM
BP Logix
 
PPTX
Lean six sigma tollgate template videos only
Steven Bonacorsi
 
PDF
20080115 03 - Qualimétrie et CMMi dans les applications temps réel embarquées
LeClubQualiteLogicielle
 
PDF
How to apply Six Sigma DMAIC for Reducing Client's Line Wait Time at the Bank...
Jeremy Jay V. Lim, MBB, PMP
 
PPTX
Lean six sigma executive overview (case study) templates
Steven Bonacorsi
 
PDF
PACE: Process and Critical Equipment Conference in Dubai, Sept 24-25
Ricky Smith CMRP, CMRT
 
PPTX
Zero defect
Soft Skills World
 
PDF
Agile in an ANSI-748-C environment
Glen Alleman
 
PPT
QM-007-Design for 6 sigma
handbook
 
PPTX
Agile Business Rhythm
Glen Alleman
 
PDF
KPI Users Group - Failure Reports
Ricky Smith CMRP, CMRT
 
PDF
Management of Change (MOC) Concepts
Mahendra Bathia
 
PDF
Control systems
Glen Alleman
 
PPT
C10 project management
hakimizaki
 
PPT
Chap08 project quality management
DM's College, Assagao Goa
 
PPTX
Improve phase lean six sigma tollgate template
Steven Bonacorsi
 
White Belt DMAIC Project Line G MTTR
Irfan Rasheed Rana
 
Failure Reporting, Analysis, Corrective Action System
Ricky Smith CMRP, CMRT
 
7 Steps to a Working Failure Reporting System - FRACAS
Ricky Smith CMRP, CMRT
 
Pmbok 4th edition chapter 8 - Project Quality Management
Ahmad Maharma, PMP,RMP
 
BP Logix Whitepaper: Adding the Dimension of Time to BPM
BP Logix
 
Lean six sigma tollgate template videos only
Steven Bonacorsi
 
20080115 03 - Qualimétrie et CMMi dans les applications temps réel embarquées
LeClubQualiteLogicielle
 
How to apply Six Sigma DMAIC for Reducing Client's Line Wait Time at the Bank...
Jeremy Jay V. Lim, MBB, PMP
 
Lean six sigma executive overview (case study) templates
Steven Bonacorsi
 
PACE: Process and Critical Equipment Conference in Dubai, Sept 24-25
Ricky Smith CMRP, CMRT
 
Zero defect
Soft Skills World
 
Agile in an ANSI-748-C environment
Glen Alleman
 
QM-007-Design for 6 sigma
handbook
 
Agile Business Rhythm
Glen Alleman
 
KPI Users Group - Failure Reports
Ricky Smith CMRP, CMRT
 
Management of Change (MOC) Concepts
Mahendra Bathia
 
Control systems
Glen Alleman
 
C10 project management
hakimizaki
 
Chap08 project quality management
DM's College, Assagao Goa
 
Improve phase lean six sigma tollgate template
Steven Bonacorsi
 
Ad

Similar to K metrics (20)

PDF
Project Management.pdf
ShivareddyGangam
 
PDF
PMO Performance Measurement and Metrics - Kendrick
Jim Kendrick
 
PDF
Cmmi agile kulpa 2004meas cmmi[1]
JULIO GONZALEZ SANZ
 
PDF
Ch2 pressman
suresh461
 
PPTX
Software Metrics - Software Engineering
Drishti Bhalla
 
PDF
Software Project Management
KUMKUMOKUSSIA
 
PDF
Effectively managing project performance reporting
Mindtree Ltd.
 
PPTX
Lgyt6ttftnjihuhunjnnjnrd6tf tfv ytgyuguy-8.pptx
VenkataSujiAparnaSri
 
PPTX
Remade Slides.pptx
AshokKumar705948
 
PPT
Project Management
ahmad bassiouny
 
PDF
Capability maturity model
Roy Antony Arnold G
 
PPTX
A Guide to Effective Benchmarking of Applications Development
Computer Aid, Inc
 
PPTX
Pmp basics you need to know
Pradeep Patel, PMP®
 
PPT
Chapter 11 Metrics for process and projects.ppt
ssuser3f82c9
 
PPTX
Agile Metrics...That Matter
Erik Weber
 
PPTX
A contextual approach to improving software metrics practices
Johnny Kingdom
 
PPTX
Power Point For Cmgt 410
steffiann88
 
PDF
Benchmark METRICS THAT MATTER October 4 2012
BenchmarkQA
 
PPT
8 project planning
randhirlpu
 
PPT
Project Management - Introduction
SAINBAYAR Bayarsaikhan
 
Project Management.pdf
ShivareddyGangam
 
PMO Performance Measurement and Metrics - Kendrick
Jim Kendrick
 
Cmmi agile kulpa 2004meas cmmi[1]
JULIO GONZALEZ SANZ
 
Ch2 pressman
suresh461
 
Software Metrics - Software Engineering
Drishti Bhalla
 
Software Project Management
KUMKUMOKUSSIA
 
Effectively managing project performance reporting
Mindtree Ltd.
 
Lgyt6ttftnjihuhunjnnjnrd6tf tfv ytgyuguy-8.pptx
VenkataSujiAparnaSri
 
Remade Slides.pptx
AshokKumar705948
 
Project Management
ahmad bassiouny
 
Capability maturity model
Roy Antony Arnold G
 
A Guide to Effective Benchmarking of Applications Development
Computer Aid, Inc
 
Pmp basics you need to know
Pradeep Patel, PMP®
 
Chapter 11 Metrics for process and projects.ppt
ssuser3f82c9
 
Agile Metrics...That Matter
Erik Weber
 
A contextual approach to improving software metrics practices
Johnny Kingdom
 
Power Point For Cmgt 410
steffiann88
 
Benchmark METRICS THAT MATTER October 4 2012
BenchmarkQA
 
8 project planning
randhirlpu
 
Project Management - Introduction
SAINBAYAR Bayarsaikhan
 
Ad

Recently uploaded (20)

PDF
Danielle Oliveira New Jersey - A Seasoned Lieutenant
Danielle Oliveira New Jersey
 
PDF
Withum Webinar - OBBBA: Tax Insights for Food and Consumer Brands
Withum
 
PDF
Infrastructure and geopolitics.AM.ENG.docx.pdf
Andrea Mennillo
 
DOCX
India's Emerging Global Leadership in Sustainable Energy Production The Rise ...
Insolation Energy
 
PPTX
Social Media Marketing for Business Growth
vidhi622006
 
PDF
Retinal Disorder Treatment Market 2030: The Impact of Advanced Diagnostics an...
Kumar Satyam
 
PPTX
Chapter 3 Distributive Negotiation: Claiming Value
badranomar1990
 
PPTX
Pakistan’s Leading Manpower Export Agencies for Qatar
Glassrooms Dubai
 
PDF
GenAI for Risk Management: Refresher for the Boards and Executives
Alexei Sidorenko, CRMP
 
PPTX
Brain Based Enterprises - Harmonising Man, Woman and Machine
Peter Cook
 
PDF
William Trowell - A Construction Project Manager
William Trowell
 
PPTX
Final PPT on DAJGUA, EV Charging, Meter Devoloution, CGRF, Annual Accounts & ...
directord
 
PDF
Using Innovative Solar Manufacturing to Drive India's Renewable Energy Revolu...
Insolation Energy
 
DOCX
unit 1 BC.docx - INTRODUCTION TO BUSINESS COMMUICATION
MANJU N
 
PDF
12 Oil and Gas Companies in India Driving the Energy Sector.pdf
Essar Group
 
PDF
Alan Stalcup - Principal Of GVA Real Estate Investments
Alan Stalcup
 
PDF
bain-temasek-sea-green-economy-2022-report-investing-behind-the-new-realities...
YudiSaputra43
 
PPTX
Financial Management for business management .pptx
Hasibullah Ahmadi
 
PPTX
The Ultimate Guide to Customer Journey Mapping
RUPAL AGARWAL
 
PDF
Equinox Gold - Corporate Presentation.pdf
Equinox Gold Corp.
 
Danielle Oliveira New Jersey - A Seasoned Lieutenant
Danielle Oliveira New Jersey
 
Withum Webinar - OBBBA: Tax Insights for Food and Consumer Brands
Withum
 
Infrastructure and geopolitics.AM.ENG.docx.pdf
Andrea Mennillo
 
India's Emerging Global Leadership in Sustainable Energy Production The Rise ...
Insolation Energy
 
Social Media Marketing for Business Growth
vidhi622006
 
Retinal Disorder Treatment Market 2030: The Impact of Advanced Diagnostics an...
Kumar Satyam
 
Chapter 3 Distributive Negotiation: Claiming Value
badranomar1990
 
Pakistan’s Leading Manpower Export Agencies for Qatar
Glassrooms Dubai
 
GenAI for Risk Management: Refresher for the Boards and Executives
Alexei Sidorenko, CRMP
 
Brain Based Enterprises - Harmonising Man, Woman and Machine
Peter Cook
 
William Trowell - A Construction Project Manager
William Trowell
 
Final PPT on DAJGUA, EV Charging, Meter Devoloution, CGRF, Annual Accounts & ...
directord
 
Using Innovative Solar Manufacturing to Drive India's Renewable Energy Revolu...
Insolation Energy
 
unit 1 BC.docx - INTRODUCTION TO BUSINESS COMMUICATION
MANJU N
 
12 Oil and Gas Companies in India Driving the Energy Sector.pdf
Essar Group
 
Alan Stalcup - Principal Of GVA Real Estate Investments
Alan Stalcup
 
bain-temasek-sea-green-economy-2022-report-investing-behind-the-new-realities...
YudiSaputra43
 
Financial Management for business management .pptx
Hasibullah Ahmadi
 
The Ultimate Guide to Customer Journey Mapping
RUPAL AGARWAL
 
Equinox Gold - Corporate Presentation.pdf
Equinox Gold Corp.
 

K metrics

  • 1. SOFTWARE METRICS PCMM/LEMTRICS/1 ©CyberQ Consulting
  • 2. Recap…….Process Taxonomy Project Line Processes RA SD Code Test RA SD Code Test Project Planning Risk Management Project Support Processes Estimation Configuration Mgt. Reviews Project Monitoring Organization Organization Process Deployment Support Processes Training Metrication Strong Moderate Strengths Weak
  • 3. Why Measure? Need for measures PCMM/LEMTRICS/3 ©CyberQ Consulting
  • 4. Exercise 1. Why do we need measures? _______________________ _______________________ _______________________ _______________________ PCMM/LEMTRICS/4 ©CyberQ Consulting
  • 5. Why Measure? • If you don’t know where you are going, any road will do - CHINESE PROVERB • If you don’t know where you are, a map won’t help - WATTS S. HUMPHREY PCMM/LEMTRICS/5 ©CyberQ Consulting
  • 6. Why Measure?...contd. • Management implies measures / quantitative control • Think of all management functions • Measurement has been the Basis of all Scientific & Engineering progress What you cannot measure, you cannot manage - DRUCKER PCMM/LEMTRICS/6 ©CyberQ Consulting
  • 7. Why Measure?...contd. Do we have the answers to the following: 1. How much did we produce? 2. Are our products of high quality? 3. Are we improving? 4. How well do we compare with other companies? Can we really do without measures? PCMM/LEMTRICS/7 ©CyberQ Consulting
  • 8. Why Measure?...contd. A management view: Dashboard • Tells at a glance • When Situation is out of Control • Key Elements to focus on • Understand what they are doing • Know quality and productivity levels PCMM/LEMTRICS/8 ©CyberQ Consulting
  • 9. Why Measure?...contd. An engineering view: Measures help to: – better understand attributes of software that we have produced – assess the quality of our product PCMM/LEMTRICS/9 ©CyberQ Consulting
  • 10. It is not really a question of “Why measure?” but “Why not measure?” PCMM/LEMTRICS/10 ©CyberQ Consulting
  • 11. However, Management Dilemma 1. Information Overload – Low level data – Too many measures 2. Selecting key indicators: – Quality? – Size? – Progress? PCMM/LEMTRICS/11 ©CyberQ Consulting
  • 12. But Who Needs Measures? _______________________ _______________________ _______________________ _______________________ PCMM/LEMTRICS/12 ©CyberQ Consulting
  • 13. Everybody needs Measures • Top Management • Project Managers • Testers • Quality Assurance • Auditors • Marketing • Software developers Who needs, most of all? PCMM/LEMTRICS/13 ©CyberQ Consulting
  • 14. Ideal Metrics: • Simple , Precise, Definable • Objective • Easily Obtainable • Valid • Robust PCMM/LEMTRICS/14 ©CyberQ Consulting
  • 15. A few examples of metrics PCMM/LEMTRICS/15 ©CyberQ Consulting
  • 16. Product Metrics – Measurement of Size • Function Points • Lines of code • Many others.. – Measurement of Quality • Based generally on defects data PCMM/LEMTRICS/16 ©CyberQ Consulting
  • 17. Defect Metrics • Life cycle metric • Extremely valuable for describing product “health” and process improvement opportunities • Derived from Quality Control activities • A large no. of such metrics PCMM/LEMTRICS/17 ©CyberQ Consulting
  • 18. Defect Severity Metric IBM’s Severity Code: Severity 1 System inoperable Severity 2 Major functions disabled / incorrect Severity 3 Minor functions disabled / incorrect Severity 4 Superficial functions PCMM/LEMTRICS/18 ©CyberQ Consulting
  • 19. Defect Age Time from Introduction to Detection • Can be done in terms of time • Can also Normalize this Metric e.g.. Phase Numbers Method Average Age = Σ Phase (Detected - Introduced) Number of Defects PCMM/LEMTRICS/19 ©CyberQ Consulting
  • 20. Defect Density • Defects per KLOC (Kilo Lines of Code) • Defects per Function Point • Defects per module / program Points to Error Prone Module PCMM/LEMTRICS/20 ©CyberQ Consulting
  • 21. Defect Removal Efficiency • Points to QC effectiveness before shipment • DRE = No. of Defects found prior to delivery/Total No. of Defects Good companies have DRE > 90% How do you find Total No.? PCMM/LEMTRICS/21 ©CyberQ Consulting
  • 22. Process Metrics Key processes that we will focus on: • Project Management • Estimation • Quality Control • Quality Assurance • Configuration Management PCMM/LEMTRICS/22 ©CyberQ Consulting
  • 23. Project Management Metrics • Schedule slippage Completion (Actual - Planned) No. of planned elapse days • Effort overrun Effort (Actual - Planned) Planned effort in mandays • Productivity = Size / Effort PCMM/LEMTRICS/23 ©CyberQ Consulting
  • 24. Project Management Metrics Similarly, • Cost overruns • Human resource utilisation • Project Management Effort overrun • Frequency of major replanning • Frequency of major adverse impacts to project PCMM/LEMTRICS/24 ©CyberQ Consulting
  • 25. Estimation Process Metrics • Changes to size estimates – either FPs or LOCs or others – initial estimate / reestimate – Re estimate with same scope of work – Re estimate with altered scope • Changes to effort schedule estimates PCMM/LEMTRICS/25 ©CyberQ Consulting
  • 26. Customer Satisfaction • Once in a while activity • Requires active soliciting • May be done by other than project personnel • Impact may go beyond product PCMM/LEMTRICS/26 ©CyberQ Consulting
  • 27. An Interesting Metric • Combine Customer Satisfaction and Defect Data Deep Trouble How do you do it, guys!! Defects Something else Excellent! is wrong Customer satisfaction PCMM/LEMTRICS/27 ©CyberQ Consulting
  • 28. REMEMBER! • WHAT YOU CANNOT MEASURE, YOU CANNOT MANAGE • STORY OF THE THREE BLIND MEN AND THE ELEPHANT PCMM/LEMTRICS/28 ©CyberQ Consulting
  • 29. When To Do ? • Throughout the project PAs – Measurement and Analysis Also, OPF / OPD and Engineering PAs + PAs at Level 4 and Level 5 PCMM/LEMTRICS/29 ©CyberQ Consulting
  • 30. Recap…….Process Taxonomy Project Line Processes RA SD Code Test RA SD Code Test Project Planning Risk Management Project Support Processes Estimation Configuration Mgt. Reviews Project Monitoring Organization Organization Process Deployment Support Processes Training Metrication Strong Moderate Strengths Weak